CN207714371U - Assembled cast-in-place concrete structure non-dismantling formwork piping lane - Google Patents

Assembled cast-in-place concrete structure non-dismantling formwork piping lane Download PDF

Info

Publication number
CN207714371U
CN207714371U CN201721747667.3U CN201721747667U CN207714371U CN 207714371 U CN207714371 U CN 207714371U CN 201721747667 U CN201721747667 U CN 201721747667U CN 207714371 U CN207714371 U CN 207714371U
Authority
CN
China
Prior art keywords
dismantling formwork
piping lane
prefabricated
place concrete
cast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721747667.3U
Other languages
Chinese (zh)
Inventor
林国海
翟洪远
林宣佐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Hongsheng building material manufacturing Limited by Share Ltd
Harbin Hongsheng House Energy Saving System R&D Center
Original Assignee
Harbin Hongsheng House Energy Saving System R&D Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Hongsheng House Energy Saving System R&D Center filed Critical Harbin Hongsheng House Energy Saving System R&D Center
Priority to CN201721747667.3U priority Critical patent/CN207714371U/en
Application granted granted Critical
Publication of CN207714371U publication Critical patent/CN207714371U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

Provided by the utility model is assembled cast-in-place concrete structure non-dismantling formwork piping lane.Including cast-in-place concrete bottom plate, two prefabricated non-dismantling formwork system wallboards and prefabricated exempt to tear floorboard open, reserve wall anchor bar in the both sides of cast-in-place concrete bottom plate, prefabricated non-dismantling formwork system wallboard includes metal truss and the non-dismantling formwork mounted on metal truss both sides, it is prefabricated to exempt to tear the bar-mat reinforcement that floorboard includes bottom surface non-dismantling formwork and is laid on the non-dismantling formwork of bottom surface open, two prefabricated non-dismantling formwork system wallboard vertical runs are in the both sides of cast-in-place concrete bottom plate, it is prefabricated to exempt to tear the top that floorboard is laid in two prefabricated non-dismantling formwork system wallboards open, there is casting concrete load bearing wall in gap between the non-dismantling formwork of prefabricated non-dismantling formwork system wallboard, it is prefabricated exempt to tear open have casting concrete top layer on floorboard.The agent structure of the piping lane of the utility model on construction ground complete by the outer form by batch production, is assembled at the construction field (site), improves the speed of application of piping lane, reduce difficulty of construction.

Description

Assembled cast-in-place concrete structure non-dismantling formwork piping lane
Technical field
The utility model relates to a kind of underground pipe gallery, specifically a kind of assembled underground pipe gallery.
Background technology
Underground pipe gallery is the structures and affiliated facility for being built in Urban Underground for accommodating all kinds of municipal engineering pipelines.
Underground pipe gallery is divided into main line piping lane, branch line piping lane and cable piping lane etc. according to type.Which kind of underground pipe gallery applied using Work mode depends on the feasibility of cost and implementation, and main line piping lane is because section is big, slots from the big generally use of great, quantities Method, cast-in-place form of construction work.Using fluting method construction, push pipe demand is not adapted to.Rainy day, northern area winter can not construct. The construction operation time is long, situ wet operation heavy workload, needs longer concrete curing Enhanced time.It is limited by building-site condition System, long time period, and the concrete impermeability made are easy locally to ooze not as good as the concrete made in factory Easily there is construction crack, culvert body sidewall entire crack etc. in leakage, culvert pipe.
Rubber water-proof band connection is used between the box culvert segmentation of field fabrication, the disadvantage is that anti-uneven settlement of foundation ability Difference, interface easily occur dislocation up and down and deformation, cause waterstop by drawing crack;Cast-in-place construction need to stay branch modular space, earth volume to increase, It is also big to surrounding enviroment destructive power, it is unfavorable for the protection of ecological environment.
Invention content
The purpose of this utility model is to provide a kind of construction efficiency that can improve underground pipe gallery, promote underground pipe gallery Quality assembled cast-in-place concrete structure non-dismantling formwork piping lane.
What the purpose of this utility model was realized in:Including cast-in-place concrete bottom plate, two prefabricated non-dismantling formwork systems Wallboard and it is prefabricated exempt to tear open floorboard, wall anchor bar is reserved in the both sides of the cast-in-place concrete bottom plate, described prefabricated to exempt from form removal Plate system wallboard includes metal truss and the non-dismantling formwork mounted on metal truss both sides, and metal truss lays reinforcing bar, described pre- It includes bottom surface non-dismantling formwork and the bar-mat reinforcement that is laid on the non-dismantling formwork of bottom surface that system, which exempts to tear open floorboard, two prefabricated non-dismantling formwork systems Wallboard vertical runs unite in the both sides of cast-in-place concrete bottom plate, it is prefabricated exempt to tear floorboard open be laid in two prefabricated non-dismantling formwork systems There is casting concrete load bearing wall at the top of wallboard in the gap between the non-dismantling formwork of prefabricated non-dismantling formwork system wallboard, prefabricated Exempting to tear open has casting concrete top layer on floorboard.
The utility model can also include:
1, the wall anchor bar is N-shaped.
2, the reinforcing bar in the metal truss in prefabricated non-dismantling formwork system wallboard and the wall anchor in cast-in-place concrete bottom plate Gu reinforcing bar is connected.
3, the height of the non-dismantling formwork on the inside of prefabricated non-dismantling formwork system wallboard is less than non-dismantling formwork on the outside of metal truss Highly, the prefabricated bar-mat reinforcement for exempting to tear open floorboard stretches out the edge of bottom surface non-dismantling formwork and is connected with the reinforcing bar in metal truss.
4, the reinforcing bar in metal truss is vertical with metal truss.
5, the length direction of piping lane is segmental structure, is connected by flexible connection rubber sealing between two sections.
6, there is the division wall that piping lane is divided into different functional areas in piping lane.
Underground pipe gallery is designed to assembly with pouring the form being combined by the utility model, and the agent structure of piping lane is being constructed It is completed by the form of batch production outside place, is assembled at the construction field (site), improve the speed of application of underground pipe gallery, reduce Difficulty of construction.Some engineerings can not make concrete floor basis, before piping lane is installed, behind can earth backing, resume traffic.Having It can also construct under conditions of water, be not required to precipitation.
The bell and spigot of the utility model is flexibly connected using cushion rubber, and the preferable antidetonation resist displacement of energy solves rigid interface Sealing is by longitudinal tensioning, and antidetonation resist displacement is impacted, and attachment anti-corrosive durability is poor, the few problem of waterproof safeguard.
The main effect of the utility model is embodied in:
1. relative to traditional construction mode, reduces the usage amount of plank sheathing, flitch supporting etc., reduce natural resources and disappear Consumption, reduces cost.
2. the prefabricated non-dismantling formwork system of batch production improves speed of application and construction precision.
3. continuous cast-in-place construction, integral waterproofing good airproof performance.
Description of the drawings
Fig. 1 is the assembling stereogram of the utility model(It does not include concrete).
Fig. 2 is the schematic diagram of cast-in-place concrete bottom plate.
Fig. 3 is the schematic diagram of prefabricated non-dismantling formwork system wallboard.
Fig. 4 is the prefabricated schematic diagram for exempting to tear floorboard open.
Fig. 5 is the front view of Fig. 1.
Fig. 6 is the assembling stereogram of the utility model(Including concrete).
Fig. 7 is the schematic diagram of second of embodiment of the utility model.
Specific implementation mode
It illustrates below in conjunction with the accompanying drawings for a more detailed description to the utility model.
In conjunction with Fig. 1, the first embodiment of the utility model, which includes that cast-in-place concrete bottom plate 1, two is prefabricated, exempts from form removal Plate system wallboard 2,3 and prefabricated exempt to tear floorboard 4 open.
In conjunction with Fig. 2, cast-in-place concrete bottom plate specifically includes bottom reinforcement bars 1-1, casting concrete layer 1-2 and positioned at both sides Reserved wall anchor bar 1-3, wall anchor bar is preferably N-shaped.
In conjunction with Fig. 3, prefabricated non-dismantling formwork system wallboard specifically include the metal truss being made of shaped steel 2-3, reinforcing bar 2-4, Non-dismantling formwork 2-2 on the outside of the metal truss and non-dismantling formwork 2-1 on the inside of metal truss.Non-dismantling formwork passes through Screw is fixed on metal truss, and the reinforcing bar in metal truss can also use in-site installation.Reinforcing bar in metal truss and gold It is vertical to belong to truss.
In conjunction with Fig. 4, it is prefabricated exempt to tear floorboard open specifically include bottom surface non-dismantling formwork 4-1, be laid on the non-dismantling formwork of bottom surface Bar-mat reinforcement 4-2 and reinforced bar support seat 4-3, and two sides has two layers of reinforcing bar.
Two prefabricated non-dismantling formwork system wallboard vertical runs are prefabricated to exempt to tear floorboard open in the both sides of cast-in-place concrete bottom plate It is laid in the top of two prefabricated non-dismantling formwork system wallboards.After on-site hoisting combination, in prefabricated non-dismantling formwork system wallboard Non-dismantling formwork between gap in have casting concrete load bearing wall, it is prefabricated exempt to tear open have casting concrete top layer on floorboard, And concrete top layer is the low domatic in intermediate high both sides.
The reinforcing bar in metal truss in prefabricated non-dismantling formwork system wallboard is anchored with the wall in cast-in-place concrete bottom plate Reinforcing bar is connected.
The height of non-dismantling formwork on the inside of prefabricated non-dismantling formwork system wallboard is less than the height of non-dismantling formwork on the outside of metal truss Degree, the prefabricated both sides for exempting to tear the bar-mat reinforcement stretching bottom surface non-dismantling formwork of floorboard open, bar-mat reinforcement are connected with metal truss.
The length direction of piping lane is segmental structure, is connected by flexible connection rubber sealing between two sections.
In conjunction with Fig. 7, second of embodiment of the utility model is on the basis of the first embodiment, in piping lane The division wall 5 that piping lane is divided into different functional areas is set.

Claims (10)

1. a kind of assembled cast-in-place concrete structure non-dismantling formwork piping lane, it is characterized in that:Including cast-in-place concrete bottom plate, two it is pre- Non-dismantling formwork system wallboard processed and it is prefabricated exempt to tear open floorboard, wall anchor bar is reserved in the both sides of the cast-in-place concrete bottom plate, The prefabricated non-dismantling formwork system wallboard includes metal truss and the non-dismantling formwork mounted on metal truss both sides, metal truss cloth If reinforcing bar, it is described it is prefabricated exempt to tear open the bar-mat reinforcement that floorboard includes bottom surface non-dismantling formwork and is laid on the non-dismantling formwork of bottom surface, two Prefabricated non-dismantling formwork system wallboard vertical runs in the both sides of cast-in-place concrete bottom plate, it is prefabricated exempt to tear open floorboard be laid in two it is pre- The top of non-dismantling formwork system wallboard processed pours coagulation in gap between the non-dismantling formwork of prefabricated non-dismantling formwork system wallboard Native load bearing wall, it is prefabricated exempt to tear open have casting concrete top layer on floorboard.
2. assembled cast-in-place concrete structure non-dismantling formwork piping lane according to claim 1, it is characterized in that:The wall anchor Gu reinforcing bar is N-shaped.
3. assembled cast-in-place concrete structure non-dismantling formwork piping lane according to claim 1, it is characterized in that:It is prefabricated to exempt from form removal The reinforcing bar in metal truss in plate system wallboard is connected with the wall anchor bar in cast-in-place concrete bottom plate.
4. assembled cast-in-place concrete structure non-dismantling formwork piping lane according to claim 1, it is characterized in that:It is prefabricated to exempt from form removal The height of non-dismantling formwork on the inside of plate system wallboard is less than the height of non-dismantling formwork on the outside of metal truss, prefabricated to exempt to tear floorboard open Bar-mat reinforcement stretches out the edge of bottom surface non-dismantling formwork and is connected with the reinforcing bar in metal truss.
5. the assembled cast-in-place concrete structure non-dismantling formwork piping lane according to claim 1-4 any one, it is characterized in that: Reinforcing bar in metal truss is vertical with metal truss.
6. the assembled cast-in-place concrete structure non-dismantling formwork piping lane according to claim 1-4 any one, it is characterized in that: The length direction of piping lane is segmental structure, is connected by flexible connection rubber sealing between two sections.
7. assembled cast-in-place concrete structure non-dismantling formwork piping lane according to claim 5, it is characterized in that:The length of piping lane Direction is segmental structure, is connected by flexible connection rubber sealing between two sections.
8. the assembled cast-in-place concrete structure non-dismantling formwork piping lane according to claim 1-4 any one, it is characterized in that: There is the division wall that piping lane is divided into different functional areas in piping lane.
9. assembled cast-in-place concrete structure non-dismantling formwork piping lane according to claim 5, it is characterized in that:Have in piping lane by Piping lane is divided into the division wall of different functional areas.
10. assembled cast-in-place concrete structure non-dismantling formwork piping lane according to claim 6, it is characterized in that:Have in piping lane Piping lane is divided into the division wall of different functional areas.
CN201721747667.3U 2017-12-15 2017-12-15 Assembled cast-in-place concrete structure non-dismantling formwork piping lane Active CN207714371U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721747667.3U CN207714371U (en) 2017-12-15 2017-12-15 Assembled cast-in-place concrete structure non-dismantling formwork piping lane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721747667.3U CN207714371U (en) 2017-12-15 2017-12-15 Assembled cast-in-place concrete structure non-dismantling formwork piping lane

Publications (1)

Publication Number Publication Date
CN207714371U true CN207714371U (en) 2018-08-10

Family

ID=63055867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721747667.3U Active CN207714371U (en) 2017-12-15 2017-12-15 Assembled cast-in-place concrete structure non-dismantling formwork piping lane

Country Status (1)

Country Link
CN (1) CN207714371U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108005116A (en) * 2017-12-15 2018-05-08 哈尔滨鸿盛房屋节能体系研发中心 Assembled cast-in-place concrete structure non-dismantling formwork piping lane
CN111576480A (en) * 2020-04-20 2020-08-25 中铁建工集团有限公司 Construction process for trench disassembly-free formwork

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108005116A (en) * 2017-12-15 2018-05-08 哈尔滨鸿盛房屋节能体系研发中心 Assembled cast-in-place concrete structure non-dismantling formwork piping lane
CN111576480A (en) * 2020-04-20 2020-08-25 中铁建工集团有限公司 Construction process for trench disassembly-free formwork

Similar Documents

Publication Publication Date Title
CN108005116A (en) Assembled cast-in-place concrete structure non-dismantling formwork piping lane
CN103205979B (en) Method for constructing large raft foundation under high temperature
CN104805866A (en) Prefabricated comprehensive pipe gallery and construction method
CN110878700B (en) Tunnel waterproof structure and construction method thereof
CN101298782A (en) Method and system for basement engineering water proof and water drain
CN204098065U (en) A kind of can the precast assembly pipe gallery of stretch-draw in body
CN204753627U (en) Prefabricated comprehensive piping lane
CN205530344U (en) Utility tunnel is pour to split type no mould
CN109914474A (en) A kind of pipe gallery U-type groove, which is excavated, presses push construction method
CN111997088A (en) Groove type prefabricated assembly type cable duct bank and working well installation and construction method
CN207714371U (en) Assembled cast-in-place concrete structure non-dismantling formwork piping lane
CN202416379U (en) Precipitation post-pouring belt capable of stopping dewatering in advance
CN110295630B (en) Multilayer constraint anti-leakage post-pouring belt structure
CN205259214U (en) Pin -connected panel rainwater regulation pond of method of sinking construction
CN108547316B (en) Double-layer corrugated steel structure for underground comprehensive pipe gallery
AU2019202413B2 (en) Improved concrete road pavement with more sustainability benefits
CN101603299B (en) Broken line type dam joint structure and construction method thereof
CN110056071A (en) A kind of municipal administration storm sewer assembling module and construction method
CN113186977B (en) Reverse-order construction method for underground comprehensive pipe gallery
CN115012451A (en) Underground structure induced joint
CN201196299Y (en) Prefabricated concrete pipe gallery
CN207597430U (en) A kind of Urban Underground piping lane
CN201196308Y (en) Precast pre-stress concrete pipe gallery with edge rounding
CN111962632A (en) Rainwater sewer and construction method thereof
CN111350164A (en) Anti-freezing damage near-water retaining wall and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191104

Address after: 150036 No. 145, Xiangfang Avenue, Xiangfang District, Heilongjiang, Harbin

Co-patentee after: Harbin Hongsheng building material manufacturing Limited by Share Ltd

Patentee after: Hongsheng Room Energy Saving System Research Dev. Centre, Harbin

Address before: 150036 No. 145, Xiangfang Avenue, Xiangfang District, Heilongjiang, Harbin

Patentee before: Hongsheng Room Energy Saving System Research Dev. Centre, Harbin

TR01 Transfer of patent right