CN108005083A - Anchor cable processing method in the range of a kind of foundation pit enclosure structure - Google Patents
Anchor cable processing method in the range of a kind of foundation pit enclosure structure Download PDFInfo
- Publication number
- CN108005083A CN108005083A CN201711136658.5A CN201711136658A CN108005083A CN 108005083 A CN108005083 A CN 108005083A CN 201711136658 A CN201711136658 A CN 201711136658A CN 108005083 A CN108005083 A CN 108005083A
- Authority
- CN
- China
- Prior art keywords
- rope saw
- anchor cable
- hydraulic
- rope
- grooving machine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Earth Drilling (AREA)
Abstract
The invention discloses anchor cable processing method in the range of a kind of foundation pit enclosure structure, belong to anchor cable processing technology field.Anchor cable processing method disclosed by the invention is grabbed bucket using hydraulic grooving machine plus rope sawing is except the arrangement and method for construction of anchor cable, before anchor cable is run into, using hydraulic grooving machine grooving operation, after running into anchor cable, rope saw frame is detachably mounted in hydraulic grooving machine grab bucket by dismounting facility A, hydraulic grooving machine is grabbed bucket and rope saw frame, rope saw, dismounting facility A is collectively forming hydraulic grab handling system, then hydraulic grooving machine fluid power system is connected with rope saw drive system, rope saw cut anchor cable is driven using hydraulic grooving machine fluid power system, after cutting off anchor cable, hydraulic grooving machine fluid power system and rope saw drive system are disconnected, remove rope saw frame, hydraulic grooving machine continues grooving operation.Anchor cable processing method disclosed by the invention cuts anchor cable to reach processing intent while grooving, and security is good, short time limit, workable.
Description
Technical field
The invention belongs to anchor cable processing technology field, and in particular to anchor cable processing side in the range of a kind of foundation pit enclosure structure
Method.
Background technology
In the process of China's urban construction, with being on the increase for deep-foundation pit engineering, prestress anchorage cable is once used as civil engineering
Foundation pit enclosure structure construction a kind of economical and effective means and extensive use.Compared with other support technologies, anchor cable has valency
Lattice are cheap, construction is simple is ripe, speed is fast, it is safe and reliable, be not take up the advantages that main body construction work.Meanwhile face as one kind
When property supporting measure, anchor cable can not recycle after supporting disabler, forever buried together with the structures built in underground without
Method is taken out, and forms underground garbage, causes underground environmental pollution, pile foundation construction, excavation of foundation pit to adjacent plot, the municipal administration of surrounding
Construction, subway work, the long-term plan in city and sustainable development cause to seriously affect.Especially as the progressively hair of urban construction
Exhibition and the utilization of the underground space, originally foundation pit cable bolting become follow-up underground space construction especially foundation pit enclosure structure
The obstacle of construction, must be handled for the anchor cable constructed in advance, just can guarantee that the smooth implementation of foundation pit enclosure structure.
For the anchor cable process problem encountered in base pit engineering, generally use is such as during construction activity at present
Lower method is handled:1st, cutting machine imderwater cutting anchor cable is utilized;2nd, anchor cable is thrust using impact drill impulse force.
There are the following problems for above-mentioned anchor cable processing method:1st, existing building structure is abolished, quantities is larger, and it is difficult to coordinate;2、
Original geologic structure is destroyed, causes large area to cave in, backfill influences building enclosure construction quality;3rd, impact drill cannot be guaranteed hole
Verticality, and it is less efficient.So construction needs there are still notable unsatisfied urban construction, it would be highly desirable to exploitation more preferably anchor
Rope processing method.
The content of the invention
In order to solve the above technical problems, the present invention provides anchor cable processing method in the range of a kind of foundation pit enclosure structure.
The present invention solves technical solution used by above-mentioned technical problem:
Anchor cable processing method in the range of a kind of foundation pit enclosure structure, sawing of being grabbed bucket plus restricted using hydraulic grooving machine remove the construction of anchor cable
Scheme, it is after running into anchor cable, rope saw frame is detachable by dismounting facility A using hydraulic grooving machine grooving operation before running into anchor cable
Ground is installed to hydraulic grooving machine grab bucket, hydraulic grooving machine grab bucket(7)Hydraulic pressure is collectively forming with rope saw frame, rope saw, dismounting facility A
Hydraulic grooving machine fluid power system, is then connected, utilizes hydraulic grooving machine liquid by cargo handling with grabs system with rope saw drive system
Drive system driving rope saw cut anchor cable is pressed, after cutting off anchor cable, by hydraulic grooving machine fluid power system and rope saw drive system
Disconnect, remove rope saw frame, hydraulic grooving machine continues grooving operation;
The rope saw is installed to hydraulic grooving machine grab bucket by saw frame of restricting;The rope saw frame is to be used to rope saw being fixed on hydraulic pressure
The upper structure of chute forming machine grab bucket.
Before anchor cable is run into, using the normal grooving operation of hydraulic grooving machine, after running into anchor cable, for during reducing anchor cable processing
Cell wall caves in, and rope saw is quick mounting in the form of saw frame of restricting in chute forming machine grab bucket, utilizes hydraulic grooving machine hydraulic-driven
System drive rope saw cut anchor cable, to realize the purpose to anchor cable fly-cutting;After cutting off anchor cable, rope saw frame, hydraulic pressure are removed
Chute forming machine continues grooving operation, avoids chute forming machine shift position and causes to reposition, accelerates construction speed, at the same time
Also the safety and quality of construction of diaphragm wall are effectively guaranteed.
Further, the rope saw includes saw chain bar of restricting(3), rope saw driving wheel(4), rope saw directive wheel(5), rope saw hydraulic pressure
Drive motor(6);The rope saw frame and rope saw driving wheel(4)Directive wheel is sawed with rope(5)Nonrotational position, it is described rope saw frame with
Rope saw hydraulic drive motor(6)It is removably secured by dismounting facility B.
Further, the dismounting facility A is bolt and nut chaining part, and the rope saw frame is rope saw Steel plate frame(1);Restricting
Saw Steel plate frame(1)Grab bucket with hydraulic grooving machine(7)It is upper that bolt hole, rope saw Steel plate frame are set respectively(1)Grab bucket with hydraulic grooving machine
(7)It is bolted by bolt hole.
Further, it is described to be arranged at rope saw Steel plate frame(1)On bolt hole be slotted eye, it is described to be arranged at hydraulic pressure
Chute forming machine is grabbed bucket(7)On bolt hole be round hole.
Further, the dismounting facility B is bolt and nut chaining part, the rope saw frame and rope saw driving wheel(4)And rope
Saw directive wheel(5)Nonrotational position, it is described rope saw frame with rope saw hydraulic drive motor(6)On be provided with for the dismounting facility
The structure of B work.
Further, the rope saw is sawed for hydraulic diamond rope.
Further, carry out grooving is grabbed in the hydraulic grooving machine grooving operation point three, after first of anchor cable position is verified,
Framing is carried out to diaphram wall according to design requirement again, chute forming machine is positioned according to framing line position.
Further, the mark that above-mentioned hydraulic grooving machine runs into anchor cable is that chute forming machine grab bucket cannot close during fetching earth
Can tentatively verify has anchor cable at this.
Further, after tentatively verifying anchor cable position, anchor cable specific location is further verified using magnet, then will rope
Saw frame is detachably mounted in hydraulic grooving machine grab bucket by dismounting facility, connection chute forming machine grab bucket hydraulic tube and rope saw hydraulic pressure
Oil pipe.
Further, above-mentioned hydraulic grooving machine is equipped with random monitoring deviation correcting device.
Optionally, the present invention has the advantages that compared with prior art:
(1)Anchor cable processing method disclosed by the invention improves the security in anchor cable processing procedure:Before anchor cable is run into, use
The normal grooving operation of hydraulic grooving machine, after running into anchor cable, rope saw is quick mounting in the form of saw frame of restricting in chute forming machine grab bucket,
Rope saw cut anchor cable is driven using hydraulic grooving machine fluid power system, the purpose to anchor cable fly-cutting is realized, reduces
Cell wall caves in during anchor cable processing.
(2)Anchor cable processing method disclosed by the invention shortens the construction period of anchor cable processing:After cutting off anchor cable, rope is removed
Saw frame, hydraulic grooving machine continue grooving operation, avoid chute forming machine shift position and cause to reposition, accelerate construction
Progress, while also it is effectively guaranteed the safety and quality of construction of diaphragm wall.
(3)Anchor cable processing method disclosed by the invention saves cost:Totality arrangement and method for construction economy disclosed by the invention.
(4)Anchor cable processing method disclosed by the invention is workable:Rope saw frame structure disclosed by the invention so that
Rope saw is convenient to assemble and disassemble, and environmental suitability increases;Rope saw frame can be removed after cutting off anchor cable, it is convenient and efficient.
(5)Anchor cable processing method disclosed by the invention cuts anchor cable to achieve the purpose that processing while grooving:Utilize
Chute forming machine gravity itself and probe strop saw position, grooving are combined with processing anchor cable.
Brief description of the drawings
Fig. 1 is the hydraulic grab front view after hydraulic grab handling system-installing rope saw of the present invention;
Fig. 2 is the hydraulic grab side view after hydraulic grab handling system-installing rope saw of the present invention;
Fig. 3 is the chute forming machine grab bucket schematic diagram of the present invention;
The rope that Fig. 4 is the present invention saws system schematic-front view;
The rope that Fig. 5 is the present invention saws system schematic-side view;
Fig. 6 is the diamond rope saw chain schematic diagram of the present invention;
Fig. 7 is the connection sheet schematic diagram with cavernous structure.
Wherein:
1st, rope saw Steel plate frame;2nd, oval bolt hole in rope saw Steel plate frame;3rd, diamond rope saw chain;4th, rope saw driving wheel;5、
Rope saw directive wheel;6th, rope saw hydraulic drive motor;7th, hydraulic grooving machine is grabbed bucket;8th, rope saw installation site.
Embodiment
With reference to specific embodiment, the present invention will be further described.It is to be understood that within the scope of the present invention, it is of the invention
Above-mentioned each technical characteristic and below(Such as embodiment)It can be mutually combined between each technical characteristic of middle specific descriptions, so that
Form new or preferable technical solution.As space is limited, not repeated them here.It is all to be realized based on the above of the present invention
Technology belong to the scope of the present invention.
Lead wall
A kind of working measure mode that wall is unit in charge of construction is led, first to be constructed before continuous wall trench underground and lead wall, it is to ensure to lead wall
Diaphram wall position is accurate and the key of grooving quality, in construction period, leads that wall often bears steel reinforcement cage, pour concrete is led
The effect of the static and dynamic loadings such as pipe, drilling machine, thus conscientiously must design and construct, the formal construction of diaphram wall could be carried out.
Diaphram wall should all set and lead wall, lead wall form have it is prefabricated and two kinds cast-in-place, it is cast-in-place lead wall shape have " L " type or
Inverted "L" shape, can select according to different soil properties.When soil layer property is preferable, inverted "L" shape can be selected, or even pre-manufactured steel leads wall, uses
" L " type leads wall, and should strengthen leading wall behind is backfilling and compacted work.Ground good location in top layer is led using simple form reinforced concrete
Wall;Wall is led using cast-in-place L-shaped reinforced concrete in the area of topsoil weakness.
Construction of guide wall is to ensure that the axial location of subterranean wall and grooving quality have critical process.In order to keep the earth's surface soil body
Stablize, attach interim wood support and stull every 1~3 meter between wall is led;The construction precision for leading wall is directly related to underground company
The precision of continuous wall, thus construct lead wall when, it has to be noted that lead the headroom size, vertical and horizontal precision and plane position of side within the walls
Put.Leading the horizontal reinforcement of wall must connect, and making to lead wall becomes an entirety, prevent because intensity deficiency or construction are not good at and
Generation accident.To ensure the construction precision of subterranean wall, easy to grooving machine operation, lead side clearway within the walls should compared with subterranean wall thickness slightly
It is larger(It is bigger 5cm than design load), lead wall top mouth and be higher by 5cm than ground, the depth for leading wall is 1.5m.Lead the construction error mark of wall
Standard is:Centerline error is ± 10mm;Absolute altitude error is ± 10mm in top surface length range.
Wall effect is led in diaphram wall:1st, guiding is provided to chute forming machine grooving;2nd, store mud and prevent notch from caving in;
The horizontal benchmark with vertical survey when the 3rd, as construction;4th, placed for steel reinforcement cage, tremie disposes, chute forming machine provides mark
It is fixed.
Rope saw
Rope saw is a kind of a kind of saw cut to crisp and hard material designed using the principle that a rope can cut through a log, is to be directed to ore deposit
Mountain, quarry stone, arc panel, big flag material, thick concrete, the cutting disassembling instrument such as irregular concrete reinforcement, bridge road.Rope
Saw easy for installation, application method is flexible, crosscutting to cut, and erects cutting.Rope saw generally comprises the driving of rope saw, flywheel, directive wheel, rope
Saw chain bar, wherein rope saw chain bar is made by diamond.
Rope saw of the present invention includes at least the driving of rope saw, flywheel, directive wheel, rope saw chain bar.
A kind of specific rope saw of the present invention includes restrict saw chain bar, rope saw driving wheel, rope saw directive wheel, rope saw hydraulic pressure
Drive motor.
In the present invention, " rope saw system " and " rope saw " in case of no particular description, can be equal and use.
Rope saw frame
" rope saw frame " of the present invention is the structure for being fixed on saw of restricting in hydraulic grooving machine grab bucket.
" rope saw frame " of the present invention it is optionally possible to be a kind of frame structure, such as rope saw Steel plate frame or
Plate structure, for example, rectangle rope saw steel plate or it is trapezoidal rope saw steel plate or except rope saw Steel plate frame, rope saw steel plate in addition to its
He can realize the structure type of the purpose of fixed rope saw.
The shape of " rope saw frame " of the present invention is adapted with chute forming machine grab bucket, it is optionally possible to be rectangle, can also
It is polygon or other irregular shapes.
The shape of " rope saw frame " of the present invention can meet that rope saw frame and hydraulic grooving machine grab bucket are removable with size
The arbitrary shape and size installed with unloading, and its mechanical strength should be able to realize that rope saw frame is grabbed bucket with rope saw, hydraulic grooving machine, torn open
The function of the cut-out anchor cable of the hydraulic grab handling system of A compositions is applied in installing.
Other modes beyond rope saw frame of the present invention can be bolted with hydraulic grooving machine grab bucket are detachable
Ground assembles, optionally or other thread connecting modes or anchor bolts.Threaded connection refers to will with screw thread
Two plates link together, including bolt and nut connection, bolt welding helical connect, screw snaps connection and tapping screw connects
Connect.
In a kind of embodiment, rope saw frame is rope saw Steel plate frame, and rope is sawed in Steel plate frame and hydraulic grooving machine grab bucket
Bolt hole is set respectively, the two is bolted by bolt hole.
In the present invention, rope saw is quick mounting in chute forming machine grab bucket by saw frame of restricting.
In the present invention, the rope saw and rope saw frame are detachably connected by dismounting facility.
Dismount facility
" dismounting facility " of the present invention is the device that can reach fast quick-detach purpose.
A kind of form realized of " dismounting facility " of the present invention is bolt and nut connector.It is optionally possible to it is
Heavy hex bolts, screw connector, and/or lifting bolt, screw connector, and/or T hook bolts, screw connector.
Preferably, " dismounting facility " of the present invention is heavy hex bolts, screw connector.
It is corresponding, reserved in restrict saw frame and hydraulic grooving machine grab bucket for the " knot of dismounting facility A " work of the present invention
Structure.Optionally, " structure of dismounting facility A " work can be cavernous structure for of the present invention.Specific work structuring can be with
It is:Bolt hole is set respectively in rope saw frame and hydraulic grooving machine grab bucket, and/or by welding by the company with cavernous structure
Contact pin(As shown in Figure 7)Be fixed on rope saw frame and hydraulic grooving machine grab bucket on, rope saw Steel plate frame and hydraulic grooving machine grab bucket so as to
It is bolted.
It is corresponding, rope saw frame and rope saw driving wheel, the nonrotational position of rope saw directive wheel and rope saw hydraulic drive motor
On reserved for " the structure of dismounting facility B " work of the present invention.Optionally, for " dismounting facility B " work of the present invention
Structure can be cavernous structure.Specifically work structuring can be:Restricting, saw frame saws the nonrotational position of driving wheel with rope, rope is sawed
Frame saws the nonrotational position of directive wheel, rope saw frame with rope with being correspondingly arranged bolt hole respectively on rope saw hydraulic drive motor(Explanation
Book attached drawing does not provide), rope saw frame and rope saw driving wheel nonrotational position, rope saw frame and rope saw directive wheel nonrotational position,
Rope saw frame and rope saw hydraulic drive motor are bolted by bolt hole.Bolt hole can be directly in rope saw frame, hydraulic grooving machine
Perforate on grab bucket, the nonrotational position of rope saw driving wheel, the nonrotational position of rope saw directive wheel and rope saw hydraulic drive motor,
And/or by welding by the connection sheet with cavernous structure(As shown in Figure 7)It is fixed on rope saw frame, hydraulic grooving machine is grabbed
In the structures such as bucket, the nonrotational position of rope saw driving wheel, the nonrotational position of rope saw directive wheel and rope saw hydraulic drive motor, with
Realization is bolted.
Hydraulic grab handling system
" hydraulic grab handling system " of the present invention is mainly by the rope saw frame and hydraulic grooving machine grab bucket group with rope saw connection
Into wherein rope saw frame and hydraulic grooving machine grab bucket are removably installed combination by dismounting facility.
After the hydraulic grooving machine grab bucket installing rope saw of " hydraulic grab handling system " of the present invention, the dynamic of the two is connected
Force system is, it can be achieved that hydraulic grooving machine fluid power system driving rope saw system works and then the function of cutting anchor cable.
Chute forming machine
Chute forming machine of the present invention is also known as groover.By the mechanized equipment of the downward milling slot of earth's surface during construction diaphram wall.
Late 1950s start to apply in construction project.During operation, according to formation condition and engineering design in soil layer or rock mass
It is empty to excavate into the flute profile of one fixed width and depth, places steel reinforcement cage and concrete perfusion and forms diaphram wall body.Chute forming machine
There are multi-head spiral brill, punching grab bucket, impact drill, Multi-drill bit and wheel milling formula, disk milling formula, pincers slot type and slicing formula etc..Into wall thickness
It can be 400~1500 millimeters, it can be 2500~2700 millimeters to be once constructed into wall length.
Chute forming machine random monitoring deviation correcting device
In order to ensure the verticality of grooving, chute forming machine is equipped with random monitoring deviation correcting device.
Optionally, during practice of construction, the present invention can also realize that anchor cable position is accurately positioned, and concrete operations are as follows:
Field technician's whole process is stuck to post during grooving, and hydraulic pressure is grabbed during observing grooving according to the basic data moment of collection
The position of anchor cable is oriented at parameters in the drift condition of bucket and construction, scene exactly.
The security that the present invention is improved in anchor cable processing procedure is also embodied in:Orient anchor cable position strictly control grooving into
Ruler, using saw cut anchor cable of restricting, avoids the landslip of the sides of the trench caused by pullling anchor cable processing in the prior art.
The present invention is further illustrated below in conjunction with specific embodiment.
Embodiment 1Hydraulic grab handling system
As shown in Figure of description 1~6, hydraulic grab handling system includes:Rope saw Steel plate frame 1, hydraulic grooving machine grab bucket 7, rope
Saw.Rope saw includes:Restricting, saw chain bar 3, rope saw driving wheel 4, rope saws directive wheel 5, rope saw hydraulic drive motor 6.
Bolt hole is directly set respectively in rope saw Steel plate frame 1 and hydraulic grooving machine grab bucket 7, is arranged at rope saw Steel plate frame 1
On bolt hole be slotted eye, be arranged at hydraulic grooving machine grab bucket 7 on bolt hole be round hole.Rope saw Steel plate frame 1 and liquid
Scouring machine grab bucket 7 is pressed into by bolt hole, is connected with heavy hex bolts, nut.Rope saw Steel plate frame 1 and hydraulic grooving machine grab bucket 7
It is bolted to realize that fast assembling-disassembling is fixed.
The installing rope saw at rope saw installation position 8 of hydraulic grooving machine grab bucket 7.
Rope saws the connection mode of each building block and rope saw frame:Rope saw Steel plate frame 1 and the nonrotational portion of rope saw driving wheel 4
On position, the nonrotational position of rope saw Steel plate frame 1 and rope saw directive wheel 5, rope saw Steel plate frame 1 and rope saw hydraulic drive motor 6 respectively
It is corresponding that bolt hole is directly set, then connected with heavy hex bolts, nut.
Embodiment 2Hydraulic grab handling system
As shown in Figure of description 1~6, hydraulic grab handling system includes:Rope saw Steel plate frame 1, hydraulic grooving machine grab bucket 7, rope
Saw.Rope saw includes:Restricting, saw chain bar 3, rope saw driving wheel 4, rope saws directive wheel 5, rope saw hydraulic drive motor 6.
Bolt hole is directly set respectively in rope saw Steel plate frame 1 and hydraulic grooving machine grab bucket 7, is arranged at rope saw Steel plate frame 1
On bolt hole be slotted eye, be arranged at hydraulic grooving machine grab bucket 7 on bolt hole be round hole.Rope saw Steel plate frame 1 and liquid
Scouring machine grab bucket 7 is pressed into by bolt hole, is connected with lifting bolt, nut.
The installing rope saw at rope saw installation position 8 of hydraulic grooving machine grab bucket 7.
Rope saws the connection mode of each building block and rope saw frame:Rope saw Steel plate frame 1 and the nonrotational portion of rope saw driving wheel 4
On position, the nonrotational position of rope saw Steel plate frame 1 and rope saw directive wheel 5, rope saw Steel plate frame 1 and rope saw hydraulic drive motor 6 respectively
Connection sheet with holes is welded, is then connected with heavy hex bolts, nut.
Embodiment 3Hydraulic grab handling system
As shown in Figure of description 1~6, hydraulic grab handling system includes:Rope saw Steel plate frame 1, hydraulic grooving machine grab bucket 7, rope
Saw.Rope saw includes:Restrict saw chain bar, rope saw driving wheel 4, rope saw directive wheel 5, rope saw hydraulic drive motor 6, rope saw Steel plate frame 1 with
Hydraulic grooving machine grab bucket 7 is bolted achievable fast assembling-disassembling and fixes.Hydraulic grooving machine grab bucket 7 is at rope saw installation position 8
Installing rope is sawed.
Connection sheet with holes is welded in rope saw Steel plate frame 1, bolt hole is directly set in hydraulic grooving machine grab bucket 7.Connection
The hole of on piece is slotted eye, and the bolt hole directly set in hydraulic grooving machine grab bucket 7 is round hole.Rope saw Steel plate frame 1 and liquid
Scouring machine grab bucket 7 is pressed into by connection sheet with holes and bolt hole, is connected with T hook bolts, nut.
Saw system of restricting and the connection mode for saw frame of restricting:Rope saw Steel plate frame 1 saws the nonrotational position of driving wheel 4 with rope, rope is sawed
Steel plate frame 1 and the nonrotational position of rope saw directive wheel 5, the position of rope saw Steel plate frame 1 corresponding connection with rope saw hydraulic drive motor 6
Bolt hole is directly set.The nonrotational position of rope saw driving wheel 4, the nonrotational position of rope saw directive wheel 5, rope saw hydraulic-driven horse
Connection sheet with holes is respectively welded on up to 6, is then connected with T hook bolts, nut.
Embodiment 4The construction process and concrete operation step that anchor cable is handled in the range of foundation pit enclosure structure
Construction process:Construction of guide wall --- chute forming machine positioning --- grooving operation --- running into anchor cable --- grab bucket installing rope saw,
Hydraulic tube connects, and --- excision anchor cable --- removes rope saw, hydraulic tube disconnects.
Specific steps:
1)Positioning
Construction of guide wall is according to geological condition, using multi-form.
2)Chute forming machine positions
Grooving process point three grabs carry out grooving, again continuous to underground according to design requirement after first of anchor cable position is verified
Wall carries out framing, and chute forming machine is positioned according to framing line position, it is ensured that grooving verticality and position are accurate.
3)Grooving operation
Chute forming machine is grabbed bucket(As shown in Figure 3)It is 2.8m to grab native width every time, in order to ensure the verticality of grooving, chute forming machine be equipped with
Machine monitors deviation correcting device.
4)Run into anchor cable
Since anchor cable intensity is higher, chute forming machine is difficult to directly grab disconnected, pulls the generation in the hole that can cause to collapse by force, chute forming machine grab bucket exists
It cannot close to verify during fetching earth and there is anchor cable at this.
5)Installing rope of grabbing bucket saw, hydraulic tube connection
After tentatively anchor cable position is verified, anchor cable specific location is further verified using magnet, rope saw frame is quickly installed into
In scouring machine grab bucket, hydraulic oil pipe and the rope saw driving hydraulic oil pipe reserved in connection chute forming machine grab bucket.
6)Cut off anchor cable
Using restricting, sawing removes the characteristics of face is stable, anchor cable anti-shear ability is weak, utilizes fluid power system to drive rope saw cut anchor
Rope, and the pressure using chute forming machine grab bucket dead weight application to anchor cable.
7)Remove rope saw, hydraulic tube disconnects
After cutting off anchor cable, chute forming machine grab bucket is lifted, rapid removal rope saw frame, disconnect chute forming machine grab bucket hydraulic tube and rope saw hydraulic pressure
Oil pipe, chute forming machine grab bucket continue construction of fetching earth.
The present invention carries out machine anchor cable positioning of fetching earth using diaphram wall, chute forming machine, is set on chute forming machine grab bucket, rope saw frame
Dismounting facility is put, anchor cable is run into during grooving, lifts chute forming machine grab bucket immediately, is installed in advance using facility Fast Installation is dismounted
There is the rope saw frame that rope is sawed(Refer to Fig. 1, Fig. 2, Fig. 3).
As preferably technical solution, the threaded hole in hydraulic grooving machine grab bucket uses round hole, corresponding rope saw Steel plate frame
On threaded hole use slotted eye, facilitate adjusting rope saw height, more adapt to anchor cable angle, reach cell wall both sides and synchronously cut
The purpose cut.
On chute forming machine after installing rope saw, grooving machine hydraulic system is connected with rope saw drive system(For example connect grooving
The hydraulic oil pipe reserved in machine grab bucket and rope saw driving hydraulic oil pipe), you can fast driving rope saw carries out cutting operation.
, can fast positioning anchor cable position by chute forming machine grooving operation.After cutting off anchor cable, by rope saw frame dismounting, chute forming machine
Grooving operation is can proceed with, chute forming machine shift position is avoided and causes to reposition, accelerate construction progress.In grooving process
Middle field technician's whole process is stuck to post, and the offset feelings of hydraulic grab during grooving are observed according to the basic data moment of collection
The position of anchor cable is accurately oriented at parameters in condition and construction, scene.Orient anchor cable position strictly control grooving into
Ruler, using saw cut anchor cable of restricting, avoids pullling anchor cable and causing landslip of the sides of the trench.
Anchor cable processing method disclosed by the invention for the anchor cable specific location in wall in foundation pit, in combination in wall construction
Equipment hydraulic grab install shear rope saw additional, be accurately positioned using grab bucket and drive rope saw to cut with hydraulic grooving machine hydraulic system
Disconnected anchor cable cuts anchor cable to reach processing intent so as to achieve the purpose that processing while grooving, security is good, short time limit,
It is workable.
Above content is only presently preferred embodiments of the present invention, for those of ordinary skill in the art, according to the present invention
Thinking, part can be changed in specific embodiment mode and its application range, this specification content should not be construed as
Limitation of the present invention.
Claims (10)
- A kind of 1. anchor cable processing method in the range of foundation pit enclosure structure, it is characterised in that saw of being grabbed bucket plus restricted using hydraulic grooving machine The arrangement and method for construction of anchor cable is cut off, before running into anchor cable, using hydraulic grooving machine grooving operation, after running into anchor cable, rope saw frame is passed through Dismounting facility A is detachably mounted in hydraulic grooving machine grab bucket, hydraulic grooving machine grab bucket(7)Set with rope saw frame, rope saw, dismounting Apply A and be collectively forming hydraulic grab handling system, be then connected hydraulic grooving machine fluid power system with rope saw drive system, profit Rope saw cut anchor cable is driven with hydraulic grooving machine fluid power system, after cutting off anchor cable, by hydraulic grooving machine fluid power system Disconnected with rope saw drive system, remove rope saw frame, hydraulic grooving machine continues grooving operation;The rope saw is installed to hydraulic grooving machine grab bucket by saw frame of restricting;The rope saw frame is to be used to rope saw being fixed on hydraulic pressure The upper structure of chute forming machine grab bucket.
- 2. anchor cable processing method in the range of foundation pit enclosure structure according to claim 1, it is characterised in that the rope saw bag Include rope saw chain bar(3), rope saw driving wheel(4), rope saw directive wheel(5), rope saw hydraulic drive motor(6);The rope saw frame and rope saw driving wheel(4)Directive wheel is sawed with rope(5)Nonrotational position, it is described rope saw frame with rope saw hydraulic pressure Drive motor(6)It is removably secured by dismounting facility B.
- 3. anchor cable processing method in the range of foundation pit enclosure structure according to claim 1, it is characterised in that the dismounting is set It is bolt and nut chaining part to apply A, and the rope saw frame is rope saw Steel plate frame(1);Steel plate frame is sawed in rope(1)Grab bucket with hydraulic grooving machine (7)It is upper that bolt hole, rope saw Steel plate frame are set respectively(1)Grab bucket with hydraulic grooving machine(7)It is bolted by bolt hole.
- 4. anchor cable processing method in the range of foundation pit enclosure structure according to claim 3, it is characterised in that described to be arranged at Rope saw Steel plate frame(1)On bolt hole be slotted eye, it is described be arranged at hydraulic grooving machine grab bucket(7)On bolt hole for circle Hole.
- 5. anchor cable processing method in the range of foundation pit enclosure structure according to claim 2, it is characterised in that the dismounting is set It is bolt and nut chaining part to apply B, the rope saw frame and rope saw driving wheel(4)Directive wheel is sawed with rope(5)Nonrotational position, described Saw frame of restricting saws hydraulic drive motor with rope(6)On be provided with structure for the dismounting facility B work.
- 6. anchor cable processing method in the range of foundation pit enclosure structure according to claim 1, it is characterised in that it is described rope saw be Hydraulic diamond rope is sawed.
- 7. anchor cable processing method in the range of the foundation pit enclosure structure according to claim 1~6 any one, its feature exist In carry out grooving is grabbed in the hydraulic grooving machine grooving operation point three, after first of anchor cable position is verified, according to design requirement weight Framing newly is carried out to diaphram wall, chute forming machine is positioned according to framing line position.
- 8. anchor cable processing method in the range of the foundation pit enclosure structure according to claim 1~6 any one, its feature exist The mark of anchor cable is run into, the hydraulic grooving machine cannot close during fetching earth for chute forming machine grab bucket and can tentatively verify this Place has anchor cable.
- 9. anchor cable processing method in the range of foundation pit enclosure structure according to claim 8, it is characterised in that tentatively verify anchor Rope position postpones, and anchor cable specific location is further verified using magnet, is then removably installed rope saw frame by dismounting facility To hydraulic grooving machine grab bucket, connection chute forming machine grab bucket hydraulic tube and rope saw hydraulic oil pipe.
- 10. anchor cable processing method in the range of the foundation pit enclosure structure according to claim 1~6 any one, its feature exist In the hydraulic grooving machine is equipped with random monitoring deviation correcting device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711136658.5A CN108005083B (en) | 2017-11-16 | 2017-11-16 | Anchor cable processing method within the scope of a kind of foundation pit enclosure structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711136658.5A CN108005083B (en) | 2017-11-16 | 2017-11-16 | Anchor cable processing method within the scope of a kind of foundation pit enclosure structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108005083A true CN108005083A (en) | 2018-05-08 |
CN108005083B CN108005083B (en) | 2019-11-19 |
Family
ID=62052452
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711136658.5A Active CN108005083B (en) | 2017-11-16 | 2017-11-16 | Anchor cable processing method within the scope of a kind of foundation pit enclosure structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108005083B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110630196A (en) * | 2019-10-12 | 2019-12-31 | 中国建筑第四工程局有限公司 | Anchor cable sleeving and taking machine for construction of tunnel crossing anchor cable by shield method |
CN115045355A (en) * | 2022-05-30 | 2022-09-13 | 中交二公局铁路建设有限公司 | Grab bucket assembly device of trenching machine for grabbing and breaking anchor cable and use method of grab bucket assembly device |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02171422A (en) * | 1988-12-26 | 1990-07-03 | Mitsui Constr Co Ltd | Underground continuous wall construction process |
CN201411728Y (en) * | 2009-05-08 | 2010-02-24 | 山东交通学院 | Gripping apparatus of mechanical digging machine |
CN201738362U (en) * | 2010-08-03 | 2011-02-09 | 中天建设集团有限公司 | Hydraulic grab bucket of shearable underground anchor rod slotting machine |
CN102086653A (en) * | 2010-12-30 | 2011-06-08 | 北京市三一重机有限公司 | Continuous wall grab |
CN102974721A (en) * | 2012-10-24 | 2013-03-20 | 北京发研工程技术有限公司 | Underground anchor cable cutting construction method and cutting device thereof |
CN104763438A (en) * | 2015-04-23 | 2015-07-08 | 张清林 | Rope sawing type heading machine |
CN204738332U (en) * | 2015-03-17 | 2015-11-04 | 中铁十六局集团有限公司 | Hydraulic pressure grooving machine |
CN106088099A (en) * | 2016-07-15 | 2016-11-09 | 南昌轨道交通集团有限公司 | A kind of subway foundation pit anchor cable processing method |
-
2017
- 2017-11-16 CN CN201711136658.5A patent/CN108005083B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02171422A (en) * | 1988-12-26 | 1990-07-03 | Mitsui Constr Co Ltd | Underground continuous wall construction process |
CN201411728Y (en) * | 2009-05-08 | 2010-02-24 | 山东交通学院 | Gripping apparatus of mechanical digging machine |
CN201738362U (en) * | 2010-08-03 | 2011-02-09 | 中天建设集团有限公司 | Hydraulic grab bucket of shearable underground anchor rod slotting machine |
CN102086653A (en) * | 2010-12-30 | 2011-06-08 | 北京市三一重机有限公司 | Continuous wall grab |
CN102974721A (en) * | 2012-10-24 | 2013-03-20 | 北京发研工程技术有限公司 | Underground anchor cable cutting construction method and cutting device thereof |
CN204738332U (en) * | 2015-03-17 | 2015-11-04 | 中铁十六局集团有限公司 | Hydraulic pressure grooving machine |
CN104763438A (en) * | 2015-04-23 | 2015-07-08 | 张清林 | Rope sawing type heading machine |
CN106088099A (en) * | 2016-07-15 | 2016-11-09 | 南昌轨道交通集团有限公司 | A kind of subway foundation pit anchor cable processing method |
Non-Patent Citations (1)
Title |
---|
杨光值,潘鸿宝: "金刚石绳索切割技术在某地下既有锚索拆除中的应用", 《施工技术》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110630196A (en) * | 2019-10-12 | 2019-12-31 | 中国建筑第四工程局有限公司 | Anchor cable sleeving and taking machine for construction of tunnel crossing anchor cable by shield method |
CN110630196B (en) * | 2019-10-12 | 2022-12-06 | 中国建筑第四工程局有限公司 | Anchor cable sleeving and taking machine for construction of tunnel crossing anchor cable by shield method |
CN115045355A (en) * | 2022-05-30 | 2022-09-13 | 中交二公局铁路建设有限公司 | Grab bucket assembly device of trenching machine for grabbing and breaking anchor cable and use method of grab bucket assembly device |
Also Published As
Publication number | Publication date |
---|---|
CN108005083B (en) | 2019-11-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1837506B (en) | Construction method for excavating box-shape structure over an operating tunnel | |
CN106320333B (en) | Combined drainage type water filling pile device and construction method | |
CN106978807A (en) | Existing bridge pile pulling device and construction method are passed through by a kind of weak soil shield driving area | |
CN104775437A (en) | Cutting type constructing method for excavating rock foundation pits in construction site | |
CN104532842A (en) | Sleeve rotating friction type breaking pile-extracting construction method | |
CN108978661B (en) | Construction method for removing cast-in-situ bored pile | |
CN108005083B (en) | Anchor cable processing method within the scope of a kind of foundation pit enclosure structure | |
CN114108654A (en) | Construction method for removing obstacles in foundation pit area invaded by pressure-bearing water dock | |
CN112942399A (en) | Open caisson mechanical construction device and method for penetrating rock stratum | |
CN114837209A (en) | Construction method of deep sand layer large-diameter pile foundation in karst development area | |
CN209958343U (en) | Connecting joint for connecting reinforced concrete cast-in-place piles | |
CN103866787B (en) | A kind of spacious reverse masonry method concrete cut that digs builds construction technology | |
CN201943077U (en) | Waterproof curtain of CT-type fore shaft steel pipe pile | |
CN109056709A (en) | A method of using full-sleeve hydraulic drill rig construction In Karst Areas For Bridge pile foundation | |
CN115478543B (en) | Artificial hole digging pile foundation pit supporting structure and construction method | |
CN218060412U (en) | Utility tunnel enclosure wall construction structures | |
CN206570811U (en) | Existing bridge pile pulling device is passed through in weak soil shield driving area | |
CN115075249A (en) | Pile foundation clearing device and pile foundation clearing process | |
CN201334293Y (en) | Hoist and excavation construction system used for deep foundation pit excavation using top-down method | |
EP2098642B1 (en) | Screw equipment for digging to construct diaphragms | |
CN113684838A (en) | Grooving construction method for rock-socketed ultra-deep underground diaphragm wall | |
CN102505724B (en) | Hole guiding device and hole guiding method for bad ground | |
CN111155523A (en) | Underground pile foundation demolition method and device | |
CN206289633U (en) | A kind of foundation ditch flexible supporting structure | |
CN114687356B (en) | Construction method for deep foundation pit excavation of building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |