CN107989299A - 一种拼装式墙板的涂料施工方法 - Google Patents

一种拼装式墙板的涂料施工方法 Download PDF

Info

Publication number
CN107989299A
CN107989299A CN201711322075.1A CN201711322075A CN107989299A CN 107989299 A CN107989299 A CN 107989299A CN 201711322075 A CN201711322075 A CN 201711322075A CN 107989299 A CN107989299 A CN 107989299A
Authority
CN
China
Prior art keywords
metope
time
scraper plate
brush
puttying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711322075.1A
Other languages
English (en)
Inventor
孙运峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Great Fu Decorates Ltd Co
Original Assignee
Anhui Great Fu Decorates Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Great Fu Decorates Ltd Co filed Critical Anhui Great Fu Decorates Ltd Co
Priority to CN201711322075.1A priority Critical patent/CN107989299A/zh
Publication of CN107989299A publication Critical patent/CN107989299A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster

Abstract

本发明公开了一种拼装式墙板的涂料施工方法,包括如下百分比:墙面刮腻子1‑3遍使墙面平整,腻子重量配比为乳胶:滑石粉(或大白粉):2%羧甲基纤维素=1:5:3.5,厨房、厕所、浴室用聚醋酸乙烯乳液:水泥:水=1:5:1耐水性腻子,第1遍用胶皮刮板横向满刮,第2遍用胶皮刮板竖向满刮,第3遍用胶皮刮板找补腻子或用钢片刮板满刮腻子,刷3遍乳胶漆,每次皆使用搅拌器搅拌5‑10min,包括如下步骤:墙板清洁,清理墙面,修补墙面,板材插接,刮腻子,刷乳胶漆,本发明结构科学合理,使用安全方便,便于施工操作,提高了工作效率,避免了接缝处出现漆面脱落问题,增强了涂料的附着力以及避免了墙板开裂,增强了整体的美观性。

Description

一种拼装式墙板的涂料施工方法
技术领域
本发明属于墙板涂料施工技术领域,具体涉及一种拼装式墙板的涂料施工方法。
背景技术
涂料施工是指在被涂物表面涂敷一层装饰性或保护性涂料的整个过程。为获得坚固性的涂膜,涂料施工常包括底材表面处理、涂漆、固化和涂膜检验四个步骤。墙板,古时明清家具部件名称。位于家具左右两侧,呈垂直面的板材统称“旁板”或称“墙板”。现指一种建材。是由墙和楼板组成承重体系的房屋结构。墙板结构的承重墙可用砖、砌块、预制或现浇混凝土做成。按所用材料和建造方法的不同可分为混合结构、装配式大板结构、现浇式墙板结构三类。
然而现有的拼装式墙板的涂料施工的过程中仍然存在着一些不合理的因素,现有的拼装式墙板的涂料施工时,接缝处出现漆面脱落问题,还会出现透底,刷纹明显的问题。
发明内容
本发明的目的在于提供一种拼装式墙板的涂料施工方法,以解决上述背景技术中提出的现有的拼装式墙板的涂料施工的过程中仍然存在着一些不合理的因素,现有的拼装式墙板的涂料施工时,接缝处出现漆面脱落问题,还会出现透底,刷纹明显的问题。
为实现上述目的,本发明提供如下技术方案:一种拼装式墙板的涂料施工方法,所述施工方法如下:
步骤一:墙板清洁,清理墙板及相连墙板间的板缝的灰尘;
步骤二:清理墙面,将墙面起皮及松动处清除干净,并用水泥砂浆补抹,将残留灰渣铲干净,然后将墙面扫净;
步骤三:修补墙面,用水石膏将墙面磕碰处及坑洼缝隙等处找平,干燥后用砂纸对凸出处磨掉,将浮尘扫净;
步骤四:板材插接,测量尺寸并找平墙面,在板材背面迂回式打胶或者采用胶点矩阵,将挂件卡入板材一侧,在保证连接紧密性的同时用木螺丝固定于墙面,将板材铺于墙面,板材插接;
步骤五:刮腻子,对墙面刮腻子1-3遍使墙面平整,腻子重量配比为乳胶:滑石粉(或大白粉):2%羧甲基纤维素=1:5:3.5,厨房、厕所、浴室用聚醋酸乙烯乳液:水泥:水=1:5:1耐水性腻子,第1遍用胶皮刮板横向满刮,干燥后砂纸磨平并清扫干净,第2遍用胶皮刮板竖向满刮,干燥后砂纸磨平并清扫干净,第3遍用胶皮刮板找补腻子或用钢片刮板满刮腻子,将墙面刮平整,干燥后用细砂纸磨平磨光;
步骤六:刷乳胶漆,将步骤三所述的刮腻子3遍后刷3遍乳胶漆,刷第1遍乳胶漆:涂刷使用搅拌器搅拌5-10min,涂刷顺序是先刷顶板后刷墙面,墙面是先上后下,乳胶漆用排笔涂刷,将排笔上的浮毛和不牢固的毛理掉,刷第2遍乳胶漆:使用搅拌器搅拌5-10min,漆膜干燥后,用细砂纸将墙面小疙瘩和排笔毛打磨掉,磨光滑后清扫干净,刷第3遍乳胶漆:使用搅拌器搅拌5-10min,漆膜干燥后,用细砂纸将墙面小疙瘩和排笔毛打磨掉,磨光滑后清扫干净,涂刷时从一头开始,逐渐刷向另一头,要上下顺刷互相衔接,后一排笔紧接前一排笔。
作为本发明的一种优选技术方案,包括如下百分比:墙面刮腻子1-3遍使墙面平整,腻子重量配比为乳胶:滑石粉(或大白粉):2%羧甲基纤维素=1:5:3.5,厨房、厕所、浴室用聚醋酸乙烯乳液:水泥:水=1:5:1耐水性腻子,第1遍用胶皮刮板横向满刮,第2遍用胶皮刮板竖向满刮,第3遍用胶皮刮板找补腻子或用钢片刮板满刮腻子,刷3遍乳胶漆,每次皆使用搅拌器搅拌5-10min。
作为本发明的一种优选技术方案,所述步骤三中,在装修中需要找平地面,施工前做好地面的基底处理,然后用水泥砂浆进行地面找平,在水泥干透之后,用专用的水平尺确定整个地面的平整度。
作为本发明的一种优选技术方案,所述墙面上有两种颜色的涂料相对接时,第1种颜色的边沿处贴上胶带,再涂刷另1种颜色的涂料,施工完毕后撕去胶带。
作为本发明的一种优选技术方案,所述步骤六中,刷3遍乳胶漆时每一遍的时间间隔≥2h,温度≥5℃,相对湿度≥85%。
与现有技术相比,本发明的有益效果是:本发明结构科学合理,使用安全方便,避免了接缝处出现漆面脱落问题,增强了涂料的附着力以及避免了墙板开裂,增强了整体的美观性。
具体实施方式
实施例1
一种拼装式墙板的涂料施工方法,包括如下百分比:墙面刮腻子1遍使墙面平整,腻子重量配比为乳胶:滑石粉(或大白粉):2%羧甲基纤维素=1:5:3.5,厨房、厕所、浴室用聚醋酸乙烯乳液:水泥:水=1:5:1耐水性腻子,第1遍用胶皮刮板横向满刮,第2遍用胶皮刮板竖向满刮,第3遍用胶皮刮板找补腻子或用钢片刮板满刮腻子,刷3遍乳胶漆,每次皆使用搅拌器搅拌5min。
包括如下步骤:
步骤一:墙板清洁,清理墙板及相连墙板间的板缝的灰尘;
步骤二:清理墙面,将墙面起皮及松动处清除干净,并用水泥砂浆补抹,将残留灰渣铲干净,然后将墙面扫净;
步骤三:修补墙面,用水石膏将墙面磕碰处及坑洼缝隙等处找平,干燥后用砂纸对凸出处磨掉,将浮尘扫净;
步骤四:板材插接,测量尺寸并找平墙面,在板材背面迂回式打胶或者采用胶点矩阵,将挂件卡入板材一侧,在保证连接紧密性的同时用木螺丝固定于墙面,将板材铺于墙面,板材插接;
步骤五:刮腻子,对墙面刮腻子1-3遍使墙面平整,腻子重量配比为乳胶:滑石粉(或大白粉):2%羧甲基纤维素=1:5:3.5,厨房、厕所、浴室用聚醋酸乙烯乳液:水泥:水=1:5:1耐水性腻子,第1遍用胶皮刮板横向满刮,干燥后砂纸磨平并清扫干净,第2遍用胶皮刮板竖向满刮,干燥后砂纸磨平并清扫干净,第3遍用胶皮刮板找补腻子或用钢片刮板满刮腻子,将墙面刮平整,干燥后用细砂纸磨平磨光;
步骤六:刷乳胶漆,将步骤三所述的刮腻子3遍后刷3遍乳胶漆,刷第1遍乳胶漆:涂刷使用搅拌器搅拌5-10min,涂刷顺序是先刷顶板后刷墙面,墙面是先上后下,乳胶漆用排笔涂刷,将排笔上的浮毛和不牢固的毛理掉,刷第2遍乳胶漆:使用搅拌器搅拌5-10min,漆膜干燥后,用细砂纸将墙面小疙瘩和排笔毛打磨掉,磨光滑后清扫干净,刷第3遍乳胶漆:使用搅拌器搅拌5-10min,漆膜干燥后,用细砂纸将墙面小疙瘩和排笔毛打磨掉,磨光滑后清扫干净,涂刷时从一头开始,逐渐刷向另一头,要上下顺刷互相衔接,后一排笔紧接前一排笔。
实施例2
一种拼装式墙板的涂料施工方法,包括如下百分比:墙面刮腻子2遍使墙面平整,腻子重量配比为乳胶:滑石粉(或大白粉):2%羧甲基纤维素=1:5:3.5,厨房、厕所、浴室用聚醋酸乙烯乳液:水泥:水=1:5:1耐水性腻子,第1遍用胶皮刮板横向满刮,第2遍用胶皮刮板竖向满刮,第3遍用胶皮刮板找补腻子或用钢片刮板满刮腻子,刷3遍乳胶漆,每次皆使用搅拌器搅拌8min。
包括如下步骤:
步骤一:墙板清洁,清理墙板及相连墙板间的板缝的灰尘;
步骤二:清理墙面,将墙面起皮及松动处清除干净,并用水泥砂浆补抹,将残留灰渣铲干净,然后将墙面扫净;
步骤三:修补墙面,用水石膏将墙面磕碰处及坑洼缝隙等处找平,干燥后用砂纸对凸出处磨掉,将浮尘扫净;
步骤四:板材插接,测量尺寸并找平墙面,在板材背面迂回式打胶或者采用胶点矩阵,将挂件卡入板材一侧,在保证连接紧密性的同时用木螺丝固定于墙面,将板材铺于墙面,板材插接;
步骤五:刮腻子,对墙面刮腻子1-3遍使墙面平整,腻子重量配比为乳胶:滑石粉(或大白粉):2%羧甲基纤维素=1:5:3.5,厨房、厕所、浴室用聚醋酸乙烯乳液:水泥:水=1:5:1耐水性腻子,第1遍用胶皮刮板横向满刮,干燥后砂纸磨平并清扫干净,第2遍用胶皮刮板竖向满刮,干燥后砂纸磨平并清扫干净,第3遍用胶皮刮板找补腻子或用钢片刮板满刮腻子,将墙面刮平整,干燥后用细砂纸磨平磨光;
步骤六:刷乳胶漆,将步骤三所述的刮腻子3遍后刷3遍乳胶漆,刷第1遍乳胶漆:涂刷使用搅拌器搅拌5-10min,涂刷顺序是先刷顶板后刷墙面,墙面是先上后下,乳胶漆用排笔涂刷,将排笔上的浮毛和不牢固的毛理掉,刷第2遍乳胶漆:使用搅拌器搅拌5-10min,漆膜干燥后,用细砂纸将墙面小疙瘩和排笔毛打磨掉,磨光滑后清扫干净,刷第3遍乳胶漆:使用搅拌器搅拌5-10min,漆膜干燥后,用细砂纸将墙面小疙瘩和排笔毛打磨掉,磨光滑后清扫干净,涂刷时从一头开始,逐渐刷向另一头,要上下顺刷互相衔接,后一排笔紧接前一排笔。
实施例3
一种拼装式墙板的涂料施工方法,包括如下百分比:墙面刮腻子3遍使墙面平整,腻子重量配比为乳胶:滑石粉(或大白粉):2%羧甲基纤维素=1:5:3.5,厨房、厕所、浴室用聚醋酸乙烯乳液:水泥:水=1:5:1耐水性腻子,第1遍用胶皮刮板横向满刮,第2遍用胶皮刮板竖向满刮,第3遍用胶皮刮板找补腻子或用钢片刮板满刮腻子,刷3遍乳胶漆,每次皆使用搅拌器搅拌10min。
包括如下步骤:
步骤一:墙板清洁,清理墙板及相连墙板间的板缝的灰尘;
步骤二:清理墙面,将墙面起皮及松动处清除干净,并用水泥砂浆补抹,将残留灰渣铲干净,然后将墙面扫净;
步骤三:修补墙面,用水石膏将墙面磕碰处及坑洼缝隙等处找平,干燥后用砂纸对凸出处磨掉,将浮尘扫净;
步骤四:板材插接,测量尺寸并找平墙面,在板材背面迂回式打胶或者采用胶点矩阵,将挂件卡入板材一侧,在保证连接紧密性的同时用木螺丝固定于墙面,将板材铺于墙面,板材插接;
步骤五:刮腻子,对墙面刮腻子1-3遍使墙面平整,腻子重量配比为乳胶:滑石粉(或大白粉):2%羧甲基纤维素=1:5:3.5,厨房、厕所、浴室用聚醋酸乙烯乳液:水泥:水=1:5:1耐水性腻子,第1遍用胶皮刮板横向满刮,干燥后砂纸磨平并清扫干净,第2遍用胶皮刮板竖向满刮,干燥后砂纸磨平并清扫干净,第3遍用胶皮刮板找补腻子或用钢片刮板满刮腻子,将墙面刮平整,干燥后用细砂纸磨平磨光;
步骤六:刷乳胶漆,将步骤三所述的刮腻子3遍后刷3遍乳胶漆,刷第1遍乳胶漆:涂刷使用搅拌器搅拌5-10min,涂刷顺序是先刷顶板后刷墙面,墙面是先上后下,乳胶漆用排笔涂刷,将排笔上的浮毛和不牢固的毛理掉,刷第2遍乳胶漆:使用搅拌器搅拌5-10min,漆膜干燥后,用细砂纸将墙面小疙瘩和排笔毛打磨掉,磨光滑后清扫干净,刷第3遍乳胶漆:使用搅拌器搅拌5-10min,漆膜干燥后,用细砂纸将墙面小疙瘩和排笔毛打磨掉,磨光滑后清扫干净,涂刷时从一头开始,逐渐刷向另一头,要上下顺刷互相衔接,后一排笔紧接前一排笔。
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。

Claims (5)

1.一种拼装式墙板的涂料施工方法,其特征在于,所述施工方法如下:
步骤一:墙板清洁,清理墙板及相连墙板间的板缝的灰尘;
步骤二:清理墙面,将墙面起皮及松动处清除干净,并用水泥砂浆补抹,将残留灰渣铲干净,然后将墙面扫净;
步骤三:修补墙面,用水石膏将墙面磕碰处及坑洼缝隙等处找平,干燥后用砂纸对凸出处磨掉,将浮尘扫净;
步骤四:板材插接,测量尺寸并找平墙面,在板材背面迂回式打胶或者采用胶点矩阵,将挂件卡入板材一侧,在保证连接紧密性的同时用木螺丝固定于墙面,将板材铺于墙面,板材插接;
步骤五:刮腻子,对墙面刮腻子1-3遍使墙面平整,腻子重量配比为乳胶:滑石粉(或大白粉):2%羧甲基纤维素=1:5:3.5,厨房、厕所、浴室用聚醋酸乙烯乳液:水泥:水=1:5:1耐水性腻子,第1遍用胶皮刮板横向满刮,干燥后砂纸磨平并清扫干净,第2遍用胶皮刮板竖向满刮,干燥后砂纸磨平并清扫干净,第3遍用胶皮刮板找补腻子或用钢片刮板满刮腻子,将墙面刮平整,干燥后用细砂纸磨平磨光;
步骤六:刷乳胶漆,将步骤三所述的刮腻子3遍后刷3遍乳胶漆,刷第1遍乳胶漆:涂刷使用搅拌器搅拌5-10min,涂刷顺序是先刷顶板后刷墙面,墙面是先上后下,乳胶漆用排笔涂刷,将排笔上的浮毛和不牢固的毛理掉,刷第2遍乳胶漆:使用搅拌器搅拌5-10min,漆膜干燥后,用细砂纸将墙面小疙瘩和排笔毛打磨掉,磨光滑后清扫干净,刷第3遍乳胶漆:使用搅拌器搅拌5-10min,漆膜干燥后,用细砂纸将墙面小疙瘩和排笔毛打磨掉,磨光滑后清扫干净,涂刷时从一头开始,逐渐刷向另一头,要上下顺刷互相衔接,后一排笔紧接前一排笔。
2.根据权利要求1所述的一种拼装式墙板的涂料施工方法,其特征在于,包括如下百分比:墙面刮腻子1-3遍使墙面平整,腻子重量配比为乳胶:滑石粉(或大白粉):2%羧甲基纤维素=1:5:3.5,厨房、厕所、浴室用聚醋酸乙烯乳液:水泥:水=1:5:1耐水性腻子,第1遍用胶皮刮板横向满刮,第2遍用胶皮刮板竖向满刮,第3遍用胶皮刮板找补腻子或用钢片刮板满刮腻子,刷3遍乳胶漆,每次皆使用搅拌器搅拌5-10min。
3.根据权利要求1所述的一种拼装式墙板的涂料施工方法,其特征在于:所述步骤三中,在装修中需要找平地面,施工前做好地面的基底处理,然后用水泥砂浆进行地面找平,在水泥干透之后,用专用的水平尺确定整个地面的平整度。
4.根据权利要求1所述的一种拼装式墙板的涂料施工方法,其特征在于:所述墙面上有两种颜色的涂料相对接时,第1种颜色的边沿处贴上胶带,再涂刷另1种颜色的涂料,施工完毕后撕去胶带。
5.根据权利要求1所述的一种拼装式墙板的涂料施工方法,其特征在于:所述步骤六中,刷3遍乳胶漆时每一遍的时间间隔≥2h,温度≥5℃,相对湿度≥85%。
CN201711322075.1A 2017-12-12 2017-12-12 一种拼装式墙板的涂料施工方法 Pending CN107989299A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711322075.1A CN107989299A (zh) 2017-12-12 2017-12-12 一种拼装式墙板的涂料施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711322075.1A CN107989299A (zh) 2017-12-12 2017-12-12 一种拼装式墙板的涂料施工方法

Publications (1)

Publication Number Publication Date
CN107989299A true CN107989299A (zh) 2018-05-04

Family

ID=62036010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711322075.1A Pending CN107989299A (zh) 2017-12-12 2017-12-12 一种拼装式墙板的涂料施工方法

Country Status (1)

Country Link
CN (1) CN107989299A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108951439A (zh) * 2018-07-17 2018-12-07 中国水利水电第五工程局有限公司 一种预制装配式箱涵防水层施工方法
CN109797919A (zh) * 2019-01-15 2019-05-24 莱芜职业技术学院 一种建筑外墙涂料的施工方法
CN110306800A (zh) * 2019-07-25 2019-10-08 北京鑫源轩建筑装饰工程有限公司 一种避免装修工程中涂料开裂的方法
CN114161512A (zh) * 2021-11-29 2022-03-11 天地伟业技术有限公司 一种内球面制作装置及方法
CN114352055A (zh) * 2021-12-23 2022-04-15 上海建工集团股份有限公司 老旧墙面翻新涂料施工工艺

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108951439A (zh) * 2018-07-17 2018-12-07 中国水利水电第五工程局有限公司 一种预制装配式箱涵防水层施工方法
CN109797919A (zh) * 2019-01-15 2019-05-24 莱芜职业技术学院 一种建筑外墙涂料的施工方法
CN110306800A (zh) * 2019-07-25 2019-10-08 北京鑫源轩建筑装饰工程有限公司 一种避免装修工程中涂料开裂的方法
CN114161512A (zh) * 2021-11-29 2022-03-11 天地伟业技术有限公司 一种内球面制作装置及方法
CN114352055A (zh) * 2021-12-23 2022-04-15 上海建工集团股份有限公司 老旧墙面翻新涂料施工工艺

Similar Documents

Publication Publication Date Title
CN107989299A (zh) 一种拼装式墙板的涂料施工方法
CN107044196A (zh) 一种混凝土抹灰面乳胶漆涂刷工艺
CN109797920B (zh) 一种室内涂饰施工方法
CN109098370A (zh) 一种建筑施工方法
CN101565997A (zh) 大面积不规则地面砖施工方法
CN108343203A (zh) 一种墙面防裂批嵌工艺
CN103952052A (zh) 仿洞石弹性质感涂料及其制备方法
CN109826396A (zh) 一种a级防火艺术地坪的施工方法
CN109424135A (zh) 对建筑物中墙面的腻子进行涂覆的工艺
CN106760285A (zh) 家具厂房中采用腻子对室内墙面涂覆的工艺
CN108343213A (zh) 一种地下停车库环氧砂浆耐磨地坪及施工方法
CN113152814A (zh) 一种外墙真石漆喷涂施工方法
CN107386681A (zh) 刮腻子及刷乳胶漆的施工工艺
Ochilova Technology of painting works in construction
CN104120860A (zh) 一种水泥砂浆地面找平的施工方法
CN108979034A (zh) 墙面施工工艺
CN110359651A (zh) 一种墙面涂刷乳胶漆工艺
CN209568594U (zh) 一种装配式钢结构楼板顶棚
CN107476448A (zh) 一种用于卫生间门口处防水的施工方法
CN203834826U (zh) 一种新型楼梯间滴水槽
CN211949245U (zh) 一种屋面石材泛水结构
CN109372204A (zh) 无机干粉条纹状外墙装饰砂浆涂料系统施工工法
CN107620434A (zh) 家具厂房中采用腻子对室内墙面涂覆的工艺
CN206438727U (zh) 一种彩色高强复合地坪
TWI230755B (en) Method for constructing pebble and cement wall face for a building without applying roughening and waterproofing processes

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180504

WD01 Invention patent application deemed withdrawn after publication