CN107989191A - 一种集成型钢现场焊接接口结构 - Google Patents
一种集成型钢现场焊接接口结构 Download PDFInfo
- Publication number
- CN107989191A CN107989191A CN201711376597.XA CN201711376597A CN107989191A CN 107989191 A CN107989191 A CN 107989191A CN 201711376597 A CN201711376597 A CN 201711376597A CN 107989191 A CN107989191 A CN 107989191A
- Authority
- CN
- China
- Prior art keywords
- shaped steel
- plate
- integrated shaped
- integrated
- section bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K33/00—Specially-profiled edge portions of workpieces for making soldering or welding connections; Filling the seams formed thereby
Abstract
本发明公开了一种集成型钢现场焊接接口结构,其包括第一集成型钢和第二集成型钢,两个集成型钢的两端均开设有两条缺口,所述第一集成型钢和第二集成型钢的拼焊端的两条缺口内分别插接有第一插板和第二插板,所述第二插板包括竖直部分,所述竖直部分的上端向外侧折弯有水平部分,所述竖直部分的一侧面紧贴型材侧板内壁设置,另一侧面熔焊固定于型材底板上,所述水平部分位于所述缺口之外且其底部熔焊固定于型材侧板的端部,所述第一插板的端部伸出所述第一集成型钢且通过开坡口焊接于所述水平部分的外端面上。上述集成型钢现场焊接接口结构不仅结构简单,制造成本低;而且能够将应力集中处的受力分散到型材上,大大提高了集成型钢的焊接结合力。
Description
技术领域
本发明属于集成型钢加工技术,尤其是涉及一种集成型钢现场焊接接口结 构。
背景技术
集成型钢住宅产品的自身优点在施工过程中得到一定的认可,具有广阔的 应用前景。但是集成型钢住宅产品在建造过程中,需要将集成型钢沿高度方向 进行现场拼接,以形成不同高度的墙体。
目前,现有的集成型钢沿高度方向的拼接都是采用在上下两个集成型钢之 间设置连接法兰,通过将两个集成型钢分别焊接于连接法兰上,以实现两个集 成型钢在高度方向的拼接,这种拼接结构存在如下缺点:
1)必须设置连接法兰,结构复杂,成本高;
2)采用连接法兰焊接的方式,其连接处应力集中,影响墙体整体的承重力 和强度。
发明内容
本发明的目的在于提供一种集成型钢现场焊接接口结构,其具有结构简单、 成本低和受力均匀的特点,以解决现有技术中集成型钢拼接结构存在的上述问 题。
为达此目的,本发明采用以下技术方案:
一种集成型钢现场焊接接口结构,其包括第一集成型钢和第二集成型钢, 两个集成型钢的两端均开设有两条缺口,其中,所述第一集成型钢和第二集成 型钢的拼焊端的两条缺口内分别插接有第一插板和第二插板,所述第一插板采 用“一”字型结构,其一侧面紧贴型材侧板内壁设置,另一侧面熔焊固定于型 材底板上,所述第二插板包括竖直部分,所述竖直部分的上端向外侧折弯有水 平部分,所述竖直部分的一侧面紧贴型材侧板内壁设置,另一侧面熔焊固定于 型材底板上,所述水平部分位于所述缺口之外且其底部熔焊固定于型材侧板的 端部,所述第一插板的端部伸出所述第一集成型钢且通过开坡口焊接于所述水 平部分的外端面上。
特别地,所述竖直部分与水平部分的折弯处为向内侧凸起的圆弧段,所述 圆弧段的内壁与型材侧板进行熔焊连接。
特别地,所述第一插板在第二插板上的连接位置对应所述竖直部分设置。
特别地,所述第一集成型钢和第二集成型钢均由“C”型钢或方钢管的任一 种或两种组合拼焊而成。
特别地,所述第一插板和第二插板均采用辊压冷轧型材。
本发明的有益效果为,与现有技术相比所述集成型钢现场焊接接口结构具 有以下优点:
1)通过第一插板和第二插板实现两个集成型钢的拼接固定,相比采用连接 法兰的拼接方式,结构简单,成本低;
2)第一插板和第二插板通过熔焊固定缺口内,且与型材的侧壁焊接固定, 提高了受力面积,能够将应力集中处的受力分散到型材上,大大提高了装配焊 接结合力,从而提高连接处的承重力和强度;
3)第二插板采用特殊的结构设计,能够增加两个工件焊接时的焊接面积, 提高第一集成型钢和第二集成型钢的焊接结合力;
4)第一插板和第二插板均采用辊压冷轧型材,生产成本低、便于制作,有 利于大批量自动化生产。
附图说明
图1是本发明具体实施方式提供的集成型钢现场焊接接口结构的结构示意 图;
图2是本发明具体实施方式提供的集成型钢现场焊接接口结构的第一集成 型钢的焊接端的结构示意图;
图3是本发明具体实施方式提供的集成型钢现场焊接接口结构的第二集成 型钢的焊接端的结构示意图。
具体实施方式
下面结合附图并通过具体实施方式来进一步说明本发明的技术方案。
请参阅图1至图3所示,一种集成型钢现场焊接接口结构包括第一集成型 钢1和第二集成型钢2,所述第一集成型钢1和第二集成型钢2均由若干根型材 相互拼焊而成,所述型材采用“C”型钢或方钢管的任一种或两种组合。且所述 第一集成型钢1和第二集成型钢2两端均开设有两条缺口,所述第一集成型钢1 和第二集成型钢2的拼焊端的两条缺口内分别插接有第一插板3和第二插板4。
所述第一插板3采用“一”字型结构,其一侧面紧贴型材侧板5内壁设置, 另一侧面熔焊固定于型材底板6上,所述第二插板4包括竖直部分40,所述竖 直部分40的上端向外侧折弯有水平部分41,所述竖直部分40的一侧面紧贴型 材侧板5内壁设置,另一侧面熔焊固定于型材底板6上,所述水平部分41位于 所述缺口之外且其底部熔焊固定于型材侧板5的端部,所述竖直部分40与水平 部分41的折弯处为向内侧凸起的圆弧段42,所述圆弧段42的内壁与型材侧板 5进行熔焊连接。
所述第一插板3的端部伸出所述第一集成型钢1且通过开坡口焊接于所述 水平部分41的外端面上,所述第一插板3在第二插板4上的连接位置对应所述 竖直部分40设置,所述第二插板4整体呈“L”型结构,这样能够在第一插板3 焊接时增加对接面积,提供两根集成型钢的结合力。
所述第一插板3和第二插板4均采用辊压冷轧型材,生产成本低,便于制 作,有利于大批量自动化生产。
以上实施例只是阐述了本发明的基本原理和特性,本发明不受上述事例限 制,在不脱离本发明精神和范围的前提下,本发明还有各种变化和改变,这些 变化和改变都落入要求保护的本发明范围内。本发明要求保护范围由所附的权 利要求书及其等效物界定。
Claims (5)
1.一种集成型钢现场焊接接口结构,其包括第一集成型钢和第二集成型钢,两个集成型钢的两端均开设有两条缺口,其特征在于,所述第一集成型钢和第二集成型钢的拼焊端的两条缺口内分别插接有第一插板和第二插板,所述第一插板采用“一”字型结构,其一侧面紧贴型材侧板内壁设置,另一侧面熔焊固定于型材底板上,所述第二插板包括竖直部分,所述竖直部分的上端向外侧折弯有水平部分,所述竖直部分的一侧面紧贴型材侧板内壁设置,另一侧面熔焊固定于型材底板上,所述水平部分位于所述缺口之外且其底部熔焊固定于型材侧板的端部,所述第一插板的端部伸出所述第一集成型钢且通过开坡口焊接于所述水平部分的外端面上。
2.根据权利要求1所述的集成型钢现场焊接接口结构,其特征在于,所述竖直部分与水平部分的折弯处为向内侧凸起的圆弧段,所述圆弧段的内壁与型材侧板进行熔焊连接。
3.根据权利要求1或2所述的集成型钢现场焊接接口结构,其特征在于,所述第一插板在第二插板上的连接位置对应所述竖直部分设置。
4.根据权利要求1所述的集成型钢现场焊接接口结构,其特征在于,所述第一集成型钢和第二集成型钢均由“C”型钢或方钢管的任一种或两种组合拼焊而成。
5.根据权利要求1所述的集成型钢现场焊接接口结构,其特征在于,所述第一插板和第二插板均采用辊压冷轧型材。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711376597.XA CN107989191B (zh) | 2017-12-19 | 2017-12-19 | 一种集成型钢现场焊接接口结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711376597.XA CN107989191B (zh) | 2017-12-19 | 2017-12-19 | 一种集成型钢现场焊接接口结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107989191A true CN107989191A (zh) | 2018-05-04 |
CN107989191B CN107989191B (zh) | 2023-02-17 |
Family
ID=62039103
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711376597.XA Active CN107989191B (zh) | 2017-12-19 | 2017-12-19 | 一种集成型钢现场焊接接口结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107989191B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108560833A (zh) * | 2018-06-05 | 2018-09-21 | 苏州光彩建筑钢品有限公司 | 一种螺纹钢筋的现场施工结构 |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1303748A (zh) * | 2000-01-12 | 2001-07-18 | 町田工业株式会社 | 钢筋结构件的单侧焊接方法 |
CN201760712U (zh) * | 2010-08-20 | 2011-03-16 | 抚顺市亨易金属制品有限责任公司 | 一种牢固型钢质门门扇 |
CN102995758A (zh) * | 2012-12-14 | 2013-03-27 | 金天德 | 组合型钢管混凝土柱与钢梁的刚接节点 |
CN104475998A (zh) * | 2014-11-28 | 2015-04-01 | 哈尔滨电机厂有限责任公司 | 承载臂焊接方法 |
CN104747801A (zh) * | 2015-03-24 | 2015-07-01 | 诸城市福日机械有限公司 | 停车制动器导线支架 |
US20150337883A1 (en) * | 2013-03-28 | 2015-11-26 | David A. Corden | Quick Attachment System for Modular Construction |
JP2016073985A (ja) * | 2014-10-03 | 2016-05-12 | 新日鐵住金株式会社 | 応力集中が低減する溶接構造部材 |
CN205782817U (zh) * | 2016-05-26 | 2016-12-07 | 江西江联国际工程有限公司 | 一种锅炉受热面蛇形管系统中的连接装置 |
CN206562665U (zh) * | 2017-02-20 | 2017-10-17 | 深圳雅致钢结构工程有限公司 | 一种钢结构 |
CN206607678U (zh) * | 2017-03-22 | 2017-11-03 | 浙江工业职业技术学院 | 大截面建筑型钢对接固定结构 |
CN207776097U (zh) * | 2017-12-19 | 2018-08-28 | 无锡市光彩机械制造有限公司 | 一种集成型钢现场焊接接口结构 |
-
2017
- 2017-12-19 CN CN201711376597.XA patent/CN107989191B/zh active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1303748A (zh) * | 2000-01-12 | 2001-07-18 | 町田工业株式会社 | 钢筋结构件的单侧焊接方法 |
CN201760712U (zh) * | 2010-08-20 | 2011-03-16 | 抚顺市亨易金属制品有限责任公司 | 一种牢固型钢质门门扇 |
CN102995758A (zh) * | 2012-12-14 | 2013-03-27 | 金天德 | 组合型钢管混凝土柱与钢梁的刚接节点 |
US20150337883A1 (en) * | 2013-03-28 | 2015-11-26 | David A. Corden | Quick Attachment System for Modular Construction |
JP2016073985A (ja) * | 2014-10-03 | 2016-05-12 | 新日鐵住金株式会社 | 応力集中が低減する溶接構造部材 |
CN104475998A (zh) * | 2014-11-28 | 2015-04-01 | 哈尔滨电机厂有限责任公司 | 承载臂焊接方法 |
CN104747801A (zh) * | 2015-03-24 | 2015-07-01 | 诸城市福日机械有限公司 | 停车制动器导线支架 |
CN205782817U (zh) * | 2016-05-26 | 2016-12-07 | 江西江联国际工程有限公司 | 一种锅炉受热面蛇形管系统中的连接装置 |
CN206562665U (zh) * | 2017-02-20 | 2017-10-17 | 深圳雅致钢结构工程有限公司 | 一种钢结构 |
CN206607678U (zh) * | 2017-03-22 | 2017-11-03 | 浙江工业职业技术学院 | 大截面建筑型钢对接固定结构 |
CN207776097U (zh) * | 2017-12-19 | 2018-08-28 | 无锡市光彩机械制造有限公司 | 一种集成型钢现场焊接接口结构 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108560833A (zh) * | 2018-06-05 | 2018-09-21 | 苏州光彩建筑钢品有限公司 | 一种螺纹钢筋的现场施工结构 |
Also Published As
Publication number | Publication date |
---|---|
CN107989191B (zh) | 2023-02-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107524232A (zh) | 一种集成型钢及其现场拼接结构 | |
CN204843369U (zh) | 钢箱梁钢结构焊接反变形平台装置 | |
CN107989191A (zh) | 一种集成型钢现场焊接接口结构 | |
CN202607136U (zh) | 一种加工t型材的工装结构 | |
CN207776097U (zh) | 一种集成型钢现场焊接接口结构 | |
CN107263101A (zh) | 一种电除尘器极板分片整体安装方法 | |
CN104625340A (zh) | 一种高强度小尺寸h型钢的手工焊接方法 | |
CN209129155U (zh) | 一种集成型钢焊接结构 | |
CN205476407U (zh) | 一种建筑施工梁架 | |
CN207348224U (zh) | 一种集成型钢及其现场拼接结构 | |
CN208246135U (zh) | 一种焊接工装 | |
CN207358360U (zh) | 电梯门板的点焊加工设备 | |
CN204980766U (zh) | 一种电梯斜拉杆座 | |
CN206676543U (zh) | 一种湿法电除尘器阴极系统装置 | |
CN207858036U (zh) | 接缝焊接设备 | |
CN103397631B (zh) | H型桩接桩装置及加工方法 | |
CN203842962U (zh) | 一种方管矫形装置 | |
CN206013559U (zh) | 方便提升的框架及采用该框架的垃圾桶 | |
CN208303555U (zh) | 一种工地简易弯板装置 | |
CN202357888U (zh) | 一种汽车仪表板横梁的焊接结构 | |
CN204277282U (zh) | 一种芯片组件焊接工装 | |
CN206941202U (zh) | 一种立式染色机 | |
CN204565603U (zh) | 压力钢管加劲环安装调整校正装置 | |
CN106025808A (zh) | 低压成套开关设备立柱连接三通结构 | |
CN204279662U (zh) | 汽车车厢底架纵梁 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |