CN107964919A - A kind of Channel slope Ecosystem restoration system - Google Patents
A kind of Channel slope Ecosystem restoration system Download PDFInfo
- Publication number
- CN107964919A CN107964919A CN201710730440.6A CN201710730440A CN107964919A CN 107964919 A CN107964919 A CN 107964919A CN 201710730440 A CN201710730440 A CN 201710730440A CN 107964919 A CN107964919 A CN 107964919A
- Authority
- CN
- China
- Prior art keywords
- layer
- channel slope
- restoration system
- plant
- ecosystem restoration
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G17/00—Cultivation of hops, vines, fruit trees, or like trees
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
- E02B3/14—Preformed blocks or slabs for forming essentially continuous surfaces; Arrangements thereof
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/40—Protecting water resources
- Y02A20/402—River restoration
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Botany (AREA)
- Environmental Sciences (AREA)
- Revetment (AREA)
Abstract
The present invention relates to a kind of Channel slope Ecosystem restoration system, clay layer, sand stone layer, soil layer, organic horizon and vegetation plantation layer including being successively set on Channel slope surface, vegetation plantation layer includes multiple trapezoidal concrete segments, building block hole is equipped with trapezoidal concrete segment, the compost containing organic matter is loaded in building block hole and plants vegetation, vegetation plantation layer is sequentially arranged drought-enduring plant layer, flooded plant layer, watercress layer and water plant layer from top to bottom.The present invention uses hierarchical design thinking, it is arranged in parallel clay layer, sand stone layer, soil layer and organic horizon along Channel slope respectively according to difference in functionality, along vegetation plantation layer longitudinal direction variety classes vegetation is designed according to plant growth characteristics, achieve the purpose that to repair river, significant effect, and it is simple in structure, cost is low, is easy to be widely applied.
Description
Technical field
The present invention relates to ecological restoration technical field, and in particular to a kind of Channel slope Ecosystem restoration system.
Background technology
At present, China's rivers, lake and reservoir are generally contaminated, and are still being developed rapidly.Water pollution exacerbates water money
Source shortage, directly threatens the safety of drinking water and the health of the people, influences industrial and agricultural production and Crop securify.According to preliminary
Estimation, economic loss caused by water pollution is about the 1.5%~3% of gross national product.Water pollution become no less than big flood,
Drought even more serious disaster.Water prevention and cure of pollution have become the critical support of national economy sustainable development.
Particularly, urban river is a flowing in urban landscape, is closely connected with life of urban resident environment, and phase
To open Complex Ecological Systems.River to external source pollution with self certain purification recovery capability, but urban river by
Large number of in littoral resident, the production and living of resident cause tremendous influence to urban river, cause urban river ecological functions
Degenerate and lose continuous, black smelly, mosquito occur and grow, the function as urban landscape is not only lost, on the contrary as city
Burden, disturbs the normal production and living of resident, influences city reputation.
In the past few years, many beneficial explorations have been carried out in terms of the protection and reparation of river ecosystem.Pass through river
The measures such as the water and soil conservation in source, water transfer, wetland reparation, make some regional ecosystems be improved significantly.
Chinese patent 201610286970.1 discloses a kind of slope ecological repair system and method, slope ecological reparation system
System includes fill-type ecological blanket and the Seed Layer in the fill-type ecological blanket, the laying that the fill-type ecological blanket is fixed
In in slope surface, and the fill-type ecological blanket includes multiple filling bags being arranged side by side, filling casting resin in the filling bag.Base
Include S1 in the ecological restoring method of the slope ecological repair system, fill-type ecological blanket is laid with slope surface, and use anchor pole
It is fixed;S2, casting resin is filled into fill-type ecological blanket;S3, Seed Layer is set in the fill-type ecological blanket for completing filling, should
Slope ecological repair system and method construction technology are relatively simple, greatly reduce the cost of construction, are beneficial on large area slope
Promoted and applied in the restoration of the ecosystem work in face.But the repair system for repair Channel slope effect be not very significantly, it is right
Sewage disposal in river is acted on than relatively limited.
The content of the invention
The purpose of the present invention is exactly to solve the above-mentioned problems and provides a kind of Channel slope Ecosystem restoration system.
The purpose of the present invention is achieved through the following technical solutions:
A kind of Channel slope Ecosystem restoration system, including it is successively set on clay layer, sand stone layer, the soil on Channel slope surface
Matter layer, organic horizon and vegetation plantation layer, vegetation plantation layer include multiple trapezoidal concrete segments, and described is trapezoidal
Building block hole is equipped with concrete segment, the compost containing organic matter is loaded in the building block hole and plants vegetation, the plant
Drought-enduring plant layer, flooded plant layer, watercress layer and water plant layer are sequentially arranged by plantation layer from top to bottom.
Further, the trapezoidal concrete segment is made by stone and concrete, the stone and concrete
Mass ratio is 1:0.8, gap is very big, maintains preferable permeability and water penetration.
Further, the long side of the trapezoidal concrete segment upwardly, downwards, advise short side by trapezoidal concrete segment
Organic surface is then arranged in, a building block in irregular shape is reserved in each plane of trapezoidal concrete segment
Hole, plant grow out from the cap blocks hole of trapezoidal concrete segment.
Further, hole is formed between the trapezoidal concrete segment, on the one hand the effect of hole is that creation is aerobic
Environment, necessary oxygen is provided for the root system of plant;On the other hand flood current and rainwash are slowed down to Channel slope
Souring, plays the protective effect to Channel slope.
Further, the top of the clay layer, sand stone layer, soil layer and organic horizon covers a layer thickness and is
The overburden layer of 20-30cm, the overburden layer is concordant with the top of Channel slope, the component of overburden layer and the soil property of Channel slope
Component is identical, is effectively covered clay layer, sand stone layer, soil layer, organic horizon and concrete segment layer by overburden layer,
During rainy season, rainwater can enter clay layer, sand stone layer, soil layer, organic horizon and the concrete segment of lower section through overburden layer
Layer;During dry season, overburden layer can also prevent to store water in clay layer, sand stone layer, soil layer, organic horizon and concrete segment layer
The evaporation divided, moisture necessary to preserving growth for plant.
Further, the thickness of the clay layer is 20-30cm, and clay layer act as holding river water, prevents
The a large amount of seepage flow of streamflow.
Further, the thickness of the sand stone layer is 40-50cm, is made of the sandstone that average grain diameter is 3-5cm, sandstone
The main function of layer is preserves moisture, moisture necessary to providing growth for the plant in trapezoidal concrete segment.
Further, the thickness of the soil layer is 40-50cm, and the main component of soil layer is required for plant growth
Normal soil property, for plant root growth provide soil property basis.
Further, the thickness of the organic horizon is 10-20cm, organic horizon according to plant growth characteristics choose with
The best organic matter of plant growth, the main function of organic horizon is, to fertilizer, to be attracted trapezoidal mixed using root system of plant
The root system of plant is grown to Channel slope direction in solidifying earth building blocks, while provides nutrition foundation for the fast-growth of plant.
Further, pedestal is set between the river bed and last trapezoidal concrete segment of row of Channel slope bottom,
The pedestal is made of concrete or stone, and the main function of pedestal is to prevent current scour river bed from causing shadow to concrete segment layer
Ring.
Difference of the invention according to drought and waterlogging season river water level line height, in the trapezoidal concrete segment of Channel slope,
Different plants is planted, in the trapezoidal concrete segment of bottom close to river bed, due to being flooded by current throughout the year, mainly plants water
Plant;In the top of water plant, according to drought and waterlogging season river water level line altitudes, plantation happiness water is planted successively from bottom to top
Thing, flooded plant and drought-enduring plant.During the rainy day, it is not only able to play the souring for slowing down flood current and rainwash, and
And can the rainwash higher to pollutional load play a role in filtering.
Compared with prior art, the present invention is recovering river according to " back to nature " and the river harnessing ideas of " people-oriented "
Meet that resident's activity need carries out control and plan and design to river while original natural functions, form a kind of Channel slope life
State repair system, the system use hierarchical design thinking, are arranged in parallel clay layer, sand along Channel slope successively according to soil function
Rock layers, soil layer and organic horizon, plant layer longitudinal design variety classes plant along vegetation according to plant characteristic, reach and repair river
The purpose of road slope ecological, significant effect, and system structure is simple, cost is low, is easy to be widely applied.
Brief description of the drawings
Fig. 1 is the structure diagram of present system;
Fig. 2 is the structure diagram of the trapezoidal concrete segment of the present invention;
In figure:It is Channel slope 1, clay layer 2, sand stone layer 3, soil layer 4, organic horizon 5, overburden layer 6, building block hole 7, drought-enduring
Layer of plants 8, flooded plant layer 9, trapezoidal concrete segment 10, watercress layer 11, hole 12, water plant layer 13, pedestal 14,
River bed 15.
Embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.
Embodiment 1
A kind of Channel slope Ecosystem restoration system, as shown in Figure 1, the clay including being successively set on 1 surface of Channel slope
Layer 2, sand stone layer 3, soil layer 4, organic horizon 5 and vegetation plantation layer, vegetation plantation layer include multiple trapezoidal concrete segments
10, trapezoidal concrete segment 10 is interior to be equipped with building block hole 7, and compost of the filling containing organic matter simultaneously plants vegetation, vegetation in building block hole 7
Plantation layer is sequentially arranged drought-enduring plant layer 8, flooded plant layer 9, watercress layer 11 and water plant layer 13 from top to bottom.
Such as Fig. 2, trapezoidal concrete segment 10 is made by stone and concrete, and the mass ratio of stone and concrete is 1:
0.8, upwardly, downwards, trapezoidal concrete segment 10 is regularly arranged in organic matter for short side for the long side of trapezoidal concrete segment 10
Layer surface, vegetation grow out from the cap blocks hole 7 of trapezoidal concrete segment 10, are formed between trapezoidal concrete segment 10
Hole 12, clay layer 2, sand stone layer 3, the top of soil layer 4 and organic horizon 5 cover the earthing that a layer thickness is 20-30cm
Layer 6, overburden layer 6 is concordant with the top of Channel slope 1, and the thickness of clay layer 2 is 20-30cm, and the thickness of sand stone layer 3 is 40-
50cm, is made of, the thickness of soil layer 4 is 40-50cm, and the thickness of organic horizon 5 is 10- the sandstone that average grain diameter is 3-5cm
Last is arranged pedestal 14 is set between trapezoidal concrete segment 10 for 20cm, river bed 15 and 1 bottom of Channel slope, the pedestal 14 by
Concrete or stone composition.
Trapezoidal concrete segment gap is larger, maintains preferable permeability and water penetration.On the one hand the effect of hole is
Aerobic environment is created, necessary oxygen is provided for the root system of plant;On the other hand it is to slow down flood current and rainwash to river
The souring of road side slope, plays the protective effect to Channel slope.The component of overburden layer and the soil property component phase of Channel slope
Together, clay layer, sand stone layer, soil layer, organic horizon and concrete segment layer are effectively covered by overburden layer, rainy season
When, rainwater can enter clay layer, sand stone layer, soil layer, organic horizon and the concrete segment layer of lower section through overburden layer;Drought
Ji Shi, overburden layer can also prevent to store moisture in clay layer, sand stone layer, soil layer, organic horizon and concrete segment layer
Evaporation, moisture necessary to preserving growth for plant.Clay layer act as holding river water, prevents streamflow from largely oozing
Stream, the main function of sand stone layer is preserves moisture, moisture necessary to providing growth for the plant in trapezoidal concrete segment, soil
The main component of matter layer is the required normal soil property of plant growth, and soil property basis, organic matter are provided for the root growth of plant
The main function of layer is to fertilizer, to attract the root system of plant in trapezoidal concrete segment using root system of plant to Channel slope
Direction is grown, while provides nutrition foundation for the fast-growth of plant, and pedestal is made of concrete or stone, the main work of pedestal
With being to prevent current scour river bed from being impacted to concrete segment layer.
The system is according to the difference of drought and waterlogging season river water level line height, in the trapezoidal concrete segment of Channel slope,
Different plants is planted, in the trapezoidal concrete segment of bottom close to river bed, due to being flooded by current throughout the year, mainly plants water
Plant;In the top of water plant, according to drought and waterlogging season river water level line altitudes, plantation happiness water is planted successively from bottom to top
Thing, flooded plant and drought-enduring plant.During the rainy day, it is not only able to play the souring for slowing down flood current and rainwash, and
And can the rainwash higher to pollutional load play a role in filtering.
Claims (10)
- A kind of 1. Channel slope Ecosystem restoration system, it is characterised in that the clay including being successively set on Channel slope (1) surface Layer (2), sand stone layer (3), soil layer (4), organic horizon (5) and vegetation plantation layer, vegetation plantation layer include multiple Trapezoidal concrete segment (10), the trapezoidal concrete segment (10) is interior to be equipped with building block hole (7), in the building block hole (7) Compost of the filling containing organic matter simultaneously plants vegetation, vegetation plantation layer be sequentially arranged from top to bottom drought-enduring plant layer (8), Flooded plant layer (9), watercress layer (11) and water plant layer (13).
- A kind of 2. Channel slope Ecosystem restoration system according to claim 1, it is characterised in that the trapezoidal concrete Building block (10) is made by stone and concrete, and the mass ratio of the stone and concrete is 1:0.8.
- A kind of 3. Channel slope Ecosystem restoration system according to claim 2, it is characterised in that the trapezoidal concrete Upwardly, downwards, trapezoidal concrete segment (10) is regularly arranged in organic surface, described for short side for the long side of building block (10) Vegetation grows out from the cap blocks hole (7) of trapezoidal concrete segment (10).
- A kind of 4. Channel slope Ecosystem restoration system according to claim 3, it is characterised in that the trapezoidal concrete Hole (12) is formed between building block (10).
- A kind of 5. Channel slope Ecosystem restoration system according to claim 1, it is characterised in that the clay layer (2), The top of sand stone layer (3), soil layer (4) and organic horizon (5) covers the overburden layer (6) that a layer thickness is 20-30cm, described Overburden layer (6) it is concordant with the top of Channel slope (1).
- A kind of 6. Channel slope Ecosystem restoration system according to claim 1, it is characterised in that the clay layer (2) Thickness be 20-30cm.
- A kind of 7. Channel slope Ecosystem restoration system according to claim 1, it is characterised in that the sand stone layer (3) Thickness be 40-50cm, by average grain diameter be 3-5cm sandstone form.
- A kind of 8. Channel slope Ecosystem restoration system according to claim 1, it is characterised in that the soil layer (4) Thickness be 40-50cm.
- A kind of 9. Channel slope Ecosystem restoration system according to claim 1, it is characterised in that the organic horizon (5) thickness is 10-20cm.
- A kind of 10. Channel slope Ecosystem restoration system according to claim 1, it is characterised in that the river bed (15) Pedestal (14) is set between last trapezoidal concrete segment (10) of row of Channel slope (1) bottom, the pedestal (14) is by coagulation Soil or stone composition.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710730440.6A CN107964919A (en) | 2017-08-23 | 2017-08-23 | A kind of Channel slope Ecosystem restoration system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710730440.6A CN107964919A (en) | 2017-08-23 | 2017-08-23 | A kind of Channel slope Ecosystem restoration system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107964919A true CN107964919A (en) | 2018-04-27 |
Family
ID=61996685
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710730440.6A Pending CN107964919A (en) | 2017-08-23 | 2017-08-23 | A kind of Channel slope Ecosystem restoration system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107964919A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108755715A (en) * | 2018-06-25 | 2018-11-06 | 云南今禹生态工程咨询有限公司 | Water and soil conservation ecological revetment |
CN109328680A (en) * | 2018-09-27 | 2019-02-15 | 仲恺农业工程学院 | Soil ecological ditch construction method |
CN110106826A (en) * | 2019-04-18 | 2019-08-09 | 重庆交通大学 | River bed microorganism grouting ecological anti-seepage system and its construction method |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3073379U (en) * | 2000-05-19 | 2000-11-24 | 株式会社荒川企業 | Seawall for greening and planting |
CN2873888Y (en) * | 2006-02-11 | 2007-02-28 | 襄樊学院 | Side slope protection afforestation layer structure |
CN202509507U (en) * | 2012-02-29 | 2012-10-31 | 江苏明睿科技实业有限公司 | Concrete slope protection building block |
CN203684237U (en) * | 2013-09-24 | 2014-07-02 | 中国十七冶集团有限公司 | Ecological protection structure of slope vegetation |
CN104480951A (en) * | 2014-11-17 | 2015-04-01 | 任立 | Method for ecologically softening hard revetments |
CN205171530U (en) * | 2015-10-13 | 2016-04-20 | 同济大学 | Add multi -level ecological bank protection of muscle mike pad type |
CN206128089U (en) * | 2016-08-31 | 2017-04-26 | 浙江省隧道工程公司 | Rock matter side slope ecological concrete slope protection structure |
CN207392133U (en) * | 2017-08-23 | 2018-05-22 | 同济大学 | A kind of Channel slope Ecosystem restoration system |
-
2017
- 2017-08-23 CN CN201710730440.6A patent/CN107964919A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3073379U (en) * | 2000-05-19 | 2000-11-24 | 株式会社荒川企業 | Seawall for greening and planting |
CN2873888Y (en) * | 2006-02-11 | 2007-02-28 | 襄樊学院 | Side slope protection afforestation layer structure |
CN202509507U (en) * | 2012-02-29 | 2012-10-31 | 江苏明睿科技实业有限公司 | Concrete slope protection building block |
CN203684237U (en) * | 2013-09-24 | 2014-07-02 | 中国十七冶集团有限公司 | Ecological protection structure of slope vegetation |
CN104480951A (en) * | 2014-11-17 | 2015-04-01 | 任立 | Method for ecologically softening hard revetments |
CN205171530U (en) * | 2015-10-13 | 2016-04-20 | 同济大学 | Add multi -level ecological bank protection of muscle mike pad type |
CN206128089U (en) * | 2016-08-31 | 2017-04-26 | 浙江省隧道工程公司 | Rock matter side slope ecological concrete slope protection structure |
CN207392133U (en) * | 2017-08-23 | 2018-05-22 | 同济大学 | A kind of Channel slope Ecosystem restoration system |
Non-Patent Citations (1)
Title |
---|
江源: "《道路生态影响与公路边坡植被恢复生态研究》", 中国环境科学出版社, pages: 157 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108755715A (en) * | 2018-06-25 | 2018-11-06 | 云南今禹生态工程咨询有限公司 | Water and soil conservation ecological revetment |
CN108755715B (en) * | 2018-06-25 | 2023-12-15 | 云南今禹生态工程咨询有限公司 | Ecological slope protection for water and soil conservation |
CN109328680A (en) * | 2018-09-27 | 2019-02-15 | 仲恺农业工程学院 | Soil ecological ditch construction method |
CN109328680B (en) * | 2018-09-27 | 2021-06-08 | 仲恺农业工程学院 | Soil ecological ditch construction method |
CN110106826A (en) * | 2019-04-18 | 2019-08-09 | 重庆交通大学 | River bed microorganism grouting ecological anti-seepage system and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103583172B (en) | A kind of arid arid area pattern of farming and implantation methods thereof | |
CN201495549U (en) | Abandoned automobile tire and packing composite ecological protecting slope | |
CN204741964U (en) | Rainwater garden | |
CN103548519A (en) | Vegetation restoration structure of discarded metal mine and vegetation restoration method of discarded metal mine | |
CN111919621B (en) | Cold region habitat recovery-based street tree pool structure and manufacturing method | |
CN206089200U (en) | Farmland benthophyte ecological ditch canal | |
CN105986566B (en) | Multifunctional ecological management method for cavernous body | |
CN110235682B (en) | Movable sand fixation unit and sand fixation method | |
CN107964919A (en) | A kind of Channel slope Ecosystem restoration system | |
CN109267626A (en) | A kind of landscape ecology rainwater recycle utilizes system | |
CN207392133U (en) | A kind of Channel slope Ecosystem restoration system | |
CN105123318A (en) | Ecological network ground weir type channel structure | |
CN104186178A (en) | Economical seashore saline soil greening quick planting method | |
CN107905208B (en) | Water and soil conservation structure for accelerating rock weathering in stony desertification region and construction method thereof | |
CN204875850U (en) | Rainwater garden | |
CN211896276U (en) | Ecological riparian zone combining river water purification and slope greenbelt maintenance | |
CN210559648U (en) | Step multi-section undercurrent artificial wet land treating pool | |
CN107691166A (en) | The ecological recovery planting matrix and multiple method for green of refuse landfill sealing | |
CN210459442U (en) | Sponge urban greening road | |
CN105756015B (en) | Method for restoring biodiversity dynamic landscape ecological composite system | |
CN112482411A (en) | River course ecological slope protection and construction method thereof | |
CN204645061U (en) | Dam and block sand ship shape traverse furrow in hillside fields | |
CN207739092U (en) | Landscape ecology Pavement Construction | |
CN203492484U (en) | Plantation structure for arid desertification area | |
CN207110011U (en) | Storm-water system is built in a kind of low influence under overhead section of road middle orbit traffic |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |