CN107939400A - A kind of fully-mechanized mining equipment installation method - Google Patents
A kind of fully-mechanized mining equipment installation method Download PDFInfo
- Publication number
- CN107939400A CN107939400A CN201711204104.4A CN201711204104A CN107939400A CN 107939400 A CN107939400 A CN 107939400A CN 201711204104 A CN201711204104 A CN 201711204104A CN 107939400 A CN107939400 A CN 107939400A
- Authority
- CN
- China
- Prior art keywords
- chute
- fully
- crane
- mechanized mining
- hydraulic support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 title claims abstract description 29
- 238000005065 mining Methods 0.000 title claims abstract description 22
- 238000000034 method Methods 0.000 title claims abstract description 19
- 239000003245 coal Substances 0.000 claims abstract description 10
- 238000011900 installation process Methods 0.000 abstract description 3
- 230000000694 effects Effects 0.000 abstract description 2
- 239000000178 monomer Substances 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Remote Sensing (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
The present invention provides a kind of installation method of fully-mechanized mining equipment, in coal wall side, crane is set, the component and hydraulic support of scratch board conveyor, and assembly chute while hydraulic support is installed are transported by old man's siding track, so as to complete the installation that fully-mechanized mining working is mined with support apparatus.A kind of the advantages of installation method of fully-mechanized mining equipment provided by the invention, is:Installation process is simplified, avoids and is laid with track in coal wall side, reduces workload, personnel's input is reduced, improves production efficiency, there is good promotion effect.
Description
Technical field
The present invention relates to coal-mine integrated-mining equipment technical field, more particularly to a kind of fully-mechanized mining equipment installation method.
Background technology
Coal mine fully-mechanized mining working needs to install the fully-mechanized mining equipments such as scratch board conveyor before exploitation, in transhipment assembling scraper plate transport
During machine, first to fix chain-drive section and then a section installation chute, and the transhipment of chain-drive section and chute all by
Coal wall side is laid with track and is transported to mount point so as to being installed, and in chute installation process will also to the track of coal wall side into
Row is removed, so as to increase labor intensity, influences work efficiency.In addition, it is necessary to peace during scratch board conveyor is installed
The place filled is carried out for canopy to carry out advance support, and hydraulic support to the back of fully-mechanized mining working using hydraulic support
Assembling often to take many times, and the installation speed of hydraulic support causes the group of hydraulic support far faster than assembling speed
During dress, the working time of installation exercise personnel wastes, so as to influence production efficiency, causes man-hour to waste.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of efficient fully-mechanized mining equipment installation method.
The present invention is to solve above-mentioned technical problem by the following technical programs:
A kind of fully-mechanized mining equipment installation method, comprises the following steps:
1) by old man's siding track by crane transfer to fully-mechanized mining working mount point, crane is then fixed on coal wall
Side;
2) chain-drive section is installed on by the chain-drive section for transporting scratch board conveyor by old man's siding track to mount point with crane
Mount point, and head modified line groove is installed at the same time;
3) hydraulic support is transported to chain-drive section by old man's siding track, is carried out using hydraulic support for canopy to chain-drive section top plate
Carry out supporting;
4) using the time of hydraulic support assembling, chute is transported to mount point by old man's siding track, then uses lifting
Machine splices scratch board conveyor chute;
5) repeat step 3, supporting is carried out using hydraulic support to the back on chute;
6) crane is drawn to chute installation extending direction using winch and moved;
7) repeat step 4,5,6, until chute installs;
8) rail transfer coalcutter is utilized, and is installed on by crane on scratch board conveyor, then utilizes same side
Method installs tail modified line groove, and repeat step 3 carries out supporting to back.
Preferably, carry out replacing canopy operation using three hydraulic supports in step 3.
Preferably, installation two saves chute every time in step 4.
Preferably, often saved in step 5 and be correspondingly arranged on a hydraulic support above chute.
Preferably, the drawing shifting distance of crane is identical with the mounting distance of chute in step 4 in step 6.
A kind of the advantages of installation method of fully-mechanized mining equipment provided by the invention, is:Installation process is simplified, is avoided
Coal wall side is laid with track, reduces workload, reduces personnel's input, improves production efficiency, have good promotion effect.
Brief description of the drawings
Fig. 1 is the scheme of installation of the chain-drive section that the embodiment of the present invention is provided and hydraulic support;
Fig. 2 is the scheme of installation for the chute that the embodiment of the present invention is provided.
Embodiment
For the object, technical solutions and advantages of the present invention are more clearly understood, below in conjunction with specific embodiment, and reference
Attached drawing, the present invention is described in further detail.
The present invention provides a kind of fully-mechanized mining equipment installation method, comprise the following steps:
1) crane 2 is transported to fully-mechanized mining working mount point by being arranged at the track 1 of old man side, then by crane
2 are fixed on coal wall side;
2) chain-drive section 3 for transporting scratch board conveyor by old man's siding track 1 is pacified chain-drive section 3 with crane 2 to mount point
Mounted in mount point, and other necessary structures such as head modified line groove are installed at the same time;
3) hydraulic support 4 is transported to chain-drive section by old man's siding track 1, is carried out using hydraulic support 4 for canopy to chain-drive section 3
Top plate carries out supporting (with reference to figure 1);
4) time assembled using hydraulic support 4, chute 5 is transported to mount point by old man's siding track 1, is then used
Heavy-duty machine 2 splices the chute 5 of scratch board conveyor (with reference to figure 2);
5) repeat step 3, supporting is carried out using hydraulic support 4 to the back on chute 5;
6) crane 2 is installed into extending direction to chute 5 using winch and draws shifting;
7) repeat step 4,5,6, until chute 5 installs;
8) coalcutter is transported using track 1, and is installed on by crane 2 on scratch board conveyor, then utilize crane 2
Tail modified line groove is installed, so that by the assembled completion of scratch board conveyor, repeat step 3 carries out supporting to back.
Above-mentioned installation method, using being arranged on the crane 2 of coal wall side to transporting the machine to come by old man's siding track 1
Head 3, chute 5, head becomes wire casing, tail becomes wire casing and coalcutter carries out assembled so as to obtain scratch board conveyor, while
The parts of the hydraulic support 4 of scattered transport can be transported from track 1, rail is utilized while hydraulic support 4 carries out assembly
Road 1 is beaten fortune chute 5 and is installed, and is carried out so as to ensure that the installation of hydraulic support 4 is synchronous with the installment work of scratch board conveyor,
And the working time is made full use of, improve work efficiency.
Replace canopy operation using three hydraulic supports 4 in above-mentioned steps 3, ensure the steady of back on chain-drive section 3
It is fixed.
In preferred embodiment, using the often section of installation two chute 5, canopy operation is once replaced in progress, and two hydraulic pressure branch are fixed in assembling
Frame 4, then pulls back and moves a crane 2, can so ensure the installation site of chute 5 crane 2 working range it
It is interior, while work efficiency can be improved again, the drawing for reducing crane 2 moves number.
All it is the side using manual demolition before in addition, it is necessary to dismantle the monomer of original supporting when for canopy operation
Method, monomer after the method for the invention being supplied to, can be taken out by crane 2, reduce labor intensity.
Particular embodiments described above, has carried out the purpose of the present invention, technical solution and beneficial effect further in detail
Describe in detail bright, it should be understood that the foregoing is merely the specific embodiment of the present invention, be not intended to limit the invention, not
It is any modification that those of ordinary skill in the art make the present invention, equivalent on the premise of departing from the spirit and principles in the present invention
Replace, improve etc., it should all fall within the protection domain that claims of the present invention determines.
Claims (5)
- A kind of 1. fully-mechanized mining equipment installation method, it is characterised in that:Comprise the following steps:1) then crane is fixed on by crane transfer to fully-mechanized mining working mount point by coal wall side by old man's siding track;2) chain-drive section of scratch board conveyor is transported by old man's siding track to mount point, chain-drive section is installed on installation with crane Point, and head modified line groove is installed at the same time;3) hydraulic support is transported to chain-drive section by old man's siding track, using hydraulic support carry out chain-drive section top plate for canopy Supporting;4) time assembled using hydraulic support, chute is transported to mount point by old man's siding track, then will with crane Scratch board conveyor chute splices;5) repeat step 3, supporting is carried out using hydraulic support to the back on chute;6) crane is drawn to chute installation extending direction using winch and moved;7) repeat step 4,5,6, until chute installs;8) rail transfer coalcutter is utilized, and is installed on by crane on scratch board conveyor, is then pacified using same method Tail of installing becomes wire casing, and repeat step 3 carries out supporting to back.
- A kind of 2. fully-mechanized mining equipment installation method according to claim 1, it is characterised in that:Three hydraulic pressure are used in step 3 Stent carries out replacing canopy operation.
- A kind of 3. fully-mechanized mining equipment installation method according to claim 1, it is characterised in that:Installation two saves every time in step 4 Chute.
- A kind of 4. fully-mechanized mining equipment installation method according to claim 1, it is characterised in that:Often saved in step 5 above chute It is correspondingly arranged on a hydraulic support.
- A kind of 5. fully-mechanized mining equipment installation method according to claim 1, it is characterised in that:The drawing of crane moves in step 6 Distance is identical with the mounting distance of chute in step 4.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711204104.4A CN107939400A (en) | 2017-11-27 | 2017-11-27 | A kind of fully-mechanized mining equipment installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711204104.4A CN107939400A (en) | 2017-11-27 | 2017-11-27 | A kind of fully-mechanized mining equipment installation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107939400A true CN107939400A (en) | 2018-04-20 |
Family
ID=61949920
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711204104.4A Pending CN107939400A (en) | 2017-11-27 | 2017-11-27 | A kind of fully-mechanized mining equipment installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107939400A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2479213Y (en) * | 2000-12-29 | 2002-02-27 | 煤炭科学研究总院太原分院 | Self-moving device for bridge-type elevating conveyor |
RU2258139C1 (en) * | 2004-05-06 | 2005-08-10 | Брижак Андрей Олегович | Method for mine field of coal bed excavation |
RU2273733C1 (en) * | 2004-10-08 | 2006-04-10 | Институт угля и углехимии Сибирского отделения Российской Академии Наук (ИУУ СО РАН) | Method for flat-laying coal seam development |
CN202265287U (en) * | 2011-08-08 | 2012-06-06 | 淮南矿业(集团)有限责任公司 | Tail rope hanging device and multi-rope frication wheel type vertical shaft lifting system |
-
2017
- 2017-11-27 CN CN201711204104.4A patent/CN107939400A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2479213Y (en) * | 2000-12-29 | 2002-02-27 | 煤炭科学研究总院太原分院 | Self-moving device for bridge-type elevating conveyor |
RU2258139C1 (en) * | 2004-05-06 | 2005-08-10 | Брижак Андрей Олегович | Method for mine field of coal bed excavation |
RU2273733C1 (en) * | 2004-10-08 | 2006-04-10 | Институт угля и углехимии Сибирского отделения Российской Академии Наук (ИУУ СО РАН) | Method for flat-laying coal seam development |
CN202265287U (en) * | 2011-08-08 | 2012-06-06 | 淮南矿业(集团)有限责任公司 | Tail rope hanging device and multi-rope frication wheel type vertical shaft lifting system |
Non-Patent Citations (2)
Title |
---|
张家锁: "大采高综采工作面快速搬家安装实践", 《煤矿安全》 * |
李金兵等: "综采工作面机械化快速安装技术", 《煤矿机械》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104564050B (en) | Equipment for heading and anchoring parallel operation construction | |
CN101349159B (en) | Method of single channel railless plastic core-rubber-tire vehicle back withdrawing fully-mechanized mining working face | |
CN102678151B (en) | Fully-mechanized excavating self-moving type temporary support system and technological method thereof | |
CN109441459B (en) | Earth pressure balance type shield split starting side unearthing construction method | |
CN104481547A (en) | Method for quickly tunneling shed type supporting roadway | |
CN102418525B (en) | Soft coal seam long-wall high-mining-height comprehensive mechanized coal mining end mining method | |
CN103867223A (en) | Hydraulic supporting device of suspended top beams for roadways in shed | |
CN111255455A (en) | Non-divided mining area, non-entry driving and non-pillar mining and construction method for coal mine field | |
CN104389605B (en) | A kind of coal-face intensive steel cord shielding withdraws method | |
CN114542153A (en) | Mounting and dismounting device and mounting and dismounting method for mining hydraulic support | |
CN107939400A (en) | A kind of fully-mechanized mining equipment installation method | |
CN104329117B (en) | Installation method of comprehensive mechanized filling, coal mining and open-off cutting equipment | |
CN205169563U (en) | Chain scraper conveyor | |
CN205076676U (en) | Single track hanger rail way linkage | |
CN202578740U (en) | Drivage staggered type support device | |
CN105971653B (en) | More long step pitch hydraulic pressure of shield support withdraw method from shifting crossbeam and more shield supports | |
CN104531931A (en) | Method for mounting lower dedusting pipeline of blast furnace tapping field | |
CN204476407U (en) | A kind of pick anchor parallel operations construction equipment | |
CN204984453U (en) | Hydraulic support withdrawing system | |
CN203702212U (en) | Suspension top beam hydraulic supporting device for shed roadway | |
CN104500131A (en) | Transportation system and transportation method for deslagging in inclined shaft construction | |
CN110185458B (en) | Bidirectional shield launching method | |
CN208594948U (en) | Tunnel bottom ash material conveyer | |
CN102168573A (en) | Equipment matching method for fully mechanized mining working surface with large mining height | |
CN112064799A (en) | Rapid construction method for sintering engineering batching chamber |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180420 |