CN107905085A - A kind of pontoon bridge steel construction - Google Patents

A kind of pontoon bridge steel construction Download PDF

Info

Publication number
CN107905085A
CN107905085A CN201711231873.3A CN201711231873A CN107905085A CN 107905085 A CN107905085 A CN 107905085A CN 201711231873 A CN201711231873 A CN 201711231873A CN 107905085 A CN107905085 A CN 107905085A
Authority
CN
China
Prior art keywords
steel column
bridge
water
pontoon bridge
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711231873.3A
Other languages
Chinese (zh)
Inventor
朱兴明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongtai Suming High Speed Steel Products Co Ltd
Original Assignee
Dongtai Suming High Speed Steel Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongtai Suming High Speed Steel Products Co Ltd filed Critical Dongtai Suming High Speed Steel Products Co Ltd
Priority to CN201711231873.3A priority Critical patent/CN107905085A/en
Publication of CN107905085A publication Critical patent/CN107905085A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/14Floating bridges, e.g. pontoon bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/02Alarms for ensuring the safety of persons
    • G08B21/08Alarms for ensuring the safety of persons responsive to the presence of persons in a body of water, e.g. a swimming pool; responsive to an abnormal condition of a body of water

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of pontoon bridge steel construction,Including steel column,The water surface,Iron buoyancy tank and bridge floor,The water surface upper end is equipped with iron buoyancy tank,The iron buoyancy tank is fixedly connected by hinge,The iron buoyancy tank upper end is equipped with crawler belt,Steel pipe is equipped with the crawler belt,The crawler belt upper end is equipped with bridge floor,The bridge floor upper end is equipped with non-slip mat,The bridge floor both sides are equipped with guardrail,The guardrail both ends are equipped with steel column,The steel column upper end is equipped with solar panel,Steel column upper end side is equipped with camera,The steel column is internally provided with infrared sensor,The infrared sensor lower end is equipped with signal projector,The signal projector lower end is equipped with alarm,The alarm lower end is equipped with sound transducer,Pass through the non-slip mat being equipped with bridge floor upper end,Prevent people's walking from easily being slided on pontoon bridge in water,Pass through the infrared sensor being internally provided with steel column,Infrared induction is carried out to the people to walk on pontoon bridge,It is scientific and reasonable for structure,It is safe and convenient to use.

Description

A kind of pontoon bridge steel construction
Technical field
The present invention relates to a kind of pontoon bridge technical field, more particularly, to a kind of pontoon bridge steel construction.
Background technology
Pontoon bridge, refers to and replaces bridge pier with ship or buoyancy tank, the bridge kept afloat.Army is using the military floating of standard equipment spelling group Bridge, then claim the bridge of boats.The historical records of pontoon bridge are early with China.《The Book of Songs is elegant big bright》Record:" go to the bride's home to escort her back to wedding in Weihe, making boat is Beam ", records week text Wang Jichang in B.C. 1184 in Weihe River frame pontoon bridge.At abroad, the big Supreme Beings of Persian empire Ju Lushi are in Christian era Pontoon bridge was built in Mesopotamia within first 537 years.Pontoon bridge can be used for people's row, highway, railway.Its construction is simultaneously uncomplicated, and frame is torn open It is also convenient for, but maintenance cost is high.It usually can be used to emergency disaster relief or be used as provisional means of transportation, wartime can be used to ensure army The military pontoon bridge of rivers is run through, to increase its mobility, self-propelled is made in common light metal.
But existing pontoon bridge is complicated, function is single, is only used for the provisional traffic of people, walks in people During pontoon bridge, if imprudence is fallen in water, and surrounding nobody may result in situation about cannot succour in time when noticing, Cause greatly to injure not only bad for the safety of people, and to people's psychology.
The content of the invention
The technical problem to be solved in the present invention is overcome the defects of existing, there is provided a kind of pontoon bridge steel construction, by Non-slip mat that bridge floor upper end is equipped with and there is provided camera and infrared sensor, so as to solve the above problems.
To achieve the above object, the present invention provides following technical solution:A kind of pontoon bridge steel construction, including steel column, water Face, iron buoyancy tank and bridge floor, the water surface upper end are equipped with iron buoyancy tank, and the iron buoyancy tank is fixedly connected by hinge, the iron buoyancy tank Upper end is equipped with crawler belt, and steel pipe is equipped with the crawler belt, and the crawler belt upper end is equipped with bridge floor, and the bridge floor upper end is equipped with non-slip mat, The bridge floor both sides are equipped with guardrail, and the guardrail both ends are equipped with steel column, and the steel column upper end is equipped with solar panel, institute State steel column upper end side and be equipped with camera, the steel column is internally provided with infrared sensor, and the infrared sensor lower end is equipped with letter Number transmitter, the signal projector lower end are equipped with alarm, and the alarm lower end is equipped with sound transducer, and the sound passes Sensor lower end is equipped with storage battery, and water pump is connected with ultrasonic oscillator by pipeline, and the water tank lower end is equipped with water softener, institute State water softener lower end and be equipped with filter, the filter side is equipped with water inlet, and water tank, water softener, filter, water dispenser go out The mouth of a river is that pipeline connects with water inlet.
As a preferred technical solution of the present invention, the steel column shares two, and is uniformly arranged on guardrail both ends.
As a preferred technical solution of the present invention, the steel column is made of stainless steel material.
As a preferred technical solution of the present invention, the bridge floor is connected with non-slip mat bonding.
As a preferred technical solution of the present invention, the non-slip mat is made of elastomeric material.
As a preferred technical solution of the present invention, the camera is infrared camera.
Compared with prior art, the beneficial effects of the invention are as follows:This kind of pontoon bridge steel construction, by iron buoyancy tank upper end The steel pipe being equipped with the crawler belt and crawler belt being equipped with, easily can move and set up pontoon bridge, by being equipped with bridge floor upper end Non-slip mat, prevent people walking easily slided on pontoon bridge in water, can by the solar panel being equipped with steel column upper end Charged a battery with absorbing solar energy, by the way that there is provided camera, pontoon bridge bridge floor situation can be shot, by inside steel column The infrared sensor being equipped with, carries out infrared induction, by there is provided signal projector, falling in people to the people to walk on pontoon bridge Related personnel is sent a signal to during water, and is alarmed by alarm, by there is provided sound transducer, sensing people's Sound of call for help, it is scientific and reasonable for structure, it is safe and convenient to use, walk pontoon bridge for people's security row and provide a great help.
Brief description of the drawings
Attached drawing is used for providing a further understanding of the present invention, and a part for constitution instruction, the reality with the present invention Apply example to be used to explain the present invention together, be not construed as limiting the invention.In the accompanying drawings:
Fig. 1 is a kind of pontoon bridge steel construction structure diagram of the present invention;
Fig. 2 is steel column internal structure schematic diagram of the present invention;
In figure:1st, solar panel;2nd, guardrail;3rd, steel column;4th, the water surface;5th, iron buoyancy tank;6th, hinge;7th, crawler belt;8th, steel Pipe;9th, bridge floor;10th, non-slip mat;11st, camera;12nd, infrared sensor;13rd, signal projector;14th, alarm;15th, sound passes Sensor;16th, storage battery.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments, is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work Embodiment, belongs to the scope of protection of the invention.
- 2 are please referred to Fig.1, the present invention provides a kind of technical solution:A kind of pontoon bridge steel construction, including steel column 3, the water surface 4th, iron buoyancy tank 5 and bridge floor 9,4 upper end of the water surface are equipped with iron buoyancy tank 5, and iron buoyancy tank 5 is fixedly connected by hinge 6, and 5 upper end of iron buoyancy tank is set There is crawler belt 7, steel pipe 8 is equipped with crawler belt 7, can by the steel pipe 8 being equipped with the crawler belt 7 and crawler belt 7 that 5 upper end of iron buoyancy tank is equipped with Easily to move and set up pontoon bridge, 7 upper end of crawler belt is equipped with bridge floor 9, and 9 upper end of bridge floor is equipped with non-slip mat 10, by bridge The non-slip mat 10 that 9 upper end of face is equipped with, prevents people's walking from easily being slided on pontoon bridge in water, and 9 both sides of bridge floor are equipped with guardrail 2, 2 both ends of guardrail are equipped with steel column 3, and 3 upper end of steel column is equipped with solar panel 1, passes through the solar-electricity being equipped with 3 upper end of steel column Pond plate 1, can absorb solar energy and charge to storage battery 16, and 3 upper end side of steel column is equipped with camera 11, by the way that there is provided camera 11,9 situation of pontoon bridge bridge floor can be shot, steel column 3 is internally provided with infrared sensor 12, infrared by being internally provided with steel column 3 Sensor 12, carries out infrared induction, 12 lower end of infrared sensor is equipped with signal projector 13, signal to the people to walk on pontoon bridge 13 lower end of transmitter is equipped with alarm 14, by the way that there is provided signal projector 13, correlation is sent a signal to when people are overboard Personnel, and alarmed by alarm 14,14 lower end of alarm is equipped with sound transducer 15, by the way that there is provided sound transducer 15, sense the sound of call for help of people, 15 lower end of sound transducer is equipped with storage battery 16.
Steel column 3 shares two, and is uniformly arranged on 2 both ends of guardrail, and steel column 3 is made of stainless steel material, bridge floor 9 with it is anti-skidding The bonding connection of pad 10, non-slip mat 10 is made of elastomeric material, and camera 11 is infrared camera, and water pump and ultrasonic oscillator Connected by pipeline, the water tank lower end is equipped with water softener, and the water softener lower end is equipped with filter, and the filter side is set There is water inlet, and water tank, water softener, filter, water outlet of drinking machine are that pipeline connects with water inlet.
Concrete principle:In use, when people walk on the water on pontoon bridge, non-slip mat 10 prevents people's walking on pontoon bridge Easily slide into water, solar panel 1 absorbs solar energy and charges to storage battery 16, and sound transducer 15 senses the calling for help of people Sound, camera 11 shoot 9 situation of pontoon bridge bridge floor, and infrared sensor 12 carries out infrared induction, signal to the people to walk on pontoon bridge Transmitter 13 sends a signal to related personnel when people are overboard, and is alarmed by alarm 14, and guardrail 2 protects people Will not be overboard.
This kind of pontoon bridge steel construction, by the steel pipe 8 being equipped with the crawler belt 7 and crawler belt 7 that 5 upper end of iron buoyancy tank is equipped with, Pontoon bridge easily can be moved and set up, by the non-slip mat 10 being equipped with 9 upper end of bridge floor, prevents people's walking in pontoon bridge On easily slide into water, by the solar panel 1 being equipped with 3 upper end of steel column, solar energy can be absorbed and filled to storage battery 16 Electricity, by that there is provided camera 11,9 situation of pontoon bridge bridge floor can be shot, pass through the infrared sensor being internally provided with steel column 3 12, infrared induction is carried out to the people to walk on pontoon bridge, by there is provided signal projector 13, signal being sent out when people are overboard Related personnel is given, and is alarmed by alarm 14, by there is provided sound transducer 15, sensing the sound of call for help of people, It is scientific and reasonable for structure, it is safe and convenient to use, walk pontoon bridge for people's security row and provide a great help.
Finally it should be noted that:The foregoing is only a preferred embodiment of the present invention, is not intended to limit the invention, Although the present invention is described in detail with reference to the foregoing embodiments, for those skilled in the art, it still may be used To modify to the technical solution described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic, Within the spirit and principles of the invention, any modification, equivalent replacement, improvement and so on, should be included in the present invention's Within protection domain.

Claims (6)

1. a kind of pontoon bridge steel construction, including steel column (3), the water surface (4), iron buoyancy tank (5) and bridge floor (9), it is characterised in that institute State the water surface (4) upper end and be equipped with iron buoyancy tank (5), the iron buoyancy tank (5) is fixedly connected by hinge (6), iron buoyancy tank (5) upper end It is equipped with steel pipe (8) equipped with crawler belt (7), in the crawler belt (7), crawler belt (7) upper end is equipped with bridge floor (9), on the bridge floor (9) End is equipped with non-slip mat (10), and bridge floor (9) both sides are equipped with guardrail (2), and guardrail (2) both ends are equipped with steel column (3), institute State steel column (3) upper end and be equipped with solar panel (1), steel column (3) the upper end side is equipped with camera (11), the steel column (3) infrared sensor (12) is internally provided with, infrared sensor (12) lower end is equipped with signal projector (13), the signal hair Emitter (13) lower end is equipped with alarm (14), and alarm (14) lower end is equipped with sound transducer (15), the sound sensor Device (15) lower end is equipped with storage battery (16), and water pump is connected with ultrasonic oscillator by pipeline, and the water tank lower end is equipped with soft Hydrophone, the water softener lower end are equipped with filter, and the filter side is equipped with water inlet, and water tank, water softener, filter, Water outlet of drinking machine is that pipeline connects with water inlet.
A kind of 2. pontoon bridge steel construction according to claim 1, it is characterised in that the steel column (3) shares two, and It is uniformly arranged on guardrail (2) both ends.
3. a kind of pontoon bridge steel construction according to claim 1, it is characterised in that the steel column (3) is stainless steel Material is made.
4. a kind of pontoon bridge steel construction according to claim 1, it is characterised in that the bridge floor (9) and non-slip mat (10) bonding connection.
5. a kind of pontoon bridge steel construction according to claim 1, it is characterised in that the non-slip mat (10) is rubber material Material is made.
6. a kind of pontoon bridge steel construction according to claim 1, it is characterised in that the camera (11) is taken the photograph to be infrared As head.
CN201711231873.3A 2017-11-30 2017-11-30 A kind of pontoon bridge steel construction Pending CN107905085A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711231873.3A CN107905085A (en) 2017-11-30 2017-11-30 A kind of pontoon bridge steel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711231873.3A CN107905085A (en) 2017-11-30 2017-11-30 A kind of pontoon bridge steel construction

Publications (1)

Publication Number Publication Date
CN107905085A true CN107905085A (en) 2018-04-13

Family

ID=61849547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711231873.3A Pending CN107905085A (en) 2017-11-30 2017-11-30 A kind of pontoon bridge steel construction

Country Status (1)

Country Link
CN (1) CN107905085A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113417221A (en) * 2021-07-24 2021-09-21 陈忠辉 First-aid device for bridge fracture

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0653616A2 (en) * 1993-11-13 1995-05-17 DORNIER GmbH Device for monitoring the resistance to ageing of structures
CN203128998U (en) * 2013-01-18 2013-08-14 成都鑫赏电子科技有限公司 Temporary floating bridge for construction
CN104134319A (en) * 2014-08-13 2014-11-05 新昌县东茗乡德创机械厂 Reservoir dangerous swimming area monitoring device
CN204706145U (en) * 2015-05-05 2015-10-14 杭州富阳新锐生物科技有限公司 One faces bank early warning and alarming device
CN106043620A (en) * 2016-06-29 2016-10-26 赵小舞 Overwater bearing protection device
CN106530624A (en) * 2016-12-16 2017-03-22 陕西科技大学 Waterborne alarm device and application method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0653616A2 (en) * 1993-11-13 1995-05-17 DORNIER GmbH Device for monitoring the resistance to ageing of structures
CN203128998U (en) * 2013-01-18 2013-08-14 成都鑫赏电子科技有限公司 Temporary floating bridge for construction
CN104134319A (en) * 2014-08-13 2014-11-05 新昌县东茗乡德创机械厂 Reservoir dangerous swimming area monitoring device
CN204706145U (en) * 2015-05-05 2015-10-14 杭州富阳新锐生物科技有限公司 One faces bank early warning and alarming device
CN106043620A (en) * 2016-06-29 2016-10-26 赵小舞 Overwater bearing protection device
CN106530624A (en) * 2016-12-16 2017-03-22 陕西科技大学 Waterborne alarm device and application method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113417221A (en) * 2021-07-24 2021-09-21 陈忠辉 First-aid device for bridge fracture

Similar Documents

Publication Publication Date Title
CN107842007A (en) A kind of tubular Oil sucking device for adsorbed water body greasy dirt
CN107905085A (en) A kind of pontoon bridge steel construction
CN106351477A (en) Swimming pool with adjustable water depth
CN104986310A (en) Deepwater manned submersible and pressure-resistant processing method for submersible components
CN208563244U (en) A kind of assembled floating wharf
CN201816726U (en) Structure of floating type multifunctional refuge harbor
CN207173909U (en) A kind of Novel work floating mat in harbour restricted clearance
CN105369788A (en) Floating type two-layer flexible net trash-holding wave-reducing ecological grid device
CN203844992U (en) Fixed type river lifesaving device
CN202202303U (en) Floating multifunctional anti-tsunami wall structure
CN201943383U (en) Water swimming pool
CN108035325A (en) A kind of Oil sucking device with supporting structure
CN103192961A (en) Natural outdoor bathing place and water bank anti-drowning rescue platform
CN107685831B (en) A kind of cage engineering ship and ship borne type net cage method of construction
CN210353656U (en) Safety schoolbag
CN103010418A (en) Sea villa
CN210262866U (en) Shaft tower protection system
CN208733574U (en) The lifesaving device of channel hardening levee slope
CN203228919U (en) Natural bathing place and water bank drowning-preventive rescue platform
CN202749058U (en) Warning board
CN205636669U (en) Rubber dam for water conservancy
CN205742208U (en) Administer the cement grout bag of submarine pipeline suspended span
CN206888602U (en) A kind of shallow water plot structure of landscape lake
CN104499456A (en) Multifunctional urban yacht marina
CN211368567U (en) Ecological bank protection of hydraulic engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180413