CN205742208U - Administer the cement grout bag of submarine pipeline suspended span - Google Patents

Administer the cement grout bag of submarine pipeline suspended span Download PDF

Info

Publication number
CN205742208U
CN205742208U CN201620444812.XU CN201620444812U CN205742208U CN 205742208 U CN205742208 U CN 205742208U CN 201620444812 U CN201620444812 U CN 201620444812U CN 205742208 U CN205742208 U CN 205742208U
Authority
CN
China
Prior art keywords
basal layer
main part
cement grout
bag
grout bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620444812.XU
Other languages
Chinese (zh)
Inventor
苗春生
张印桐
高原
林守强
宋春娜
黄晓博
王朋飞
叶海宾
陈嬴豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cnooc Shenzhen Ocean Engineering Technology Service Co ltd
Original Assignee
SHENZHEN SEA OIL ENGINEERING UNDERWATER TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN SEA OIL ENGINEERING UNDERWATER TECHNOLOGY CO LTD filed Critical SHENZHEN SEA OIL ENGINEERING UNDERWATER TECHNOLOGY CO LTD
Priority to CN201620444812.XU priority Critical patent/CN205742208U/en
Application granted granted Critical
Publication of CN205742208U publication Critical patent/CN205742208U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of cement grout bag administering submarine pipeline suspended span, including the main part being connected up and down and basal layer;Described main part includes the multiple grout blankets being sequentially connected with from top to bottom;The cross-sectional area of described basal layer is more than the cross-sectional area of described main part;Each described grout blanket is provided with its first internal grouting mouth through, and described basal layer is provided with its second internal grouting mouth through.Cement grout bag of the present utility model, for being supported on below the submarine pipeline of suspended span, form with basal layer and main part, intensity height, Stability Analysis of Structures, safe and reliable, strong adaptability, easy and simple to handle, production technology and precision are controlled, can realize heavy industrialization.

Description

Administer the cement grout bag of submarine pipeline suspended span
Technical field
This utility model relates to Offshore Engineering technical field, particularly relates to a kind of submarine pipeline of administering and hangs Across cement grout bag.
Background technology
Submerged pipeline is after being layed in sea bed surface, for various reasons, inevitably there will be outstanding Across phenomenon, the safety in production of this phenomenon serious threat offshore oil and gas.Therefore, suitable Submarine Pipeline is taked Road suspended span maintenance measure, particularly important for guaranteeing submarine pipeline safe operation during one's term of military service.
Have employed multiple submarine pipeline suspended span preventing and treating and maintenance measure both at home and abroad, the conventional ditching again that has is buried Tube method, landfill cladding process, under water supporting methods, weighting procedure, fall stream promote silt method etc..Wherein, support under water Method is to arrange support support at unsettled section, to reduce the vibration of submarine pipeline, it can prevent suspended piping by In the pipeline break that vortex-induced vibration causes, main method has stub under water to support and underwater grouting two kinds.
Underwater grouting method is a kind of both economical method processing suspended span, can be different to the various depth of waters The suspended span of height forever processes, and therefore suffers from greatly paying close attention to, thus in the last few years, for underwater grouting Technical merit development, the research to cement grout technology increases day by day.
But, it is not enough to the material of the grouting bag that underwater grouting method uses and the research of design structure at present, Intensity and stability are the highest, and kind is single.
Utility model content
The technical problems to be solved in the utility model is, it is provided that a kind of intensity height, Stability Analysis of Structures, safety Administer the cement grout bag of submarine pipeline suspended span reliably.
This utility model solves its technical problem and be the technical scheme is that offer one administers Submarine Pipeline The cement grout bag of road suspended span, including the main part being connected up and down and basal layer;Described main part bag Include the multiple grout blankets being sequentially connected with from top to bottom;The cross-sectional area of described basal layer is more than described main part Cross-sectional area;
Each described grout blanket is provided with its first internal grouting mouth through, and described basal layer is provided with and passes through Its second internal grouting mouth logical.
Preferably, each described grout blanket is additionally provided with its first internal porus excretorius through;Described basis Layer is provided with its second internal porus excretorius through.
Preferably, described first porus excretorius and described first grouting mouth are positioned at the opposite sides of described grout blanket On.
Preferably, described second porus excretorius is positioned on described basal layer the diagonal angle away from described second grouting mouth Place;Or, described second porus excretorius is positioned in the opposite sides of described basal layer with described second grouting mouth.
Preferably, being interval with multiple interlayer in described main part from top to bottom, multiple described interlayers are by institute State main part and be divided into multiple described grout blanket.
Preferably, the geometric center position of described interlayer is additionally provided with the 3rd porus excretorius of up/down perforation.
Preferably, the edge, top at least of described main part is provided with the first sleeve for poling;And/or, At least one lateral edges of described basal layer is provided with the second sleeve for poling.
Preferably, the outer peripheral edge of described main part and/or basal layer is interval with clip.
Preferably, described main part is quadrangular frustum pyramid shaped.
Preferably, described basal layer is flat cube structure.
Preferably, this cement grout bag is geotextile bag.
Cement grout bag of the present utility model, for being supported on below the submarine pipeline of suspended span, by basal layer Coordinate with main part and form, intensity height, Stability Analysis of Structures, safe and reliable, strong adaptability, easy and simple to handle, Production technology and precision are controlled, can realize heavy industrialization.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail, in accompanying drawing:
Fig. 1 is the solid of the cement grout bag administering submarine pipeline suspended span of this utility model one embodiment Structural representation;
Fig. 2 is the side structure schematic diagram of Fig. 1;
Fig. 3 is the cross-sectional view of Fig. 2.
Detailed description of the invention
In order to technical characteristic of the present utility model, purpose and effect are more clearly understood from, existing comparison Accompanying drawing describes detailed description of the invention of the present utility model in detail.
As Figure 1-3, the cement grout administering submarine pipeline suspended span of this utility model one embodiment Bag, it may include the main part 10 being connected up and down and basal layer 20.Main part 10 above basal layer 20, For being supported on the lower section of outstanding submarine pipeline;Basal layer 20 is positioned at below main part 10, and it is transversal Area, more than the cross-sectional area of main part 10, plays the levelling effect in seabed.
Wherein, main part 10 includes the multiple grout blankets 11 being sequentially connected with from top to bottom;Multiple grout blankets 11 are positioned on the center of basal layer 20 with laminated arrangement.
Each grout blanket 11 is provided with its first internal grouting mouth 12 through, cement by pipeline and this One grouting mouth 12 enters in grout blanket 11, is filled with its inside, has some strength to be formed Supporting construction.Can be provided with on each grout blanket 11 two first grouting mouths 12, one as main grouting mouth, Another is as standby grouting mouth.
Its first internal porus excretorius 13 through it is additionally provided with on each grout blanket 11.First porus excretorius 13 has There are the excretory functions such as draining, also there is permeation functions, and penetrate cement mortar when grouting by it Judge the full situation of grouting of grout blanket 11, if stop grouting.
Preferably, in the present embodiment, as in figure 2 it is shown, the first porus excretorius 13 and the first grouting mouth 12 It is positioned in the opposite sides of grout blanket 11.The end face of main part 10 also can be provided with the first porus excretorius 13.
Specifically, being interval with multiple interlayer 14 in main part 10 from top to bottom, multiple interlayers 14 will be main Body 10 is separated into multiple grout blanket 11.
The geometric center position of interlayer 14 is additionally provided with the 3rd porus excretorius 15 of up/down perforation.Neighbouring Two grout blankets 11 can be connected by the 3rd porus excretorius 15.Be positioned at the grout blanket 11 of the bottom also by every Layer 14 is connected with basal layer 20, and by the 3rd porus excretorius 15 on this interlayer 14 and basal layer 20 phase Connection.
The edge, top at least of main part 10 is provided with the first sleeve 16 for poling, to main body after poling Portion 10 shapes, and makes the flexible lateral of main part 10 become rigidity side.Additionally, main part 10 Also it is interval with clip 17 on outer peripheral edge, can be used for lifting by crane, transferring this grouting bag.
In the present embodiment, main part 10 is in quadrangular frustum pyramid shaped.The width of main part 10 is passed the most successively Subtract.The end face of main part 10 is plane.Accordingly, it is designed with fixing at every pair of horns of main part 10 Button 17;The relative two edges of main part 10 are provided with the first sleeve 16, or four edges are designed with first set Cylinder 16.
Basal layer 20 is positioned at bottom in this grouting bag, for levelling and be positioned at sea bed face.This basis Layer 20 is provided with its second internal grouting mouth 21 through, and cement is by pipeline and this second grouting mouth 21 Enter in basal layer 20, its inside is filled with, have bottom the support of some strength to be formed.
Can be provided with on basal layer 20 two second grouting mouths 21, one as main grouting mouth, another is as standby With grouting mouth.
It is additionally provided with its second internal porus excretorius 22 through on basal layer 20, there is the excretory functions such as draining, Also there is permeation functions, and penetrate cement mortar when grouting by it and judge the grouting of grout blanket 11 Full situation, if stop grouting.
Preferably, the second porus excretorius 22 is positioned on basal layer 20 at the diagonal angle away from the second grouting mouth 21; Or, the second porus excretorius 22 and the second grouting mouth 21 are positioned in the opposite sides of basal layer 20.
At least one lateral edges of basal layer 20 is provided with the second sleeve 23 for poling, to basal layer after poling 20 shape, and make the flexible lateral of basal layer 20 become rigidity side.On the outer peripheral edge of basal layer 20 It is interval with clip 24, can be used for lifting by crane, transferring this grouting bag.
In the present embodiment, basal layer 20 is flat cube structure, and can be the shape such as rectangle, square Shape.Clip 24 is preferably provided at basal layer 20 diagonal angle.
This cement grout bag is geotextile bag, is formed by composite braided fabric sewing.
When administering the submarine pipeline of suspended span, first cement grout bag can be placed on below submarine pipeline, then lead to Cross grouting ship it is in the milk, fill into the supporter with certain volume, intensity, to be supported on sea Below bottom pipeline.
The foregoing is only embodiment of the present utility model, not thereby limit patent model of the present utility model Enclose, every equivalent structure utilizing this utility model description and accompanying drawing content to be made or equivalence flow process conversion, Or directly or indirectly it is used in other relevant technical fields, the most in like manner it is included in patent of the present utility model In protection domain.

Claims (10)

1. the cement grout bag administering submarine pipeline suspended span, it is characterised in that include main part (10) and the basal layer (20) being connected up and down;Described main part (10) includes the multiple grout blankets (11) being sequentially connected with from top to bottom;The cross-sectional area of described basal layer (20) is more than the cross-sectional area of described main part (10);
Each described grout blanket (11) is provided with its first internal grouting mouth (12) through, and described basal layer (20) is provided with its second internal grouting mouth (21) through.
Cement grout bag the most according to claim 1, it is characterised in that be additionally provided with its internal first porus excretorius (13) through on each described grout blanket (11);Described basal layer (20) is provided with its internal second porus excretorius (22) through.
Cement grout bag the most according to claim 2, it is characterised in that described first porus excretorius (13) is positioned in the opposite sides of described grout blanket (11) with described first grouting mouth (12).
Cement grout bag the most according to claim 2, it is characterised in that described second porus excretorius (22) is positioned on described basal layer (20) at the diagonal angle away from described second grouting mouth (21);Or, described second porus excretorius (22) is positioned in the opposite sides of described basal layer (20) with described second grouting mouth (21).
Cement grout bag the most according to claim 1, it is characterised in that be interval with multiple interlayer (14) in described main part (10) from top to bottom, described main part (10) is separated into multiple described grout blanket (11) by multiple described interlayers (14).
Cement grout bag the most according to claim 5, it is characterised in that the geometric center position of described interlayer (14) is additionally provided with the 3rd porus excretorius (15) of up/down perforation.
Cement grout bag the most according to claim 1, it is characterised in that the edge, top at least of described main part (10) is provided with the first sleeve (16) for poling;And/or, at least one lateral edges of described basal layer (20) is provided with the second sleeve (23) for poling.
Cement grout bag the most according to claim 1, it is characterised in that be interval with clip (17) on the outer peripheral edge of described main part (10);And/or, the outer peripheral edge of described basal layer (20) is interval with clip (24).
9. according to the cement grout bag described in any one of claim 1-8, it is characterised in that described main part (10) is in quadrangular frustum pyramid shaped;
Described basal layer (20) is flat cube structure.
10. according to the cement grout bag described in any one of claim 1-8, it is characterised in that this cement grout bag is geotextile bag.
CN201620444812.XU 2016-05-16 2016-05-16 Administer the cement grout bag of submarine pipeline suspended span Active CN205742208U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620444812.XU CN205742208U (en) 2016-05-16 2016-05-16 Administer the cement grout bag of submarine pipeline suspended span

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620444812.XU CN205742208U (en) 2016-05-16 2016-05-16 Administer the cement grout bag of submarine pipeline suspended span

Publications (1)

Publication Number Publication Date
CN205742208U true CN205742208U (en) 2016-11-30

Family

ID=57367204

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620444812.XU Active CN205742208U (en) 2016-05-16 2016-05-16 Administer the cement grout bag of submarine pipeline suspended span

Country Status (1)

Country Link
CN (1) CN205742208U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106949304A (en) * 2017-03-29 2017-07-14 广东国利先进复合材料研发有限公司 A kind of water-bed pipeline suspended span method for supporting and device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106949304A (en) * 2017-03-29 2017-07-14 广东国利先进复合材料研发有限公司 A kind of water-bed pipeline suspended span method for supporting and device

Similar Documents

Publication Publication Date Title
CN205822279U (en) A kind of marine structure anti-scouring system
JP2020041315A (en) Scour preventing construction around pile-shaped body, and construction method of scour preventing construction around pile-shaped body
CN110512638A (en) Offshore wind farm steel pipe pile foundation Anti-scouring structure and its construction method
CN103233444A (en) Underwater riprap foundation bed and side slope erosion resisting structure and construction method thereof
CN205742208U (en) Administer the cement grout bag of submarine pipeline suspended span
CN204491641U (en) Waterwall unit and self-balancing cofferdam structure
CN106223355A (en) A kind of high bearing platform supported on piles in deep water Hold Hoop method has device and the construction method of end steel jacket box
CN208395869U (en) Using the offshore pile basis Anti-scouring structure of concrete platoon
CN105129597B (en) A kind of floating container breakwater special hanger
CN207775947U (en) A kind of isolated footing structure equipped with splash guard
CN216339705U (en) Vertical composite anti-seepage membrane wall
CN205604273U (en) Last cofferdam of sandy silt
CN106013094A (en) Method applicable to pouring of concrete for artificial excavating pile body
CN105926531B (en) A kind of case net type floating breakwater based on FRP material
CN203188174U (en) Underwater riprap foundation bed and side-slope erosion prevention structure
RU158735U1 (en) REVETMENT
CN210562188U (en) Major diameter pile foundation scour prevention grouting device that active and passive protection combined together
CN211113784U (en) Waterproof sealing structure of anti-floating anchor rod
CN209010962U (en) A kind of pier dry method mounting structure
CN207419371U (en) A kind of yacht wharf pontoon bridge pile holding structure
CN204456151U (en) Bamboo raft dowel super large cofferdam
CN212248062U (en) Antifouling curtain suitable for river and lake environment-friendly dredging engineering
CN208844605U (en) A kind of cement grout bag of seabed composite soft tube pipeline suspended span
RU2562487C2 (en) Method for embedding filtration deformations in channel dam
CN207878420U (en) A kind of oil suction volume

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 4th Floor, Main Building, Science and Technology Building, No. 1067 Nanhai Avenue, Nanshan District, Shenzhen City, Guangdong Province, 518067

Patentee after: CNOOC Shenzhen Ocean Engineering Technology Service Co.,Ltd.

Address before: 4th Floor, Main Building, Science and Technology Building, No. 1067 Nanhai Avenue, Nanshan District, Shenzhen City, Guangdong Province, 518067

Patentee before: COOEC SUBSEA TECHNOLOGY Co.,Ltd.