CN208395869U - Using the offshore pile basis Anti-scouring structure of concrete platoon - Google Patents

Using the offshore pile basis Anti-scouring structure of concrete platoon Download PDF

Info

Publication number
CN208395869U
CN208395869U CN201820798113.4U CN201820798113U CN208395869U CN 208395869 U CN208395869 U CN 208395869U CN 201820798113 U CN201820798113 U CN 201820798113U CN 208395869 U CN208395869 U CN 208395869U
Authority
CN
China
Prior art keywords
concrete
platoon
nylon rope
hanger
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820798113.4U
Other languages
Chinese (zh)
Inventor
周胡
罗金平
王淡善
吕娜
王滨
夏艳慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201820798113.4U priority Critical patent/CN208395869U/en
Application granted granted Critical
Publication of CN208395869U publication Critical patent/CN208395869U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a kind of offshore pile basis Anti-scouring structures using concrete platoon.That the purpose of the utility model is to provide a kind of structures is simple, easy for construction, adaptability is good, the good integrity offshore pile basis Anti-scouring structure using concrete platoon.The technical solution of the utility model is: a kind of offshore pile basis Anti-scouring structure using concrete platoon, it is characterised in that: pile foundation suspends the concrete platoon for having muti-piece to be centered around around the pile foundation in midair through hanger;The concrete platoon has the concrete block of several arrangeds in length and breadth, it is linked to be entirety through lateral nylon rope and longitudinal nylon rope between concrete block in concrete platoon, concrete block top surface is embedded with suspention nylon rope, and wire rope suspensioning of the concrete block through being connected on suspention nylon rope thereon is on the hanger.The utility model is suitable for offshore and field of ocean engineering.

Description

Using the offshore pile basis Anti-scouring structure of concrete platoon
Technical field
The utility model relates to a kind of offshore pile basis Anti-scouring structures using concrete platoon.Suitable for offshore and sea Foreign field of engineering technology.
Background technique
Offshore pile basis is very widely used in coastal waters and marine engineering construction field, and application field mainly includes bridge Engineering, Wharf Engineering and offshore wind farm engineering etc..
Since pile foundation changes periphery local flow field, can be generated around marine pile it is larger wash away, especially for large size The diameter of marine project, pile foundation is increasing, and washing away problem also becomes increasingly severe, and the appearance of scour hole can not only be reduced The bearing capacity of structure, influences stability;It also will affect structure frequency and influence sea simultaneously for washing away as fields such as offshore wind farms Cable safety, to generate certain adverse effect to the operational safety of blower.Traditional jackstone method is anti-to pile foundation main structure Rotten coating has certain destruction, and the movements such as jackstone is easy to happen drift under flow action, rolling moves, while jackstone method stone Globality poor between block, environment friendly are poor.
Summary of the invention
Technical problem to be solved by the utility model is: in view of the above problems, provide that a kind of structure is simple, construction Facilitate, adaptability is good, the good integrity offshore pile basis Anti-scouring structure using concrete platoon.
The technical scheme adopted by the utility model is a kind of offshore pile basis protection against erosion knot using concrete platoon Structure, it is characterised in that: pile foundation suspends the concrete platoon for having muti-piece to be centered around around the pile foundation in midair through hanger;
The concrete platoon has the concrete block of several arrangeds in length and breadth, the concrete block in concrete platoon Between through lateral nylon rope and longitudinal nylon rope be linked to be entirety, concrete block top surface is embedded with suspention nylon rope, the concrete block Wire rope suspensioning through being connected on suspention nylon rope thereon is on the hanger.
Rubber spacer is lined between the hanger and the pile foundation.
The hanger is composed of several I-shaped steel type truss being criss-cross arranged, which is formed with can be with Concrete block on the concrete platoon suspends otic placode in midair correspondingly, and suspention otic placode connects the wirerope.
Clearance filled small sandbag between the concrete platoon and the pile foundation.
The concrete platoon and concrete platoon intersection have overlay region, and overlay region range is 3~5 times of coagulations Soil block length.
The design grade of the concrete block be greater than C15, concrete block block use prefabrication system, block spacing be 20~ 50mm, with a thickness of 300~500mm.
The hanger upper surface is welded with several hanger otic placodes.
Connection is reinforced through interconnection nylon rope between the concrete block at concrete platoon edge.
The transverse direction nylon rope, longitudinal nylon rope, interconnection nylon rope and suspention nylon rope diameter are greater than 20mm.
The beneficial effects of the utility model are: if the utility model has dry concrete by hanger suspention around pile foundation Platoon, structure is simple, installation is convenient.The utility model 1) adaptability is good, it is suitable for pile foundation different geological conditions nearby With the engineering of different terrain variation;Good integrity, durability is good, and concret block is serially connected with each other by composite rope, erosion control Component should not disperse;Construction efficiency is good, and basic processing and fabricating is completed by land, offshore construction excellent in efficiency, " single step " installation side Offshore construction efficiency, save the cost is greatly improved in method.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of embodiment.
Fig. 2 is the top view of embodiment.
Fig. 3 is the plan view of concrete platoon in embodiment.
Fig. 4 is the side view of concrete platoon in embodiment.
Fig. 5 is the schematic diagram of hanger in embodiment.
1, pile foundation;2, hanger;3, otic placode is suspended in midair;4, hanger otic placode;5, wirerope;6, concrete block;7, nylon is suspended in midair Rope;8, nylon rope is interconnected;9, longitudinal nylon rope;10, lateral nylon rope;11, small sandbag;12, rubber spacer.
Specific embodiment
As shown in Figure 1 and Figure 2, the present embodiment is a kind of offshore pile basis Anti-scouring structure using concrete platoon, pile foundation Plinth has two pieces of concrete platoons being centered around around the pile foundation through hanger suspention.
As shown in Figure 3, Figure 4, concrete block of the concrete platoon with several arrangeds in length and breadth in the present embodiment, is mixed It is linked to be entirety through lateral nylon rope and longitudinal nylon rope between concrete block in solidifying soil platoon, concrete block top surface is embedded with outstanding Nylon rope is hung, reinforces connection through interconnection nylon rope between the concrete block at concrete platoon edge.
The intersection of concrete platoon and concrete platoon overlaps to form overlay region in this example, and the range of overlay region is 3~5 Concrete block length again.
Hanger is mainly composed of criss-cross I-shaped steel type truss in the present embodiment, and hanger upper layer is welded with hanger Otic placode, lower layer are welded with suspention otic placode, and the pre-buried nylon rope above suspention otic placode and concrete platoon, which corresponds, to be arranged, pass through Suspention nylon rope on wirerope connection suspention otic placode and lower concrete block.To avoid hanger to pile foundation surface layer antifouling paint Destruction, hanger circular arc type part, with pile foundation contact surface post rubber spacer (see Fig. 5).
In order to improve pile foundation entirety protection against erosion ability, concrete platoon is used in combination with small sandbag, in pile foundation and is mixed Small sand pocket is filled between solidifying soil platoon, small sandbag is along stake week uniform throwing.
The diameter of each nylon rope is greater than 20mm in the present embodiment;The design grade of concrete block is greater than C15, concrete block block Body uses prefabrication system, and block spacing is 20~50mm, with a thickness of 300~500mm.

Claims (9)

1. a kind of offshore pile basis Anti-scouring structure using concrete platoon, it is characterised in that: pile foundation (1) is through hanger (2) Suspention has muti-piece to be centered around the concrete platoon around the pile foundation (1);
The concrete platoon has the concrete block (6) of several arrangeds in length and breadth, the concrete block (6) in concrete platoon Between through lateral nylon rope (10) and longitudinal nylon rope (9) be linked to be entirety, concrete block (6) top surface is embedded with suspention nylon rope (7), wirerope (5) of the concrete block (6) through being connected in suspention nylon rope (7) thereon is suspended on the hanger (2).
2. the offshore pile basis Anti-scouring structure according to claim 1 using concrete platoon, it is characterised in that: described Rubber spacer (12) are lined between hanger (2) and the pile foundation (1).
3. the offshore pile basis Anti-scouring structure according to claim 1 or 2 using concrete platoon, it is characterised in that: The hanger (2) is composed of several I-shaped steel type truss being criss-cross arranged, which is formed with can be with institute It states the concrete block (6) on concrete platoon and suspends otic placode (3) in midair correspondingly, suspention otic placode (3) connects the wirerope (5)。
4. the offshore pile basis Anti-scouring structure according to claim 1 using concrete platoon, it is characterised in that: described Clearance filled small sandbag (11) between concrete platoon and the pile foundation (1).
5. the offshore pile basis Anti-scouring structure according to claim 1 using concrete platoon, it is characterised in that: described Concrete platoon and concrete platoon intersection have overlay region, and overlay region range is 3~5 times of concrete block (6) length.
6. the offshore pile basis Anti-scouring structure according to claim 1 using concrete platoon, it is characterised in that: described The design grade of concrete block (6) is greater than C15, and concrete block (6) block uses prefabrication system, and block spacing is 20~50mm, With a thickness of 300~500mm.
7. the offshore pile basis Anti-scouring structure according to claim 1 using concrete platoon, it is characterised in that: described Hanger (2) upper surface is welded with several hanger otic placodes (4).
8. the offshore pile basis Anti-scouring structure according to claim 1 using concrete platoon, it is characterised in that: be located at Connection is reinforced through interconnection nylon rope (8) between the concrete block (6) at concrete platoon edge.
9. the offshore pile basis Anti-scouring structure according to claim 8 using concrete platoon, it is characterised in that: described Lateral nylon rope (10), longitudinal nylon rope (9), interconnection nylon rope (8) and suspention nylon rope (7) diameter are greater than 20mm.
CN201820798113.4U 2018-05-25 2018-05-25 Using the offshore pile basis Anti-scouring structure of concrete platoon Active CN208395869U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820798113.4U CN208395869U (en) 2018-05-25 2018-05-25 Using the offshore pile basis Anti-scouring structure of concrete platoon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820798113.4U CN208395869U (en) 2018-05-25 2018-05-25 Using the offshore pile basis Anti-scouring structure of concrete platoon

Publications (1)

Publication Number Publication Date
CN208395869U true CN208395869U (en) 2019-01-18

Family

ID=65137659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820798113.4U Active CN208395869U (en) 2018-05-25 2018-05-25 Using the offshore pile basis Anti-scouring structure of concrete platoon

Country Status (1)

Country Link
CN (1) CN208395869U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115182391A (en) * 2022-07-26 2022-10-14 中交第三航务工程局有限公司 Construction method of anti-scouring interlocking block soft mattress for large-diameter single pile
CN116378109A (en) * 2023-04-07 2023-07-04 上海勘测设计研究院有限公司 Anti-scouring structure of floating crane integrated pile foundation, manufacturing and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115182391A (en) * 2022-07-26 2022-10-14 中交第三航务工程局有限公司 Construction method of anti-scouring interlocking block soft mattress for large-diameter single pile
CN115182391B (en) * 2022-07-26 2024-02-02 中交第三航务工程局有限公司 Construction method of anti-scour interlocking block mollusk for large-diameter single pile
CN116378109A (en) * 2023-04-07 2023-07-04 上海勘测设计研究院有限公司 Anti-scouring structure of floating crane integrated pile foundation, manufacturing and construction method
CN116378109B (en) * 2023-04-07 2024-01-05 上海勘测设计研究院有限公司 Anti-scouring structure of floating crane integrated pile foundation, manufacturing and construction method

Similar Documents

Publication Publication Date Title
CN208395869U (en) Using the offshore pile basis Anti-scouring structure of concrete platoon
CN204225146U (en) Pulling resistant anchor pile basal disc
CN104963323B (en) A kind of chain prefabricated section mask anti-scour trench
CN107761668A (en) A kind of strand Bin Ku makes ground type bank protection structure and its construction process
CN208844550U (en) A kind of FRP pipe-PHC tubular pole interlayer concrete filled composite structure
CN204326031U (en) Concrete adds the flexible apron structure of rough pier
CN203821306U (en) Flexible anti-scour protection pad
CN104088288B (en) The preparation method of container caisson and application thereof
CN205617317U (en) Asphalt concrete core and concrete foundation's connection structure
CN107135999A (en) Gravity type anchoring basis and its construction method that a kind of cement plate assembles
CN204185819U (en) Honeycomb dykes and dams shore protection component
CN204512795U (en) The flexible scour protection device of a kind of submerged pipeline float-ball type
CN103122620B (en) Protective hooking body
CN207083863U (en) The gravity type anchoring basis that a kind of cement plate assembles
CN207405657U (en) A kind of cable-stayed type immersed tube tunnel structure
CN203420267U (en) Novel geogrid attached with ground anchors
CN202466525U (en) Cement-sand-gravel dam
CN202755350U (en) Assembly type isolated bollard on side slope of approach channel of navigation lock of inland river
CN207211076U (en) A kind of slope protection block and ecological interlock type antiscour ecological revetment
CN207160072U (en) A kind of protection type submerged tunnel
CN206941506U (en) A kind of penetrating circular arc shaped steel frame flood control structure of large span landscape
CN206680947U (en) Steel water stone separates blocking dam
CN205742208U (en) Administer the cement grout bag of submarine pipeline suspended span
CN110397070A (en) A kind of skirt piles formula offshore wind power foundation
CN205259216U (en) Adopt steel truss to add concrete structure of back cover under water of muscle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant