CN107893665A - A kind of prefabricated assembled composite supporting construction mounting process based on shaped steel - Google Patents

A kind of prefabricated assembled composite supporting construction mounting process based on shaped steel Download PDF

Info

Publication number
CN107893665A
CN107893665A CN201711079723.5A CN201711079723A CN107893665A CN 107893665 A CN107893665 A CN 107893665A CN 201711079723 A CN201711079723 A CN 201711079723A CN 107893665 A CN107893665 A CN 107893665A
Authority
CN
China
Prior art keywords
shaped steel
supporting construction
concrete component
anchor
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711079723.5A
Other languages
Chinese (zh)
Other versions
CN107893665B (en
Inventor
王军
谢浩
左建平
顾薛青
徐亮
宋建新
王正泽
王波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jianzhu University
Original Assignee
Shandong Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Jianzhu University filed Critical Shandong Jianzhu University
Priority to CN201711079723.5A priority Critical patent/CN107893665B/en
Publication of CN107893665A publication Critical patent/CN107893665A/en
Application granted granted Critical
Publication of CN107893665B publication Critical patent/CN107893665B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • E21D11/083Methods or devices for joining adjacent concrete segments
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts

Abstract

The present invention relates to a kind of prefabricated assembled composite supporting construction mounting process based on shaped steel,(1)Concrete component lifting is in place, structure is anchored on bottom plate by the anchor pole/anchor cable hole reserved in structure with anchor pole and/or anchor cable;(2)Remaining concrete component in addition to bottom plate is installed by special installation apparatus, and after in place per the installation of block concrete component, structure is anchored on country rock by the anchor pole/anchor cable hole reserved on structure;(3)Multistage shaped steel is embedded among the groove of concrete component, forms shape steel bracket;(4)Shape steel bracket joint is blocked with card cable, adjust card cable tightness so that shape steel bracket joint can the mutual changing of the relative positions, to discharge the pressure gathered in support, complete the function of release;(5)Complete the installation of monocyclic supporting construction body, repeat step(1)‑(4)Carry out the installation of next ring supporting construction;The invention reside in:Improve structural stability and bearing capacity.

Description

A kind of prefabricated assembled composite supporting construction mounting process based on shaped steel
Technical field
The present invention relates to roadway support field, and in particular to a kind of prefabricated assembled composite supporting construction peace based on shaped steel Dress technique.
Background technology
At present, the main support technology in Deep Soft Rock tunnel has:Bolt-mesh-spurting supporting series technique, shape steel bracket supporting series skill Art, reinforced concrete structure supporting series technique and steel pipe concrete bracket support technology etc..
With the increase of tunnel buried depth, the conventional supporting means such as simple anchor shaft anchor cable can not meet Drift stability Demand, under powerful roadway surrounding rock pressure effect, tunnel needs not the composite supporting construction body that Bolt net and jet and support are formed Disconnected to reprocess, Deformation in Soft Rock Tunnel seriously even destroys.
Steel pipe concrete bracket also achieves good supporting although with high-strength bearing capacity among engineering practice Effect, but its higher cost governs its popularization and application always.
U-shaped steel support participate in combined supporting, be solve the soft broken wall rock laneway support problem of high pressure important channel it One.U-shaped steel support cost is cheap and has larger bearing capacity.But due to roadway surrounding rock concave-convex surface among engineering practice Injustice, support force complicated condition, easily form stress concentration or uneven loading action.U-shaped steel support is made in roadway surrounding rock pressure The bending in plane and bad break, or out-of-plane upset distortion often occur under, wherein being no lack of due to structural instability, indulging Lost to low-resistance caused by stress, unbalance loading inclination so that the bearing capacity of U-shaped steel support can not play completely.Support once occurs The destruction of the above situation, almost loses whole bearing capacities, and the later stage constantly reprocesses the waste for not only causing fund, and the time into This is high.
In summary, supporting construction low bearing capacity is primarily present in Deep Soft Rock Roadway Support Technology, cost is high, can contracting amount Small, tunnel needs continuous the problem of reprocessing.If U-shaped steel support uniform stressed can be ensured, the unfavorable conditions such as unbalance loading are eliminated Influence, the bearing capacity of U-shaped steel support can be given full play to as compared with the past under identical wall rock condition, maintain tunnel to enclose reaching While rock stabilization, the purpose of reduction repair rate, by cost control within limits, a set of Deep Soft Rock tunnel will be formed The new method of supporting.The present invention with reference to prefabricated reinforced concrete arc plate, and is aided with anchor shaft anchor cable based on U-shaped steel support Etc. conventional supporting means, reach the purpose that Deep Soft Rock Drift stability controls.
The content of the invention
It is an object of the invention to provide a kind of prefabricated assembled composite supporting construction mounting process based on shaped steel, solves deep Well soft rock roadway support problem.Underground supporting construction is subjected to huge load and stress condition is complicated, stress concentration, Phenomena such as unbalance loading, make it that the life cycle of supporting construction is excessively of short duration.How to ensure the intensity of supporting construction, alleviate stress concentration, Structural failure caused by the unfavorable conditions such as unbalance loading, it is technical barrier to be solved by this invention to reduce repair of laneway rate.
Specific structure of the present invention includes precast concrete and shaped steel, and the shaped steel is embedded in the concrete structure In part, multiple structures are circumferentially the assembled structure being integrated, the integral construction profile and the lane around tunnel Road profile matches;The structure is installed by following steps:
(1) concrete component is lifted in place, passes through the anchor bar/anchor cable reserved in structure with anchor pole and/or anchor cable Structure is anchored on bottom plate by hole;
(2) remaining concrete component in addition to bottom plate by special installation apparatus a series of lift, translate, rotate Installation is completed in action, after per block concrete component, installation is in place, by anchor pole/anchor cable hole for being reserved on structure by structure anchor Gu on country rock;
(3) structure and after allowing pressure component installation to form closure supporting construction, is embedded into concrete by multistage shaped steel Among the groove of component, shape steel bracket is formed;
(4) shape steel bracket joint is blocked with card cable, adjusts card cable tightness so that shape steel bracket joint can phase The mutual changing of the relative positions, to discharge the pressure gathered in support, complete the function of release;
(5) installation of monocyclic supporting construction body is completed, repeat step (1)-(4) carry out the installation of next ring supporting construction.
Further, also include bottom plate gunite concrete to certain altitude in the step (1), will with simple monorail crane The lifting of arc plate is in place.
Further, in the step (2), using spoil woven bag or using pulp shooting machine after being installed in place per block structure body Cement mortar is filled between arc plate and country rock.
Further, in the step (1), in addition to the both ends that pressure component will be allowed to be installed to the concrete component, institute State and make pressure element cross-section shape identical with the shape of cross section of concrete component.
Further, in addition to step (6), by multiple monocyclic supporting construction bodies in step (5) along the tunnel axle The support system is spliced to form to another monocyclic supporting construction body.
Further, in the step (3), one end joint of two sections of shaped steel is embedded in the groove by card cable Interior, the other end of two sections of shaped steel stretches out the concrete component and passes through card with the shaped steel in another concrete component groove Cable clamping.
Further, in the step (4), the concrete component includes bolt, the bolt and the concrete structure Part is affixed, and is arranged on the both sides of the groove, and the card cable is provided with bolt hole, and the card cable is fastened shaped steel by bolt On the concrete component.
Further, in the step (4), described card cable one end is platy structure, the other end be with outside shaped steel opposite side The shaped steel by bolt and the structure snapping and is connected to the groove by the structure that shape matches, the card cable other end It is interior.
Further, in the step (6), the concrete component includes pin-and-hole, and the pin-and-hole is arranged on concrete structure On two sides of part in the width direction, the monocyclic supporting construction body passes through pin-and-hole and pin and another monocyclic supporting construction body edge The passage is axially assembled.
Further, in the step (1) and (2), the concrete component includes anchor pole/anchor cable hole, the anchor pole/anchor Rope hole is arranged on the both sides of the groove, and the concrete component is fixed on the country rock of passage by anchor pole/anchor cable hole, described Anchor pole/anchor cable hole is long and narrow band round rectangle hole, with prevent because reinforced concrete arc plate with surrouding rock deformation is inconsistent causes anchor cable to be cut Cut through bad.
The present invention at least has the advantages that:
(1) all precast construction bodies use consistent specification, are easy to mass to make.The making of precast construction body uses phase With mould both can, reduce die cost.Precast construction body is simple in construction, and splicing is convenient;
(2) precast construction body is prefabricated on ground, ensures that it has higher intensity, it is as the mistake between country rock and support Component is crossed, roadway surrounding rock can be applied to the evenly load that the complicated stress condition conversion arc plate of support is applied to support, changed It has been apt to the stress condition of U-shaped steel support, has avoided the generation of the unfavorable conditions such as stress concentration, unbalance loading, give full play to rack bearing Ability;
(3) it is reserved with 4 anchor pole (rope) holes on every piece of precast construction body, during underground construction, passes through anchor pole (rope) hole Arc plate can be directly anchored on country rock, the stability of structure in work progress is ensure that while convenient construction;
(4) be provided with twice groove in the middle part of precast construction body, the projection among groove just with the U row groove phase contracts on support Close, load is evenly distributed on support, while also limit trend of the U-shaped steel support to motion outside plane, prevent support from existing Out-of-plane upset distortion occurs when stress is excessive;
(5) two kinds of release modes:First, laminated structure is allowed to realize lane when bearing compression between precast construction body The compression of road ring, reach and allow the purpose of pressure;Second, being connected between U-shaped steel support with card cable, adjustment card cable elasticity makes It can realize that high resistant slides, be in good time stuck at Support joint, discharge the pressure gathered in support, be formed and allow, resist suitable effect. Two kinds of release modes have been annotated in New Austrian Tunneling Method well avoids the initial period of tunnel excavation moderate finite deformation, to give full play to country rock itself carrying energy The support principle of power.
(6) specification of U-shaped steel is normalized, and all relatively easy convenience, easy transportation and installation are repaired or replaced in processing Fast, can be used repeatedly, beneficial to mechanized construction.
(7) card cable is directly installed on arc plate, and compared with the service condition of card cable under normal circumstances, it is not only realized The connection function of U-shaped steel support, and can securing the stand on precast construction body, limit support planar or plane Outer movement tendency, it is ensured that support consolidates, and gives full play to rack bearing ability;
(8) monocyclic supporting construction body is axially connected together by steel pin made of concrete filled steel tube along tunnel, is made each monocyclic Acted synergistically between supporting construction body, form integer support structure, further improve structural stability and bearing capacity.Separately Outside, steel pin can also play a part of fixed precast construction body in precast construction body installation process.
(9) along tunnel, axially connection is integral by monocyclic supporting construction body for steel pin, acts synergistically between structure, holds jointly Carry pressure from surrounding rock and maintain stability of the roadway.
(10) anchor pole/anchor cable hole is long and narrow band round rectangle hole, to prevent because reinforced concrete arc plate differs with surrouding rock deformation Cause causes anchor cable failure by shear.
Brief description of the drawings
Fig. 1 is the structural representation of support system of the present invention;
Fig. 2 is the schematic diagram of monocyclic supporting construction body;
Fig. 3 is the prefabricated construction body schematic diagram with shaped steel;
Fig. 4 is prefabricated construction body schematic diagram;
Fig. 5 is card cable structure schematic diagram;
Fig. 6 is to allow pressed wood block structure schematic diagram.
Main Reference Numerals explanation:
1- steel pins, 2- allow pressed wood block, 3- prefabricated construction bodies, and 4- reserves anchor pole/anchor cable hole, 5- bolts, 6-U shaped steel Support, 7- card cables, 8- grooves, 9- reserve pin-and-hole, 10- bolts hole.
Embodiment
The invention will be further described below in conjunction with the accompanying drawings.
In order that present disclosure is easier to be clearly understood, below according to specific embodiment and with reference to accompanying drawing to this Invention is described in further detail.
As illustrated, the present invention includes monocyclic supporting construction body, insert-type steel in the monocyclic supporting construction body is described monocyclic The construction profile of supporting construction body matches with channel profile;Multiple monocyclic supporting construction bodies axially connect along the passage Form the support system.Specifically, the monocyclic supporting construction body includes multistage prefabricated construction body 3;Multistage institute State prefabricated assembly structural body 3 and fit together the composition monocyclic supporting construction body;Multiple monocyclic supporting construction bodies are along institute State passage and be axially spliced to form the support system with another monocyclic supporting construction body.Specifically, the prefabricated assembled knot Structure body 3 includes groove 8, and the groove 8 is arranged on the medial surface or lateral surface of the through-thickness of prefabricated construction body 3 On, the shape of the groove 8 matches with the profile of shaped steel side.Specifically, the shaped steel is two sections, two sections of shaped steel One end joint is embedded in the groove 8 by card cable 7, and the other end of two sections of shaped steel stretches out the prefabricated assembled knot Structure body 3 passes through the clamping of card cable 7 with the shaped steel in another groove 8 of prefabricated construction body 3.Specifically, in addition to bolt 5, The bolt 5 and the prefabricated construction body 3 are affixed, and are arranged on the both sides of the groove 8, and the card cable 7 is provided with Shaped steel is fastened on the prefabricated construction body 3 by bolt hole 10, the card cable 7 by bolt 5.Specifically, it is described The one end of card cable 7 is platy structure, and the other end is the structure to match with shaped steel opposite side profile, and bolt hole 10 is opened in platy structure On, the shaped steel by bolt and the prefabricated construction body snapping and is connected in the groove 8 by the card cable 7. Specifically, prefabricated construction body also includes pin-and-hole, and the pin-and-hole is arranged on prefabricated construction body in the width direction Side on, the prefabricated construction body is by pin-and-hole and pin and another prefabricated construction body along passage axial direction It is assembled.Specifically, the prefabricated construction body also includes anchor pole/anchor cable hole, and the anchor pole/anchor cable hole is arranged on described The both sides of groove, the structure are fixed on the country rock of passage by anchor pole/anchor cable hole, and anchor pole/anchor cable hole is long and narrow band Round rectangle hole, with prevent because reinforced concrete arc plate with surrouding rock deformation is inconsistent causes anchor cable failure by shear.Specifically, it is described pre- Fabricated construction body processed is described to allow the transversal of pressed wood block around the circumferential structure by allowing pressed wood block assembly to be integrated of the passage Face shape is identical with the shape of cross section of prefabricated construction body.Specifically, the profile of the prefabricated construction body For arcuation, the non-arc structure of strip or other bendings.I.e. supporting construction body may be designed as flat oval, vertical ellipse etc. other Shape.
Specifically, monocyclic supporting construction body of the invention is made up of 6 blocks of arc plates 3, is installed with and is allowed between adjacent arcs plate 3 Pressed wood block 2, to ensure the resistance to overturning of supporting construction body, the inner side of arc plate 3 installation U-shaped steel support 6, support 6 is perfect with arc plate 3 Agree with.Connected between tunnel axial direction arc plate 3 by steel pin 1, each ring arc plate 3 acts synergistically, and forms integer support structure.Monocyclic branch Protection structure is as shown in Fig. 2 integer support system is as shown in Figure 1.
Supporting construction body allows pressure mode to have two kinds, when by compressible wooden unit 2 realize, when supporting construction body by During larger pressure, pressed wood block 2 is allowed to tend to the state of standard circular along tunnel circumferential ring to compression, supporting construction body;Second, Realized by U-shaped steel support 6 and allow pressure.The joint of U-shaped steel support 6 is fixed on arc plate 4 by card cable 7, by adjusting the pine of card cable 7 Tightness realizes the size of the joint resistance of support 6, realizes the effect that high resistant slides, and discharges the pressure gathered in support, reaches and allow The purpose of pressure.
Along tunnel, axially connection is integral by steel pin made of concrete filled steel tube 1 for monocyclic supporting construction body, makes structure Between act synergistically, improve structural stability and bearing capacity.
Arc plate is reinforced concrete structure body, for ensure armored concrete arc plate 3 intensity, arc plate 3 it is prefabricated on ground and Into.One drift section can form monocyclic supporting construction body by 6 sections of arc plates 3 are assembled, and monocyclic supporting construction body is axial along tunnel Extension forms the complete supporting to tunnel.Arc plate radius of curvature size allows pressed wood block 2 to compress according to drift section size design Supporting construction body after 50% is in standard circular.Pin-and-hole 9, bolt 5, groove 8 are designed with arc plate 3.
The detailed construction of arc plate is as shown in figure 4, pin-and-hole 9, the effect of bolt 5, groove 8 are respectively:Pin-and-hole:Inserted in pin-and-hole Concrete filled steel tube steel pin, monocyclic supporting construction is axially connected together along tunnel so that cooperateed between monocyclic supporting construction body Effect, improve the globality and bearing capacity of supporting construction body;Bolt:Bolt is arranged in arc plate central slot both sides, pours , thereon can be with installation card cable 7 with fixation, connecting U-shaped steel bracket 6, in limit bracket plane or out-of-plane fortune on arc plate Dynamic trend, gives full play to rack bearing ability;Groove:Groove on arc plate shares twice, and U-shaped steel support can be embedded into groove In agree with arc plate perfection.Load is uniformly applied on support by such a agree with, and is improved support force situation, is improved supporting Structure integrated carrying ability, while also prevent support and out-of-plane upset distortion occurs;Reserved anchor pole (rope) hole 4:In arc plate In installation process, arc plate can be anchored in by reserved anchor pole (rope) hole on country rock, be easy to the progress of subsequent installation process.In advance Stay staying to set and also indirectly improving structure stability for anchor pole (rope) hole.
Spatial relation between the components such as card cable, U-shaped steel support, arc plate, bolt, steel pin is as shown in Figure 6.Card cable: It is made by metal material.Bolt hole is reserved with card cable, is had with arc plate identical curvature to agree with arc plate and U-shaped steel branch Frame.The effect of card cable is connecting U-shaped steel bracket and is fixed on arc plate, while can prevent U-shaped steel support from plane occurs Interior bending and bad break, or due to out-of-plane upset distortion caused by unbalance loading.Steel pin:In hollow steel casing pack coagulation Soil, Concrete-filled Tubular Steel Stub Columns are made.The effect of steel pin is that along tunnel, axially connection is integral by monocyclic supporting construction body, makes each list Ring supporting construction body acts synergistically, and improves supporting construction body resistance to overturning and bearing capacity.
Make the structure of pressed wood block as shown in Figure 6.Pressed wood block 2 is allowed between two sections of adjacent arc plates.With 6 pieces of structures of arc plate 3 Into supporting construction body exemplified by, allow pressed wood block to share 6 pieces, allowing on pressed wood block has and arc plate identical groove is to agree with U-shaped steel Support.The thickness of pressed wood block is allowed typically between 0.5~1.0m between arc plate, and there is larger compressibility, can play Allow the effect of pressure;To avoid allowing pressed wood block rotten, preservative treatment should be carried out to it, such as using the method for pitch or bituminizing; The direction of batten fiber should be kept when allowing pressed wood block to place along tunnel radial direction, and is paved with along tunnel long axis direction, so can Giving full play to the compressible characteristic and can of wooden unit makes arc plate uniform stressed;Allow pressed wood block to choose neither too hard, nor too soft timber, compress Amount is preferably 50% or so.Wooden unit does not have very much the effect of pressure of allowing firmly.Wooden unit it is too soft then can due to tunnel initial deformation speed, Wooden unit is caused to compress too early, decrement is big, it is impossible to which the later stage, which plays, in tunnel allows pressure to act on.
The present invention is to carry out the supporting construction in tunnel by the following method, and the installation of supporting construction body is simple and convenient, The equipment mainly used has:1st, simple monorail crane;2nd, special installation apparatus.Bottom arc plate need to only use simple monorail crane to complete Lifting positioning.Its complement of an arc plate, will be lifted on special installation apparatus by monorail crane, then be completed by the mechanical arm in equipment flat The action such as shifting and rotation, you can be installed in place arc plate.
By taking the supporting construction body that 6 sections of arc plates are formed as an example, work progress is as follows:
(1) bottom plate gunite concrete is lifted arc plate in place with simple monorail crane to after designing bottom plate heights.Led to anchor pole Arc plate is anchored on bottom plate by reserved anchor pole (rope) hole crossed on arc plate, and pressed wood block will be allowed to be installed to arc plate both ends.
(2) its complement of an arc plate by special installation apparatus carry out it is a series of lift, translate, the action such as rotate and complete installation, every piece After the installation of arc plate is in place, arc plate should be anchored on country rock by anchor pole (rope) hole reserved on arc plate, using pulp shooting machine by water Cement mortar is filled between arc plate and country rock, can also use spoil woven bag to fill;
(3) arc plate and allow pressed wood block installation, after forming closure supporting construction, by U-shaped steel support be embedded into arc plate with Allow among the groove of pressed wood block, blocked at U-shaped steel Support joint with card cable, adjust card cable tightness so that U-shaped steel branch bridge joint Head at can the mutual changing of the relative positions, to discharge the pressure gathered in support, complete the function of release;
(4) installation of monocyclic supporting construction is completed, carries out the installation of next ring supporting construction, repeat step (1) (2) (3).
(5) multiple monocyclic supporting construction bodies are axially spliced to form along the tunnel with another monocyclic supporting construction body The support system.
According to the difference of the conditions such as tunnel buried depth, geological conditions, crustal stress and lithology, it is necessary to design different supporting construction Body size.According to on-site actual situations it needs to be determined that major parameter have:Thickness, intensity and the curvature of arc plate, pin-and-hole depth, list Bolt group number on block arc plate, allow the thickness and its compressed thickness of pressed wood block, the model of steel pin and length, the model of U-shaped steel support, The size of card cable.
It is described above, only the preferred embodiment of the present invention, but protection scope of the present invention is not limited thereto, ability Field technique personnel are not it should be understood that departing from principle and spirit of the invention that its scope is limited by claim and its equivalent In the case of, these embodiments can be modified and perfect, these are changed and improved also should be in protection scope of the present invention It is interior.

Claims (10)

1. a kind of prefabricated assembled composite supporting construction mounting process based on shaped steel, it is characterised in that the structure includes Precast concrete and shaped steel, the shaped steel are embedded in the concrete component, and multiple structures are circumferential around tunnel The structure being integrated for assembly, the integral construction profile match with the tunnel profile;The structure passes through following Step is installed:
(1) concrete component is lifted in place, will by the anchor pole/anchor cable hole reserved in structure with anchor pole and/or anchor cable Structure is anchored on bottom plate;
(2) remaining concrete component in addition to bottom plate by special installation apparatus a series of lift, translate, the action such as rotate Installation is completed, after in place per the installation of block concrete component, is anchored at structure by the anchor pole/anchor cable hole reserved on structure On country rock;
(3) structure and after allowing pressure component installation to form closure supporting construction, is embedded into concrete component by multistage shaped steel Groove among, form shape steel bracket;
(4) shape steel bracket joint is blocked with card cable, adjusts card cable tightness so that shape steel bracket joint can be mutually wrong It is dynamic, to discharge the pressure gathered in support, complete the function of release;
(5) installation of monocyclic supporting construction body is completed, repeat step (1)-(4) carry out the installation of next ring supporting construction.
2. mounting process as claimed in claim 1, it is characterised in that also include bottom plate spraying coagulation in the step (1) Soil arrives certain altitude, is lifted arc plate in place with simple monorail crane.
3. mounting process as claimed in claim 1, it is characterised in that in the step (2), after being installed in place per block structure body Cement mortar is filled between arc plate and country rock using spoil woven bag or using pulp shooting machine.
4. mounting process as claimed in claim 1, it is characterised in that in the step (1), in addition to pressure component will be allowed to install It is described to make pressure element cross-section shape identical with the shape of cross section of concrete component to the both ends of the concrete component.
5. mounting process as claimed in claim 1, it is characterised in that, will be multiple described in step (5) also including step (6) Monocyclic supporting construction body is axially spliced to form the support system along the tunnel with another monocyclic supporting construction body.
6. mounting process as claimed in claim 1, it is characterised in that in the step (3), a termination of two sections of shaped steel It is embedded at head by card cable in the groove, the other end of two sections of shaped steel stretches out the concrete component and another coagulation Shaped steel in native member recess passes through card cable clamping.
7. mounting process as claimed in claim 6, it is characterised in that in the step (4), the concrete component includes spiral shell Bolt, the bolt and the concrete component are affixed, and are arranged on the both sides of the groove, and the card cable is provided with bolt hole, Shaped steel is fastened on the concrete component by the card cable by bolt.
8. mounting process as claimed in claim 7, it is characterised in that in the step (4), described card cable one end is tabular knot Structure, the other end are the structure to match with shaped steel opposite side profile, and the card cable other end passes through bolt and the structure snapping And the shaped steel is connected in the groove.
9. mounting process as claimed in claim 5, it is characterised in that in the step (6), the concrete component includes pin Hole, the pin-and-hole are arranged on two sides of concrete component in the width direction, and the monocyclic supporting construction body passes through pin-and-hole It is axially assembled along the passage with pin and another monocyclic supporting construction body.
10. the mounting process as described in claim 1-9, it is characterised in that in the step (1) and (2), the concrete structure Part includes anchor pole/anchor cable hole, and the anchor pole/anchor cable hole is arranged on the both sides of the groove, the concrete component by anchor pole/ Anchor cable hole is fixed on the country rock of passage, and the anchor pole/anchor cable hole is long and narrow band round rectangle hole, to prevent because of reinforced concrete arc Plate with surrouding rock deformation is inconsistent causes anchor cable failure by shear.
CN201711079723.5A 2017-11-06 2017-11-06 A kind of prefabricated assembled composite supporting construction mounting process based on fashioned iron Active CN107893665B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711079723.5A CN107893665B (en) 2017-11-06 2017-11-06 A kind of prefabricated assembled composite supporting construction mounting process based on fashioned iron

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711079723.5A CN107893665B (en) 2017-11-06 2017-11-06 A kind of prefabricated assembled composite supporting construction mounting process based on fashioned iron

Publications (2)

Publication Number Publication Date
CN107893665A true CN107893665A (en) 2018-04-10
CN107893665B CN107893665B (en) 2019-07-05

Family

ID=61804135

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711079723.5A Active CN107893665B (en) 2017-11-06 2017-11-06 A kind of prefabricated assembled composite supporting construction mounting process based on fashioned iron

Country Status (1)

Country Link
CN (1) CN107893665B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098718A (en) * 2018-10-09 2018-12-28 北方工业大学 Assembled roadway construction method
CN110748005A (en) * 2019-10-29 2020-02-04 华中科技大学 Axial insertion horizontal pin type mortise-tenon joint and assembly type construction component
CN110748010A (en) * 2019-10-29 2020-02-04 武汉市市政建设集团有限公司 Rigid assembling mortise-tenon joint and assembling type construction component
CN110761414A (en) * 2019-10-29 2020-02-07 华中科技大学 I-type standard block combined mortise and tenon joint and assembled construction component
CN111424697A (en) * 2020-04-19 2020-07-17 中铁上海工程局集团有限公司 Construction method for prefabricating deep and large open caisson by slicing

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87216389U (en) * 1987-12-11 1988-07-20 董显枢 Retractable arch with high strength
CN201460915U (en) * 2009-08-05 2010-05-12 焦作煤业集团赵固(新乡)能源有限责任公司 Telescopic U-shaped steel roadway support
CN103557013A (en) * 2013-11-06 2014-02-05 王静 Annular steel structure supporting construction method with open type TBM (tunnel boring machine)
CN104763442A (en) * 2015-03-12 2015-07-08 中国矿业大学(北京) High-intensity large-shrinkage sealed cambered-plate support structural element
KR20170048943A (en) * 2015-10-27 2017-05-10 경성대학교 산학협력단 Precast concrete segment for preventing of damage end part and manufacturing method of the same
CN206220978U (en) * 2016-08-25 2017-06-06 河北工业大学 Vcehicular tunnel first lined steel bow member supporting construction integrated with prestressed anchor

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87216389U (en) * 1987-12-11 1988-07-20 董显枢 Retractable arch with high strength
CN201460915U (en) * 2009-08-05 2010-05-12 焦作煤业集团赵固(新乡)能源有限责任公司 Telescopic U-shaped steel roadway support
CN103557013A (en) * 2013-11-06 2014-02-05 王静 Annular steel structure supporting construction method with open type TBM (tunnel boring machine)
CN104763442A (en) * 2015-03-12 2015-07-08 中国矿业大学(北京) High-intensity large-shrinkage sealed cambered-plate support structural element
KR20170048943A (en) * 2015-10-27 2017-05-10 경성대학교 산학협력단 Precast concrete segment for preventing of damage end part and manufacturing method of the same
CN206220978U (en) * 2016-08-25 2017-06-06 河北工业大学 Vcehicular tunnel first lined steel bow member supporting construction integrated with prestressed anchor

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098718A (en) * 2018-10-09 2018-12-28 北方工业大学 Assembled roadway construction method
CN110748005A (en) * 2019-10-29 2020-02-04 华中科技大学 Axial insertion horizontal pin type mortise-tenon joint and assembly type construction component
CN110748010A (en) * 2019-10-29 2020-02-04 武汉市市政建设集团有限公司 Rigid assembling mortise-tenon joint and assembling type construction component
CN110761414A (en) * 2019-10-29 2020-02-07 华中科技大学 I-type standard block combined mortise and tenon joint and assembled construction component
CN111424697A (en) * 2020-04-19 2020-07-17 中铁上海工程局集团有限公司 Construction method for prefabricating deep and large open caisson by slicing

Also Published As

Publication number Publication date
CN107893665B (en) 2019-07-05

Similar Documents

Publication Publication Date Title
CN107893665A (en) A kind of prefabricated assembled composite supporting construction mounting process based on shaped steel
US9745712B2 (en) Cementitious foundation cap with post-tensioned helical anchors and method of making the same
CN104763442B (en) The big contracting amount enclosed type Arc plate support structure of high intensity
CN109372556B (en) Sandwich arch suitable for high-stress soft rock tunnel surrounding rock support and construction method
CN108119164A (en) A kind of prefabricated assembled composite supporting construction
CN207828965U (en) A kind of pouch expansion variable diameters steel reinforcement cage and anchor pole or pile foundation
CN107542087A (en) A kind of pouch expansion variable diameters steel reinforcement cage and anchor pole or pile foundation
CN107725068A (en) A kind of assembled supporting construction and its construction method based on outside steel arch-shelf and inner side concrete slab
JP6615869B2 (en) Method for expanding the space below a stone arch bridge and a stone arch bridge
CN107849831A (en) Method for carrying out pushing tow/construction bridge using prefabricated panel and steel-pipe concrete truss
DE2434200C3 (en) Process for the production of underground cavities
CN211113663U (en) Recoverable anchor rope fender pile combined supporting structure of anchor rope
CN105178979A (en) Supporting structure of tunnel in bias salt cavity environment and construction method of supporting structure
CN102587367A (en) Mechanical connection type anchor rod
CN109113081A (en) Fabricated drainage prestress anti-slide pile structure and construction process thereof
CN103510540A (en) Construction method for reinforcing mortar rubble retaining wall and structure of mortar rubble retaining wall
WO2016005941A1 (en) Structural strengthening system with internally anchored reinforcements by adherence
NL2030784B1 (en) Rapid construction device and method for prestressed basalt fiber anchor rod
CN206346216U (en) A kind of ruggedized construction of power transmission line iron tower foundation
CN109931077A (en) Support system and its construction method for Segment rehabilitation
CN212612522U (en) Truss string concrete combined supporting system
CN107630708A (en) A kind of prefabricated assembled composite support system based on shaped steel
CN220550582U (en) Concrete pile with drum part and root pile for prefabricating pile foundation structure
CN207673348U (en) A kind of prefabricated assembled composite support system based on shaped steel
CN209838429U (en) Back anchor shield constructs lining cutting supporting construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant