CN107884107A - TBM execution conditions detecting earth stress of lower all the period of time systems - Google Patents
TBM execution conditions detecting earth stress of lower all the period of time systems Download PDFInfo
- Publication number
- CN107884107A CN107884107A CN201711225570.0A CN201711225570A CN107884107A CN 107884107 A CN107884107 A CN 107884107A CN 201711225570 A CN201711225570 A CN 201711225570A CN 107884107 A CN107884107 A CN 107884107A
- Authority
- CN
- China
- Prior art keywords
- tbm
- period
- table top
- execution conditions
- detecting earth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 241001669679 Eleotris Species 0.000 claims description 7
- 230000003139 buffering effect Effects 0.000 claims description 2
- 239000007787 solid Substances 0.000 claims description 2
- 238000009662 stress testing Methods 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 14
- 229910000831 Steel Inorganic materials 0.000 description 7
- 239000010959 steel Substances 0.000 description 7
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000012876 topography Methods 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01L—MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
- G01L5/00—Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes
- G01L5/0047—Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes measuring forces due to residual stresses
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
The present invention discloses a kind of TBM execution conditions detecting earth stress of lower all the period of time system, especially a kind of TBM execution conditions detecting earth stress of lower all the period of time systems for high altitude localities geological stress testing field.TBM execution conditions detecting earth stress of lower all the period of time system of the present invention, including wind band, test platform, jack up unit, transport vehicle, test equipment, fixture, the test platform includes table top and the support frame being arranged on below table top, the transport vehicle is located at below table top, the test equipment is fixed on the table top of test platform, between transport vehicle and wind band, the fixture is fixedly connected with test platform for the test equipment and table top.Can under TBM execution conditions all the period of time carry out detecting earth stress, and can realize it is overall quick mobile, it is convenient and swift, it is time saving and energy saving.
Description
Technical field
It is especially a kind of to be used for High aititude the present invention relates to a kind of TBM execution conditions detecting earth stress of lower all the period of time system
TBM execution conditions detecting earth stress of the lower all the period of time systems in regional geology stress test field.
Background technology
Since 21st century, the industry such as traffic, water conservancy and hydropower and energy is rapidly developed, and the mankind live in the earth's crust
Constantly extension and the extension of the breadth and depth in dynamic space, particularly in the last few years China in high slope, high-ground stress, buried length
The topography and geomorphology such as tunnel complex area, has built numerous Geotechnical Engineerings.Existing increasing number is it was demonstrated that earth's surface and underground work
The rock excavation that journey construction period is carried out tends to cause a series of deformations associated with stress release and breakoff phenomenon, this
With regard to needs, Stress Field Distribution rule has sufficient understanding over the ground, and the research most direct approach of the stress field regularity of distribution is exactly to carry out
Detecting earth stress, but in recent years, the deep and long tunnels of some complicated geographical reliefs use tunneling boring tunnel piercing more when excavating
Machine (TBM) is constructed, and during TBM normal operations, can not ensure have enough spaces to carry out detecting earth stress, therefore prior art
Detecting earth stress only could be carried out in TBM idle periods, and the time shared by TBM operations is longer, therefore use
The detecting earth stress system of prior art greatly reduces operating efficiency, have impact on construction speed.
The content of the invention
The technical problems to be solved by the invention be to provide one kind can under TBM execution conditions all the period of time carry out crustal stress
Test, and overall quick mobile, convenient and swift, time saving and energy saving test system can be realized.
The present invention solves TBM execution conditions detecting earth stress of lower all the period of time systems used by its technical problem, including wind
Band, test platform, jack up unit, transport vehicle, test equipment, fixture, the test platform include table top and are arranged on table top
The support frame of lower section, the transport vehicle are located at below table top, and the test equipment is fixed on the table top of test platform, the survey
Equipment and table top are tried between transport vehicle and wind band, the fixture is fixedly connected with test platform, the jack up unit
Lower end is fixed on transport vehicle, and the fixture is located at the top of jack up unit.
It is further to be provided with bolster between the fixture and jack up unit.
It is further that the bolster is sleeper.
It is further that the jack up unit is jack.
The beneficial effects of the invention are as follows:TBM execution conditions detecting earth stress of the lower all the period of time systems of the application set test
Standby and table top is arranged between transport vehicle and wind band, so as to the ingenious region for avoiding TBM constructions.Applied using the TBM of the application
All the period of time, detecting earth stress system did not interfered with TBM normal construction under the conditions of work so that detecting earth stress and TBM constructions can be with
Carry out simultaneously, so all periods can be made all to be fully used, the period without avoiding TBM constructions, realize complete
The target of period detecting earth stress, the duration can be thus greatlyd save, significantly improve production efficiency, accelerating construction progress.When
Installation test request can utilize the jack up unit on transport vehicle will be fixed when needing to carry the test equipment of the application
Upper test platform is increased to certain altitude fixed, the support frame of test platform is departed from supporting plane, then utilizes fortune
Defeated car, test platform and test equipment are transported into specified location.After test platform reaches specified location, jack up unit allows
Test platform, which declines certain altitude, to be made, support frame fall on the supporting plane in tunnel formed to after the secure support of test system just
Test job of the test equipment to crustal stress can be started.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Parts, position and numbering in figure:It is wind band 1, test platform 2, jack up unit 3, transport vehicle 4, test equipment 5, solid
Determine part 6, sleeper 7, support frame 8.
Embodiment
The invention will be further described below in conjunction with the accompanying drawings.
As shown in figure 1, TBM execution conditions detecting earth stress of the lower all the period of time systems of the present invention, including wind band 1, test are put down
Platform 2, jack up unit 3, transport vehicle 4, test equipment 5, fixture 6, the test platform 2 include table top and are arranged on below table top
Support frame 8, the transport vehicle 4 is located at below table top, and the test equipment 5 is fixed on the table top of test platform 2, the survey
Equipment 5 and table top are tried between transport vehicle 4 and wind band 1, the fixture 6 is fixedly connected with test platform 2, the raising dress
Put 3 lower end to be fixed on transport vehicle 4, the fixture 6 is located at the top of jack up unit 3.Under the TBM execution conditions of the application
Test equipment 5 and table top are arranged between transport vehicle 4 and wind band 1 by all the period of time detecting earth stress system, are avoided so as to ingenious
The region of TBM constructions.Therefore TBM normal construction has not been interfered with using all the period of time detecting earth stress system of the application, has been made
Obtaining detecting earth stress and TBM constructions can be carried out simultaneously, so all periods can be made all to be fully used, without keeping away
The period of TBM constructions is opened, the target of all the period of time detecting earth stress is realized, can thus greatly save the duration, significantly improve
Production efficiency, accelerating construction progress.It can be utilized when installing test request and needing and the test equipment 5 of the application is carried
Jack up unit 3 on transport vehicle 4 will be fixed on to fix is increased to certain altitude by upper test platform 2, makes the branch of test platform 2
Support 8 departs from supporting plane, and then using transport vehicle 4, test platform 2 and test equipment 5 are transported into specified location.Work as survey
After trying the arrival specified location of platform 2, jack up unit 3, which allows test platform 2 to decline certain altitude, to be made, and support frame 8 falls on the branch in tunnel
Formed in support plane and test job of the test equipment 5 to crustal stress is started to can after the secure support of test system.
In order to effectively be protected to liter system platform and test equipment 5, ensure the precision of test, the application is also in institute
State and bolster is provided between girder steel and jack up unit 3, relax jack up unit 3 between the starting stage of lifting and fixture 6
Impact, to ensure that test equipment 5 will not cause to damage because of impact.
The bolster is sleeper 7.Bolster convenient material drawing is used as using sleeper 7, cost is low, makes simple, buffering effect
Fruit is good.
Jack up unit 3 is jack, and the application is preferentially using jack as jack up unit 3, and use is efficient and convenient, raising
Height can adjust.Fixture 6 uses I-steel girder steel in the specific implementation.
Embodiment 1
In the present embodiment, jack up unit 3 uses two symmetrically placed 20t jack, and fixture 6 uses I-steel steel
Beam.The quantity of sleeper 7 is consistent with jack quantity, and when test system needs to carry, girder steel is fixed on into the bracket of test platform 2
Above, sleeper 7 and jack are placed between girder steel and transport vehicle 4, is risen whole test system by being pressurizeed to jack,
Then can be carried it by transport vehicle 4 to specified location, whole transportation is convenient and swift, time saving and energy saving.
TBM constructions can not be influenceed using the detecting earth stress system of the application completely, in the period of TBM constructions, may be used yet
To carry out detecting earth stress, and can be needed quickly and easily to be moved to specified location according to test.
Claims (5)
1.TBM execution conditions detecting earth stress of lower all the period of time systems, it is characterised in that:Including wind band (1), test platform (2), rise
Device (3), transport vehicle (4), test equipment (5), fixture (6) are risen, the test platform (2) includes table top and is arranged on table top
The support frame (8) of lower section, the transport vehicle (4) are located at below table top, and the test equipment (5) is fixed on test platform (2)
On table top, the test equipment (5) and table top are located between transport vehicle (4) and wind band (1), and the fixture (6) is flat with test
Platform (2) is fixedly connected, and the lower end of the jack up unit (3) is fixed on transport vehicle (4), and the fixture (6) is located at raising dress
Put the top of (3).
2. TBM execution conditions detecting earth stress of lower all the period of time system as claimed in claim 1, it is characterised in that:Described solid
Determine part (6) and bolster is provided between raising.
3. TBM execution conditions detecting earth stress of lower all the period of time system as claimed in claim 2, it is characterised in that:The buffering
Part is sleeper (7).
4. TBM execution conditions detecting earth stress of lower all the period of time system as claimed in claim 1, it is characterised in that:The raising
Device (3) is jack.
5. TBM execution conditions detecting earth stress of lower all the period of time system as claimed in claim 1, it is characterised in that:It is described very heavy
Top is symmetricly set on transport vehicle (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711225570.0A CN107884107B (en) | 2017-11-29 | 2017-11-29 | Full-time-period ground stress testing system under TBM construction condition |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711225570.0A CN107884107B (en) | 2017-11-29 | 2017-11-29 | Full-time-period ground stress testing system under TBM construction condition |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107884107A true CN107884107A (en) | 2018-04-06 |
CN107884107B CN107884107B (en) | 2023-11-21 |
Family
ID=61775939
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711225570.0A Active CN107884107B (en) | 2017-11-29 | 2017-11-29 | Full-time-period ground stress testing system under TBM construction condition |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107884107B (en) |
Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009103604A (en) * | 2007-10-24 | 2009-05-14 | Ihi Corp | Device for measuring thrust of water jet propelled ship |
CN101514926A (en) * | 2009-03-20 | 2009-08-26 | 中国矿业大学 | Coal-rock mass ground stress continuous testing device and method thereof |
CN101592533A (en) * | 2009-07-10 | 2009-12-02 | 沈阳重型机械集团有限责任公司 | Synchronous detection test device for multi-item parameters of linear TBM hobs |
CN101922985A (en) * | 2010-08-04 | 2010-12-22 | 中国水电顾问集团华东勘测设计研究院 | Measurement method for stress change of rocks during TBM tunneling |
CN102426069A (en) * | 2011-08-29 | 2012-04-25 | 中国科学院武汉岩土力学研究所 | Measurement method for rock mass crustal stress under extremely high stress condition |
CN102620871A (en) * | 2012-04-17 | 2012-08-01 | 辽宁工程技术大学 | Particle radiation monitoring mine rock stratum stress state system and monitoring method |
CN102928138A (en) * | 2012-10-29 | 2013-02-13 | 南阳理工学院 | Baseplate stress monitoring device and method based on reflected optical fiber sensing and fiber bragg grating sensing of Brillouin optical time domain |
US20150204741A1 (en) * | 2014-01-22 | 2015-07-23 | Ford Global Technologies, Llc | Traction-Battery Vehicle Test Trailer |
CN205292373U (en) * | 2015-11-27 | 2016-06-08 | 深圳市招科智控科技有限公司 | Take lift platform's automated guided transporting vehicle |
CN105758565A (en) * | 2016-03-03 | 2016-07-13 | 山东科技大学 | Coal roadway driving head-on stress measuring method and danger assessment method |
CN105784206A (en) * | 2016-04-28 | 2016-07-20 | 中国矿业大学 | Gun drilling full-segment multiple-point wall abutting type three-dimensional mining induced stress monitoring device and gun drilling full-segment multiple-point wall abutting type three-dimensional mining induced stress monitoring method |
CN105952465A (en) * | 2016-05-26 | 2016-09-21 | 中国科学院武汉岩土力学研究所 | A monitoring method for a surrounding rock and full face tunnel boring machine shield interaction process |
CN205664963U (en) * | 2016-06-08 | 2016-10-26 | 中国电建集团成都勘测设计研究院有限公司 | Rock mass surface secondary stress test instrument |
CN106370333A (en) * | 2016-09-21 | 2017-02-01 | 武汉大学 | TBM hobbing cutter stress online real-time monitoring apparatus and monitoring method |
CN107100628A (en) * | 2017-06-21 | 2017-08-29 | 水利部交通运输部国家能源局南京水利科学研究院 | A kind of monitoring instrument of parallel tunneling with TBM process buries platform and method |
CN207779594U (en) * | 2017-11-29 | 2018-08-28 | 中国电建集团成都勘测设计研究院有限公司 | TBM execution conditions detecting earth stress of lower all the period of time systems |
-
2017
- 2017-11-29 CN CN201711225570.0A patent/CN107884107B/en active Active
Patent Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009103604A (en) * | 2007-10-24 | 2009-05-14 | Ihi Corp | Device for measuring thrust of water jet propelled ship |
CN101514926A (en) * | 2009-03-20 | 2009-08-26 | 中国矿业大学 | Coal-rock mass ground stress continuous testing device and method thereof |
CN101592533A (en) * | 2009-07-10 | 2009-12-02 | 沈阳重型机械集团有限责任公司 | Synchronous detection test device for multi-item parameters of linear TBM hobs |
CN101922985A (en) * | 2010-08-04 | 2010-12-22 | 中国水电顾问集团华东勘测设计研究院 | Measurement method for stress change of rocks during TBM tunneling |
CN102426069A (en) * | 2011-08-29 | 2012-04-25 | 中国科学院武汉岩土力学研究所 | Measurement method for rock mass crustal stress under extremely high stress condition |
CN102620871A (en) * | 2012-04-17 | 2012-08-01 | 辽宁工程技术大学 | Particle radiation monitoring mine rock stratum stress state system and monitoring method |
CN102928138A (en) * | 2012-10-29 | 2013-02-13 | 南阳理工学院 | Baseplate stress monitoring device and method based on reflected optical fiber sensing and fiber bragg grating sensing of Brillouin optical time domain |
US20150204741A1 (en) * | 2014-01-22 | 2015-07-23 | Ford Global Technologies, Llc | Traction-Battery Vehicle Test Trailer |
CN205292373U (en) * | 2015-11-27 | 2016-06-08 | 深圳市招科智控科技有限公司 | Take lift platform's automated guided transporting vehicle |
CN105758565A (en) * | 2016-03-03 | 2016-07-13 | 山东科技大学 | Coal roadway driving head-on stress measuring method and danger assessment method |
CN105784206A (en) * | 2016-04-28 | 2016-07-20 | 中国矿业大学 | Gun drilling full-segment multiple-point wall abutting type three-dimensional mining induced stress monitoring device and gun drilling full-segment multiple-point wall abutting type three-dimensional mining induced stress monitoring method |
CN105952465A (en) * | 2016-05-26 | 2016-09-21 | 中国科学院武汉岩土力学研究所 | A monitoring method for a surrounding rock and full face tunnel boring machine shield interaction process |
CN205664963U (en) * | 2016-06-08 | 2016-10-26 | 中国电建集团成都勘测设计研究院有限公司 | Rock mass surface secondary stress test instrument |
CN106370333A (en) * | 2016-09-21 | 2017-02-01 | 武汉大学 | TBM hobbing cutter stress online real-time monitoring apparatus and monitoring method |
CN107100628A (en) * | 2017-06-21 | 2017-08-29 | 水利部交通运输部国家能源局南京水利科学研究院 | A kind of monitoring instrument of parallel tunneling with TBM process buries platform and method |
CN207779594U (en) * | 2017-11-29 | 2018-08-28 | 中国电建集团成都勘测设计研究院有限公司 | TBM execution conditions detecting earth stress of lower all the period of time systems |
Non-Patent Citations (1)
Title |
---|
王伟: "《长大隧道独头掘进高地应力施工技术研究》", 《四川水泥》 * |
Also Published As
Publication number | Publication date |
---|---|
CN107884107B (en) | 2023-11-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103669216A (en) | Steel box girder scattered-splicing sliding device and installation method | |
US20170138194A1 (en) | Method for removing hydraulic support for solid filling coal mining | |
CN103256053B (en) | Excavation and construction method of underground cavity ball coronary dome | |
CN105697013A (en) | Contractible temporary support for tunneling tunnel | |
CN104481547B (en) | A kind of shed ding support tunnel speedy drivage method | |
CN106193117B (en) | A kind of assembling and construction method of the prefabricated pipe gallery in underground | |
CN207779594U (en) | TBM execution conditions detecting earth stress of lower all the period of time systems | |
CN104895592A (en) | Fully-mechanized coal mining and caving face support retracement supporting method | |
CN105736044A (en) | Method for rapidly withdrawing fully mechanized coal mining face device of steep seam | |
CN202831000U (en) | Fixed tower crane overall moving mechanism | |
CN103967052B (en) | A kind of method of protecting the new and old frame core-tube system substrate discrepancy in elevation soil body | |
CN203271739U (en) | Support for electric coal drill | |
CN107884107A (en) | TBM execution conditions detecting earth stress of lower all the period of time systems | |
CN102704512B (en) | Immersed tube bottom jack type deviation rectifying fine adjusting system and adjusting technology | |
CN208684247U (en) | A kind of prefabricated subsection hanging apparatus | |
CN104863599B (en) | Fully-mechanized mining working synchronously expands side installation method and support system | |
CN103352704B (en) | Construction method for enabling tunnel shield to pass through vertical shaft structure | |
CN203310412U (en) | GNSS (global navigation satellite system) observation pillar for reducing multipath effect | |
CN204754937U (en) | Special meeting platform of tunnel boring machine | |
CN205977257U (en) | Mining excavation is walking prop and entry driving machine for working face | |
CN204754950U (en) | It puts force piece to combine to adopt to combine | |
CN203452796U (en) | Vertical shaft base structure for shield machine to pass through | |
CN205778524U (en) | A kind of chassis of one people controlled multiple stage rock drill | |
CN202787314U (en) | Immersed tube bottom end forklift-type rectifying and fine adjusting system | |
CN202913431U (en) | Immersed tube bottom end jack type deviation-rectifying accurate adjustment system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |