CN107883107A - 石油控温管道 - Google Patents
石油控温管道 Download PDFInfo
- Publication number
- CN107883107A CN107883107A CN201711413639.2A CN201711413639A CN107883107A CN 107883107 A CN107883107 A CN 107883107A CN 201711413639 A CN201711413639 A CN 201711413639A CN 107883107 A CN107883107 A CN 107883107A
- Authority
- CN
- China
- Prior art keywords
- interconnected
- cooling
- pipe
- condenser
- induction coil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L53/00—Heating of pipes or pipe systems; Cooling of pipes or pipe systems
Abstract
本发明公开了一种石油控温管道,包括:管道本体,在所述管道本体的外侧设置有螺旋散热片,在所述螺栓散热片与管道本体之间设置有U型螺旋岩棉,在所述U型螺旋岩棉内设置有感应线圈缠绕凹槽,在所述感应线圈缠绕凹槽内缠绕有感应线圈,在所述螺旋散热片内设置有冷却通道,所述冷却通道的一端通过进水管与冷却水箱的下端相互连通,在所述进水管上设置有进水阀和进水泵,所述冷却通道的另一端通过出水管与溢流水箱的上端相互连通,在所述出水管上设置有出水阀和出水泵,所述溢流水箱和冷却水箱之间设置有冷凝器,所述冷凝器的一端通过第一溢流管与溢流水箱的上端相互连通。
Description
技术领域
本发明涉及一种石油设备,尤其涉及一种石油控温管道。
背景技术
石油在输油管中的输送过程中,由于环境温度的变化,会带来石油油温的变化。在寒冷的冬季油温下降后,石油的粘度上升,影响石油在管道中的流动,经常发生冻堵爆管,影响输油效率,严重时影响抽油井的正常生产;在炎热的夏季油温上升后,石油管道内的热能消耗较大,从而导致石油损耗,造成较大损失,满足不了石油输送要求。
发明内容
本发明所要解决的技术问题是:提供一种控温效果好的石油控温管道。
为了解决上述技术问题,本发明采用的技术方案是:石油控温管道,包括:管道本体,在所述管道本体的外侧设置有螺旋散热片,在所述螺栓散热片与管道本体之间设置有U型螺旋岩棉,在所述U型螺旋岩棉内设置有感应线圈缠绕凹槽,在所述感应线圈缠绕凹槽内缠绕有感应线圈,在所述螺旋散热片内设置有冷却通道,所述冷却通道的一端通过进水管与冷却水箱的下端相互连通,在所述进水管上设置有进水阀和进水泵,所述冷却通道的另一端通过出水管与溢流水箱的上端相互连通,在所述出水管上设置有出水阀和出水泵,所述溢流水箱和冷却水箱之间设置有冷凝器,所述冷凝器的一端通过第一溢流管与溢流水箱的上端相互连通,所述冷凝器的另一端通过第二溢流管与冷却水箱的上端相互连通。
本发明的优点是:上述石油控温管道,结构新颖,控温效果好,能够在冬季对石油管道进行加热升温,防止石油粘度上升导致石油管道冻堵爆管,保证输油效率,能够在夏季对石油管道进行散热降温,防止石油管道内热能消耗过大导致石油损耗,保证石油输送产量,满足了了石油的输送要求。
附图说明
图1为本发明石油控温管道的结构示意图。
图中:1、管道本体,2、螺旋散热片,3、U型螺旋岩棉,4、感应线圈缠绕凹槽,5、感应线圈,6、冷却通道,7、进水管,8、冷却水箱,9、进水阀,10、进水泵,11、出水管,12、溢流水箱,13、出水阀,14、出水泵,15、冷凝器,16、第一溢流管,17、第二溢流管。
具体实施方式
下面结合附图和具体实施例详细描述一下本发明的具体内容。
如图1所示,石油控温管道,包括:管道本体1,在所述管道本体1的外侧设置有螺旋散热片2,在所述螺栓散热片2与管道本体1之间设置有U型螺旋岩棉3,在所述U型螺旋岩棉3内设置有感应线圈缠绕凹槽4,在所述感应线圈缠绕凹槽4内缠绕有感应线圈5,在所述螺旋散热片2内设置有冷却通道6,所述冷却通道6的一端通过进水管7与冷却水箱8的下端相互连通,在所述进水管7上设置有进水阀9和进水泵10,所述冷却通道6的另一端通过出水管11与溢流水箱12的上端相互连通,在所述出水管11上设置有出水阀13和出水泵14,所述溢流水箱12和冷却水箱8之间设置有冷凝器15,所述冷凝器15的一端通过第一溢流管16与溢流水箱12的上端相互连通,所述冷凝器15的另一端通过第二溢流管17与冷却水箱8的上端相互连通。
上述石油控温管道冬季使用时,关闭进水阀9和进水泵10,打开出水阀13和出水泵14将冷却通道6内的冷却水全部抽入到溢流水箱12内,然后关闭出水阀13和出水泵14使冷却通道6内保持空腔状态,给感应线圈5通电,在感应电流的作用下管道本体1发热从而对管道内的石油进行加热,防止凝结。
上述石油控温管道夏季使用时,感应线圈5停止通电,同时打开进水阀9、进水泵10、出水阀13和出水泵14,进水泵10将冷却水箱8内的冷却水通过进水管7抽入到冷却通道6内,管道本体1内的热量散发到螺旋散热片2内,冷却通道6内的冷却水流经时将热量带走,出水泵14通过出水管11将冷却通道6内吸热后的冷却水抽入到溢流水箱12内,溢流水箱12内吸热后的冷却水装满后通过第一溢流管16流入到冷凝器15内,冷凝器15对吸热后的冷却水进行降温,降温后的冷却水通过第二溢流管17进入到冷却水箱8内供循环冷却使用。
Claims (1)
1.石油控温管道,其特征在于:包括:管道本体(1),在所述管道本体(1)的外侧设置有螺旋散热片(2),在所述螺栓散热片(2)与管道本体(1)之间设置有U型螺旋岩棉(3),在所述U型螺旋岩棉(3)内设置有感应线圈缠绕凹槽(4),在所述感应线圈缠绕凹槽(4)内缠绕有感应线圈(5),在所述螺旋散热片(2)内设置有冷却通道(6),所述冷却通道(6)的一端通过进水管(7)与冷却水箱(8)的下端相互连通,在所述进水管(7)上设置有进水阀(9)和进水泵(10),所述冷却通道(6)的另一端通过出水管(11)与溢流水箱(12)的上端相互连通,在所述出水管(11)上设置有出水阀(13)和出水泵(14),所述溢流水箱(12)和冷却水箱(8)之间设置有冷凝器(15),所述冷凝器(15)的一端通过第一溢流管(16)与溢流水箱(12)的上端相互连通,所述冷凝器(15)的另一端通过第二溢流管(17)与冷却水箱(8)的上端相互连通。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711413639.2A CN107883107A (zh) | 2017-12-24 | 2017-12-24 | 石油控温管道 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711413639.2A CN107883107A (zh) | 2017-12-24 | 2017-12-24 | 石油控温管道 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107883107A true CN107883107A (zh) | 2018-04-06 |
Family
ID=61772155
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711413639.2A Pending CN107883107A (zh) | 2017-12-24 | 2017-12-24 | 石油控温管道 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107883107A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112066136A (zh) * | 2020-08-28 | 2020-12-11 | 李宛芸 | 一种石油天然气控温管道 |
CN117781070A (zh) * | 2024-02-27 | 2024-03-29 | 青岛汇森能源设备股份有限公司 | 一种带有热量测量装置的安全性管道电磁加热系统 |
-
2017
- 2017-12-24 CN CN201711413639.2A patent/CN107883107A/zh active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112066136A (zh) * | 2020-08-28 | 2020-12-11 | 李宛芸 | 一种石油天然气控温管道 |
CN112066136B (zh) * | 2020-08-28 | 2023-08-04 | 固始县弘昌天然气有限责任公司 | 一种石油天然气控温管道 |
CN117781070A (zh) * | 2024-02-27 | 2024-03-29 | 青岛汇森能源设备股份有限公司 | 一种带有热量测量装置的安全性管道电磁加热系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205717919U (zh) | 相变蓄热式热水器 | |
CN204612524U (zh) | 闭式防冻供冷装置 | |
CN107883107A (zh) | 石油控温管道 | |
CN108895665A (zh) | 一种空气源热泵热水器分区域梯级储热一体机 | |
CN104952590A (zh) | 一种供电系统中的散热过滤油浸式变压器 | |
CN203810794U (zh) | 一种地源热泵空调系统的地埋管换热器结构 | |
CN207935600U (zh) | 石油控温管道 | |
CN206094990U (zh) | 多层套管式预热器 | |
CN201449014U (zh) | 一种热泵热水器水箱 | |
CN106152507A (zh) | 一种热泵热水器循环系统 | |
CN205843060U (zh) | 换热器及相变蓄热式热水器 | |
CN205937324U (zh) | 液压站余热利用系统 | |
CN203036851U (zh) | 天然气混合能源介质低温加热炉 | |
CN206478212U (zh) | 一种同时泵出及回吸型油冷系统 | |
CN103185406B (zh) | 电辅助加热间接式热水系统中应用的蓄热水箱 | |
CN204765061U (zh) | 一种新型空气能饮水机 | |
CN204412387U (zh) | 砂磨机冷却循环系统 | |
CN203203280U (zh) | 电辅助加热间接式热水系统中应用的蓄热水箱 | |
CN103423809B (zh) | 多热源热水系统 | |
CN203011190U (zh) | 一种智能采暖散热器水循环装置 | |
CN206488538U (zh) | 一种利用工业空调冷却水实现测试机冷循环装置 | |
CN205013443U (zh) | 一种柴油机热水循环加热液压油装置 | |
CN206338948U (zh) | 一种分区加热式水箱 | |
CN205936734U (zh) | 一种快速散热的机油冷却器 | |
CN201177376Y (zh) | 一种热水器水箱 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180406 |
|
WD01 | Invention patent application deemed withdrawn after publication |