CN107863716A - Double division offline coasters of overhead transmission line - Google Patents

Double division offline coasters of overhead transmission line Download PDF

Info

Publication number
CN107863716A
CN107863716A CN201610840745.8A CN201610840745A CN107863716A CN 107863716 A CN107863716 A CN 107863716A CN 201610840745 A CN201610840745 A CN 201610840745A CN 107863716 A CN107863716 A CN 107863716A
Authority
CN
China
Prior art keywords
axle
framework
clamping plate
overhead transmission
coasters
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610840745.8A
Other languages
Chinese (zh)
Inventor
鲁大勇
丁晓飞
李朝伟
王蕊
李朋
杜瑞军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Puyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Puyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Puyang Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610840745.8A priority Critical patent/CN107863716A/en
Publication of CN107863716A publication Critical patent/CN107863716A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Handcart (AREA)

Abstract

The invention discloses a kind of double division offline coasters of overhead transmission line, including framework, framework is provided with directive wheel, the upper end of four columns is provided with guiding wheel frame on the framework, the top for being oriented to wheel frame is ∩ shape frameworks, the bottom for being oriented to wheel frame is arranged on the upper end of upright of frame by bolt, is provided with short axle at ∩ shape frameworks, directive wheel is provided with short axle;Brake gear is also equipped with the guiding wheel frame.The operation that the present invention can be used on double division overhead transmission lines, hung over by the directive wheel set on framework on double bundle conductor, the left friction pad in brake gear and right friction pad are clamped into wire again, operating personnel pulls with hand wire and moved forward and backward during walking, workmen first adjusts the binding nut of the right clamping plate both sides in first axle during stationary deployment, right splint position is fixed, then with hand rotational handle, makes to be arranged on the left clamping plate on the second axle and moves inward and clamp wire.

Description

Double division offline coasters of overhead transmission line
Technical field
The invention belongs to power equipment, more particularly to a kind of double division offline coasters of overhead transmission line.
Background technology
For a long time, the installation of transmission line wire conductor spacer and conducting wire mending work use rope ladder, staff's warp always Climbed by rope ladder to job site, and it is mobile more difficult.Because rope ladder is in light weight, in the weather operation such as strong wind, using During easily occur waving, stretch, staff is produced the feared state of mind.
The content of the invention
The shortcomings that it is an object of the invention to overcome above-mentioned prior art, there is provided it is a kind of simple in construction, it is easy to operation, can Realize that one installs and the patch work of wire strand breakage equivalent damage to double division electricity transmission line conductor spacers.
The present invention is achieved by the following technical solutions:
A kind of double division offline coasters of overhead transmission line, including framework, framework are provided with directive wheel, and four are stood on the framework The upper end of post is provided with guiding wheel frame, and the top for being oriented to wheel frame is ∩ shape frameworks, and the bottom for being oriented to wheel frame leads to The upper end that bolt is arranged on upright of frame is crossed, short axle is installed at ∩ shape frameworks, directive wheel is installed in short axle;The guiding Brake gear is also equipped with wheel frame.
The brake gear has installed in being oriented on the support frame on the longer one side of wheel frame, with being oriented to wheel frame on support frame One side of connection is bearing diagonal, and support frame top is ∪ shape frameworks, ∪ shapes framework be provided with the first relative mounting hole of position and Second mounting hole, first axle is housed between the first mounting hole, the second axle is installed between the second mounting hole, is located at ∪ on the second axle Handle is provided with the outside of shape framework;Equipped with the left clamping plate and right clamping plate that can be moved left and right in first axle and the second axle;First axle The upper both sides positioned at right clamping plate are provided with two binding nuts, and the outside being located on the second axle axle on left clamping plate is fixedly mounted with nut, nut On the second axle.
The relative left friction pad in position and right friction pad are provided with the inside of the left clamping plate and the right clamping plate other end.
Bearing diagonal on support frame as described above is provided with least two mounting holes;It is connected on the guiding wheel frame with framework Side is provided with least two through holes corresponding with the position of mounting hole on bearing diagonal.
The framework lower end is provided with pedal.
The upper end for being oriented to wheel frame is provided with quarter butt, and lever is provided between quarter butt.
It is an advantage of the invention that:The operation that the present invention can be used on double division overhead transmission lines, by being set on framework The directive wheel put is hung on double bundle conductor, then the left friction pad in brake gear and right friction pad clamped into wire, during walking Operating personnel pulls with hand wire and moved forward and backward, and workmen first adjusts the right clamping plate both sides in first axle during stationary deployment Binding nut, right splint position is fixed, then with hand rotational handle, make to be arranged on the left clamping plate on the second axle and move inward simultaneously Clamp wire.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention.
Fig. 2 is brake device structure schematic diagram in Fig. 1.
Fig. 3 is support frame structure side view in Fig. 2.
Embodiment:Double division offline coasters of overhead transmission line as shown in the figure, including framework 6, framework 6 are provided with directive wheel 2, the lower end of framework 6 is provided with pedal 21.The upper end of four columns, which is provided with, on the framework 6 is oriented to wheel frame 4, described to lead It is ∩ shapes framework 1 to the top of wheel frame 4, the bottom for being oriented to wheel frame 4 is arranged on the upper end of the column of framework 6 by bolt 5. Short axle 3 is installed at 1 on ∩ shape frameworks, directive wheel 2 is installed in short axle 3.Brake dress is also equipped with the guiding wheel frame 4 Put.
The brake gear has installed in being oriented on the support frame 9 on wheel frame 4 longer one side, on support frame 9 with directive wheel One side that framework 4 connects is bearing diagonal(As shown in Figure 3), the bearing diagonal is provided with least two mounting holes 19.Pass through installation The spacing of brake gear and directive wheel 2 is adjusted to the mounting hole 19 of diverse location.Bearing diagonal on support frame as described above 9 is provided with At least two mounting holes 19;The side being connected on wheel frame 4 with framework 6 that is oriented to is provided with least two and the peace on bearing diagonal Fill the through hole 23 of the position correspondence of hole 19.The top of support frame 9 is ∪ shape frameworks(Shown in Fig. 2), it is relative that ∪ shapes framework is provided with position The first mounting hole 14 and the second mounting hole 20, first axle 22 is housed between the first mounting hole 14, pacified between the second mounting hole 20 Equipped with the second axle 10, handle 11 is provided with the outside of ∪ shapes framework on the second axle 10;Being equipped with the axle 10 of first axle 22 and second can With the left clamping plate 15 and right clamping plate 13 moved left and right, the both sides positioned at right clamping plate 13 in first axle 22 are provided with two binding nuts 12, the outside on the second axle 10 on left clamping plate 15 is fixedly mounted with nut 16, and nut 16 is arranged on the second axle 10.For driving a left side Clamping plate 15 moves left and right together.The left clamping plate 15 left friction pad 17 He relative with position is provided with the inside of the right other end of clamping plate 13 Right friction pad 18, left friction pad 17 and right friction pad 18 play braking action for clamping wire.
In order to increase security, the upper end that wheel frame 4 is oriented at four is equipped with quarter butt 7, is provided between adjacent quarter butt 7 Lever 8.
In use, the directive wheel 2 on framework 6 is arranged on double bundle conductor, operating personnel, which pulls with hand, during walking leads Line is moved forward and backward, and workmen first adjusts the binding nut 12 of the both sides of right clamping plate 13 in first axle during stationary deployment, will The right position of clamping plate 13 is fixed, then rotates the handle 11 on the second axle 10 with hand, and handle 11 drives the second axle 10 to rotate, makes to be arranged on The nut 16 that the outside of left clamping plate 15 on second axle 10 is fixedly mounted with travels inward through left friction pad 17 and right friction pad 18 clamping and led Line.Operation is completed, and rotational handle 11 is displaced outwardly left clamping plate 15, unclamps the wire of clamping.The present invention is applicable a people Or two people carry out operation in framework 6.

Claims (6)

1. a kind of double division offline coasters of overhead transmission line, including framework, framework are provided with directive wheel, it is characterized in that:It is described The upper end of four columns is provided with guiding wheel frame on framework, and the top for being oriented to wheel frame is ∩ shape frameworks, directive wheel The bottom of framework is arranged on the upper end of upright of frame by bolt, is provided with short axle at ∩ shape frameworks, is provided with and leads in short axle To wheel;Brake gear is also equipped with the guiding wheel frame.
2. double division offline coasters of overhead transmission line according to claim 1, it is characterized in that:The brake gear has peace Mounted in being oriented on the support frame on the longer one side of wheel frame, the one side being connected on support frame with being oriented to wheel frame is bearing diagonal, support Frame top is ∪ shape frameworks, and ∪ shapes framework is provided with relative the first mounting hole and the second mounting hole in position, the first mounting hole it Between first axle is housed, the second axle is installed between the second mounting hole, handle is provided with the outside of ∪ shapes framework on the second axle; Equipped with the left clamping plate and right clamping plate that can be moved left and right on one axle and the second axle;In first axle two are provided with positioned at the both sides of right clamping plate Individual binding nut, the outside on the second axle axle on left clamping plate are fixedly mounted with nut, and nut is arranged on the second axle.
3. double division offline coasters of overhead transmission line according to claim 2, it is characterized in that:The left clamping plate and right folder The relative left friction pad in position and right friction pad are provided with the inside of the plate other end.
4. double division offline coasters of overhead transmission line according to claim 2, it is characterized in that:It is oblique on support frame as described above Support is provided with least two mounting holes;The side being connected on the guiding wheel frame with framework is provided with least two and bearing diagonal On position of mounting hole corresponding to through hole.
5. double division offline coasters of overhead transmission line according to claim 1, it is characterized in that:The framework lower end is provided with Pedal.
6. double division offline coasters of overhead transmission line according to claim 1, it is characterized in that:The guiding wheel frame Upper end is provided with quarter butt, and lever is provided between quarter butt.
CN201610840745.8A 2016-09-22 2016-09-22 Double division offline coasters of overhead transmission line Pending CN107863716A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610840745.8A CN107863716A (en) 2016-09-22 2016-09-22 Double division offline coasters of overhead transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610840745.8A CN107863716A (en) 2016-09-22 2016-09-22 Double division offline coasters of overhead transmission line

Publications (1)

Publication Number Publication Date
CN107863716A true CN107863716A (en) 2018-03-30

Family

ID=61698749

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610840745.8A Pending CN107863716A (en) 2016-09-22 2016-09-22 Double division offline coasters of overhead transmission line

Country Status (1)

Country Link
CN (1) CN107863716A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110190551A (en) * 2019-04-19 2019-08-30 国网河南省电力公司栾川县供电公司 A kind of route cleaning and maintenance equipment used for transmission line
CN111313316A (en) * 2020-01-03 2020-06-19 国网冀北电力有限公司秦皇岛供电公司 Brake mechanism and device for breaking aluminum armor tape

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1075513A (en) * 1964-02-25 1967-07-12 King Ltd Geo W Improvements in or relating to conveyor systems
KR20090003561A (en) * 2007-07-03 2009-01-12 한전케이피에스 주식회사 Transferring vehicle with power device
CN202127199U (en) * 2011-06-16 2012-01-25 山东电力集团公司济南供电公司 Folding dirigible chair for double bundle conductors of power transmission line
CN202513498U (en) * 2012-04-06 2012-10-31 宁夏电力公司银川供电局 Rope ladder pulley for overhauling power transmission line
CN204633226U (en) * 2015-06-03 2015-09-09 国家电网公司 Cable laying cable coaster
RU2015103433A (en) * 2015-02-03 2016-08-27 Игорь Сергеевич Кузнецов ELECTRICAL WIRES OF THE ELECTRIC TRANSMISSION LINE AND METHOD OF ITS LAYING
CN206060050U (en) * 2016-09-22 2017-03-29 国网河南省电力公司濮阳供电公司 It is double to divide the offline coaster of overhead transmission line

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1075513A (en) * 1964-02-25 1967-07-12 King Ltd Geo W Improvements in or relating to conveyor systems
KR20090003561A (en) * 2007-07-03 2009-01-12 한전케이피에스 주식회사 Transferring vehicle with power device
CN202127199U (en) * 2011-06-16 2012-01-25 山东电力集团公司济南供电公司 Folding dirigible chair for double bundle conductors of power transmission line
CN202513498U (en) * 2012-04-06 2012-10-31 宁夏电力公司银川供电局 Rope ladder pulley for overhauling power transmission line
RU2015103433A (en) * 2015-02-03 2016-08-27 Игорь Сергеевич Кузнецов ELECTRICAL WIRES OF THE ELECTRIC TRANSMISSION LINE AND METHOD OF ITS LAYING
CN204633226U (en) * 2015-06-03 2015-09-09 国家电网公司 Cable laying cable coaster
CN206060050U (en) * 2016-09-22 2017-03-29 国网河南省电力公司濮阳供电公司 It is double to divide the offline coaster of overhead transmission line

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110190551A (en) * 2019-04-19 2019-08-30 国网河南省电力公司栾川县供电公司 A kind of route cleaning and maintenance equipment used for transmission line
CN110190551B (en) * 2019-04-19 2024-03-26 国网河南省电力公司栾川县供电公司 Line cleaning and maintaining equipment for power transmission line
CN111313316A (en) * 2020-01-03 2020-06-19 国网冀北电力有限公司秦皇岛供电公司 Brake mechanism and device for breaking aluminum armor tape

Similar Documents

Publication Publication Date Title
CN103401185B (en) A kind of Double-bundled-conductor racing vehicle
CN106215384B (en) Concrete bar climbs workbench and its climbing device
CN102074910A (en) General combined type stringing pulley
CN205178400U (en) Power cable wire barrow
CN107863716A (en) Double division offline coasters of overhead transmission line
CN105064671B (en) A kind of electric power overhaul climbs device
CN104577870A (en) Automatic obstacle-crossing type overhead earth wire pay-off tool for maintenance
CN201408948Y (en) Height adjustable lifting-spanning stringing device
CN103618258A (en) Electric transmission line erection tightener
CN203808580U (en) Hoist driving steel wire rope lifting and fixing device
CN206060050U (en) It is double to divide the offline coaster of overhead transmission line
CN102361261A (en) Single-lead maintaining aerodyne
CN201083018Y (en) Mobile multipurpose fast mounting scaffold
CN103247966A (en) High-voltage aerial work elevator
CN204531348U (en) Electronic independent-lifting discharging platform
CN204040892U (en) A kind of electric power rope ladder pulley check mechanism
CN207043082U (en) Removable steel pipe straightening bending apparatus
CN207209877U (en) A kind of two posts four lock unilateral manual synchronization tripper
CN203398638U (en) Operation ladder for painting insulator string in power transmission line
CN206129127U (en) Retractable's terraced device of rotation
CN211691404U (en) Be used for electronic lead screw jacking device of inserted scaffold frame
CN205346676U (en) High -speed railway of not stopping transport across device's span beam becomes width of cloth rotary mechanism
CN203377545U (en) Double split conductor overhead trolley
CN210620019U (en) Anti-slip safety protection device of gantry crane
CN113879418A (en) Cross locking type robot for climbing telegraph pole

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination