CN202513498U - Rope ladder pulley for overhauling power transmission line - Google Patents
Rope ladder pulley for overhauling power transmission line Download PDFInfo
- Publication number
- CN202513498U CN202513498U CN2012201417901U CN201220141790U CN202513498U CN 202513498 U CN202513498 U CN 202513498U CN 2012201417901 U CN2012201417901 U CN 2012201417901U CN 201220141790 U CN201220141790 U CN 201220141790U CN 202513498 U CN202513498 U CN 202513498U
- Authority
- CN
- China
- Prior art keywords
- transmission line
- power transmission
- rope ladder
- pulley
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to an overhauling tool for a power transmission line, and in particular relates to a rope ladder pulley for overhauling the power transmission line. The pulley comprises two pulley wheels on a support and is characterized in that the support for mounting the two pulley wheels consists of a U-shaped support I and a U-shaped support II, the two supports are connected by a fixing plate, the inner side of the U-shaped support I is provided with two relatively distributed rectangular brake plates, a guide shaft and a lead screw are arranged between the two side plates of the U-shaped support I and are in parallel to shafts for fixing the pulley wheels, holes at the upper part of the two rectangular brake plates are matched with the guide shaft, thread holes of the two brake plates are matched with the lead screw, relative surfaces of the lower parts of the two brake plates are fixedly provided with brake sheets, a handle is arranged at one end of the lead screw, and the screwing direction of the lead screw is opposite to the screwing direction of a matching part of the two brake plates. Through the technical scheme of the utility model, based on the traditional pulley, a brake device is additionally provided so that the rope ladder pulley can be conveniently fixed at any position of the power transmission line to meet the overhauling requirements.
Description
Technical field
The utility model relates to power transmission lines overhauling instrument, particularly power transmission lines overhauling and uses the rope ladder coaster.
Background technology
When power transmission lines overhauling, when stockbridge damper positioning etc. is studied for a second time courses one has flunked, handled to the lead behind the crane short in the process, need to adopt the rope ladder coaster that rope ladder and maintainer are moved to the service work position from the suspension clamp of transmission line wire.Existing rope ladder coaster is made up of two rack-mount pulleys; During use two pulleys are placed on the transmission line, on the support under two pulleys, hang rope ladder, the mode that the maintainer overhauls on rope ladder; Because the effect of transmission line deadweight; The maintainer needs to move to lower from the eminence of transmission line, and when the rope ladder coaster drove in maintainer's moving process and overhauls, the rope ladder coaster often takes place can't be fixed and the phenomenon of positioning.Prevent that at present the mode that the positioning phenomenon takes place from mainly being that the maintainer adopts hand to brake, be very easy to crush maintainer's hand like this.How the rope ladder coaster is fixed on maintenance position and the speed that the control rope ladder moves on lead, becomes transmission line high-altitude maintenance process urgent problem.
Summary of the invention
The purpose of the utility model is to overcome the defective that prior art exists, and provides a kind of power transmission lines overhauling of the control of the fixing and translational speed of rope ladder in the maintenance process of high-altitude of can conveniently realizing to use the rope ladder coaster.
For realizing above-mentioned purpose; The technical scheme of the utility model is: a kind of power transmission lines overhauling is used the rope ladder coaster, comprises two rack-mount pulleys, and the support that it is characterized in that installing two pulleys is made up of " U " shape support I and " U " shape support II; Be connected through fixed head between the two stands; In " U " shape support I installed inside the two relative rectangle braking vanes that distribute are arranged, the axis of guide and the leading screw parallel with the axle of fixed block are installed between the biside plate of above-mentioned " U " shape support I, the hole and the axis of guide on two rectangle braking vane tops match; The screwed hole and the leading screw at two braking vanes middle part match; Be fixed with brake block on the opposite face of two braking vane bottoms, at an end of leading screw handle be installed, the match thread rotary orientation at place of above-mentioned leading screw and two braking vanes is opposite.
The technical scheme of the utility model is on the existing basis of power transmission lines overhauling with the rope ladder coaster, has increased brake gear, drives two braking vanes through leading screw and oppositely moves, thereby coaster is fixed on the transmission line.The utlity model has rational in infrastructurely, can conveniently power transmission lines overhauling be fixed on optional position on the transmission line with the rope ladder coaster, to satisfy the maintenance needs.
Description of drawings
Accompanying drawing 1 is the structural representation front view of the utility model;
Accompanying drawing 2 is the right view of the utility model accompanying drawing 1;
Accompanying drawing 3 is the vertical view of the utility model accompanying drawing 1.
Embodiment
Like Fig. 1,2, shown in 3; The pulley II 1 of left end is through on axle II 3 rotatable being installed in " U " the shape support II 2; The pulley I 6 of right-hand member is through on axle I 7 rotatable being installed in " U " the shape support I 8, about two " U " shape support be connected through fixed head 4, from top to bottom order is equipped with the axis of guide parallel with the axle of fixed block 9 and leading screw 10 between the biside plate of " U " shape support I; Installed inside in " U " shape support I 8 has the two relative rectangle braking vanes 11 that distribute; The hole and the axis of guide on two rectangle braking vane tops match, and the screwed hole and the leading screw at two braking vanes middle part match, and are fixed with brake block 15 on the opposite face of two braking vane bottoms; Left end at leading screw is equipped with handle 14, leading screw and two braking vanes match the place thread rotary orientation opposite.Through dismountable steady pin 12 rope ladder 13 is installed in two " U " shape support lower end.During the maintenance transmission line, pull down steady pin 12, power transmission lines overhauling is placed on the transmission line 5 with the rope ladder coaster, then rope ladder is suspended on the steady pin, and transmission line is between the brake block 15 on the two rectangle braking vanes.Need to overhaul when being fixed on a certain position on the transmission line with rope ladder; Through the handle rotating threaded shaft; Because the rotation direction of the screw thread that matches with two rectangle braking vanes on the leading screw is opposite; Such two rectangle braking vanes will move to the transmission line direction simultaneously, through brake block 15 transmission line are clamped, and power transmission lines overhauling is fixed on the transmission line with the rope ladder coaster.Clamping force through rotary handle adjustment brake block and transmission line just can realize that power transmission lines overhauling is with the travel speed of rope ladder coaster on transmission line.
Claims (1)
1. a power transmission lines overhauling is used the rope ladder coaster; Comprise two rack-mount pulleys; It is characterized in that the support that two pulleys are installed is made up of " U " shape support I (8) and " U " shape support II (2), be connected through fixed head (4) between the two stands the two rectangle braking vanes (11) that distribute are relatively arranged in " U " shape support I (8) installed inside; " the parallel axis of guide (9) and the leading screw (10) of axle with fixed block is installed between the biside plate of U-shaped support I; hole and the axis of guide on two rectangle braking vane tops match, the screwed hole and the leading screw at two braking vanes middle part match, and are fixed with brake block (15) on the opposite face of two braking vane bottoms; the end at leading screw is equipped with handle (14), and above-mentioned leading screw (10) and the two braking vanes thread rotary orientation of locating that matches is opposite above-mentioned.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201417901U CN202513498U (en) | 2012-04-06 | 2012-04-06 | Rope ladder pulley for overhauling power transmission line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201417901U CN202513498U (en) | 2012-04-06 | 2012-04-06 | Rope ladder pulley for overhauling power transmission line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202513498U true CN202513498U (en) | 2012-10-31 |
Family
ID=47065955
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012201417901U Expired - Fee Related CN202513498U (en) | 2012-04-06 | 2012-04-06 | Rope ladder pulley for overhauling power transmission line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202513498U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105140830A (en) * | 2015-10-09 | 2015-12-09 | 国网北京市电力公司 | Pulley, pulley parking device and pulley parking method |
CN106451213A (en) * | 2016-11-02 | 2017-02-22 | 国网江苏省电力公司仪征市供电公司 | Overhead trolly working on aerial line |
CN107863716A (en) * | 2016-09-22 | 2018-03-30 | 国网河南省电力公司濮阳供电公司 | Double division offline coasters of overhead transmission line |
CN107905719A (en) * | 2017-10-31 | 2018-04-13 | 国网河南省电力公司检修公司 | A kind of electric power overhaul ladder |
WO2021134734A1 (en) * | 2019-01-26 | 2021-07-08 | 贾守富 | Self-rescue descent control cabin for fire hazards |
CN113991528A (en) * | 2021-12-01 | 2022-01-28 | 中国南方电网有限责任公司超高压输电公司梧州局 | Power transmission line hauling and moving device |
-
2012
- 2012-04-06 CN CN2012201417901U patent/CN202513498U/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105140830A (en) * | 2015-10-09 | 2015-12-09 | 国网北京市电力公司 | Pulley, pulley parking device and pulley parking method |
CN107863716A (en) * | 2016-09-22 | 2018-03-30 | 国网河南省电力公司濮阳供电公司 | Double division offline coasters of overhead transmission line |
CN106451213A (en) * | 2016-11-02 | 2017-02-22 | 国网江苏省电力公司仪征市供电公司 | Overhead trolly working on aerial line |
CN106451213B (en) * | 2016-11-02 | 2018-08-07 | 国网江苏省电力公司仪征市供电公司 | A kind of driving for on-line operation |
CN107905719A (en) * | 2017-10-31 | 2018-04-13 | 国网河南省电力公司检修公司 | A kind of electric power overhaul ladder |
CN107905719B (en) * | 2017-10-31 | 2019-02-22 | 国网河南省电力公司检修公司 | A kind of electric power overhaul ladder |
WO2021134734A1 (en) * | 2019-01-26 | 2021-07-08 | 贾守富 | Self-rescue descent control cabin for fire hazards |
CN113991528A (en) * | 2021-12-01 | 2022-01-28 | 中国南方电网有限责任公司超高压输电公司梧州局 | Power transmission line hauling and moving device |
CN113991528B (en) * | 2021-12-01 | 2024-04-02 | 中国南方电网有限责任公司超高压输电公司梧州局 | Power transmission line hauling mobile device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202513498U (en) | Rope ladder pulley for overhauling power transmission line | |
CN201881138U (en) | Large-sized wind driven generator spindle and gear case centering device | |
CN109353948A (en) | A kind of water conservancy and hydropower pipeline laying boom hoisting that convenience clamps pipeline | |
CN204980934U (en) | Cantilever crane device | |
CN204858899U (en) | Last coil of linear electric motor and magnet remove device | |
CN203542443U (en) | Clamping tool for connecting flanges | |
CN204474220U (en) | A kind of electric hoist conductor rope device with position-limited lever | |
CN203445577U (en) | Cable drum rapid wire releaser | |
CN205104841U (en) | A auto -lock pulley gear for circuit overhauls | |
CN211470604U (en) | Hoisting device for transformer substation | |
CN203428720U (en) | Adjustable lifting device of beveling machine for end surface of pipeline | |
CN209291877U (en) | A kind of water conservancy and hydropower pipeline laying boom hoisting that convenience clamps pipeline | |
CN210955717U (en) | Modular pulley structure learning equipment | |
CN205148269U (en) | Machinery lift platform | |
CN109877726A (en) | A kind of automotive wheel maintenance fixture | |
CN204271856U (en) | A kind of motor bearings extracting tool | |
CN204416650U (en) | A kind of can the feeding clip mechanism of vertical direction movement | |
CN204243994U (en) | Movable heavy electric machinery position regulator | |
CN206515530U (en) | A kind of covered wire cable clamping and fixing device | |
CN205333302U (en) | Stopper test device's elevating platform | |
CN103879888A (en) | Lifting balance device | |
CN204772289U (en) | Hydraulic pressure spanner for aerial lift device with insulating arm live working | |
CN209522367U (en) | A kind of automatic rubberizing carrying device | |
CN204369467U (en) | A kind of multifunctional mobile hoisting device | |
CN201817142U (en) | Wire take-up device for steel wire heat treatment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121031 Termination date: 20160406 |