CN201408948Y - Adjustable height elevating straddle stringing device - Google Patents
Adjustable height elevating straddle stringing device Download PDFInfo
- Publication number
- CN201408948Y CN201408948Y CN2009201070487U CN200920107048U CN201408948Y CN 201408948 Y CN201408948 Y CN 201408948Y CN 2009201070487 U CN2009201070487 U CN 2009201070487U CN 200920107048 U CN200920107048 U CN 200920107048U CN 201408948 Y CN201408948 Y CN 201408948Y
- Authority
- CN
- China
- Prior art keywords
- magnesium alloy
- aluminum
- pulley
- spanning
- pole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及一种输变电工程架线施工辅助设备。The utility model relates to an auxiliary equipment for stringing construction of a power transmission and transformation project.
背景技术 Background technique
输变电工程架线施工中经常要跨越电力线路、高速公路、铁路等障碍物,跨越施工往往要搭设跨越架。目前搭设跨越架多数采用杉木杆、竹竿或者钢管等。采用这些架材搭跨越架费时、费力、费材,尤其是停电搭设跨越架,因停电时间很短,所以上述架设方式不能满足时间上的要求。During the wiring construction of power transmission and transformation projects, it is often necessary to cross obstacles such as power lines, highways, and railways, and spanning construction often requires spanning frames. Most of the spanning frames are set up at present and adopt fir poles, bamboo poles or steel pipes. It is time-consuming, laborious, and material-intensive to adopt these frame materials to build a spanning frame, especially when a power failure is used to set up a spanning frame. Because the power failure time is very short, the above-mentioned erection method cannot meet the time requirements.
发明内容 Contents of the invention
本实用新型的目的是提供一种可调节高度升降式跨越线架装置,以解决传统的架材搭设跨越架存在的费时、费力、费材等问题。The purpose of the utility model is to provide a height-adjustable lift-type spanning wire frame device to solve the problems of time-consuming, laborious, and material waste in the traditional frame material erection spanning frame.
本实用新型所述可调节高度升降式跨越架线装置,它包括四组可伸缩套装在一起的铝镁合金抱杆,按一侧两组构成跨越架;在同一侧可伸缩套装在一起的铝镁合金抱杆之间的顶部搭设一根绝缘线,在所述两侧跨越架上的绝缘线上放置新建输电线;所述若干段依次可伸缩套装在一起的铝镁合金抱杆在除最下段以外的每段铝镁合金抱杆下端固定有第一滑轮,在除最上段以外的每段铝镁合金抱杆顶部一侧固定有第二滑轮;每段可升降的铝镁合金抱杆对应一根钢丝绳,所述每根钢丝绳的一端固定在对应的铝镁合金抱杆顶部相对于第二滑轮对应一侧,该钢丝绳绕过位于该铝镁合金抱杆的上一段的铝镁合金抱杆下端固定的第一滑轮,再绕过该铝镁合金抱杆顶部固定的第二滑轮后,向下通过地面设置的第三滑轮与牵引绞磨装置连接。The height-adjustable lifting type straddling stringing device described in the utility model includes four groups of aluminum-magnesium alloy holding poles that can be telescopically set together, and two groups on one side form a spanning frame; An insulated wire is erected on the top between the magnesium alloy poles, and a newly-built transmission line is placed on the insulation wires on the spanning frames on both sides; The first pulley is fixed at the lower end of each section of aluminum-magnesium alloy pole except the lower section, and the second pulley is fixed on the top side of each section of aluminum-magnesium alloy pole except the uppermost section; each liftable aluminum-magnesium alloy pole corresponds to A steel wire rope, one end of each steel wire rope is fixed on the corresponding side of the top of the corresponding aluminum-magnesium alloy holding pole relative to the second pulley, and the steel wire rope goes around the aluminum-magnesium alloy holding pole at the upper section of the aluminum-magnesium alloy holding pole The first pulley fixed at the lower end walks around the second pulley fixed on the top of the aluminum-magnesium alloy pole, and then connects with the traction winching device through the third pulley arranged on the ground downwards.
如上所述的可调节高度升降式跨越架线装置,在每段铝镁合金抱杆的顶端四角处,设有固定平衡线缆的挂钩。In the height-adjustable elevating straddle stringing device mentioned above, hooks for fixing the balance cables are provided at the top four corners of each section of the aluminum-magnesium alloy pole.
如上所述的可调节高度升降式跨越架线装置,在铝镁合金抱杆顶部设有供固定绝缘线的辊轮。As mentioned above, the height-adjustable elevating spanning wire device is provided with rollers for fixing insulated wires on the top of the aluminum-magnesium alloy pole.
如上所述的可调节高度升降式跨越架线装置,在所述两侧跨越架上的绝缘线之间连接一个安全防护网,新建输电线位于该安全防护网之上。In the height-adjustable elevating straddling wiring device described above, a safety protection net is connected between the insulated wires on the spanning racks on both sides, and the newly-built transmission line is located on the safety protection net.
本实用新型具有如下优点:在输变电工程架线施工中,利用若干段可伸缩依次套装在一起的升降装置,实现快速、高效地搭设跨越架。特别是停电搭设跨越架情况下,能够在停电时间很短的前提下,完成跨越线路的施工。The utility model has the following advantages: in the wiring construction of the power transmission and transformation project, the spanning frame can be erected quickly and efficiently by using a plurality of stretchable lifting devices which are sequentially fitted together. Especially in the case of a power outage to build a crossing frame, the construction of the crossing line can be completed under the premise of a very short power outage time.
附图说明 Description of drawings
图1是本实用新型的工作状态结构示意图。Fig. 1 is a schematic diagram of the working state structure of the utility model.
具体实施方式 Detailed ways
本实用新型的结构参见图1。在图1中,示出了本实用新型的部分跨越架结构。在实际使用中,图1仅为设置在需要跨越的障碍物一侧的两组可伸缩套装在一起的铝镁合金抱杆的工作状态结构示意图。另一侧的两组可伸缩套装在一起的铝镁合金抱杆的结构与图1的相同,故省略。Structure of the present utility model is referring to Fig. 1. In Fig. 1, a partial spanning frame structure of the present invention is shown. In actual use, Fig. 1 is only a schematic diagram of the working state structure of two sets of retractable aluminum-magnesium alloy poles arranged on one side of the obstacle to be crossed. The structure of the two sets of aluminum-magnesium alloy holding poles that can be telescopically fitted together on the other side is the same as that in Figure 1, so it is omitted.
本实用新型包括四组可伸缩套装在一起的铝镁合金抱杆,按一侧两组构成跨越架;在同一侧可伸缩套装在一起的铝镁合金抱杆之间的顶部搭设一根绝缘线2,在所述两侧跨越架上的绝缘线上放置新建输电线;所述若干段依次可伸缩套装在一起的铝镁合金抱杆在除最下段以外的每段铝镁合金抱杆下端固定有第一滑轮,在除最上段以外的每段铝镁合金抱杆顶部一侧固定有第二滑轮;每段可升降的铝镁合金抱杆对应一根钢丝绳,所述每根钢丝绳的一端固定在对应的铝镁合金抱杆顶部相对于第二滑轮对应一侧,该钢丝绳绕过位于该铝镁合金抱杆的上一段的铝镁合金抱杆下端固定的第一滑轮,再绕过该铝镁合金抱杆顶部固定的第二滑轮后,向下通过地面设置的第三滑轮与牵引绞磨装置连接。The utility model includes four groups of aluminum-magnesium alloy holding poles that can be telescopically set together, and two groups on one side form a spanning frame; an insulating wire is erected on the top between the aluminum-magnesium alloy holding poles that can be telescopically set together on the same side 2. Place newly-built transmission lines on the insulating wires on the spanning frames on both sides; the several sections of aluminum-magnesium alloy poles that can be telescopically packaged together in turn are fixed at the lower end of each section of aluminum-magnesium alloy poles except the lowest section There is a first pulley, and a second pulley is fixed on the top side of each aluminum-magnesium alloy pole except the uppermost section; each liftable aluminum-magnesium alloy pole corresponds to a steel wire rope, and one end of each steel wire rope is fixed On the side corresponding to the second pulley at the top of the corresponding aluminum-magnesium alloy pole, the steel wire rope goes around the first pulley fixed at the lower end of the aluminum-magnesium alloy pole on the upper section of the aluminum-magnesium alloy pole, and then around the aluminum-magnesium alloy pole. After the second pulley fixed on the top of the magnesium alloy pole, the third pulley set on the ground is downwardly connected with the traction winching device.
在图1中,铝镁合金抱杆8下端固定第一滑轮6,第一段铝镁合金抱杆8的位于下一段的第二段铝镁合金抱杆顶部一侧固定第二滑轮5。其它段铝镁合金抱杆的机构以此类推。在最高一段铝镁合金抱杆8顶部设有固定引导绝缘线的辊轮1。每段铝镁合金抱杆的升降均通过与之对应的一根钢丝绳牵引。以钢丝绳4为例,说明牵引的结构。钢丝绳4的一端固定在第二段铝镁合金抱杆顶部相对于第二滑轮5的对面一侧,先绕经第一滑轮6后向上,再绕经第二滑轮5向下,至地面固定的滑轮3后与牵引绞磨装置连接。使用中可以根据施工高度来确定各段抱杆的实际升降高度。当升降高度较高时,为了确保伸缩套装抱杆的稳定性,在每段抱杆的顶部四角位置处,设有固定平衡线缆的挂钩(图中省略未示出)。所述平衡线缆的另一端引至地面被固定,以使每段抱杆在升高状态下,能处于稳定的状态。In Fig. 1, the
为了施工更为安全,在所述两侧跨越架上的绝缘线之间连接一个面积能罩住障碍物的安全防护网,新建输电线位于该安全防护网之上。For safer construction, a safety protection net with an area capable of covering obstacles is connected between the insulated wires on the spanning frames on both sides, and the newly-built transmission line is located on the safety protection net.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009201070487U CN201408948Y (en) | 2009-05-21 | 2009-05-21 | Adjustable height elevating straddle stringing device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009201070487U CN201408948Y (en) | 2009-05-21 | 2009-05-21 | Adjustable height elevating straddle stringing device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201408948Y true CN201408948Y (en) | 2010-02-17 |
Family
ID=41679895
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2009201070487U Expired - Fee Related CN201408948Y (en) | 2009-05-21 | 2009-05-21 | Adjustable height elevating straddle stringing device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201408948Y (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101950933A (en) * | 2010-08-23 | 2011-01-19 | 上海电力带电作业技术开发有限公司 | Lifting device for laying electrified span tubular bus bars in transformer substation |
| CN102412527A (en) * | 2011-12-02 | 2012-04-11 | 河南省电力公司南阳供电公司 | Controllable lifting live across equipment and its construction method |
| CN104300422A (en) * | 2014-08-29 | 2015-01-21 | 国家电网公司 | Safe landing device for objects falling from high altitudes in electric power operation and application method thereof |
| CN105162033A (en) * | 2015-09-06 | 2015-12-16 | 安徽华电工程咨询设计有限公司 | Mechanized self-lifting portal crossing frame |
| CN102412527B (en) * | 2011-12-02 | 2016-11-30 | 国网河南省电力公司南阳供电公司 | Controllable lifting live crossover device and construction method thereof |
| CN108390322A (en) * | 2018-01-29 | 2018-08-10 | 饶榕琦 | One kind having multi-functional power construction draft gear |
| CN109524916A (en) * | 2017-09-20 | 2019-03-26 | 胡广生 | A kind of crossing frame |
| CN109787141A (en) * | 2018-12-29 | 2019-05-21 | 国网浙江杭州市富阳区供电有限公司 | Isolating device is used in a kind of construction of power overhead network |
| CN112360225A (en) * | 2020-11-25 | 2021-02-12 | 国网山东省电力公司烟台供电公司 | Telescopic holding pole for assembling iron tower |
-
2009
- 2009-05-21 CN CN2009201070487U patent/CN201408948Y/en not_active Expired - Fee Related
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101950933A (en) * | 2010-08-23 | 2011-01-19 | 上海电力带电作业技术开发有限公司 | Lifting device for laying electrified span tubular bus bars in transformer substation |
| CN101950933B (en) * | 2010-08-23 | 2012-08-01 | 上海电力带电作业技术开发有限公司 | Lifting device for laying electrified span tubular bus bars in transformer substation |
| CN102412527A (en) * | 2011-12-02 | 2012-04-11 | 河南省电力公司南阳供电公司 | Controllable lifting live across equipment and its construction method |
| CN102412527B (en) * | 2011-12-02 | 2016-11-30 | 国网河南省电力公司南阳供电公司 | Controllable lifting live crossover device and construction method thereof |
| CN104300422A (en) * | 2014-08-29 | 2015-01-21 | 国家电网公司 | Safe landing device for objects falling from high altitudes in electric power operation and application method thereof |
| CN104300422B (en) * | 2014-08-29 | 2017-01-18 | 国家电网公司 | Safe landing device for objects falling from high altitudes in electric power operation and application method thereof |
| CN105162033A (en) * | 2015-09-06 | 2015-12-16 | 安徽华电工程咨询设计有限公司 | Mechanized self-lifting portal crossing frame |
| CN109524916A (en) * | 2017-09-20 | 2019-03-26 | 胡广生 | A kind of crossing frame |
| CN108390322A (en) * | 2018-01-29 | 2018-08-10 | 饶榕琦 | One kind having multi-functional power construction draft gear |
| CN109787141A (en) * | 2018-12-29 | 2019-05-21 | 国网浙江杭州市富阳区供电有限公司 | Isolating device is used in a kind of construction of power overhead network |
| CN112360225A (en) * | 2020-11-25 | 2021-02-12 | 国网山东省电力公司烟台供电公司 | Telescopic holding pole for assembling iron tower |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102359303B (en) | Extra-high voltage common circuit iron tower assembling method | |
| CN203377546U (en) | High speed railway spanning construction apparatus | |
| CN105129627B (en) | The folding suspension arm assembly that electric pole is supported | |
| CN105186378A (en) | Power transmission line channel crossing protection mechanism | |
| CN103236656B (en) | Column suspension type crossing structure and operating method thereof | |
| CN103311844B (en) | Alpine terrain crosses over the stringing method of live high voltage circuit | |
| CN203339564U (en) | High-altitude lengthened wiring clamp | |
| CN202544476U (en) | Tower crane type holding rod | |
| CN102761077B (en) | Insulating hoisting bracket for strain insulator string of 1000kV extra-high alternating current line | |
| CN205846585U (en) | Transmission line of electricity stretches crossing frame | |
| CN203674618U (en) | Dedicated ladder facilitating operation of 220 KV/ 66 KV in-and-out wire | |
| CN105186387B (en) | A kind of electric cable with large cross-section tunnel lays uses device | |
| CN202465182U (en) | Lifting device for live-wire operation | |
| CN205646634U (en) | Device is strideed across with highway to electric wire netting construction | |
| CN204696565U (en) | Line pulley is crossed in a kind of simple and easy scissors crossing | |
| CN106300128B (en) | One kind changes double bundle conductor conductor spacer and puies forward the Line tool and application method | |
| CN103199461A (en) | Method for lifting lightning conductor of power transmission line and special portable lifter | |
| CN203359890U (en) | Small-sized electric pole hoisting device | |
| CN205555750U (en) | Frame is accomodate to earth connection | |
| CN205429592U (en) | Tunnel cabling hoisting device | |
| CN203977995U (en) | A kind of Telescopic fence support that is fixed on operation field | |
| CN105271078B (en) | A kind of electric power is ascended a height Operation Van | |
| CN202949163U (en) | Maintenance platform for tubular busbar post insulator | |
| CN212366650U (en) | Auxiliary mounting bracket for electric power engineering | |
| CN204980945U (en) | Supplementary tower crane dismounting device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100217 Termination date: 20110521 |