CN107859536A - 用于具有改进机动性和减小拖车数的移动发电厂的系统和方法 - Google Patents

用于具有改进机动性和减小拖车数的移动发电厂的系统和方法 Download PDF

Info

Publication number
CN107859536A
CN107859536A CN201710859438.9A CN201710859438A CN107859536A CN 107859536 A CN107859536 A CN 107859536A CN 201710859438 A CN201710859438 A CN 201710859438A CN 107859536 A CN107859536 A CN 107859536A
Authority
CN
China
Prior art keywords
main body
trailer
turbogenerator
generator
movement main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710859438.9A
Other languages
English (en)
Other versions
CN107859536B (zh
Inventor
K.R.奥斯丁
V.塞蒂
R.K.冯
J.E.吉伦
R.A.巴滕
D.G.莱英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
General Electric Co PLC
Original Assignee
General Electric Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by General Electric Co filed Critical General Electric Co
Publication of CN107859536A publication Critical patent/CN107859536A/zh
Application granted granted Critical
Publication of CN107859536B publication Critical patent/CN107859536B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02CGAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
    • F02C6/00Plural gas-turbine plants; Combinations of gas-turbine plants with other apparatus; Adaptations of gas-turbine plants for special use
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D15/00Adaptations of machines or engines for special use; Combinations of engines with devices driven thereby
    • F01D15/10Adaptations for driving, or combinations with, electric generators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02BINTERNAL-COMBUSTION PISTON ENGINES; COMBUSTION ENGINES IN GENERAL
    • F02B63/00Adaptations of engines for driving pumps, hand-held tools or electric generators; Portable combinations of engines with engine-driven devices
    • F02B63/04Adaptations of engines for driving pumps, hand-held tools or electric generators; Portable combinations of engines with engine-driven devices for electric generators
    • F02B63/044Adaptations of engines for driving pumps, hand-held tools or electric generators; Portable combinations of engines with engine-driven devices for electric generators the engine-generator unit being placed on a frame or in an housing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62DMOTOR VEHICLES; TRAILERS
    • B62D63/00Motor vehicles or trailers not otherwise provided for
    • B62D63/06Trailers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D25/00Component parts, details, or accessories, not provided for in, or of interest apart from, other groups
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02CGAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
    • F02C3/00Gas-turbine plants characterised by the use of combustion products as the working fluid
    • F02C3/04Gas-turbine plants characterised by the use of combustion products as the working fluid having a turbine driving a compressor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M3/00Portable or wheeled frames or beds, e.g. for emergency power-supply aggregates, compressor sets
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02KDYNAMO-ELECTRIC MACHINES
    • H02K7/00Arrangements for handling mechanical energy structurally associated with dynamo-electric machines, e.g. structural association with mechanical driving motors or auxiliary dynamo-electric machines
    • H02K7/18Structural association of electric generators with mechanical driving motors, e.g. with turbines
    • H02K7/1807Rotary generators
    • H02K7/1823Rotary generators structurally associated with turbines or similar engines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05DINDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
    • F05D2220/00Application
    • F05D2220/70Application in combination with
    • F05D2220/76Application in combination with an electrical generator

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Power Engineering (AREA)
  • Transportation (AREA)
  • Connection Of Motors, Electrical Generators, Mechanical Devices, And The Like (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

一种系统,包括构造成支承涡轮发动机和联接至涡轮发动机的进气区段的第一移动主体。该系统还包括构造成支承发电机的第二移动主体。第一移动主体和第二移动主体构造成在涡轮发动机与发电机之间引导可拆除的联接。该系统还包括构造成支承与涡轮发动机和发电机相关联的一个或多个部分组装的部件的第三移动主体。

Description

用于具有改进机动性和减小拖车数的移动发电厂的系统和 方法
技术领域
本发明涉及燃气轮机系统,并且更具体地涉及用于运送和安装移动涡轮机的系统和方法。
背景技术
一般地,永久发电厂建造成向连接至电网的用户提供电力。但是,存在永久发电厂未必能够满足用户的电力需求的各种原因。例如,在剧烈增长的周期中,用户的需求可能增大以超过永久发电厂能够发出的功率。在一些情况中,永久电厂可能关闭或经历设备维修。作为进一步的示例,比如为飓风和地震的自然灾害可能破坏供给一部分用户的电力。
移动发电厂可以运送至下述环境以满足用户的电力需求,在所述环境中永久发电厂可能无法输送电力,或者可能无法有效地输送电力。在一些情况下,移动发电厂可以以部件的部分组装状态输送至现场,随后进行这些部件的现场安装。根据各种外界条件,移动发电厂的运输和现场安装可能花费长达数个小时至数天的时间。因此,可能有利的是提供提高移动发电厂的部件的机动性以便将这些部件有效地运输至现场的系统和方法。另外,可能有利的是提供改善这些部件现场的安装时间以便快速满足顾客对电力的需求的系统和方法。
发明内容
以下概括范围与初始要求保护的发明相称的一些实施例。这些实施例并不旨在限制所要求保护的发明的范围,而这些实施例旨在仅提供本发明的可能的形式的概要。事实上,本发明可以包括可以与以下所述实施例相似或不同的各种形式。
本发明一方面提供一种系统,系统包括构造成支承涡轮发动机和联接至涡轮发动机的进气区段的第一移动主体。该系统还包括构造成支承发电机的第二移动主体。第一移动主体和第二移动主体构造成使得涡轮发动机与发电机对准以实现可拆除联接。该系统还包括构造成支承与涡轮发动机和发电机相关联的一个或多个部分组装的部件的第三移动主体。
根据本发明的一个实施例,第一移动主体包括第一拖车,第二移动主体包括第二拖车,第三移动主体包括第三拖车。
根据本发明的一个实施例,第三移动主体构造成支承排气烟囱,排气烟囱构造成与涡轮发动机联接,以及其中,排气烟囱构造成从涡轮发动机排出排气。
根据本发明的一个实施例,第三移动主体包括构造成与涡轮发动机的进气区段联接的第一过滤器和第二过滤器,其中,第一过滤器和第二过滤器构造成将空气流过滤并且吸入涡轮发动机内。
根据本发明的一个实施例,第一过滤器构造成联接至进气区段的第一部分,第二过滤器构造成联接至进气区段的第二部分。
根据本发明的一个实施例,第三移动主体包括构造成与发电机联接的进气过滤器,其中,进气过滤器构造成过滤包围发电机的空气。
根据本发明的一个实施例,第三移动主体包括吊车,吊车构造成将一个或多个部分组装的部件中的每一个从第三移动主体输送至第一移动主体或第二移动主体。
根据本发明的一个实施例,系统包括第四移动主体,第四移动主体构造成支承通信地联接至涡轮发动机和发电机的控制系统。
根据本发明的一个实施例,系统包括第四移动主体,第四移动主体构造成支承与涡轮发动机相关联的第一通风系统和与发电机相关联的第二通风系统。
本发明的另一方面提供一种系统,系统包括构造成支承涡轮发动机的第一移动主体和构造成支承发电机的第二移动主体。第一移动主体和第二移动主体构造成使得涡轮发动机与发电机对准以实现可拆除联接。该系统还包括第三移动主体,第三移动主体构造成支承通信地联接至涡轮发动机和发电机的控制系统。第三移动主体构造成支承与涡轮发动机相关联的第一通风系统。
根据本发明的一个实施例,第三移动主体构造成支承控制室系统,并且构造成支承与发电机相关联的第二通风系统。
根据本发明的一个实施例,第一移动主体构造成支承联接至涡轮发动机的进气区段。
根据本发明的一个实施例,进气区段包括消音器。
根据本发明的一个实施例,系统包括第四移动主体,第四移动主体构造成支承与涡轮发动机和发电机相关联的一个或多个部分组装的部件。
根据本发明的一个实施例,一个或多个部分组装的部件包括与涡轮发动机相关联的一个或多个过滤器、与发电机相关联的一个或多个过滤器以及与涡轮发动机相关联的排气烟囱。
本发明的再一方面提供一种方法,方法包括通过第一移动主体运输涡轮发动机和联接至涡轮发动机的进气区段。该方法还包括通过第二移动主体运输构造成与涡轮发动机可拆除地联接的发电机。该方法还包括通过第三移动主体运输与涡轮发动机和发电机相关联的一个或多个部分组装的部件。该方法还包括通过布置在第三移动主体上的输送机构将一个或多个部分组装的部件从第三移动主体输送至第一移动主体或第二移动主体。
根据本发明的一个实施例,方法包括通过第四移动主体运输控制系统,控制系统构造成通信地联接至涡轮发动机和发电机。
根据本发明的一个实施例,方法包括通过第四移动主体运输与涡轮发动机相关联的第一通风系统和与发电机相关联的第二通风系统。
根据本发明的一个实施例,方法包括将第一通风系统从第四移动主体输送至第一移动主体。
根据本发明的一个实施例,方法包括将第二通风系统从第四移动主体输送至第二移动主体。
附图说明
当参照附图阅读以下详细说明时将变得更容易地理解本发明的这些以及其他特征、方面和优势,其中相同的附图标记在整个附图中表示相同的零件,其中:
图1是在运输阶段期间移动发电厂系统的实施例的框图,其中移动发电厂包括发电机拖车、具有辅助橇装设备的涡轮机拖车、运输拖车和控制室拖车;
图2是在移动发电厂系统的运输阶段期间图1的运输拖车的实施例的透视图;
图3是在移动发电厂系统的运输阶段期间图1的控制室拖车的实施例的透视图;
图4是在安装阶段期间图1的移动发电厂系统的实施例的框图;
图5是图1的移动发电厂系统的实施例的框图,描绘了辅助橇装设备与燃气涡轮发动机之间的一个或多个互连件;
图6是在安装阶段之后的图1的移动发电厂系统的实施例的透视图;
图7是在移动发电厂系统的运输阶段期间布置在图1的涡轮机拖车上的壳体内的消音器的实施例;以及
图8是在移动发电厂系统的安装阶段之后图3的涡轮机拖车的通风系统和排气烟囱的实施例的透视图,其中通风系统联接至图7的壳体。
具体实施方式
本发明的一个或多个具体实施例将如下所述。为致力于提供这些实施例的简要说明,实际实施方式的全部特征可以不在说明书中进行说明。应该理解的是,在任何这些实际实施方式的开发过程中,如在任何工程或设计项目中,必须做出众多实施方式的特定决定以实现开发者的特定目标,比如与系统相关和商业相关的限制的一致性,这对不同的实施方式是不同的。此外,应该理解的是,这种开发计划可能是复杂和费时的,但对于受益于本发明的本领域技术人员来说仍然是设计、加工和制造的日常任务。
当介绍本发明的各个实施例的元件时,词汇“一”、“一种”、“该”和“所述”旨在表示存在一个或多个元件。术语“包括”、“包含”和“具有”旨在包含在内并且意味着均有除所列元件之外的另外的元件。
所公开的实施例涉及用于将移动发电厂系统的部件运送至安装地点以满足永久发电厂不能输送电力的用户的电力需求。移动发电厂可以是通过船运、空运或陆运运送至安装地点的安装在拖车上的系统。在一些情况下,移动发电厂可以以部件的部分组装状态输送至安装地点,部件安装或布置在一个或多个拖车(trailer)(或其他类型的移动主体)上。所公开的实施例涉及包括发电机拖车、涡轮机拖车和控制室拖车的移动发电厂系统。在一些实施例中,移动发电厂系统可以包括用于将一个或多个部件运送至安装地点的运输拖车。在这些实施例中,布置在运输拖车上的一个或多个部件可以从运输拖车运送至安装地点的发电机拖车和/或涡轮机拖车。
可能有利的是将移动发电厂系统的部分组装的部件以高效方式运输至安装地点,以便快速地满足用户的电力需求。因此,所公开的实施例涉及通过改进在运输期间布置在一个或多个拖车上的部分组装部件的布置减少移动发电厂系统的拖车数量的系统和方法。事实上,利用更少的拖车运输部分组装的部件可以有助于提高运输的简易性并且可以帮助降低与将移动发电厂系统运输至安装地点相关的时间和成本。此外,改善部件在拖车上的布置和/或在一个或多个拖车上重新组织部分组装的部件可以有助于减少用于将移动发电厂系统运输至安装地点的拖车的数量。
此外,所公开的实施例可以实现移动发电厂系统的现场快速安装。在一些实施例中,所公开的实施例配置成用于减少用于连接涡轮机拖车和控制室拖车的多个电力和数据通信线缆(例如线缆)。具体地,部分组装的部件在一个或多个拖车上的布置可以帮助减少一个或多个拖车之间的互连件,由此减少安装时间并且提高可以组装移动发电厂系统的速度。另外,减少电力和数据通信线缆的数目可以帮助反复安装(例如安装和卸载)移动发电厂系统。例如,所公开的实施例可以实现快速脱离并且重新定位另一个安装地点,由此提供移动发电厂系统的灵活性和机动性。事实上,快速运输部件和交付移动发电厂系统的能力可以减少系统部件的停机时间并且降低损失收益。如前所述,所公开的实施例的特征可以提高移动发电厂的各个部件在被运输至安装地点时的机动性,并且可以提供移动发电厂在安装地点的更快的安装时间。
例如,在一些实施例中,在移动发电厂系统的运输阶段期间,移动发电厂系统的各个部件可以布置在一个或多个拖车(例如发电机拖车、涡轮机拖车、控制室拖车、运输拖车等等)上并且运输至安装地点。例如,发电机拖车可以包括用于移动发电厂系统的产生电力的发电机。此外,涡轮机拖车可以包括燃气涡轮发动机、包括布置在壳体内的消音器的吸气区段和/或辅助橇装设备。在一些实施例中,辅助橇装设备可以布置在涡轮机拖车的后部并且可以包括联接(例如通信地联接)至布置在涡轮机拖车(例如,燃气涡轮发动机)上的多个部件的多个部件。在一些实施例中,辅助橇装设备可以布置在涡轮机拖车的前部。在一些实施例中,控制室拖车可以运输具有控制器的控制系统、用于燃气涡轮发动机的通风系统和用于发电机的空气通风系统。此外,在一些实施例中,运输拖车可以包括过滤器组件、进气过滤器组件和/或排气烟囱。在一些实施例中,运输拖车可以包括吊车,吊车可被用于在移动发电厂系统的安装阶段期间将这些部件中的每一个从运输拖车输送至发电机拖车和/或涡轮机拖车。
在一些实施例中,布置在涡轮机拖车上的辅助橇装设备(auxiliary skid)可以包括涡轮机拖车控制面板、水洗系统、发动机润滑系统和/或起动系统(例如液压起动系统)。在一些实施例中,辅助橇装设备可以包括位于辅助橇装设备和燃气涡轮发动机的部件之间的一个或多个互连件(例如,电力和数据通信线缆)。例如,布置在辅助橇装设备内的液压起动系统可以构造成控制和/或调节燃气涡轮发动机的液压电机。作为另一个例子,发动机润滑系统和/或水洗系统可以布置在涡轮机拖车上的辅助橇装设备内,并且可以构造成分别地控制和/或调节用于燃气涡轮发动机的润滑油和水流。此外,在一些实施例中,布置在辅助橇装设备的涡轮机拖车控制面板内的部件可以包括用于监视和/或控制燃气涡轮发动机的操作的一个或多个特征。具体地,布置在辅助橇装设备内的这些部件可以帮助减少一般建立在一个或多个拖车之间的互连件的数目,由此减少安装时间并且提高移动发电厂系统可被组装的速度。
现在参考附图,图1是在运输阶段期间移动发电厂系统10的实施例的框图。具体地,移动发电厂系统10包括构造成将涡轮机(例如移动发电厂系统10的一个或多个部件)运输至预定位置的一个或多个拖车11,比如运输至安装地点(例如现场位置)以满足永久发电厂可以输送电力或不能输送电力的用户的电力需求。在一些实施例中,移动发电厂系统10包括涡轮机拖车12、发电机拖车14和控制室拖车16,以便将移动发电厂系统10的一个或多个部件运输至安装地点。在一些实施例中,移动发电厂系统10另外可以包括将一个或多个另外的部件运输至预定位置的运输拖车18。在一些实施例中,布置在运输拖车18和/或控制室拖车16上的部件可以可替代地通过传统运输技术运输。具体地,移动发电厂系统10在运输阶段期间的结构可以实现更快的安装时间、更低的安装成本以及更大的机动性,如以下进一步说明的。
在一些实施例中,如关于图4进一步详细说明的,移动发电厂系统10的部件可以在安装阶段期间组装在一起至产生电力。例如,在通过拖车11将部件运输至安装地点之后,部件中的一个或多个可以在安装阶段期间在拖车11之间输送。此外,部件中的一个或多个可以在安装阶段期间组装在一起以产生电力。例如,在一些实施例中,如关于图4进一步说明的,运输拖车18上的一个或多个部件可以在安装阶段期间被输送至发电机拖车14和/或涡轮机拖车12。类似地,在一些实施例中,如关于图4进一步说明的,控制室拖车16上的一个或多个部件可以在安装阶段期间被输送至发电机拖车14和/或涡轮机拖车12。具体地,虽然所示出的实施例详细说明了特定运输阶段结构,但应该注意到可以利用如下进一步说明的其他运输阶段结构。
在一些实施例中,移动发电厂系统10可以在不建造传统发电厂的情况下能够现场满足工业业务的电力需求。例如,移动发电厂系统10可被用于比如为工业性作业或应急场所(例如断电、限电、比如为水灾、飓风或地震的自然灾害等等)的环境中。因此,移动发电厂系统10可以包括布置在拖车11中的每一个(例如,涡轮机拖车12、发电机拖车14、控制室拖车16和/或运输拖车18)下面的多个车轮20,以便能够高效地运输和安装。在一些实施例中,拖车11可以包括能够实现现场快速安装的模块化设计。具体地,移动发电厂系统10的各个部件可以安装在一个或多个拖车11上并且被运输(例如,通过海上、陆地、空中),使得移动涡轮机系统10可以一旦到达其指定位置即被快速部署并交付使用以提供电力。具体地,在一些实施例重,移动发电厂系统10的部件在一个或多个拖车11中的每一个之间的布置可以帮助减小与将移动发电厂系统运送至安装地点相关的时间和成本。
在一些实施例中,拖车11可以包括能够有效地运输至指定地点的各种特征。例如,拖车11中的每一个可以包括通过最小化转弯圆帮助改善陆地机动性的一个或多个可转向轮轴(steerable axles)13。此外,应注意到拖车11中的每一个的轮轴跨距可被容易地调整以满足特定国家的管理标准。在一些实施例中,拖车11中的每一个可以包括可被构造成帮助调整一个或多个拖车11之间的快速对准(和/或对接程序)的空气悬架系统15。具体地,拖车11中的每一个可以包括能够实现在拖车11上进行重量(例如由拖车11支承的部件的重量)分配的各种特征。例如,重量分布可以基于国家规章、轮轴的数目和/或类型、拖车11的结构、待运输的部件的数目和/或类型或其组合确定。例如,在一些实施例中,移动发电厂系统10的部件可以基于待运输的部件的数目和重量、可用轮轴(例如每个轮轴可以支承不同的重量)和/或结构(例如拖车11上的鹅颈结构可以支承附加重量)布置在拖车11上。
在一些实施例中,在运输阶段期间,涡轮机拖车12可被构造成将涡轮机(例如燃气涡轮发动机22、蒸汽轮机、水涡轮、风力涡轮机或任何涡轮机系统)运输至安装地点。例如,布置在封壳24内的燃气涡轮发动机22可以安装在涡轮机拖车12上。此外,在运输阶段期间,具有布置在壳体30内的消音器28的进气部分26可以安装在涡轮机拖车12上。在一些实施例中,辅助橇装设备32可以布置在涡轮机拖车12的后端34处(例如与头端36相反)。例如,在图示的实施例中,辅助橇装设备32可以安装在涡轮机拖车12的后附件38上。在一些实施例中,辅助橇装设备32可以布置在涡轮机拖车12的前端,并且可以安装在前附件38上。在一些实施例中,另外的支持系统可以布置在封壳24内,和/或可以联接或集成在燃气涡轮发动机22内。例如,构造成使润滑油通过燃气涡轮发动机22的活动部分循环的润滑系统40和/或构造成注入一个或多个流体流(例如水、蒸汽等等)的水洗系统42可以布置在涡轮机拖车12上。
如进一步关于图5详细说明的,辅助橇装设备32可以包括位于辅助橇装设备32的部件与燃气涡轮发动机22、润滑系统40和/或水洗系统42之间的一个或多个快速互连件44(例如电力和/或数据通信线缆)。在一些实施例中,辅助橇装设备32可以包括构造成调节和/或监控燃气涡轮发动机22和/或支持系统(例如润滑系统40、水洗系统42等等)的一个或多个部件。应注意到,其他支持系统可以与燃气涡轮发动机22相关联,比如构造成将一个或多个流体流(例如,水、蒸汽、比如为氮气的惰性气体、再循环排气或其任何组合)注入燃气涡轮发动机22内的流体注入系统、冷却系统、构造成供给燃料流的燃料系统、热/间隙控制系统或者与燃气涡轮发动机22相关联的任何其他支持系统。
在一些实施例中,在运输阶段期间,移动发电厂系统10的负载50可以包括发电机52。在图示的实施例中,构造成为移动发电厂系统10发电的发电机52可以安装在发电机拖车14上。此外,在一些实施例中,比如为气体燃料过滤器54的一个或多个另外的支持部件可以在运输阶段和/或安装阶段期间安装在发电机拖车14上。在一些实施例中,各种其他部件55(例如开关设备、热交换器等等)在运输阶段和/或安装阶段期间可以安装在发电机拖车14上。例如,在一些实施例中,构造成将发电机52连接至电网的开关设备可以安装在发电机拖车14上。作为另一个例子,构造成冷却发电机润滑油的热交换器在运输阶段期间可以安装在发电机拖车14上。如关于图4进一步说明的,安装在发电机拖车14上的一个或多个支持部件可以在移动发电厂系统10的安装阶段期间进行输送。燃气涡轮发动机22可以通过共用轴56可移除地联接至发电机52,以及可以驱动发电机52。具体地,在安装阶段期间,发电机52可以分别通过发电机拖车14和涡轮机拖车12与燃气涡轮发动机22对准。另外,发电机52可以在安装阶段的对接过程期间可移除地联接至燃气涡轮发动机22。
在一些实施例中,在运输阶段期间,控制室拖车16可以包括构造成监控和/或调节移动发电厂系统10的操作的一个或多个部件。例如,控制室拖车16可以包括电池系统、灭火系统(例如隔火墙)、充电系统和/或用于控制或调节移动发电厂系统10的操作的其他系统。在一些实施例中,包括联接至处理器74和存储器76的控制器72的控制系统70可以在运输阶段和/或安装阶段期间安装在控制室拖车16上。另外,在一些实施例中,在运输阶段期间,通风系统78(与燃气涡轮发动机22相关联)和排气系统80(与发电机52相关联)可以安装在控制室拖车16上。如关于图4进一步说明的,在安装阶段期间,通风系统78可以可被输送至涡轮机拖车12,排气系统80可被输送至发电机拖车14。具体地,如关于图4和图5进一步说明的,通风系统78可被构造成使环绕燃气涡轮发动机22的空间通风,排气系统80可被构造成使环绕发电机52的空间通风。在一些实施例中,通风系统78可以包括多个风机以能够对燃气涡轮发动机22进行充分的冷却,并且更具体地对其内布置燃气涡轮发动机22的封壳24进行充分冷却。
在一些实施例中,控制系统70的控制器72可被构造成通过辅助橇装设备32接收并且处理来自燃气涡轮发动机22的反馈。例如,存储器76存储能够通过处理器74执行的软件指令或代码,以控制燃气涡轮发动机22和支持系统(例如,润滑系统40、水洗系统42等等)的各个方面。具体地,如上所述,辅助橇装设备32可以包括与燃气涡轮发动机22和与燃气涡轮发动机22相关联的支持系统(例如润滑系统40、水洗系统42等等)对接的一个或多个互连件。在一些实施例中,控制器72可被构造成与辅助橇装设备32对接以接收并处理来自燃气涡轮发动机22和/或与燃气涡轮发动机22相关联的支持系统的反馈。这样,控制器72可被构造成通过辅助橇装设备32接收并处理与燃气涡轮发动机22相关的反馈,由此如关于图5进一步说明地减少控制室拖车16与涡轮机拖车12之间的电气和/或通信线路(例如线缆)的数量。
在一些实施例中,在运输阶段期间,运输拖车18可以构造成运输过滤器组件82、排气烟囱84和进气过滤器组件86。在一些实施例中,过滤器组件82可以包括第一过滤器88和第二过滤器90。具体地,如关于图4进一步说明的,过滤器组件82可以在安装阶段期间被从运输拖车18输送至涡轮机拖车12,并且可被构造成与进气区段26和通风系统78联接。过滤器组件82可被构造成过滤空气流并且将空气流吸入燃气涡轮发动机22,如关于图4和图5进一步说明的。此外,在一些实施例中,进气过滤器组件86可以包括第一进气过滤器92和第二进气过滤器94。如关于图4进一步说明的,进气过滤器组件86可以在安装阶段期间从运输拖车18输送至发电机拖车14,并且可以构造成与排气系统80联接。进气过滤器组件86可以构造成将空气流过滤到发电机52内,如关于图4和图5进一步说明的。在一些实施例中,运输拖车18可以构造成运输排气烟囱84(例如管道、消音器、排放物控制设备),排气烟囱84可以构造成从燃气涡轮发动机22排出排气,如关于图5进一步说明的。
具体地,在一些实施例中,运输拖车18可以包括吊车96,吊车96可以在安装阶段期间被用于将一个或多个部件从运输拖车18输送至涡轮机拖车12和/或发电机拖车14。例如,如关于图4进一步说明的,吊车96可被用于将过滤器组件82和排气烟囱84输送至涡轮机拖车12。此外,如关于图4所述的,吊车96可被用于将进气过滤器组件86输送至发电机拖车14。应注意到在一些实施例中,移动发电厂系统10的一个或多个另外的部件可被运输至运输拖车18上的安装地点。例如,气体燃料过滤器54、排气系统80和/或通风系统78可以安装在运输拖车18上,用于运输至安装地点。同样地,在一些实施例中,安装在运输拖车18上的一个或多个部件可以安装在控制室拖车16上以便运输,和/或可以通过可替代的运输技术运输。
图2是在移动发电厂系统10的运输阶段期间图1的运输拖车18的实施例的透视图。在图示的实施例中,运输拖车18包括过滤器组件82(例如,第一过滤器88和第二过滤器90)、排气烟囱84和进气过滤器组件86(例如第一进气过滤器92和第二进气过滤器94)。在一些实施例中,运输拖车18可以包括构造成将安装在运输拖车18上的一个或多个部件输送到涡轮机拖车12和/或发电机拖车14上的吊车96。在一些实施例中,任何可替代输送机构可被用于将一个或多个部件从运输拖车18输送至涡轮机拖车12和/或发电机拖车14。
在一些实施例中,吊车96可被用于将过滤器组件82的第一过滤器88和第二过滤器90从运输拖车18输送至涡轮机拖车12。具体地,第一过滤器88和第二过滤器90可以联接至与燃气涡轮发动机22相关联的进气区段26并且安装在涡轮机拖车12上。在运输阶段期间,过滤器组件82可以竖直地布置在运输拖车18上,使得第一过滤器88和第二过滤器90沿着中心线连接100联接。在一些实施例中,中心线连接100可以包括构造成使第一过滤器88和第二过滤器90彼此紧固以及紧固至运输拖车18的一个或多个附连机构102(例如螺栓、紧固件、螺杆等等)。此外,在一些实施例中,第一过滤器88和第二过滤器90可以各自包括构造成通过一个或多个附连机构102与中心线连接100接合的一个或多个支承机构104。在一些实施例中,一个或多个支承机构104可被用于在安装阶段期间将过滤器88、90中的每一个联接至进气区段26。
在一些实施例中,进气组件86的第一进气过滤器92和第二进气过滤器94可以布置在过滤器壳体106内。具体地,过滤器壳体106可以构造成封装和/或部分地封装进气组件86,由此在运输阶段期间紧固进气组件86的单独的部件。在一些实施例中,操作人员可以拆开一个或多个附连机构104或拆卸过滤器壳体106以允许吊车96(或其他输送装置)将过滤器组件82和/或进气组件86输送至发电机拖车14。
图3是在移动发电厂系统10的运输阶段期间图1的控制室拖车16的实施例的透视图。在图示的实施例中,控制室拖车16包括控制系统70、通风系统78和排气系统80。在一些实施例中,如上所述,在安装阶段期间,通风系统78可以从控制室拖车16输送至涡轮机拖车12,如关于图4进一步说明的。此外,排气系统80可以从控制室拖车16输送至发电机拖车14,如关于图4进一步说明的。
在一些实施例中,控制系统70可以布置在控制箱110内,控制箱110可以构造成在运输期间将控制器72紧固在内部(联接至处理器74和存储器76)。在一些实施例中,控制器72可以利用一个或多个直接电力线缆和数据通信线缆(例如线缆)与安装在涡轮机拖车12(或发电机拖车14)上的部件直接对接。另外,如上所述,在一些实施例中,控制器72可以构造成与涡轮机拖车12的辅助橇装设备32对接。具体地,控制器70可以构造成接收和处理来自辅助橇装设备32的反馈,辅助橇装设备32接着可以通信地联接至燃气涡轮发动机22的一个或多个部件。因此,在一些实施例中,布置在涡轮机拖车12上的辅助橇装设备32可以构造成减少控制室拖车16与涡轮机拖车12之间的互连件的数量,如关于图5进一步说明的。
图4是在安装阶段期间图1的移动发电厂系统的实施例的框图。在安装阶段期间,安装在发电机拖车14上的发电机52可以与安装在涡轮机拖车12上的燃气涡轮发动机22可拆除地联接。具体地,发电机52可以在对接处理期间与燃气涡轮发动机22对准,当涡轮机拖车12固定时发电机拖车14可以沿相反方向120运动,使得发电机52可以与燃气涡轮发动机22可拆除地联接。在一些实施例中,涡轮机拖车12可以朝向固定发电机拖车14运动,和/或拖车12、14两者可以在对接处理期间朝向彼此运动。在一些实施例中,在发电机52与燃气涡轮发动机22可拆除地联接之后,安装在运输拖车18和/或控制室拖车16上的一个或多个部件可被输送以完成移动发电厂系统10的安装和交付使用。在一些实施例中,安装在运输拖车18和/或控制室拖车16上的一个或多个部件可以在对接处理之前被输送和安装。
如上所述,在安装阶段期间,运输拖车18和/或控制室拖车16上的一个或多个部件可以输送至发电机拖车14和/或涡轮机拖车12。例如,在一些实施例中,过滤器组件82和排气烟囱84可以从运输拖车18输送至涡轮机拖车12。具体地,第一过滤器88可以沿着参考路径122输送以联接至进气区段30的第一侧124。同样地,第二过滤器90可以沿着参考路径126输送以联接至进气区段30的第二侧128(与第一侧124相反)。在具体的实施例中,如上关于图2所述,第一过滤器88和第二过滤器90可以通过一个或多个附连机构102固定或紧固至进气区段30。此外,一个或多个支承机构104可被用于沿着进气区段30的第一侧124和第二侧128紧固第一过滤器88和第二过滤器90。同样地,在一些实施例中,排气烟囱84可以沿着参考路径132从运输拖车18输送至涡轮机拖车12,使其布置至封壳24的顶部表面。
此外,在一些实施例中,通风系统78可以沿着参考路径130从控制室拖车16输送至涡轮机拖车12。在图示的实施例中,通风系统78可以安装在进气区段30和燃气涡轮发动机22的上面,以使其联接至封壳24的顶部表面。此外,在一些实施例中,排气系统80可以沿着参考路径134从控制室拖车16输送至发电机拖车14。在图示的实施例中,排气系统80可以安装在发电机52上面,使其布置在发电机52的顶部表面上面。另外,在一些实施例中,进气过滤器组件86(包括第一进气过滤器92和第二进气过滤器94)可以从运输拖车18输送至发电机拖车14。具体地,在图示的实施例中,第一进气过滤器92可以沿着参考路径136输送(从运输拖车18至发电机拖车14)并且联接至排气系统78的第一侧138。另外,第二进气过滤器94可以沿着参考路径140输送(从运输拖车18至发电机拖车14)并且联接至排气系统78的第二侧142。
在一些实施例中,一个或多个另外的部件可以安装在涡轮机拖车12和/或发电机拖车14上,并且可以在安装阶段期间输送。例如,在图示的实施例中,气体燃料过滤器54可以布置在发电机拖车14上,并且可以沿着参考路径144输送并且联接至与涡轮机拖车12相关联的互连软管146。具体地,气体燃料过滤器54可以构造成过滤比如为天然气、丙烷等等的气体燃料。
图5是图1的移动发电厂系统10的实施例的框图,描绘了辅助橇装设备32与燃气涡轮发动机22之间的一个或多个互连件44。所示出的实施例是在运输和安装阶段之后组装的移动发电厂系统10的实施例的框图。如上所述,在一些实施例中,一个或多个拖车11上的部分组装部件的布置可以帮助减少一个或多个拖车11之间的互连件(例如,电力和/或数据通信线缆45、流体线路181等等)的数量,由此减少安装时间并且提高可以组装移动发电厂系统10的速度。在图示的实施例中,描绘了在安装阶段之后包括涡轮机拖车12和发电机拖车14的移动发电厂系统10的局部视图。具体地,在图示的实施例中,一个或多个互连件将布置在辅助橇装设备32内的涡轮机控制面板150通信地联接至与燃气涡轮发动机22相关联的一个或多个系统,如以下进一步详细说明的。在一些实施例中,互连件44可以是电力和/或数据通信线缆45,以及构造成将流体(例如合成润滑油、液压润滑油、水、清洗液等等)从辅助橇装设备32传输至燃气涡轮发动机22的流体线路181。
在一些实施例中,燃气涡轮发动机22可以包括通过共用轴56联接至压缩机154的燃气轮机152。大气空气156可以进入过滤器组件82以在进入压缩机154内之前去除污染物。过滤器组件82可以包括过滤设备以在进入吸气区段30之前从空气156去除灰尘、沙粒、废气或其他环境污染物。压缩机154通过进气区段30将氧化剂(例如空气156)吸入燃气涡轮发动机22内。如本文所述,氧化剂可以包括但不限于空气156、氧气、富氧空气、贫氧空气或其任何组合。氧化剂(例如空气156)可以经由比如为冷空气吸入区段的适当的吸入区段通过进气区段30吸收到燃气涡轮发动机22内,用于将氧化剂后续输送到压缩机154内。在一些实施例中,吸气区段30可以利用热交换器以在将空气156引入至压缩机154之前控制过滤空气的温度。压缩机154压缩进入空气,通过旋转压缩机154内的叶片而形成加压空气(例如压缩空气)。
加压空气158进入燃料喷嘴160以及与燃料162混合以形成空气燃料混合物。燃气涡轮发动机22可以利用气体燃料或液体燃料操作。燃料源可以通过可以联接至燃烧室164的燃料系统调节。燃料喷嘴158将空气燃料混合物导入燃烧室164内。燃烧室164点燃并燃烧空气燃料混合物,以形成燃烧产物。燃烧产物被导向燃气轮机152,在此燃烧产物膨胀并且围绕轴56驱动燃气轮机152的叶片。燃气轮机22可以通过共用轴56驱动负载50。如将理解的,负载50可以包括发电机52(例如发电机)。最后,燃烧产物作为排气166排出燃气轮机152,排气166然后通过排气烟囱84排出移动发电厂系统10。在一些实施例中,排气166可以导向封壳24的外部。
燃气涡轮发动机22可以联接至通风系统78(例如通风系统78)和排气烟囱84。通风系统78可以去除来自涡轮机152的热的一些,使得涡轮机152可以在不会由于过热而中断的情况下操作。通风系统78还可以使得泄漏气体能够被稀释以及充分地分散以避免气体聚集。排气166可以通过扩散器排出燃气涡轮发动机22进入排气烟囱84内。排气烟囱84可以通过排气框架联接至燃气涡轮发动机22。在移动发电厂系统10被包围的实施例中,排气烟囱84使得高压气体能够排出燃气涡轮发动机22的封壳。
在一些实施例中,燃气涡轮发动机22可以包括另外的支持系统,比如,例如润滑系统170、液压起动系统172和/或水洗系统174。润滑系统170可被构造成使润滑油(例如通过液压起动系统172的合成润滑油、通过涡轮机152的液压润滑油或者通过两者的合成润滑油和液压润滑油的组合)循环,以便润滑燃气涡轮发动机22的运动部件。在一些实施例中,四个互连件44(例如四个流体线路181)可以实现润滑系统170与辅助橇装设备32之间的流体连通。水洗系统174可以构造成泵送水(或其他清洁流体)通过燃气涡轮发动机22以清洁燃气涡轮发动机22。在一些实施例中,一个互连件44(例如一个流体线路181)可以实现水洗系统174与辅助橇装设备32之间的流体连通。液压起动系统172可以包括与燃气涡轮发动机22相关联的电机176,液压起动系统172可以构造成接合电机176以起动燃气涡轮发动机22的操作。在一些实施例中,三个互连件44(例如三个数据和/或流体线路181)可以实现液压起动系统172与辅助橇装设备之间的流体连通。在一些实施例中,另外的支持系统可以包括用于将一个或多个流体流(例如水、蒸汽、比如为氮气的惰性气体、再循环排气、清洗液、油或其任何组合)注入燃气涡轮发动机22内的流体注入系统、冷却系统、构造成供给燃料流的燃料系统、热/间隙控制系统或与燃气涡轮发动机22相关联的任何其他支持系统。
具体地,在一些实施例中,布置在辅助橇装设备32内的涡轮机控制面板150(例如TCP150)可以构造成与燃气涡轮发动机22的一个或多个支持部件直接对接。例如,在一些实施例中,涡轮机控制面板150可以包括构造成支持燃气涡轮发动机22的一个或多个支持系统(例如润滑系统170、液压起动系统172和/或水洗系统174)中的每一个的操作的各种支持配线和/或器具。
在一些实施例中,辅助橇装设备32可以包括各种支持部件以辅助地支持所述支持系统的操作。例如,燃气涡轮发动机22的水洗系统174可以与布置在辅助橇装设备32内的各种水洗部件180(例如容器、泵、过滤器、马达控制器等等)相关联。如关于图6进一步说明的,水洗部件180可以通信地联接(和/或流体地联接)至燃气涡轮发动机22的水洗系统174,并且可以调节水流用于清洁燃气涡轮发动机22。因此,除燃气涡轮发动机22的部件与辅助橇装设备32之间一个或多个互连件44(例如线缆45和流体线路181)之外,一个或多个流体线路181可以跨越涡轮机拖车12的长度183设置在辅助橇装设备32与燃气涡轮发动机22之间。
作为另一个例子,在一些实施例中,燃气涡轮发动机22的润滑系统170可以与各种润滑系统部件182(例如容器、过滤器、泵、仪表、马达控制器等等)相关联。润滑系统部件182可以包括由润滑系统170利用的润滑油源,以使润滑油循环通过燃气涡轮发动机22。在一些实施例中,润滑系统170可以包括构造成保持合成润滑油(例如在液压起动系统170内利用)和液压润滑油(例如在涡轮机152内利用)两者的容器。具体地,在一些实施例中,合成润滑油和液压润滑油可以组合在单个容器内。类似地,润滑系统170与润滑部件182之间的一个或多个流体线路181可以延伸跨越涡轮机拖车12的长度183。作为另一个例子,在一些实施例中,燃气涡轮发动机22的液压起动系统172可以包括构造成起动燃气涡轮发动机22的操作的液压电机176。在一些实施例中,各种支持部件和仪表(例如液压起动部件184)可被用于通过互连件44(例如电力和/或数据通信线缆45、流体线路181等等)调节液压电机176,互连件44延伸涡轮机拖车12的在燃气涡轮发动机22与辅助橇装设备32之间的长度183。
在一些实施例中,涡轮机控制面板150可以与构造成接收并处理来自燃气涡轮发动机22的反馈的控制器相关联。例如,涡轮机控制面板150可以与存储器76和处理器74相关联。存储器76可以存储能够通过处理器74执行的软件指令或代码,以控制燃气涡轮发动机22和支持系统(例如,润滑系统40、水洗系统42等等)的各个方面。此外,在一些实施例中,涡轮机控制面板150可以与控制室拖车16的控制系统70对接(例如提供反馈和/或一个或多个数据通信信道)。因此,这样,在辅助橇装设备32内包括与燃气涡轮发动机22相关联的一个或多个支持部件可以有助于减少一个或多个拖车之间的互连件44,由此减少安装时间并且提高移动发电厂系统可以组装的速度。具体地,在辅助橇装设备内包括与燃气涡轮发动机22的支持系统相关联的支持部件可以帮助减少燃气涡轮发动机22与控制室拖车16之间的互连件的数量。
图6是在安装阶段之后的图1的移动发电厂系统10的实施例的透视图。具体地,在图示的实施例中,安装在发电机拖车14上的发电机52可以与安装在涡轮机拖车12上的燃气涡轮发动机22联接。进一步地,安装在运输拖车18和/或控制室拖车16上的一个或多个部件可被输送和安装以便交付移动发电厂系统10用于产生电力。
如上所述,在一些实施例中,在安装阶段之后,过滤器组件82和排气烟囱84可以联接至燃气涡轮发动机22。具体地,第一过滤器88可以联接至进气区段30的第一侧124。同样地,第二过滤器90可以联接至进气区段30的第二侧128(与第一侧124相反)。在具体的实施例中,如上关于图2所述,第一过滤器88和第二过滤器90可以通过一个或多个附连机构102固定或紧固至进气区段30。此外,一个或多个支承机构104可被用于沿着进气区段30的第一侧124和第二侧128紧固第一过滤器88和第二过滤器90。在一些实施例中,排气烟囱84可以邻近构造成封装燃气涡轮发动机22的封壳24的顶部表面安装。在一些实施例中,封壳24的顶部表面可以包括使操作人员能够对燃气涡轮发动机22内的部件执行保养或修理的顶部通路。进一步地,通过封壳24的顶部表面的顶部通路可以使得通过顶部拆卸发动机更快。
在一些实施例中,通风系统78可以安装在进气区段30和燃气涡轮发动机22的上面,以使其联接至封壳24的顶部表面。此外,在一些实施例中,排气系统80可以安装在发电机52上面,使其布置在发电机52的顶部表面上面。另外,在一些实施例中,进气过滤器组件86(包括第一进气过滤器92和第二进气过滤器94)可以联接至排气系统78的第一侧138和第二侧142。
图7是在移动发电厂系统10的运输阶段期间布置在图1的涡轮机拖车12的进气区段30的壳体202内的消音器200的实施例的透视图。在图示的实施例中,壳体202可以包括构造成在运输阶段期间封装和包覆消音器200的框架204。具体地,消音器200可以布置在进气区段30内,并且可以安装到涡轮机拖车12上用于运输至安装地点。
图8是在移动发电厂系统10的安装阶段之后图3的涡轮机拖车12的通风系统78和排气烟囱84的实施例的透视图,其中通风系统78联接至包围图7的燃气涡轮发动机22的封壳24。
本发明的技术效果包括通过安装在拖车上的系统将移动发电厂系统10的部件运送至安装地点,以满足永久发电厂可能不能输送电力的用户的电力需求。在一些实施例中,在移动发电厂系统10的运输阶段期间,发电机拖车14可以运输用于移动发电厂系统10的发电的发电机52。涡轮机拖车12可以运输燃气涡轮发动机22、包括布置在消音器壳体202内的消音器200的吸气区段30和/或辅助橇装设备32。在一些实施例中,辅助橇装设备32可以布置在涡轮机拖车12的后部并且可以包括联接(例如通信地联接)至与燃气涡轮发动机22相关联的多个部件的多个部件。此外,在运输阶段期间,控制室拖车16可以运输具有控制器72的控制系统70、用于燃气涡轮发动机22的通风系统78以及用于发电机52的空气通风系统80。此外,在一些实施例中,运输拖车18可以运输过滤器组件82、进气过滤器组件86和/或排气烟囱84。
在安装阶段期间,由拖车11运输至安装地点的一个或多个部件可以重新布置以装配和交付移动发电厂系统10。因此,所公开的实施例涉及通过改进在运输期间布置在一个或多个拖车11上的部分组装部件的布置减少移动发电厂系统10的拖车数量的系统和方法。此外,涡轮机拖车12上的部分组装部件的布置(例如辅助橇装设备32)可以帮助减少涡轮机拖车12与控制室拖车16之间的互连件,由此减少安装时间并且提高可以组装移动发电厂系统的速度。
该书面说明书利用例子公开本发明,包括最佳方式,并且还使本领域技术人员能够实施本发明,包括制造和使用任何装置或系统以及执行任何采用的方法。本发明的可获得专利的范围由权利要求限定,并且可能包括本领域技术人员想到的其他例子。如果这些其他例子具有与权利要求的文字措辞没有不同之处的结构元件,或者这些其他例子包括与权利要求的文字措辞无实质区别的等同结构元件,则这些其他例子旨在落入权利要求的范围内。

Claims (10)

1.一种系统,包括:
第一移动主体,所述第一移动主体构造成支承涡轮发动机和联接至所述涡轮发动机的进气区段;
第二移动主体,所述第二移动主体构造成支承发电机,其中,所述第一移动主体和所述第二移动主体构造成使得所述涡轮发动机与所述发电机对准以实现可拆除联接;以及
第三移动主体,所述第三移动主体构造成支承与所述涡轮发动机和所述发电机相关联的一个或多个部分组装的部件。
2.根据权利要求1所述的系统,其中,所述第一移动主体包括第一拖车,所述第二移动主体包括第二拖车,所述第三移动主体包括第三拖车。
3.根据权利要求1所述的系统,其中,所述第三移动主体构造成支承排气烟囱,所述排气烟囱构造成与所述涡轮发动机联接,以及其中,所述排气烟囱构造成从所述涡轮发动机排出排气。
4.根据权利要求1所述的系统,其中,所述第三移动主体包括构造成与所述涡轮发动机的所述进气区段联接的第一过滤器和第二过滤器,其中,所述第一过滤器和所述第二过滤器构造成将空气流过滤并且吸入所述涡轮发动机内。
5.根据权利要求4所述的系统,其中,所述第一过滤器构造成联接至所述进气区段的第一部分,所述第二过滤器构造成联接至所述进气区段的第二部分。
6.根据权利要求1所述的系统,其中,所述第三移动主体包括构造成与所述发电机联接的进气过滤器,其中,所述进气过滤器构造成过滤包围所述发电机的空气。
7.根据权利要求1所述的系统,其中,所述第三移动主体包括吊车,所述吊车构造成将所述一个或多个部分组装的部件中的每一个从所述第三移动主体输送至所述第一移动主体或所述第二移动主体。
8.根据权利要求1所述的系统,包括第四移动主体,所述第四移动主体构造成支承通信地联接至所述涡轮发动机和所述发电机的控制系统。
9.一种系统,包括:
第一移动主体,所述第一移动主体构造成支承涡轮发动机;
第二移动主体,所述第二移动主体构造成支承发电机,其中,所述第一移动主体和所述第二移动主体构造成使得所述涡轮发动机与所述发电机对准以实现可拆除联接;以及
第三移动主体,所述第三移动主体构造成支承通信地联接至所述涡轮发动机和所述发电机的控制系统,其中,所述第三移动主体构造成支承与所述涡轮发动机相关联的第一通风系统。
10.一种方法,包括:
通过第一移动主体运输涡轮发动机和联接至所述涡轮发动机的进气区段;
通过第二移动主体运输构造成与所述涡轮发动机可拆除地联接的发电机;
通过第三移动主体运输与所述涡轮发动机和所述发电机相关联的一个或多个部分组装的部件;以及
通过布置在所述第三移动主体上的输送机构将所述一个或多个部分组装的部件从所述第三移动主体输送至所述第一移动主体或所述第二移动主体。
CN201710859438.9A 2016-09-21 2017-09-21 用于具有改进机动性和减小拖车数的移动发电厂的系统和方法 Active CN107859536B (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US15/272050 2016-09-21
US15/272,050 US10184397B2 (en) 2016-09-21 2016-09-21 Systems and methods for a mobile power plant with improved mobility and reduced trailer count

Publications (2)

Publication Number Publication Date
CN107859536A true CN107859536A (zh) 2018-03-30
CN107859536B CN107859536B (zh) 2021-11-26

Family

ID=60009413

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710859438.9A Active CN107859536B (zh) 2016-09-21 2017-09-21 用于具有改进机动性和减小拖车数的移动发电厂的系统和方法

Country Status (4)

Country Link
US (1) US10184397B2 (zh)
EP (1) EP3299603B1 (zh)
JP (1) JP7012487B2 (zh)
CN (1) CN107859536B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110145399A (zh) * 2019-06-25 2019-08-20 烟台杰瑞石油装备技术有限公司 一种移动式发电系统
CN110159432A (zh) * 2019-06-25 2019-08-23 烟台杰瑞石油装备技术有限公司 一种用于提供移动电力的系统
CN111412064A (zh) * 2020-04-28 2020-07-14 烟台杰瑞石油装备技术有限公司 一种车载式燃气轮机发电机组
WO2020258005A1 (zh) * 2019-06-25 2020-12-30 烟台杰瑞石油装备技术有限公司 一种用于提供移动电力的系统
CN115288651A (zh) * 2021-01-26 2022-11-04 烟台杰瑞石油装备技术有限公司 压裂设备
US11702980B2 (en) 2019-08-20 2023-07-18 Yantai Jereh Petroleum Equipment & Technologies Co., Ltd. Mobile power system
WO2024087272A1 (zh) * 2022-10-27 2024-05-02 烟台杰瑞石油装备技术有限公司 燃气轮机启动系统和动力设备
US11994065B2 (en) 2021-07-15 2024-05-28 Yantai Jereh Petroleum Equipment & Technologies Co., Ltd. Air supply device, gas turbine system and using method thereof

Families Citing this family (60)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016100524A1 (en) 2014-12-19 2016-06-23 Evolution Well Services, Llc Mobile electric power generation for hydraulic fracturing of subsurface geological formations
ES2584919B1 (es) * 2016-04-20 2017-08-04 Kemtecnia Tecnología Química Y Renovables, S.L. Sistema móvil autónomo, escalable, auto desplegable, monitorizable y reprogramable de forma remota, de generación de energía eléctrica
US11624326B2 (en) 2017-05-21 2023-04-11 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11498445B1 (en) * 2018-01-02 2022-11-15 Michael Gurin Distributed and decoupled charging and discharging energy storage system
GB2579207A (en) * 2018-11-23 2020-06-17 Centrax Ltd A gas turbine system and method for direct current consuming components
US11085266B2 (en) * 2018-12-20 2021-08-10 Bj Services, Llc Deployment devices and related methods for hydraulic fracturing systems
US11560845B2 (en) 2019-05-15 2023-01-24 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11746636B2 (en) 2019-10-30 2023-09-05 Yantai Jereh Petroleum Equipment & Technologies Co., Ltd. Fracturing apparatus and control method thereof, fracturing system
US11680474B2 (en) 2019-06-13 2023-06-20 Yantai Jereh Petroleum Equipment & Technologies Co., Ltd. Fracturing apparatus and control method thereof, fracturing system
CN110118127A (zh) 2019-06-13 2019-08-13 烟台杰瑞石油装备技术有限公司 一种电驱压裂设备的供电半挂车
CN110284972A (zh) * 2019-06-25 2019-09-27 烟台杰瑞石油装备技术有限公司 一种移动发电系统的方法
CN110159433A (zh) * 2019-06-25 2019-08-23 烟台杰瑞石油装备技术有限公司 一种移动发电系统
US11753991B2 (en) 2019-06-25 2023-09-12 Yantai Jereh Petroleum Equipment & Technologies Co., Ltd. Intake-exhaust transport apparatus mobile power generation system and assembling method thereof
CA3092829C (en) 2019-09-13 2023-08-15 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
CA3092859A1 (en) 2019-09-13 2021-03-13 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US10895202B1 (en) 2019-09-13 2021-01-19 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11015594B2 (en) 2019-09-13 2021-05-25 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US12065968B2 (en) 2019-09-13 2024-08-20 BJ Energy Solutions, Inc. Systems and methods for hydraulic fracturing
US10989180B2 (en) * 2019-09-13 2021-04-27 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11555756B2 (en) 2019-09-13 2023-01-17 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US10815764B1 (en) 2019-09-13 2020-10-27 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11002189B2 (en) 2019-09-13 2021-05-11 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US10961914B1 (en) 2019-09-13 2021-03-30 BJ Energy Solutions, LLC Houston Turbine engine exhaust duct system and methods for noise dampening and attenuation
CA3092865C (en) 2019-09-13 2023-07-04 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11015536B2 (en) 2019-09-13 2021-05-25 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
CN110848028A (zh) * 2019-12-17 2020-02-28 烟台杰瑞石油装备技术有限公司 一种用于提供移动电力的系统
WO2021218969A1 (zh) * 2020-04-28 2021-11-04 烟台杰瑞石油装备技术有限公司 车载式燃气轮机发电机组
US11708829B2 (en) 2020-05-12 2023-07-25 Bj Energy Solutions, Llc Cover for fluid systems and related methods
US10968837B1 (en) 2020-05-14 2021-04-06 Bj Energy Solutions, Llc Systems and methods utilizing turbine compressor discharge for hydrostatic manifold purge
US11428165B2 (en) 2020-05-15 2022-08-30 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11208880B2 (en) 2020-05-28 2021-12-28 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US10961908B1 (en) 2020-06-05 2021-03-30 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11109508B1 (en) 2020-06-05 2021-08-31 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11208953B1 (en) 2020-06-05 2021-12-28 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11066915B1 (en) 2020-06-09 2021-07-20 Bj Energy Solutions, Llc Methods for detection and mitigation of well screen out
US11111768B1 (en) 2020-06-09 2021-09-07 Bj Energy Solutions, Llc Drive equipment and methods for mobile fracturing transportation platforms
US10954770B1 (en) 2020-06-09 2021-03-23 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11022526B1 (en) 2020-06-09 2021-06-01 Bj Energy Solutions, Llc Systems and methods for monitoring a condition of a fracturing component section of a hydraulic fracturing unit
US11028677B1 (en) 2020-06-22 2021-06-08 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11939853B2 (en) 2020-06-22 2024-03-26 Bj Energy Solutions, Llc Systems and methods providing a configurable staged rate increase function to operate hydraulic fracturing units
US11125066B1 (en) 2020-06-22 2021-09-21 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11933153B2 (en) 2020-06-22 2024-03-19 Bj Energy Solutions, Llc Systems and methods to operate hydraulic fracturing units using automatic flow rate and/or pressure control
US11473413B2 (en) 2020-06-23 2022-10-18 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11466680B2 (en) 2020-06-23 2022-10-11 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11220895B1 (en) 2020-06-24 2022-01-11 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11149533B1 (en) 2020-06-24 2021-10-19 Bj Energy Solutions, Llc Systems to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US11193361B1 (en) 2020-07-17 2021-12-07 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
KR102464656B1 (ko) * 2020-10-16 2022-11-10 (주)대륜엔지니어링 이동식 친환경 전기에너지 공급시스템
US11788668B1 (en) 2020-10-26 2023-10-17 Relevant Power Solutions, LLC Mobile electric power generation trailer system and methods
US11598477B1 (en) 2020-10-26 2023-03-07 Relevant Power Solutions, LLC Mobile electric power generation trailer system and methods
EP4001615A1 (en) * 2020-11-19 2022-05-25 General Electric Technology GmbH System and method for treating fuel for a gas turbine engine
US20220185404A1 (en) * 2020-12-11 2022-06-16 Solar Turbines Incorporated Transportation trailer and machinery coupling alignment system
CN113315111B (zh) 2021-04-26 2023-01-24 烟台杰瑞石油装备技术有限公司 一种供电方法及供电系统
US11639654B2 (en) 2021-05-24 2023-05-02 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods
CN221074441U (zh) 2021-06-04 2024-06-04 烟台杰瑞石油装备技术有限公司 发电设备和电力系统
CN215870792U (zh) 2021-10-12 2022-02-18 烟台杰瑞石油装备技术有限公司 用于井场电驱设备的供电系统
US11815018B2 (en) 2021-12-15 2023-11-14 General Electric Company Box-shaped air intake silencer with vertical baffles for gas turbine system
US11668234B1 (en) * 2022-03-23 2023-06-06 Enerset Electric Ltd. High density mobile power unit and system
US20230304437A1 (en) * 2022-03-23 2023-09-28 Enerset Electric Ltd. High Density Mobile Power Unit and System
US11725582B1 (en) * 2022-04-28 2023-08-15 Typhon Technology Solutions (U.S.), Llc Mobile electric power generation system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201769729U (zh) * 2010-09-16 2011-03-23 天津德赛机电设备有限公司 移动式发电车
CN202071742U (zh) * 2011-05-25 2011-12-14 福州福发发电设备有限公司 挂车电站
US20120153634A1 (en) * 2010-12-20 2012-06-21 Solar Turbines Incorporated Mobile Power System
CN102619620A (zh) * 2012-04-10 2012-08-01 瑞昌哥尔德发电设备(无锡)制造有限公司 移动式高压电站
CN104864226A (zh) * 2014-02-24 2015-08-26 卡特彼勒能源方案有限公司 包括发动机的组件

Family Cites Families (84)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3453443A (en) 1966-07-28 1969-07-01 Gen Electric Gas turbine mobile powerplant
US3536928A (en) 1968-02-09 1970-10-27 Foley Machinery Co Cooling arrangement for electric power generating plants
US3800966A (en) * 1971-07-12 1974-04-02 G Newton Loader crane for gooseneck trailer
US3791682A (en) * 1972-08-23 1974-02-12 Stewart & Stevenson Serv Inc Turbine driven electrical generator
US3907435A (en) 1972-09-29 1975-09-23 Laser Alignment Light beam alignment target and method
US3925679A (en) * 1973-09-21 1975-12-09 Westinghouse Electric Corp Modular operating centers and methods of building same for use in electric power generating plants and other industrial and commercial plants, processes and systems
USRE30229E (en) * 1973-09-21 1980-03-11 Robert L. Ziegelman Modular operating centers and methods of building same for use in electric power generating plants and other industrial and commercial plants, processes and systems
DE2605941C3 (de) 1976-02-14 1980-10-30 Mtu Motoren- Und Turbinen-Union Friedrichshafen Gmbh, 7990 Friedrichshafen Gehäuse
US4136432A (en) 1977-01-13 1979-01-30 Melley Energy Systems, Inc. Mobile electric power generating systems
US4159623A (en) * 1977-11-07 1979-07-03 Mcreynolds William W Automotive step-turbine engine
US4159180A (en) 1978-02-21 1979-06-26 Halliburton Company Ground fed blender
US4254625A (en) * 1978-12-04 1981-03-10 Saab-Scania Ab Turbo charging systems
US4229661A (en) * 1979-02-21 1980-10-21 Mead Claude F Power plant for camping trailer
US4311395A (en) 1979-06-25 1982-01-19 Halliburton Company Pivoting skid blender trailer
US4324984A (en) * 1981-02-03 1982-04-13 Hydrodynamic Energy Systems Corp. Portable hydrogenerating apparatus
US4447738A (en) * 1981-12-30 1984-05-08 Allison Johnny H Wind power electrical generator system
DE8505239U1 (de) * 1985-02-23 1987-08-20 M.A.N.- B & W Diesel GmbH, 8900 Augsburg Schalldämpfer mit Vorleitschaufeln an der Ansaugseite des Verdichters eines Abgasturboladers
US4992669A (en) * 1989-02-16 1991-02-12 Parmley Daniel W Modular energy system
US5517822A (en) 1993-06-15 1996-05-21 Applied Energy Systems Of Oklahoma, Inc. Mobile congeneration apparatus including inventive valve and boiler
US5684578A (en) 1994-06-23 1997-11-04 Computational Systems, Inc. Laser alignment head for use in shaft alignment
US6107691A (en) * 1995-11-14 2000-08-22 Grow International Corp. Methods for utilizing the electrical and non electrical outputs of fuel cell powered vehicles
US6266143B1 (en) 1997-03-20 2001-07-24 Brink's Mfg. Co., Inc. End cap incorporating laser alignment target
JP2000248906A (ja) * 1999-02-26 2000-09-12 Hitachi Zosen Corp 発電装置における発電室構造
US6278198B1 (en) * 2000-05-02 2001-08-21 Valmont Industries, Inc. Method and means for mounting a wind turbine on a tower
US20010038207A1 (en) * 2000-05-02 2001-11-08 Willis Jeffrey O. Method and means for mounting a wind turbine on a tower
US6888264B1 (en) * 2000-05-02 2005-05-03 Valmont Industries, Inc. Method and means for mounting a wind turbine on a tower
ATE448365T1 (de) 2000-05-05 2009-11-15 Leica Geosystems Gr Llc Lasergesteuerte baumaschine
US6450133B1 (en) 2000-09-19 2002-09-17 Solutions Jupiter Inc. Partitioned container for high output mobile generator
US6388869B1 (en) 2000-09-19 2002-05-14 Solutions Jupiter Inc. Mobile generator unit with removable breaker box
US6895903B2 (en) 2001-08-08 2005-05-24 General Electric Company Air provision systems for portable power modules
US7081682B2 (en) 2001-08-08 2006-07-25 General Electric Company Portable power modules and related systems
US7007966B2 (en) 2001-08-08 2006-03-07 General Electric Company Air ducts for portable power modules
US6765304B2 (en) * 2001-09-26 2004-07-20 General Electric Co. Mobile power generation unit
JP4366034B2 (ja) * 2001-10-02 2009-11-18 株式会社日立製作所 タービン発電設備
US6786051B2 (en) 2001-10-26 2004-09-07 Vulcan Advanced Mobile Power Systems, L.L.C. Trailer mounted mobile power system
US6838782B2 (en) * 2002-11-05 2005-01-04 Thomas H. Vu Wind energy capturing device for moving vehicles
US6930402B1 (en) * 2003-05-15 2005-08-16 Sprint Communications Company L.P. Power system for a telecommunication facility
AU2003276628A1 (en) 2002-11-27 2004-06-18 Koninklijke Philips Electronics N.V. Method and apparatus for automatic self-aligning docking of a couch with a magnetic resonance imaging scanner
US7221061B2 (en) * 2002-12-02 2007-05-22 Caterpillar Inc Power generation system having an external process module
AU2002953528A0 (en) 2002-12-24 2003-01-16 Cowey, Steven John An improved vehicle loading dock fender assembly
US6893487B2 (en) 2002-12-23 2005-05-17 Caterpillar Inc Power generation aftertreatment system having a particulate filter dimensioned to be interchangeable with a muffler
WO2005086864A2 (en) 2004-03-09 2005-09-22 Vulcan Advanced Mobile Power Systems Power trailer structural elements for air flow, sound attenuation and fire supression
US7105940B2 (en) * 2004-03-31 2006-09-12 General Electric Company Mobile renewable energy generator
US7122913B2 (en) 2004-07-09 2006-10-17 Wittmar Engineering And Construction, Inc. Modular power generation apparatus and method
US7708204B2 (en) 2005-02-07 2010-05-04 Hamar Laser Instruments, Inc. Laser alignment apparatus
CA2507073A1 (en) 2005-05-11 2006-11-11 Frac Source Inc. Transportable nitrogen pumping unit
US7274111B2 (en) * 2005-12-09 2007-09-25 General Electric Company Methods and apparatus for electric power grid frequency stabilization
US7282807B2 (en) * 2005-12-20 2007-10-16 General Electric Company Systems and methods for testing a wind turbine
US7608938B2 (en) * 2006-10-12 2009-10-27 General Electric Company Methods and apparatus for electric power grid frequency stabilization
US7615876B2 (en) 2007-02-23 2009-11-10 Marshall Michael J Mobile power generation system and method
RU2342542C1 (ru) 2007-04-04 2008-12-27 Федеральное государственное унитарное предприятие "Московское машиностроительное производственное предприятие "Салют" Установка для получения энергии
US7615883B2 (en) * 2007-06-06 2009-11-10 Meheen H Joe Wind driven venturi turbine
WO2009017686A2 (en) * 2007-07-27 2009-02-05 Skybuilt Power Renewable energy trailer
US8506267B2 (en) 2007-09-10 2013-08-13 Schlumberger Technology Corporation Pump assembly
US7819209B1 (en) 2008-05-31 2010-10-26 Complete Production Services Guided transport unit
CA2634861C (en) 2008-06-11 2011-01-04 Hitman Holdings Ltd. Combined three-in-one fracturing system
US7619319B1 (en) 2008-07-15 2009-11-17 F3 & I2, Llc Network of energy generating modules for transfer of energy outputs
US8294286B2 (en) 2008-07-15 2012-10-23 F3 & I2, Llc Network of energy generating modules for transfer of energy outputs
US7608934B1 (en) 2008-08-14 2009-10-27 F3 & I2, Llc Power packaging with railcars
US8294285B2 (en) 2008-08-14 2012-10-23 F3 & I2, Llc Power packaging with railcars
US8076791B2 (en) * 2008-09-08 2011-12-13 Lester Hostetler Wind and water turbine
US7821147B2 (en) * 2008-10-01 2010-10-26 Antolin Du Bois Rapid response portable hybrid emergency energy generator
US8536723B2 (en) * 2009-01-21 2013-09-17 American Hydro Jet Corporation Integrated hydroelectric power-generating system and energy storage device
US8854794B2 (en) * 2010-01-21 2014-10-07 George Van Straten Mobile electricity generator using solar panels
US8295033B2 (en) * 2010-01-21 2012-10-23 George Van Straten Mobile electricity generator using solar, wind, and fuel-generated power
CN102686852B (zh) * 2010-02-15 2016-02-24 唐纳森公司 用于燃气涡轮机进气系统的线圈结构和方法
US8495869B2 (en) 2010-11-02 2013-07-30 Girtz Industries Inc. Power systems with internally integrated aftertreatment and modular features
US8803353B2 (en) * 2010-11-24 2014-08-12 Joseph Sajan Jacob Turbine-generator driven by compressed air and magnet motor
US8581429B2 (en) * 2010-11-24 2013-11-12 Joseph Sajan Jacob Turbine-generator systems and methods
US20120222771A1 (en) * 2011-03-04 2012-09-06 Pipestream B.V. On-site manufacturing of composite pipeline
US9140110B2 (en) 2012-10-05 2015-09-22 Evolution Well Services, Llc Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas
EP3453827A3 (en) 2011-04-07 2019-06-12 Evolution Well Services, LLC Electrically powered system for use in fracturing underground formations
DE102011002108A1 (de) 2011-04-15 2012-10-18 Krauss-Maffei Wegmann Gmbh & Co. Kg Krancontainer sowie Verfahren zum Betrieb eines Krancontainers
US8618683B2 (en) * 2011-08-10 2013-12-31 Jose Diaz Electrical generator system for capturing wind energy on a moving vehicle
US8789601B2 (en) 2012-11-16 2014-07-29 Us Well Services Llc System for pumping hydraulic fracturing fluid using electric pumps
US9410410B2 (en) 2012-11-16 2016-08-09 Us Well Services Llc System for pumping hydraulic fracturing fluid using electric pumps
US8872366B2 (en) 2013-01-31 2014-10-28 APR Energy, LLC Scalable portable modular power plant
US9309842B2 (en) 2013-02-07 2016-04-12 General Electric Company Air inlet silencer for turbomachines
US9395049B2 (en) 2013-07-23 2016-07-19 Baker Hughes Incorporated Apparatus and methods for delivering a high volume of fluid into an underground well bore from a mobile pumping unit
WO2015103626A1 (en) 2014-01-06 2015-07-09 Lime Instruments Llc Hydraulic fracturing system
US9950758B2 (en) 2014-09-17 2018-04-24 General Electric Company Systems and methods for a turbine trailer mechanical docking and alignment system
US10378326B2 (en) 2014-12-19 2019-08-13 Typhon Technology Solutions, Llc Mobile fracturing pump transport for hydraulic fracturing of subsurface geological formations
WO2016100524A1 (en) 2014-12-19 2016-06-23 Evolution Well Services, Llc Mobile electric power generation for hydraulic fracturing of subsurface geological formations
US10030579B2 (en) 2016-09-21 2018-07-24 General Electric Company Systems and methods for a mobile power plant with improved mobility and reduced trailer count

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201769729U (zh) * 2010-09-16 2011-03-23 天津德赛机电设备有限公司 移动式发电车
US20120153634A1 (en) * 2010-12-20 2012-06-21 Solar Turbines Incorporated Mobile Power System
CN202071742U (zh) * 2011-05-25 2011-12-14 福州福发发电设备有限公司 挂车电站
CN102619620A (zh) * 2012-04-10 2012-08-01 瑞昌哥尔德发电设备(无锡)制造有限公司 移动式高压电站
CN104864226A (zh) * 2014-02-24 2015-08-26 卡特彼勒能源方案有限公司 包括发动机的组件

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘光宇: "《船舶燃气轮机装置原理与设计》", 31 December 1992 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110145399A (zh) * 2019-06-25 2019-08-20 烟台杰瑞石油装备技术有限公司 一种移动式发电系统
CN110159432A (zh) * 2019-06-25 2019-08-23 烟台杰瑞石油装备技术有限公司 一种用于提供移动电力的系统
WO2020258005A1 (zh) * 2019-06-25 2020-12-30 烟台杰瑞石油装备技术有限公司 一种用于提供移动电力的系统
US11702980B2 (en) 2019-08-20 2023-07-18 Yantai Jereh Petroleum Equipment & Technologies Co., Ltd. Mobile power system
CN111412064A (zh) * 2020-04-28 2020-07-14 烟台杰瑞石油装备技术有限公司 一种车载式燃气轮机发电机组
CN115288651A (zh) * 2021-01-26 2022-11-04 烟台杰瑞石油装备技术有限公司 压裂设备
US11994065B2 (en) 2021-07-15 2024-05-28 Yantai Jereh Petroleum Equipment & Technologies Co., Ltd. Air supply device, gas turbine system and using method thereof
WO2024087272A1 (zh) * 2022-10-27 2024-05-02 烟台杰瑞石油装备技术有限公司 燃气轮机启动系统和动力设备

Also Published As

Publication number Publication date
EP3299603B1 (en) 2021-04-14
JP7012487B2 (ja) 2022-01-28
JP2018071541A (ja) 2018-05-10
US10184397B2 (en) 2019-01-22
US20180080376A1 (en) 2018-03-22
EP3299603A1 (en) 2018-03-28
CN107859536B (zh) 2021-11-26

Similar Documents

Publication Publication Date Title
CN107859536A (zh) 用于具有改进机动性和减小拖车数的移动发电厂的系统和方法
CN107859563A (zh) 用于具有改进机动性和减小拖车数的移动发电厂的系统和方法
US11512632B2 (en) Single-transport mobile electric power generation
CN107208557B (zh) 用于地下地质构造的水力压裂的移动发电设备
US20240035363A1 (en) Fracturing apparatus and control method thereof, fracturing system
US20220259964A1 (en) Adaptive Mobile Power Generation System
US6895325B1 (en) Overspeed control system for gas turbine electric powerplant
CN113748256A (zh) 单个运输机式移动发电设备
CN101713338B (zh) 用于提供冷却和动力的方法和系统
CN103133142B (zh) 燃气涡轮和负载配置以及减小燃气涡轮中的负载联接件上的热应力和机械应力的方法
KR101385836B1 (ko) 모듈러 압축 시스템
CN105074139A (zh) 使用排气再循环保护燃气轮机发动机中组件的系统和方法
US20230134352A1 (en) Emissions management modules and associated systems and methods
WO2022076001A1 (en) Single-transport mobile electric power generation
US7603839B2 (en) Scavenge pump system and method
US20230349279A1 (en) Adaptive Mobile Power Generation System
RU2319024C1 (ru) Силовая установка газотурбовоза
US20230400018A1 (en) Turbine Fracturing Equipment
US20230332598A1 (en) Connecting Structure, Plunger Pump Device and Generator Device
CN114233422A (zh) 多轴燃气蒸汽联合循环机组
Hladun et al. The performance of portable evacuation compressors in gas transmission service

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240114

Address after: Swiss Baden

Patentee after: GENERAL ELECTRIC CO. LTD.

Address before: New York, United States

Patentee before: General Electric Co.

TR01 Transfer of patent right