CN107840248A - 一种16t行车上驳工艺 - Google Patents
一种16t行车上驳工艺 Download PDFInfo
- Publication number
- CN107840248A CN107840248A CN201710601448.2A CN201710601448A CN107840248A CN 107840248 A CN107840248 A CN 107840248A CN 201710601448 A CN201710601448 A CN 201710601448A CN 107840248 A CN107840248 A CN 107840248A
- Authority
- CN
- China
- Prior art keywords
- steel wire
- wire rope
- lifting
- drivings
- refute
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/04—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/12—Slings comprising chains, wires, ropes, or bands; Nets
- B66C1/122—Sling or load protectors
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Control And Safety Of Cranes (AREA)
Abstract
本发明公开了一种16T行车上驳工艺,依次经过吊装和上驳,具体步骤包括:吊装:利用40T门机整机及钢丝绳吊装16T行车,钢丝绳直接兜住主梁与支腿连接位置箱体进行吊装作业,16T行车在起吊离地200mm后暂停起升,禁止观察5分钟,检查是否有异响或结构变形异常情况,若无异常,方可继续起升;上驳:16T行车吊装离地后臂架旋转,至行车就位于驳船上指定位置后,门机松钩,拆卸总装吊装钢丝绳、卸扣,然后再对16T行车就行船运绑扎。其优点在于:本发明通过钢丝绳直接兜住主梁与支腿连接位置箱体进行吊装作业,钢丝绳与行车箱体自由边位置均涉及增加包角组件,以保护吊装钢丝绳,同时,包角组件上设有挡绳块,可确保钢丝绳不侧滑,吊装安全、可靠。
Description
技术领域
本发明涉及行车上驳技术领域,特别是一种16T行车上驳工艺。
背景技术
16T行车由于自身结构并未安装整机吊耳,若加装,吊耳装配、焊接等均为高空作业,工作量大,还需要登高车进行配合,费时费力,并且行车主梁上方无任何安全栏杆、挂钩等保护设施,因此存在很大的安全隐患。
发明内容
本发明的目的克服现有技术的不足,提供一种高效的16T行车上驳工艺。
本发明解决其技术问题所采取的技术方案是:
一种16T行车上驳工艺,其创新点在于,依次经过吊装和上驳,具体步骤包括:
1)吊装:利用40T门机整机及钢丝绳吊装16T行车,钢丝绳直接兜住主梁与支腿连接位置箱体进行吊装作业,16T行车在起吊离地200mm后暂停起升,禁止观察5分钟,检查是否有异响或结构变形异常情况,若无异常,方可继续起升;
2)上驳:16T行车吊装离地后臂架旋转,至行车就位于驳船上指定位置后,门机松钩,拆卸总装吊装钢丝绳、卸扣,然后再对16T行车就行船运绑扎。
进一步的,所述步骤1中,吊装过程中的钢丝绳上包裹半剖圆管包角组件,所述包角组件上设有挡绳块。
本发明的有益效果如下:
本发明通过钢丝绳直接兜住主梁与支腿连接位置箱体进行吊装作业,钢丝绳与行车箱体自由边位置均涉及增加包角组件,以保护吊装钢丝绳,同时,包角组件上设有挡绳块,可确保钢丝绳不侧滑,吊装安全、可靠。
具体实施方式
本发明解决其技术问题所采取的技术方案是:
一种16T行车上驳工艺,依次经过吊装和上驳,具体步骤包括:
1)吊装:利用40T门机整机及钢丝绳吊装16T行车,钢丝绳直接兜住主梁与支腿连接位置箱体进行吊装作业,16T行车在起吊离地200mm后暂停起升,禁止观察5分钟,检查是否有异响或结构变形异常情况,若无异常,方可继续起升;
2)上驳:16T行车吊装离地后臂架旋转,至行车就位于驳船上指定位置后,门机松钩,拆卸总装吊装钢丝绳、卸扣,然后再对16T行车就行船运绑扎。
以上所述是本发明的优选实施方式,不能以此来限定本发明之权利范围。应当指出,对于本技术领域的普通技术人员来说,对本发明的技术方案进行修改或者等同替换,都不脱离本发明的保护范围。
Claims (2)
1.一种16T行车上驳工艺,其特征在于,依次经过吊装和上驳,具体步骤包括:
1)吊装:利用40T门机整机及钢丝绳吊装16T行车,钢丝绳直接兜住主梁与支腿连接位置箱体进行吊装作业,16T行车在起吊离地200mm后暂停起升,禁止观察5分钟,检查是否有异响或结构变形异常情况,若无异常,方可继续起升;
2)上驳:16T行车吊装离地后臂架旋转,至行车就位于驳船上指定位置后,门机松钩,拆卸总装吊装钢丝绳、卸扣,然后再对16T行车就行船运绑扎。
2.根据权利要求1所述的一种16T行车上驳工艺,其特征在于,所述步骤1中,吊装过程中的钢丝绳上包裹半剖圆管包角组件,所述包角组件上设有挡绳块。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710601448.2A CN107840248A (zh) | 2017-07-21 | 2017-07-21 | 一种16t行车上驳工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710601448.2A CN107840248A (zh) | 2017-07-21 | 2017-07-21 | 一种16t行车上驳工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107840248A true CN107840248A (zh) | 2018-03-27 |
Family
ID=61682879
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710601448.2A Pending CN107840248A (zh) | 2017-07-21 | 2017-07-21 | 一种16t行车上驳工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107840248A (zh) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201857225U (zh) * | 2010-06-03 | 2011-06-08 | 中国机械工业建设总公司 | 桥式起重机车架吊装装置 |
KR20150005811A (ko) * | 2013-07-05 | 2015-01-15 | 삼성중공업 주식회사 | 단차 조절용 블록 로더 |
CN105883636A (zh) * | 2016-06-20 | 2016-08-24 | 上海振华重工集团(南通)有限公司 | 一种32t钢板龙门吊散件转运工艺 |
-
2017
- 2017-07-21 CN CN201710601448.2A patent/CN107840248A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201857225U (zh) * | 2010-06-03 | 2011-06-08 | 中国机械工业建设总公司 | 桥式起重机车架吊装装置 |
KR20150005811A (ko) * | 2013-07-05 | 2015-01-15 | 삼성중공업 주식회사 | 단차 조절용 블록 로더 |
CN105883636A (zh) * | 2016-06-20 | 2016-08-24 | 上海振华重工集团(南通)有限公司 | 一种32t钢板龙门吊散件转运工艺 |
Non-Patent Citations (1)
Title |
---|
姚习红 等: "钢结构厂房中的大型行车梁安装", 《建筑施工》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206052555U (zh) | 抱箍式安全操作平台 | |
CN105438960B (zh) | 一种使用u型活动抱箍式吊耳吊装塔类设备的吊装方法 | |
CN104444762B (zh) | 风电基础环翻转装置及使用该装置进行基础环翻转的方法 | |
CN201614242U (zh) | 具有应急变幅功能的甲板起重机起升机构 | |
CN107989624A (zh) | 一种盾构机中心回转式拼装机与尾盾快速安拆吊装方法 | |
CN107840248A (zh) | 一种16t行车上驳工艺 | |
CN204265218U (zh) | 一种电站机组内顶盖专用吊具 | |
CN103072888A (zh) | 风力发电机组中发电机的吊装设备及吊装方法 | |
CN107458858B (zh) | 下摆臂安装机构 | |
CN205892500U (zh) | 海洋平台原油储罐快速拆除吊装装置 | |
CN104909276B (zh) | 一种轮胎吊支腿移位方法 | |
CN203428743U (zh) | 一种非道路行驶工程机械的吊装装置 | |
CN204531530U (zh) | 一种双倍保险的机械提升装置 | |
CN203903771U (zh) | 热卷吊钩 | |
CN207418167U (zh) | 一种煤矿用提升机 | |
CN209618679U (zh) | 卡爪及起吊装置 | |
CN203392758U (zh) | 一种多位一体结构的塔式起重机 | |
CN104477753B (zh) | 一种电站机组顶盖吊具及其吊装方法 | |
CN104355225B (zh) | 一种电站机组内顶盖吊装方法 | |
CN204400429U (zh) | 一种新型铁路货车中门的吊具 | |
CN205328455U (zh) | 内撑式吊装转子铁芯装置 | |
CN204778523U (zh) | 一种随车起重机用防回转装置 | |
CN204248815U (zh) | 一种用于铁路车辆制动梁的拆装工具 | |
CN201620407U (zh) | 一种海洋石油钻井平台橇块 | |
CN209143528U (zh) | 一种用于起重机起升机构的防溜钩装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180327 |