CN107829741A - Mining method of gently inclined thin ore body - Google Patents

Mining method of gently inclined thin ore body Download PDF

Info

Publication number
CN107829741A
CN107829741A CN201711208343.7A CN201711208343A CN107829741A CN 107829741 A CN107829741 A CN 107829741A CN 201711208343 A CN201711208343 A CN 201711208343A CN 107829741 A CN107829741 A CN 107829741A
Authority
CN
China
Prior art keywords
ore body
nugget
recovery method
slight slope
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711208343.7A
Other languages
Chinese (zh)
Other versions
CN107829741B (en
Inventor
周健强
张海磊
刘财林
张亭
张睿
柴衡山
孟慧媚
高志荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Research Institute of Mining and Metallurgy
Original Assignee
Northwest Research Institute of Mining and Metallurgy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwest Research Institute of Mining and Metallurgy filed Critical Northwest Research Institute of Mining and Metallurgy
Priority to CN201711208343.7A priority Critical patent/CN107829741B/en
Publication of CN107829741A publication Critical patent/CN107829741A/en
Application granted granted Critical
Publication of CN107829741B publication Critical patent/CN107829741B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/22Methods of underground mining; Layouts therefor for ores, e.g. mining placers

Abstract

The invention relates to a mining method of minerals, in particular to a mining method of gently inclined thin minerals. The mining method comprises ore block division, mining accurate cutting engineering, stoping ore removal engineering and ground pressure management; the mining method integrates the advantages of a comprehensive method, a cut-wall filling mining method, an explosive force carrying method and a caving method, can recover the ore at the maximum amount, treats the ground pressure hazard and overcomes the defects of a single mining method.

Description

A kind of slight slope and thin ore body recovery method
Technical field
The present invention relates to a kind of recovery method of mineral, and in particular to a kind of slight slope and thin ore body recovery method.
Background technology
Slight slope and thin ore body is often referred to inclination angle less than 15 °, and orebody thickness is less than 3m ore body, comprehensive coloured, yellow both at home and abroad Gold, uranium mine experience with mining, Steep Dipping Ore Body Extraction exploitation are more using mining and house column mining method, but above two mining side comprehensively Method is required to stay presses with setting substantial amounts of ore pillar control, causes larger ore losses.Can be effective it is therefore desirable to find one kind Control ground pressure and can reduces a kind of a kind of new slight slope and thin ore body recovery method of ore losses.
The content of the invention
The purpose of the present invention is that a kind of slight slope and thin ore body recovery method is provided the problem of presence for prior art.
The concrete technical scheme of the present invention is as follows:
A kind of slight slope and thin ore body recovery method, it is characterised in that comprise the following steps:
A, nugget is divided:By ore body division it is nugget along orebody trend, nugget is longwall arrangement, across pitch division point in nugget Bar, vertically division layering;Stayed in nugget and set foundation, studding and fore-set;
B, quasi- cutting is adopted:By stage transportation roadway, tunneling ventilation pedestrian goes up a hill and transported in supreme stage casing arteries and veins in the studding of nugget both ends Lane, driving slitting electric scraper discharging road to fore-set;From ventilation pedestrian's raise advance layering rock drilling gallery, to the slitting electricity close to end Rake off drive and carry out brushing, the cutting room as actual mining;
C, back production ore removal:By the horizontal fan shaped medium length hole of Drilling in layering rock drilling gallery, pinpoint blasting to slitting electric scraper discharging road, by Scraper scraping goes out stope;Cliff is carried out to gob floor, caused barren rock is piled up in goaf side, and sets up barren rock gear Wall, barren rock barricade form new by ore deposit space with the goaf opposite side behind clear bottom;With the propulsion of slitting, constantly move forward Barren rock barricade;
D, underground pressure management:Supporting is carried out to goaf using hydraulic prop, hydraulic prop is continuous forward with the propulsion of working face It is mobile, caunched blasthole avalanche top plate using free breakage or Drilling, form waste rock overburden.
In the step a, nugget high 45-80m, wide 60-100m;
In the step a, foundation thickness 5-10m, the wide 2-5m of studding, fore-set is domed, fore-set thickness 3-6m;
In the step b, electric scraper discharging road is less than fore-set bottom plate 0.5-0.8m.
The barren rock barricade is made up of support frame, covering and air bag, and grid, gas are evenly arranged with the support frame Capsule is located in the grid of support frame, and covering coats support frame in the inner;
The grid specification of the support frame is 600mm*800mm*1000m;
The support frame uses lightweight hard alloy material, and air bag uses quality of rubber materials, and covering thickeies canvas material using impact resistance Matter;
Gas injection device is provided with the air bag.
The present invention has following beneficial aspects:
The present invention be applied to slight slope and thin ore body exploit, its technical thought be using slitting, longwall separate zone production mode from On downwards to ore carry out bench formula exploitation;Cliff is carried out to gob floor, caused barren rock is piled up outside the barricade of goaf Side;Supporting is carried out to goaf using hydraulic prop, hydraulic prop constantly moves forward with the propulsion of working face, utilizes nature Avalanche or avalanche mode of caunching are handled top plate;The present invention recovery method combine breasting method, scarps filling mining method, The advantages of Handling by blast force method, Caving Method with Large Space, can the maximum amount of recovery ore, and handled ground pressure harm, solve single mining The deficiency of method.
Brief description of the drawings
Fig. 1 is the nugget arrangement and structural representation of a kind of slight slope and thin ore body recovery method of the present invention;
Fig. 2 is Fig. 1 upward view;
Fig. 3 is the structural representation of the barren rock barricade of the present invention.
Embodiment
Xinjiang copper mine Ore body morphology is in like stratiform, 18 ° -25 ° of the slanting angle of ore body, orebody thickness about 0.7-1.2m, major part Orebody thickness belongs to typical slight slope and thin ore body in below 0.8m, and original use room and pillar caving, for reduction depletion loss rate, The ore deposit is exploited using the recovery method of the present invention, nugget arrangement and structural representation are as depicted in figs. 1 and 2, specific to walk It is rapid as follows:
A, nugget is divided:By ore body division it is nugget along orebody trend, nugget is longwall arrangement, across pitch division point in nugget Bar, vertically division layering, nugget high 60m, wide 100m;Stayed in nugget and set foundation 1, studding 2 and fore-set 3, the bottom 1 thick 5m of post, 2 wide 3m of studding, fore-set 3 is domed, 3 thick 6m of fore-set;
B, quasi- cutting engineering is adopted:By stage transportation roadway 4, tunneling ventilation pedestrian goes up a hill 5 supreme stage casing arteries and veins in nugget both ends studding 2 Interior transportation roadway 6, driving slitting electric scraper discharging road 7 is to fore-set 3, and slitting electric scraper discharging road 7 is less than the bottom plate 0.8m of fore-set 3;From Ventilation pedestrian goes up a hill 5 drivings layering rock drilling gallery 8, to carrying out brushing close to the slitting electric scraper discharging road 7 of end, as back production work The cutting room of work;
C, back production ore removal engineering:By the horizontal fan shaped medium length hole 9 of Drilling, pinpoint blasting to electric scraper discharging road in layering rock drilling gallery 8 7, stope is gone out by scraper scraping;Cliff is carried out to gob floor, caused barren rock 13 is piled up in goaf side, and sets up useless Stone barricade 10, barren rock barricade 10 form new by ore deposit space with the goaf opposite side behind clear bottom;With the propulsion of slitting, constantly Move forward barren rock barricade 10;
D, underground pressure management:Using hydraulic prop 11 to goaf carry out supporting, hydraulic prop with working face propulsion constantly to Preceding movement, caunched the avalanche top plate of blasthole 12 using free breakage or Drilling, form waste rock overburden 14.
The barren rock barricade 10 of the present invention is made up of support frame 10-1, covering 10-2 and air bag 10-3 as shown in Figure 3, described Grid is evenly arranged with support frame 10-1, air bag 10-3 is located in support frame 10-1 grid, and covering 10-2 will be supported Framework 10-1 is coated in the inner;The grid specification of the support frame 10-1 is 600mm*800mm*1000m;The support frame 10-1 uses lightweight hard alloy material, and air bag 10-3 uses quality of rubber materials, and covering 10-2 thickeies canvas material using impact resistance;Institute State and be provided with gas injection device on air bag 10-3.

Claims (8)

1. a kind of slight slope and thin ore body recovery method, it is characterised in that comprise the following steps:
A, nugget is divided:By ore body division it is nugget along orebody trend, nugget is longwall arrangement, across pitch division point in nugget Bar, vertically division layering;Stayed in nugget and set foundation (1), studding (2) and fore-set (3);
B, quasi- cutting is adopted:Gone up a hill (5) supreme stage casing in the interior tunneling ventilation pedestrian of nugget both ends studding (2) by stage transportation roadway (4) Transportation roadway (6) in arteries and veins, tunnel slitting electric scraper discharging road (7) to fore-set (3);From ventilation pedestrian go up a hill (5) driving layering rock drilling put down Lane (8), to carrying out brushing, the cutting room as actual mining close to the slitting electric scraper discharging road (7) of end;
C, back production ore removal:By the horizontal fan shaped medium length hole of layering rock drilling gallery (8) interior Drilling (9), pinpoint blasting to slitting scraper goes out Drive (7), stope is gone out by scraper scraping;Cliff is carried out to gob floor, caused barren rock (13) is piled up in goaf side, And barren rock barricade (10) is set up, barren rock barricade (10) forms new by ore deposit space with the goaf opposite side behind clear bottom;With point The propulsion of bar, constantly move forward barren rock barricade (10);
D, underground pressure management:Supporting is carried out to goaf using hydraulic prop (11), hydraulic prop is continuous with the propulsion of working face Move forward, caunched blasthole (12) avalanche top plate using free breakage or Drilling, form waste rock overburden (14).
A kind of 2. slight slope and thin ore body recovery method as claimed in claim 1, it is characterised in that:In the step a, nugget is high 45-80m, wide 60-100m.
A kind of 3. slight slope and thin ore body recovery method as claimed in claim 1, it is characterised in that:In the step a, foundation (1) thick 5-10m, studding (2) wide 2-5m, fore-set (3) is domed, fore-set (3) thick 3-6m.
A kind of 4. slight slope and thin ore body recovery method as claimed in claim 1, it is characterised in that:In the step b, scraper goes out Drive (7) is less than fore-set (3) bottom plate 0.5-0.8m.
A kind of 5. slight slope and thin ore body recovery method as claimed in claim 1, it is characterised in that:The barren rock barricade (10) by Support frame (10-1), covering (10-2) and air bag (10-3) composition, the support frame (10-1) is interior to be evenly arranged with grid, Air bag (10-3) is located in the grid of support frame (10-1), and covering (10-2) coats support frame (10-1) in the inner.
A kind of 6. slight slope and thin ore body recovery method as claimed in claim 5, it is characterised in that:The support frame (10-1) Grid specification be 600mm*800mm*1000m.
A kind of 7. slight slope and thin ore body recovery method as claimed in claim 5, it is characterised in that:The support frame (10-1) Using lightweight hard alloy material, air bag (10-3) uses quality of rubber materials, and covering (10-2) thickeies canvas material using impact resistance.
A kind of 8. slight slope and thin ore body recovery method as claimed in claim 5, it is characterised in that:Set on the air bag (10-3) It is equipped with gas injection device.
CN201711208343.7A 2017-11-27 2017-11-27 Mining method of gently inclined thin ore body Active CN107829741B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711208343.7A CN107829741B (en) 2017-11-27 2017-11-27 Mining method of gently inclined thin ore body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711208343.7A CN107829741B (en) 2017-11-27 2017-11-27 Mining method of gently inclined thin ore body

Publications (2)

Publication Number Publication Date
CN107829741A true CN107829741A (en) 2018-03-23
CN107829741B CN107829741B (en) 2019-07-05

Family

ID=61645887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711208343.7A Active CN107829741B (en) 2017-11-27 2017-11-27 Mining method of gently inclined thin ore body

Country Status (1)

Country Link
CN (1) CN107829741B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661645A (en) * 2018-03-29 2018-10-16 安徽马钢张庄矿业有限责任公司 The method of end lean ore body back production
CN110761793A (en) * 2019-11-22 2020-02-07 西北矿冶研究院 High-efficiency large-scale mining method for low-grade slowly-inclined thin ore body
CN110886613A (en) * 2019-11-22 2020-03-17 西北矿冶研究院 Mechanized continuous hard rock mining method
CN110952981A (en) * 2019-11-14 2020-04-03 南华大学 Residual ore mining method for gently inclined medium-thick and large ore body
CN111156018A (en) * 2019-12-26 2020-05-15 临沂会宝岭铁矿有限公司 Grooving method for cutting groove of chamber
RU2750009C1 (en) * 2020-11-19 2021-06-21 Федеральное государственное автономное образовательное учреждение высшего образования "Северо-Восточный федеральный университет имени М.К.Аммосова" Method for developing thawed placers

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1162690A (en) * 1996-04-12 1997-10-22 崔正洙 Underground mining process
CN103953344A (en) * 2014-04-30 2014-07-30 金川集团股份有限公司 Downward drift layered cemented filling mining method
CN104453900A (en) * 2014-11-28 2015-03-25 贵州晨辉达矿业工程设计有限公司 Filling mining method of near-horizontal ore body
CN105298492A (en) * 2015-11-03 2016-02-03 化工部长沙设计研究院 Room-and-pillar mining method for mining gentle dip thin ore body
CN105735996A (en) * 2016-02-01 2016-07-06 中南大学 Presplitting type wall cutting and filling stoping method for thin ore vein
CN106089205A (en) * 2016-08-19 2016-11-09 贵州晨辉达矿业工程设计有限公司 A kind of room-and-pillar method filling mining method being applicable to very thin ore body under water body

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1162690A (en) * 1996-04-12 1997-10-22 崔正洙 Underground mining process
CN103953344A (en) * 2014-04-30 2014-07-30 金川集团股份有限公司 Downward drift layered cemented filling mining method
CN104453900A (en) * 2014-11-28 2015-03-25 贵州晨辉达矿业工程设计有限公司 Filling mining method of near-horizontal ore body
CN105298492A (en) * 2015-11-03 2016-02-03 化工部长沙设计研究院 Room-and-pillar mining method for mining gentle dip thin ore body
CN105735996A (en) * 2016-02-01 2016-07-06 中南大学 Presplitting type wall cutting and filling stoping method for thin ore vein
CN106089205A (en) * 2016-08-19 2016-11-09 贵州晨辉达矿业工程设计有限公司 A kind of room-and-pillar method filling mining method being applicable to very thin ore body under water body

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
褚亦功: "缓倾斜极薄矿脉采矿方法新突破", 《中国矿山工程》 *
黄祝辉: "垂直分条水平分段削壁充填采矿法_缓倾斜极薄矿体试采方案", 《中国锰业》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661645A (en) * 2018-03-29 2018-10-16 安徽马钢张庄矿业有限责任公司 The method of end lean ore body back production
CN110952981A (en) * 2019-11-14 2020-04-03 南华大学 Residual ore mining method for gently inclined medium-thick and large ore body
CN110761793A (en) * 2019-11-22 2020-02-07 西北矿冶研究院 High-efficiency large-scale mining method for low-grade slowly-inclined thin ore body
CN110886613A (en) * 2019-11-22 2020-03-17 西北矿冶研究院 Mechanized continuous hard rock mining method
CN111156018A (en) * 2019-12-26 2020-05-15 临沂会宝岭铁矿有限公司 Grooving method for cutting groove of chamber
CN111156018B (en) * 2019-12-26 2021-07-23 临沂会宝岭铁矿有限公司 Drilling device for blasting and method for forming cutting groove of chamber
RU2750009C1 (en) * 2020-11-19 2021-06-21 Федеральное государственное автономное образовательное учреждение высшего образования "Северо-Восточный федеральный университет имени М.К.Аммосова" Method for developing thawed placers

Also Published As

Publication number Publication date
CN107829741B (en) 2019-07-05

Similar Documents

Publication Publication Date Title
CN107829741B (en) Mining method of gently inclined thin ore body
CN102493806B (en) Mechanized continuous mining method for wall-type gentle-inclined thin ore body
CN101105129B (en) Mining environment reconstructed continuous mining afterwards filling mining method
CN105019904B (en) Mining- machine-based slowly inclined thin ore vein mechanized continuous mining method
CN103147761B (en) Filling mining method of gently inclined thin mineral deposit with soft roof
CN104481539B (en) From kerve tight-face blasting caved stopes
CN105626071B (en) Mining method for gently inclined thin ore body
CN104453901A (en) Sublevel open-stoping mining method with subsequent backfilling for long-hole caving in thin ore bodies
CN101942999A (en) Coal mining method for high-dipping low seam
CN110295908B (en) Mining method for gentle dip medium-thickness ore body in fluctuating sectional roadway
CN104989404A (en) Diagonal ore-break-down medium-length hole mining method for steeply-inclined thin vein ore body
CN103590831A (en) Novel mining method of gently-inclined thin and medium thickness ore bodies
CN107975373B (en) A kind of lower continuous digging hard-rock mine method of mechanization of liquid-gas phase transition induction
CN104481543A (en) Sub-level shrinkage caving method
CN107687341A (en) A kind of Upward slicing point pillar filling mining method of extremely thick big unstable ore body
CN108590649A (en) A kind of broken narrow vein medium-length hole recovery method of low-angle dip
CN105422102B (en) A kind of vertical medium-length hole ore blast subsection access back-filling method
CN104632220A (en) Mining method with adjustable and controllable structure size of gentle dip medium-thickness ore body strip column reconstructed stope
CN101824986B (en) Coal mining process of drilling, loading, conveying and anchoring integral machine
CN104533517A (en) High-segmentation upward deep hole ore extraction zero-dead-zone following filling mining method
CN105370280B (en) A kind of double-deck thin jade ore deposit nondestructive blasting mining methods of underground low-angle dip
CN101737051A (en) Covering layer forming method of blind ore bodies
CN106593447A (en) Mining method for gently inclined medium-thickness ore body in underground mining
CN111101944B (en) Large-scale mining method for gently inclined thin ore body
CN109630116B (en) Mining method for inclined medium-thickness blind ore body

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant