CN107798987A - Seasonal variations runoff and underground water influence monitoring model to High aititude opencut - Google Patents

Seasonal variations runoff and underground water influence monitoring model to High aititude opencut Download PDF

Info

Publication number
CN107798987A
CN107798987A CN201710849233.2A CN201710849233A CN107798987A CN 107798987 A CN107798987 A CN 107798987A CN 201710849233 A CN201710849233 A CN 201710849233A CN 107798987 A CN107798987 A CN 107798987A
Authority
CN
China
Prior art keywords
water
runoff
underground
simulation
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710849233.2A
Other languages
Chinese (zh)
Other versions
CN107798987B (en
Inventor
陈辉
温颖远
管伟明
史秀志
赵红超
姚俊辉
刘青松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang University
Original Assignee
Xinjiang University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang University filed Critical Xinjiang University
Priority to CN201710849233.2A priority Critical patent/CN107798987B/en
Publication of CN107798987A publication Critical patent/CN107798987A/en
Application granted granted Critical
Publication of CN107798987B publication Critical patent/CN107798987B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B25/00Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
    • G09B25/02Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes of industrial processes; of machinery

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses seasonal variations runoff and underground water to influence monitoring model to High aititude opencut, it is characterised in that:Temperature simulator, runoff, underground underground river analogue means, opencut model, drainage arrangement, model casing and video camera composition.The present invention is especially suitable for image displaying High aititude opencut seasonal variations, the influence of runoff and underground water to mining area, workbench water burst, end side water burst, step surface water burst, mutual bank of ore water burst, blastholes fill-water, workbench freeze, hold side to freeze to freeze live origin cause of formation overall process with step surface in simulation exploitation, implementation model temperature, runoff rate and seepage flow flow are controllable, have wide applicability to High aititude Open pit Area.

Description

Seasonal variations runoff and underground water influence monitoring model to High aititude opencut
Technical field
The present invention relates to the monitoring model that a kind of water influences on Open pit Area, more particularly to one kind is with seasonal variations footpath Stream, underground water influence monitoring model to High aititude opencut.
Background technology
China high altitude localities mining is increasing, due to seasonal variations, rainwash, snowmelt runoff, air drop Under the multiple factors such as water and runoff moisturizing, Open pit Area more occur rock slope, cave in, rig one-tenth porosity is low, freezing-thawing damage, calamity Phenomena such as evil, frequently occurs, and adverse effect is brought to High aititude mining security.In order to intuitively analyze seasonal variations water Influence to High aititude open pit bench, in the range of understanding, there is no to produce influences specifically for High aititude Open pit Area water Monitoring model.
The content of the invention
In view of the shortcomings of the prior art, the present invention provides a kind of seasonal variations runoff and underground water to High aititude opencut shadow Monitoring model is rung, to realize image displaying High aititude opencut seasonal variations, the influence of runoff and underground water to mining area, simulation is opened Middle workbench water burst, end side water burst, step surface water burst, mutual bank of ore water burst, blastholes fill-water, workbench is adopted to freeze, hold Side freezes to freeze live origin cause of formation overall process with step surface, and implementation model temperature-controllable, water are controllable.
In order to solve the above technical problems, described a kind of seasonal variations runoff and underground water influence to supervise on High aititude opencut Survey model, including temperature simulator, runoff, underground underground river analogue means, opencut model, drainage arrangement model casing and takes the photograph Camera forms;
Described temperature simulator includes refrigeration system, heating, temperature control system and air hose, wherein, it is described Refrigeration system is arranged at model side, and for simulating -35 DEG C ~ 0 DEG C of weather conditions, the heating simulates 0 DEG C ~ 40 DEG C Weather conditions, refrigeration, heating are controlled by temp testing controlling system, and air hose imports hot and cold air on the top of model;
Described runoff, underground underground river analogue means include water tank, water pump, water-pressure regulating device, runoff simulation feed pipe, simulation Underground river feed pipe and runoff collect water tank, wherein, the runoff, underground underground river analogue means are arranged at model side, and runoff is received Header tank is arranged at model opposite side, and runoff simulation feed pipe is connected with runoff simulation irrigation canals and ditches, and runoff simulation irrigation canals and ditches are received with runoff Header tank is connected, and simulation underground river feed pipe is connected with simulation underground river;
Described opencut model forms inside model casing and by runoff simulation irrigation canals and ditches, simulation underground river, table soil, country rock and alternating layers To excavate sulculus at the top of opencut model, simulation underground river composition is in opencut model for shape ore body, wherein runoff simulation irrigation canals and ditches The stephanoporate round tube of certain length is laid in inside, and table soil, country rock and mutual bank of ore are made up of simulation ground, rock mass materials layer, its In mutually bank of ore be country rock and the alternate rock mass of ore body, mining area surface is made up of open pit slope and working pit edge, working pit edge Step include step upper brace, bench face, lay drilling and step lower platform;
Described drainage arrangement includes bottom tank, drainpipe, wherein, the bottom tank is arranged at model bottom, the row Water pipe one end is connected with bottom tank, other end connection sewer;
Described model casing includes model outer cover and model support, wherein, described model outer cover model outer cover is by lucite Plate is bonded, surrounding skeleton using angle steel reinforced, model top side detachable, model be placed on it is being made up of steel construction, one Determine on the model support of height;
Video camera changes over time the video camera of relation for monitoring water level and freezeout.
The opencut analogue experiment method of the present invention:
A, the influence of spring or autumn low temperature, different runoff rates and different seepage flow flows to opencut mining area is simulated:Low temperature, no With influence of the runoff rate to opencut mining area:Video camera is opened, opens runoff, underground underground river analogue means, the water in device Different run-offs are simulated by water-pressure regulating device, water is flowed into runoff simulation irrigation canals and ditches by runoff simulation feed pipe, runoff simulation The water of irrigation canals and ditches penetrates into Open pit Area and freezeout, and the water of runoff simulation irrigation canals and ditches finally flows into runoff and collects water tank;In device Water simulates underground percolation flow by water-pressure regulating device, and water is flowed into simulation underground river by simulating underground river feed pipe, simulates underground river Water penetrate into Open pit Area;After water burst phenomenon occurs in open pit slope, temperature simulator is opened, passes through temperature control system System enters temperature control in model casing in low-temperature condition, Cryogenic air by air hose, and adjustment runoff rate makes runoff not go out Existing icing phenomenon;Observe and record different runoff rates and different seepage flow flow conditions under, opencut table soil, country rock, outdoor adopt Highwall, working pit edge composition, step upper brace, bench face, step lower platform, coal seam and carbonaceous mudstone are freezed to show As;Treat that model blocking region after expansion, does not close runoff, underground underground river analogue means, temperature simulator, passes through bottom water Groove, open drainpipe to sewer draining, observation table soil, country rock, open pit slope, working pit edge composition, step upper brace, Bench face, coal seam, carbonaceous mudstone and lay drilling and water-filling discharge level and freeze changing rule and record, treat bottom tank water After stream, drainpipe is closed, closes video camera.The video of video camera is exported, exports the video of video camera, analysis high temperature, no With runoff rate and seepage flow flow to the water burst in opencut mining area, draining and litchi freezing pattern and the origin cause of formation.
B, the influence of summer high temperature, different runoff rates and different seepage flow flows to opencut mining area is simulated:Open shooting Machine, temperature simulator is opened, is entered temperature control by air hose in the condition of high temperature, high temperature air by temperature control system Enter in model casing;Runoff, underground underground river analogue means are opened, the water in device simulates different run-offs by water-pressure regulating device, Water is flowed into runoff simulation irrigation canals and ditches by runoff simulation feed pipe, and the water of runoff simulation irrigation canals and ditches penetrates into Open pit Area, runoff simulation The water of irrigation canals and ditches finally flows into runoff and collects water tank;Water in device simulates underground percolation flow by water-pressure regulating device, and water passes through Simulate underground river feed pipe to flow into simulation underground river, the water for simulating underground river penetrates into Open pit Area;Observe and record different runoff rates With different seepage flow flows, opencut table soil, country rock, open pit slope, working pit edge composition, step upper brace, bench face, Water profit, the water burst phenomenon of step lower platform, coal seam and carbonaceous mudstone, lay drilling water-filling water level phenomenon;Treat that simulation is gushed After water, runoff, underground underground river analogue means, temperature simulator are closed, by bottom tank, opens drainpipe to sewer row Water, observation table soil, country rock, open pit slope, working pit edge composition, step upper brace, bench face, step lower platform, Coal seam, carbonaceous mudstone and the changing rule and record of laying drilling water-filling discharge level, after treating bottom tank current, close Drainpipe, close video camera.The video of video camera is exported, analysis high temperature, different runoff rates and seepage flow flow are to opencut ore deposit Water burst, draining rule and the origin cause of formation in area.
C, under the conditions of simulating Low Temperature in Spring-high temperature circulation, influence of the different seepage flow flows to opencut mining area:Open shooting Machine, temperature simulator is opened, is entered temperature control by air hose in low-temperature condition, Cryogenic air by temperature control system Enter in model casing;Runoff, underground underground river analogue means are opened, the water in device simulates underground percolation stream by water-pressure regulating device Amount, water are flowed into simulation underground river by simulating underground river feed pipe, and the water for simulating underground river penetrates into Open pit Area and freezeout;Observation And record under different underground river flow conditions, country rock, open pit slope, working pit edge composition, step upper brace, bench face, The water of coal seam and carbonaceous mudstone profit, water burst and freezeout, lay drilling water-filling water level, freezeout;Treat model blocking region Not after expansion, runoff, underground underground river analogue means, temperature simulator are closed;Observe table soil, country rock, open pit slope, Working pit edge composition, step upper brace, bench face, coal seam, carbonaceous mudstone and lay drilling and water-filling discharge level and freeze to become Law simultaneously records;Temperature control is entered in model casing in the condition of high temperature, air by air hose by temperature control system; Runoff, underground underground river analogue means are opened, the water in device simulates underground percolation flow by water-pressure regulating device, and water passes through simulation Underground river feed pipe is flowed into simulation underground river, and the water for simulating underground river penetrates into Open pit Area;Observe and record different underground river flow conditions Under, country rock, open pit slope, working pit edge composition, step upper brace, bench face, coal seam and carbonaceous mudstone Shui Run, gush Water phenomenon, lay drilling water-filling water level phenomenon;After water burst occurs in simulation, runoff, underground underground river analogue means, temperature mould are closed Intend device, by bottom tank, open drainpipe to sewer draining, observation table soil, country rock, open pit slope, working pit edge Composition, step upper brace, bench face, step lower platform, coal seam, carbonaceous mudstone and lay drilling water-filling discharge level Changing rule simultaneously records;There are a large amount of water in step lower platform in experimentation, need to open drainpipe and carry out draining;This experiment The circulation of hypo-hyperthermia condition class is carried out.After experiment terminates, by bottom tank, drainpipe is opened to sewer draining, treats bottom After portion's tank current, drainpipe is closed, closes video camera.The video of video camera is exported, analysis hypo-hyperthermia circulates, no With runoff rate to the water burst in opencut mining area, draining and litchi freezing pattern and the origin cause of formation.
The above-mentioned technical proposal of the present invention has the beneficial effect that:
Seasonal variations runoff and underground water of the present invention influence monitoring model to High aititude opencut, and the experimental model can ocular demonstration Illustrate consider different temperatures, runoff rate and seepage flow flow effect Imitating have nature of ground, different parts of digging up mine water Bit line and Freeze-thawing Characteristics, the outdoor mineral water of the High aititude of seasonal variations is influenceed to provide guidance, a vivid exhibition is provided for teaching Show platform.
Brief description of the drawings
Fig. 1 is that seasonal variations runoff and underground water influence monitoring model top view to High aititude opencut.
Fig. 2 is that seasonal variations runoff and underground water influence monitoring model side view to High aititude opencut.
In figure mark for:1- temperature simulators, 2- air hoses, 3- runoffs, underground underground river analogue means, 4- runoff simulations Feed pipe, 5- simulation underground river feed pipes, 6- runoff simulation irrigation canals and ditches, 7- simulations underground river, 8- tables soil, 9- country rocks, the mutual layered minerals of 10- Body, 11- open pit slopes, 12- working pit edges composition, 13- steps upper brace, 14- bench faces, 15- lay drilling, 16- Step lower platform, 17- bottoms tank, 18- drainpipes, 19- model outer covers, 20- model supports, 21- angle steel reinforceds, 22- moulds At the top of type, 23- video cameras, 24- runoffs collect water tank, A- coal seams, B- carbonaceous mudstones.
Embodiment
The embodiment of the present invention is elaborated with reference to drawings and examples of the present invention.
Xinjiang Tianshan mountain range at certain colliery field, minimum height above sea level 3265m, highest height above sea level 4023m, ore field east alpine zone Snowmelt runoff belongs to continental arid for the main supply source ore field of local ground watering and puna, winter avenge less, but by landform The restriction of vertical zoning, summer more showers, daily maximum rainfall amount are 10.9mm, and ore field temperature Change is big, and the cold summer is cool, heat night in daytime Cool, 1.2 DEG C of average temperature of the whole year, 25 DEG C of daily maximum temperature, -28.5 DEG C of the lowest temperature, freezing period, is typically in annual October to next year April, maximum depth of frozen ground 3.69m.
As shown in figure 1, monitoring model of the present invention includes temperature simulator 1, runoff, underground underground river analogue means 3, outdoor Ore deposit model, drainage arrangement, model casing and video camera 23 form;
Described temperature simulator 1 includes refrigeration system, heating, temperature control system and air hose 2, wherein, it is described Refrigeration system be arranged at model side, for simulating -35 DEG C ~ 0 DEG C of weather conditions, the heating simulates 0 DEG C ~ 40 DEG C Weather conditions, refrigeration, heating by temp testing controlling system control, air hose by hot and cold air importing model top;
Described runoff, underground underground river analogue means 3 include water tank, water pump, water-pressure regulating device, runoff simulation feed pipe 4, mould Intend underground river feed pipe 5 and runoff collects water tank 24, wherein, the runoff, underground underground river analogue means 3 are arranged at model side, Runoff collects water tank 24 and is arranged at model opposite side, and runoff simulation feed pipe 3 is connected with runoff simulation irrigation canals and ditches 6, runoff simulation ditch Canal 6 is collected water tank 24 with runoff and is connected, and simulation underground river feed pipe 5 is connected with simulation underground river 7;
Described opencut model forms 7, table soil 8, the and of country rock 9 inside model casing and by runoff simulation irrigation canals and ditches 6, simulation underground river To excavate sulculus at the top of opencut model, simulation underground river composition 7 is to reveal for mutual bank of ore 10, wherein runoff simulation irrigation canals and ditches 6 The stephanoporate round tube of certain length is laid inside its ore deposit model, table soil 8, country rock 9 and mutual bank of ore 10 are by simulation ground, rock mass material The bed of material forms, wherein mutual bank of ore carbonaceous mudstone B and the alternate rock mass of coal A, mining area surface is by open pit slope 11 and work Make side composition 12, the step of working pit edge includes step upper brace 13, bench face 14, lays drilling 15 and step lower platform 16;
Described drainage arrangement includes bottom tank 17, drainpipe 18, wherein, the bottom tank 17 is arranged at model bottom, Described one end of drainpipe 18 is connected with bottom tank 17, other end connection sewer;
Described model casing includes model outer cover 19 and model support 20, wherein, described model outer cover model outer cover is by organic Glass plate is bonded, and surrounding skeleton is detachable using at the top of angle steel reinforced 21, model 22, and model is placed on by steel construction group Into, on the model support 20 of certain altitude;
Video camera 23 changes over time the video camera of relation for monitoring water level and freezeout.
Embodiment 1:Simulate the influence of summer high temperature, different runoff rates to opencut mining area:Video camera 23 is opened, is opened Temperature simulator 1, temperature control is entered in 35 DEG C of conditions of high temperature, high temperature air by air hose 2 by temperature control system Enter in model casing;Runoff, underground underground river analogue means 3 are opened, the water in device simulates different run-offs by water-pressure regulating device, Water is flowed into runoff simulation irrigation canals and ditches 6 by runoff simulation feed pipe 4, and the water of runoff simulation irrigation canals and ditches 6 penetrates into Open pit Area, simulates footpath The water of stream irrigation canals and ditches 6 finally flows into runoff and collects water tank 24;Under the conditions of observing and recording different runoff rates, opencut table soil 8, enclose Rock 9, open pit slope 11, working pit edge form 12, step upper brace 13, bench face 14, coal seam A and carbonaceous mudstone B Water profit, water burst phenomenon, lay 15 water-filling water level phenomenons of drilling;After water burst occurs in simulation, runoff, underground underground river simulation dress are closed 3, temperature simulator 1 is put, by bottom tank 17, opens drainpipe 18 to sewer draining, observation table soil 8, country rock 9, dew Its stope-boundary 11, working pit edge composition 12, step upper brace 13, bench face 14, step lower platform 16, coal seam A, carbonaceous Mud stone B and the changing rule and record for laying 15 water-filling discharge levels of drilling, after treating the current of bottom tank 17, close draining Pipe 18, close video camera 23.Export the video of video camera 23, analysis high temperature, different runoff rates to the water burst in opencut mining area, Draining rule and the origin cause of formation.
Embodiment 2:Simulate the influence of summer high temperature, different seepage flow flows to opencut mining area:Video camera 23 is opened, is opened Temperature simulator 1, temperature control is entered in 35 DEG C of conditions of high temperature, high temperature air by air hose 2 by temperature control system Enter in model casing;Runoff, underground underground river analogue means 3 are opened, the water in device simulates underground percolation stream by water-pressure regulating device Amount, water are flowed into simulation underground river 7 by simulating underground river feed pipe 5, and the water on simulation underground river 7 penetrates into Open pit Area;Observe and record Under different underground river flow conditions, country rock 9, open pit slope 11, working pit edge composition 12, step upper brace 13, bench face 14th, coal seam A and carbonaceous mudstone B water profit, water burst phenomenon, 15 water-filling water level phenomenons of drilling are laid;After water burst occurs in simulation, close Runoff, underground underground river analogue means 3, temperature simulator 1 are closed, by bottom tank 17, opens drainpipe 18 to sewer row Water, observation table soil 8, country rock 9, open pit slope 11, working pit edge composition 12, step upper brace 13, bench face 14, step Lower platform 16, coal seam A, carbonaceous mudstone B and the changing rule and record of laying 15 water-filling discharge levels of drilling, treat bottom tank After 17 current, drainpipe 18 is closed, closes video camera 23.Export the video of video camera 23, analysis high temperature, different seepage flow streams Amount is to the water burst in opencut mining area, draining rule and the origin cause of formation.
Embodiment 3:Simulate the influence of summer high temperature, different runoff rates and different seepage flow flows to opencut mining area:Beat Video camera 23 is driven, opens temperature simulator 1, it is by temperature control system that temperature control is empty in 35 DEG C of conditions of high temperature, high temperature Gas is entered in model casing by air hose 2;Runoff, underground underground river analogue means 3 are opened, the water in device is by water-pressure regulating device Different run-offs are simulated, water is flowed into runoff simulation irrigation canals and ditches 6 by runoff simulation feed pipe 4, and the water of runoff simulation irrigation canals and ditches 6 penetrates into Open pit Area, the water of runoff simulation irrigation canals and ditches 6 finally flow into runoff and collect water tank 24;Water in device is simulated by water-pressure regulating device Underground percolation flow, water are flowed into simulation underground river 7 by simulating underground river feed pipe 5, and the water on simulation underground river 7 penetrates into Open pit Area; Observe and record different runoff rates and different seepage flow flows, opencut table soil 8, country rock 9, open pit slope 11, working pit edge Water profit, the water burst for forming 12, step upper brace 13, bench face 14, step lower platform 16, coal seam A and carbonaceous mudstone B are existing As laying 15 water-filling water level phenomenons of drilling;After water burst occurs in simulation, runoff, underground underground river analogue means 3, temperature mould are closed Intend device 1, by bottom tank 17, open drainpipe 18 to sewer draining, observation table soil 8, country rock 9, open pit slope 11st, working pit edge composition 12, step upper brace 13, bench face 14, step lower platform 16, coal seam A, carbonaceous mudstone B and cloth If the changing rule and record of the 15 water-filling discharge levels that drill, after treating the current of bottom tank 17, drainpipe 18 is closed, is closed Video camera 23.The video of video camera 23 is exported, analysis high temperature, different runoff rates and seepage flow flow gush to opencut mining area Water, draining rule and the origin cause of formation.
Embodiment 4:Simulate the influence of spring or autumn low temperature, different runoff rates to opencut mining area:Open video camera 23, runoff, underground underground river analogue means 3 are opened, the water in device simulates different run-offs by water-pressure regulating device, and water passes through mould Intend runoff feed pipe 4 to flow into runoff simulation irrigation canals and ditches 6, the water of runoff simulation irrigation canals and ditches 6 penetrates into Open pit Area and freezeout, simulation The water of runoff irrigation canals and ditches 6 finally flows into runoff and collects water tank 24;After water burst phenomenon occurs in open pit slope 11, temperature mould is opened Intend device 1, temperature control is entered by model by air hose 2 in -30 DEG C of low-temperature conditions, Cryogenic air by temperature control system In case, adjustment runoff rate makes runoff occur without icing phenomenon;Under the conditions of observing and recording different runoff rates, opencut table soil 8th, country rock 9, open pit slope 11, working pit edge composition 12, step upper brace 13, bench face 14, step lower platform 16, Coal seam A and carbonaceous mudstone B freezeout;Treat that runoff, underground underground river analogue means after expansion, are not closed in model blocking region 3rd, temperature simulator 1, by bottom tank 17, drainpipe 18 is opened to sewer draining, it is observation table soil 8, country rock 9, outdoor Stope-boundary 11, working pit edge composition 12, step upper brace 13, bench face 14, coal seam A, carbonaceous mudstone B and laying drilling 15 Water-filling discharge level and freeze changing rule and record, after treating the current of bottom tank 17, close drainpipe 18, close shooting Machine 23.The video of video camera 23 is exported, analysis low temperature, different runoff rates to the water burst in opencut mining area, draining and freeze to advise Rule and the origin cause of formation.
Embodiment 5:Simulate the influence of winter low temperature, different seepage flow flows to opencut mining area:Video camera 23 is opened, is opened Temperature simulator 1, temperature control is entered in -30 DEG C of low-temperature conditions, Cryogenic air by air hose 2 by temperature control system Enter in model casing;Runoff, underground underground river analogue means 3 are opened, the water in device simulates underground percolation stream by water-pressure regulating device Amount, water are flowed into simulation underground river 7 by simulating underground river feed pipe 5, and the water on simulation underground river 7 penetrates into Open pit Area and freezeout; Observe and record under different underground river flow conditions, country rock 9, open pit slope 11, working pit edge composition 12, step upper brace 13rd, water profit, water burst and the freezeout of bench face 14, coal seam A and carbonaceous mudstone B, 15 water-filling water levels of drilling is laid, are freezed now As;Treat that model blocking region after expansion, does not close runoff, underground underground river analogue means 3, temperature simulator 1, passes through bottom Tank 17, open drainpipe 18 to sewer draining, observation table soil 8, country rock 9, open pit slope 11, working pit edge composition 12, Step upper brace 13, bench face 14, coal seam A, carbonaceous mudstone B and lay drilling 15 water-filling discharge levels and freeze change rule Restrain and record, after treating the current of bottom tank 17, close drainpipe 18, close video camera 23.The video of video camera 23 is exported, Low temperature, different runoff rates are analyzed to the water burst in opencut mining area, draining and litchi freezing pattern and the origin cause of formation.
Embodiment 6:Simulate the shadow of spring or autumn low temperature, different runoff rates and different seepage flow flows to opencut mining area Ring:The influence of low temperature, different runoff rates to opencut mining area:Video camera 23 is opened, opens runoff, underground underground river analogue means 3, the water in device simulates different run-offs by water-pressure regulating device, and water passes through runoff simulation feed pipe 4 and flows into runoff simulation ditch In canal 6, the water of runoff simulation irrigation canals and ditches 6 penetrates into Open pit Area and freezeout, and the water of runoff simulation irrigation canals and ditches 6 finally flows into runoff receipts Header tank 24;Water in device simulates underground percolation flow by water-pressure regulating device, and water flows into mould by simulating underground river feed pipe 5 Intend in underground river 7, the water on simulation underground river 7 penetrates into Open pit Area;After water burst phenomenon occurs in open pit slope 11, temperature mould is opened Intend device 1, temperature control is entered by model by air hose 2 in -30 DEG C of low-temperature conditions, Cryogenic air by temperature control system In case, adjustment runoff rate makes runoff occur without icing phenomenon;Observe and record different runoff rates and different seepage flow flow bars Under part, opencut table soil 8, country rock 9, open pit slope 11, working pit edge composition 12, step upper brace 13, bench face 14, The freezeout of step lower platform 16, coal seam A and carbonaceous mudstone B;Treat model blocking region not after expansion, close runoff, Underground underground river analogue means 3, temperature simulator 1, by bottom tank 17, drainpipe 18 is opened to sewer draining, observation Table soil 8, country rock 9, open pit slope 11, working pit edge composition 12, step upper brace 13, bench face 14, coal seam A, carbonaceous Mud stone B and lay drilling and 15 water-filling discharge levels and freeze changing rule and record, after treating the current of bottom tank 17, close Drainpipe 18, close video camera 23.The video of video camera 23 is exported, exports the video of video camera 23, analysis high temperature, different runoffs Flow and seepage flow flow are to the water burst in opencut mining area, draining and litchi freezing pattern and the origin cause of formation.
Embodiment 7:Under the conditions of simulating Low Temperature in Spring-high temperature circulation, influence of the different seepage flow flows to opencut mining area:Beat Video camera 23 is driven, opens temperature simulator 1, it is by temperature control system that temperature control is empty in -10 DEG C of low-temperature conditions, low temperature Gas is entered in model casing by air hose 2;Runoff, underground underground river analogue means 3 are opened, the water in device is by water-pressure regulating device Underground percolation flow is simulated, water is flowed into simulation underground river 7 by simulating underground river feed pipe 5, and the water on simulation underground river 7 penetrates into opencut Area and freezeout;Observe and record under different underground river flow conditions, country rock 9, open pit slope 11, working pit edge composition 12, Step upper brace 13, bench face 14, coal seam A and carbonaceous mudstone B water profit, water burst and freezeout, lay drilling 15 and fill Water water level, freezeout;Treat that runoff, underground underground river analogue means 3, temperature simulation after expansion, are not closed in model blocking region Device 1;Observe table soil 8, country rock 9, open pit slope 11, working pit edge composition 12, step upper brace 13, bench face 14, Coal seam A, carbonaceous mudstone B and lay drilling and 15 water-filling discharge levels and freeze changing rule and record;Pass through temperature control system Temperature control is entered in model casing in 20 DEG C of state of temperatures, air by air hose 2;Open runoff, underground underground river simulation dress Put 3, the water in device simulates underground percolation flow by water-pressure regulating device, and to flow into simulation dark by simulating underground river feed pipe 5 for water In river 7, the water on simulation underground river 7 penetrates into Open pit Area;Observe and record under different underground river flow conditions, country rock 9, excavating plant side Side 11, working pit edge form 12, step upper brace 13, bench face 14, coal seam A and carbonaceous mudstone B water profit, water burst phenomenon, Lay 15 water-filling water level phenomenons of drilling;After water burst occurs in simulation, runoff, underground underground river analogue means 3, temperature simulation dress are closed 1 is put, by bottom tank 17, opens drainpipe 18 to sewer draining, observation table soil 8, country rock 9, open pit slope 11, work Make side composition 12, step upper brace 13, bench face 14, step lower platform 16, coal seam A, carbonaceous mudstone B and lay drilling The changing rule and record of 15 water-filling discharge levels;There are a large amount of water in step lower platform 16 in experimentation, need to open draining Pipe 18 carries out draining;The hypo-hyperthermia condition class circulation of this experiment is carried out.After experiment terminates, by bottom tank 17, open Drainpipe 18 after treating the current of bottom tank 17, closes drainpipe 18, closes video camera 23 to sewer draining.Export is taken the photograph The video of camera 23, the circulation of analysis hypo-hyperthermia, different runoff rates are to the water burst in opencut mining area, draining and litchi freezing pattern And the origin cause of formation.

Claims (5)

1. a kind of seasonal variations runoff and underground water influence monitoring model to High aititude opencut, it is characterised in that including temperature Analogue means, runoff, underground underground river analogue means, opencut model, drainage arrangement, model casing and video camera composition.
2. temperature simulator according to claim 1, it is characterized in that:Including refrigeration system, heating, temperature control System and air hose, refrigeration system are arranged at model side, for simulating -35 DEG C ~ 0 DEG C of weather conditions, heating simulation 0 DEG C ~ 40 DEG C of weather conditions, refrigeration, heating controlled by temp testing controlling system, and air hose is upper by hot and cold air importing model Portion.
3. runoff according to claim 1, underground underground river analogue means, it is characterized in that:Including water tank, water pump, hydraulic pressure are adjusted Regulating device, runoff simulation feed pipe, simulates underground river feed pipe and runoff collects water tank, and runoff, underground underground river analogue means are set In model side, runoff collects water tank and is arranged at model opposite side, and runoff simulation feed pipe is connected with runoff simulation irrigation canals and ditches, simulation Runoff irrigation canals and ditches are collected water tank with runoff and are connected, and simulation underground river feed pipe is connected with simulation underground river.
4. opencut model according to claim 1, it is characterized in that:Inside model casing and by runoff simulation irrigation canals and ditches, mould Intend underground river composition, table soil, country rock and mutual bank of ore, wherein runoff simulation irrigation canals and ditches are to excavate sulculus at the top of opencut model, Underground river composition is simulated to lay the stephanoporate round tube of certain length inside opencut model, table soil, country rock and mutual bank of ore by Ground, rock mass materials layer composition are simulated, wherein mutual bank of ore is country rock and the alternate rock mass of ore body, mining area surface is adopted by outdoor Field highwall and working pit edge composition, the step of working pit edge include step upper brace, bench face, lay drilling and step lower flat Platform.
5. a kind of seasonal variations runoff according to claim 1 and underground water influence monitoring model to High aititude opencut Experimental method, it is characterized in that:
A, the influence of summer high temperature, different runoff rates to opencut mining area is simulated:Video camera 23 is opened, opens temperature simulation dress 1 is put, is entered temperature control in model casing by air hose 2 in 35 DEG C of conditions of high temperature, high temperature air by temperature control system; Runoff, underground underground river analogue means 3 are opened, the water in device simulates different run-offs by water-pressure regulating device, and water passes through simulation Runoff feed pipe 4 is flowed into runoff simulation irrigation canals and ditches 6, and the water of runoff simulation irrigation canals and ditches 6 penetrates into Open pit Area, runoff simulation irrigation canals and ditches 6 Water finally flows into runoff and collects water tank 24;It is opencut table soil 8, country rock 9, outdoor under the conditions of observing and recording different runoff rates Stope-boundary 11, working pit edge form 12, step upper brace 13, bench face 14, coal seam A and carbonaceous mudstone B water profit, water burst Phenomenon, lay 15 water-filling water level phenomenons of drilling;After water burst occurs in simulation, runoff, underground underground river analogue means 3, temperature are closed Analogue means 1, by bottom tank 17, drainpipe 18 is opened to sewer draining, observation table soil 8, country rock 9, excavating plant side Side 11, working pit edge composition 12, step upper brace 13, bench face 14, step lower platform 16, coal seam A, carbonaceous mudstone B and The changing rule and record of 15 water-filling discharge levels of drilling are laid, after treating the current of bottom tank 17, drainpipe 18 is closed, closes Close video camera 23;The video of video camera 23 is exported, analysis high temperature, different runoff rates are advised to the water burst in opencut mining area, draining Rule and the origin cause of formation;
B, the influence of summer high temperature, different seepage flow flows to opencut mining area is simulated:Video camera 23 is opened, opens temperature simulation dress 1 is put, is entered temperature control in model casing by air hose 2 in 35 DEG C of conditions of high temperature, high temperature air by temperature control system; Runoff, underground underground river analogue means 3 are opened, the water in device simulates underground percolation flow by water-pressure regulating device, and water passes through mould Intend underground river feed pipe 5 to flow into simulation underground river 7, the water on simulation underground river 7 penetrates into Open pit Area;Observe and record different underground river flows Under the conditions of, country rock 9, open pit slope 11, working pit edge composition 12, step upper brace 13, bench face 14, coal seam A and carbon Matter mud stone B water profit, water burst phenomenon, lays 15 water-filling water level phenomenons of drilling;After water burst occurs in simulation, runoff, underground are closed Underground river analogue means 3, temperature simulator 1, by bottom tank 17, drainpipe 18 is opened to sewer draining, observation table soil 8th, country rock 9, open pit slope 11, working pit edge composition 12, step upper brace 13, bench face 14, step lower platform 16, Coal seam A, carbonaceous mudstone B and the changing rule and record for laying 15 water-filling discharge levels of drilling, treat that the current of bottom tank 17 finish Afterwards, drainpipe 18 is closed, closes video camera 23;The video of video camera 23 is exported, analysis high temperature, different seepage flow flows are to opencut Water burst, draining rule and the origin cause of formation in mining area;
C, the influence of summer high temperature, different runoff rates and different seepage flow flows to opencut mining area is simulated:Video camera 23 is opened, Temperature simulator 1 is opened, temperature control is passed through by air hose in 35 DEG C of conditions of high temperature, high temperature air by temperature control system 2 enter in model casing;Runoff, underground underground river analogue means 3 are opened, the water in device simulates different runoffs by water-pressure regulating device Amount, water are flowed into runoff simulation irrigation canals and ditches 6 by runoff simulation feed pipe 4, and the water of runoff simulation irrigation canals and ditches 6 penetrates into Open pit Area, mould The water for intending runoff irrigation canals and ditches 6 finally flows into runoff collection water tank 24;Water in device simulates underground percolation stream by water-pressure regulating device Amount, water are flowed into simulation underground river 7 by simulating underground river feed pipe 5, and the water on simulation underground river 7 penetrates into Open pit Area;Observe and record Different runoff rates and different seepage flow flows, opencut table soil 8, country rock 9, open pit slope 11, working pit edge composition 12, step Upper brace 13, bench face 14, step lower platform 16, coal seam A and carbonaceous mudstone B water profit, water burst phenomenon, lay drilling 15 water-filling water level phenomenons;After water burst occurs in simulation, runoff, underground underground river analogue means 3, temperature simulator 1 are closed, is passed through Bottom tank 17, drainpipe 18 is opened to sewer draining, observation table soil 8, country rock 9, open pit slope 11, working pit edge composition 12nd, step upper brace 13, bench face 14, step lower platform 16, coal seam A, carbonaceous mudstone B and laying drilling 15 water-fillings row The changing rule and record of water water level, after treating the current of bottom tank 17, drainpipe 18 is closed, closes video camera 23;Export The video of video camera 23, analysis high temperature, different runoff rates and seepage flow flow to the water burst in opencut mining area, draining rule and into Cause;
D, the influence of spring or autumn low temperature, different runoff rates to opencut mining area is simulated:Video camera 23 is opened, opens footpath Flow, underground underground river analogue means 3, the water in device simulates different run-offs by water-pressure regulating device, and water is supplied by runoff simulation Water pipe 4 is flowed into runoff simulation irrigation canals and ditches 6, and the water of runoff simulation irrigation canals and ditches 6 penetrates into Open pit Area and freezeout, runoff simulation irrigation canals and ditches 6 water finally flows into runoff and collects water tank 24;After water burst phenomenon occurs in open pit slope 11, temperature simulator 1 is opened, Temperature control is entered in model casing in -30 DEG C of low-temperature conditions, Cryogenic air by air hose 2 by temperature control system, adjusted Whole runoff rate makes runoff occur without icing phenomenon;Under the conditions of observing and recording different runoff rates, opencut table soil 8, country rock 9th, open pit slope 11, working pit edge composition 12, step upper brace 13, bench face 14, step lower platform 16, coal seam A With carbonaceous mudstone B freezeout;Treat that runoff, underground underground river analogue means 3, temperature after expansion, are not closed in model blocking region Analogue means 1 is spent, by bottom tank 17, opens drainpipe 18 to sewer draining, observation table soil 8, country rock 9, excavating plant Highwall 11, working pit edge composition 12, step upper brace 13, bench face 14, coal seam A, carbonaceous mudstone B and laying 15 water-fillings of drilling Discharge level and freeze changing rule and record, after treating the current of bottom tank 17, close drainpipe 18, close video camera 23;The video of video camera 23 is exported, analysis low temperature, different runoff rates are to the water burst in opencut mining area, draining and litchi freezing pattern And the origin cause of formation;
E, the influence of winter low temperature, different seepage flow flows to opencut mining area is simulated:Video camera 23 is opened, opens temperature simulation dress 1 is put, temperature control is entered by model casing by air hose 2 in -30 DEG C of low-temperature conditions, Cryogenic air by temperature control system It is interior;Runoff, underground underground river analogue means 3 are opened, the water in device simulates underground percolation flow by water-pressure regulating device, and water passes through Simulate underground river feed pipe 5 to flow into simulation underground river 7, the water on simulation underground river 7 penetrates into Open pit Area and freezeout;Observe and record Under different underground river flow conditions, country rock 9, open pit slope 11, working pit edge composition 12, step upper brace 13, bench face 14th, coal seam A and carbonaceous mudstone B water profit, water burst and freezeout, 15 water-filling water levels of drilling, freezeout are laid;Treat that model freezes Tie region after expansion, does not close runoff, underground underground river analogue means 3, temperature simulator 1, by bottom tank 17, opens Drainpipe 18 forms 12, step upper brace to sewer draining, observation table soil 8, country rock 9, open pit slope 11, working pit edge 13rd, bench face 14, coal seam A, carbonaceous mudstone B and lay drilling and 15 water-filling discharge levels and freeze changing rule and record, treat After the current of bottom tank 17, drainpipe 18 is closed, closes video camera 23;Export the video of video camera 23, analysis low temperature, no With runoff rate to the water burst in opencut mining area, draining and litchi freezing pattern and the origin cause of formation;
F, the influence of spring or autumn low temperature, different runoff rates and different seepage flow flows to opencut mining area is simulated:Low temperature, no With influence of the runoff rate to opencut mining area:Video camera 23 is opened, runoff, underground underground river analogue means 3 are opened, in device Water simulates different run-offs by water-pressure regulating device, and water is flowed into runoff simulation irrigation canals and ditches 6 by runoff simulation feed pipe 4, simulation The water of runoff irrigation canals and ditches 6 penetrates into Open pit Area and freezeout, and the water of runoff simulation irrigation canals and ditches 6 finally flows into runoff and collects water tank 24; Water in device simulates underground percolation flow by water-pressure regulating device, and water flows into simulation underground river 7 by simulating underground river feed pipe 5 In, the water on simulation underground river 7 penetrates into Open pit Area;After water burst phenomenon occurs in open pit slope 11, temperature simulator is opened 1, temperature control is entered in model casing in -30 DEG C of low-temperature conditions, Cryogenic air by air hose 2 by temperature control system, Adjustment runoff rate makes runoff occur without icing phenomenon;Observe and record different runoff rates and different seepage flow flow conditions under, Opencut table soil 8, country rock 9, open pit slope 11, working pit edge composition 12, step upper brace 13, bench face 14, step The freezeout of lower platform 16, coal seam A and carbonaceous mudstone B;Treat that runoff, underground after expansion, are not closed in model blocking region Underground river analogue means 3, temperature simulator 1, by bottom tank 17, drainpipe 18 is opened to sewer draining, observation table soil 8th, country rock 9, open pit slope 11, working pit edge composition 12, step upper brace 13, bench face 14, coal seam A, carbonaceous mudstone B With lay 15 water-filling discharge levels of drilling and freeze changing rule and record, after treating the current of bottom tank 17, close draining Pipe 18, close video camera 23;The video of video camera 23 is exported, exports the video of video camera 23, analysis high temperature, different runoff rates With seepage flow flow to the water burst in opencut mining area, draining and litchi freezing pattern and the origin cause of formation;
G, under the conditions of simulating Low Temperature in Spring-high temperature circulation, influence of the different seepage flow flows to opencut mining area:Open video camera 23, temperature simulator 1 is opened, temperature control is passed through by sky in -10 DEG C of low-temperature conditions, Cryogenic air by temperature control system Tracheae 2 enters in model casing;Runoff, underground underground river analogue means 3 are opened, the water in device simulates underground by water-pressure regulating device Seepage flow flow, water are flowed into simulation underground river 7 by simulating underground river feed pipe 5, and the water on simulation underground river 7 penetrates into Open pit Area and freezed Phenomenon;Observe and record under different underground river flow conditions, country rock 9, open pit slope 11, working pit edge composition 12, step top Platform 13, bench face 14, coal seam A and carbonaceous mudstone B water profit, water burst and freezeout, lay 15 water-filling water levels of drilling, freeze Tie phenomenon;Treat that runoff, underground underground river analogue means 3, temperature simulator 1 after expansion, are not closed in model blocking region;Observation Table soil 8, country rock 9, open pit slope 11, working pit edge composition 12, step upper brace 13, bench face 14, coal seam A, carbonaceous Mud stone B and lay drilling and 15 water-filling discharge levels and freeze changing rule and record;By temperature control system by temperature control In 20 DEG C of state of temperatures, air is entered in model casing by air hose 2;Runoff, underground underground river analogue means 3 are opened, in device Water by water-pressure regulating device simulate underground percolation flow, water by simulate underground river feed pipe 5 flow into simulation underground river 7 in, simulation The water on underground river 7 penetrates into Open pit Area;Observe and record under different underground river flow conditions, country rock 9, open pit slope 11, work Side forms 12, step upper brace 13, bench face 14, coal seam A and carbonaceous mudstone B water profit, water burst phenomenon, lays drilling 15 Water-filling water level phenomenon;After water burst occurs in simulation, runoff, underground underground river analogue means 3, temperature simulator 1 are closed, passes through bottom Portion's tank 17, drainpipe 18 is opened to sewer draining, observation table soil 8, country rock 9, open pit slope 11, working pit edge composition 12nd, step upper brace 13, bench face 14, step lower platform 16, coal seam A, carbonaceous mudstone B and laying drilling 15 water-fillings row The changing rule and record of water water level;There are a large amount of water in step lower platform 16 in experimentation, need to open drainpipe 18 and carry out Draining;The hypo-hyperthermia condition class circulation of this experiment is carried out;After experiment terminates, by bottom tank 17, drainpipe 18 is opened To sewer draining, after treating the current of bottom tank 17, drainpipe 18 is closed, closes video camera 23;Export video camera 23 Video, the circulation of analysis hypo-hyperthermia, different runoff rates are to the water burst in opencut mining area, draining and litchi freezing pattern and the origin cause of formation.
CN201710849233.2A 2017-09-20 2017-09-20 Model for monitoring influence of seasonal variation runoff and underground water on high-altitude strip mine Expired - Fee Related CN107798987B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710849233.2A CN107798987B (en) 2017-09-20 2017-09-20 Model for monitoring influence of seasonal variation runoff and underground water on high-altitude strip mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710849233.2A CN107798987B (en) 2017-09-20 2017-09-20 Model for monitoring influence of seasonal variation runoff and underground water on high-altitude strip mine

Publications (2)

Publication Number Publication Date
CN107798987A true CN107798987A (en) 2018-03-13
CN107798987B CN107798987B (en) 2020-01-07

Family

ID=61532485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710849233.2A Expired - Fee Related CN107798987B (en) 2017-09-20 2017-09-20 Model for monitoring influence of seasonal variation runoff and underground water on high-altitude strip mine

Country Status (1)

Country Link
CN (1) CN107798987B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110082284A (en) * 2019-04-09 2019-08-02 中水北方勘测设计研究有限责任公司 A kind of system and method for adjustable ice layer thickness and progress avalanche test
CN112001568A (en) * 2020-09-11 2020-11-27 新疆大学 Method for evaluating influence factors of air drilling operation efficiency in high-altitude and high-cold metal ore mining
CN116298192A (en) * 2023-02-09 2023-06-23 中国地质大学(武汉) System and method for testing frozen soil landslide model under combination of temperature, rainfall and reservoir water

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101110175A (en) * 2007-08-28 2008-01-23 成都理工大学 Geological environment simulating experiment device
CN101436359A (en) * 2008-08-18 2009-05-20 大连理工大学 Apparatus for establishing urban water-through surface water collection effect test
CN202165123U (en) * 2011-08-10 2012-03-14 鞍钢集团矿业公司 Drainage device for water pump pits of strip mine
CN102663953A (en) * 2012-04-13 2012-09-12 中国矿业大学 Simulation experiment table and method for open-pit mine
CN103969172A (en) * 2013-02-04 2014-08-06 敦煌研究院 Multi-field coupling based rock cave surrounding rock weathering and wall painting salt damage simulation test apparatus
CN104123880A (en) * 2014-07-11 2014-10-29 中国科学院烟台海岸带研究所 Testing device for simulating underground water level change and water logging and use method thereof
CN104143284A (en) * 2014-07-06 2014-11-12 陈亚军 Deep-concave strip mine production model system
CN104240578A (en) * 2014-06-19 2014-12-24 北京工业大学 Teaching model for simulating light well point precipitation construction
CN104483465A (en) * 2014-12-16 2015-04-01 上海交通大学 Ecological grassed swale simulation experiment device and experiment operating method thereof
CN104634945A (en) * 2015-02-05 2015-05-20 中国矿业大学(北京) Side slope rainfall simulation testing apparatus
CN105738596A (en) * 2016-02-29 2016-07-06 煤炭科学技术研究院有限公司 Slope deformation simulation test device under rainfall condition
CN106128275A (en) * 2016-08-24 2016-11-16 鞍钢集团矿业有限公司 A kind of simulation transition from open-pit well is adopted rock mass and is caving and cheats end waterproof test device and method
CN206134102U (en) * 2016-07-21 2017-04-26 浙江天煌科技实业有限公司 Ground source heat pump air condition technique teaching platform
CN106981248A (en) * 2017-06-06 2017-07-25 石柳莹 A kind of earth movements geographic demonstration instrument

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101110175A (en) * 2007-08-28 2008-01-23 成都理工大学 Geological environment simulating experiment device
CN101436359A (en) * 2008-08-18 2009-05-20 大连理工大学 Apparatus for establishing urban water-through surface water collection effect test
CN202165123U (en) * 2011-08-10 2012-03-14 鞍钢集团矿业公司 Drainage device for water pump pits of strip mine
CN102663953A (en) * 2012-04-13 2012-09-12 中国矿业大学 Simulation experiment table and method for open-pit mine
CN103969172A (en) * 2013-02-04 2014-08-06 敦煌研究院 Multi-field coupling based rock cave surrounding rock weathering and wall painting salt damage simulation test apparatus
CN104240578A (en) * 2014-06-19 2014-12-24 北京工业大学 Teaching model for simulating light well point precipitation construction
CN104143284A (en) * 2014-07-06 2014-11-12 陈亚军 Deep-concave strip mine production model system
CN104123880A (en) * 2014-07-11 2014-10-29 中国科学院烟台海岸带研究所 Testing device for simulating underground water level change and water logging and use method thereof
CN104483465A (en) * 2014-12-16 2015-04-01 上海交通大学 Ecological grassed swale simulation experiment device and experiment operating method thereof
CN104634945A (en) * 2015-02-05 2015-05-20 中国矿业大学(北京) Side slope rainfall simulation testing apparatus
CN105738596A (en) * 2016-02-29 2016-07-06 煤炭科学技术研究院有限公司 Slope deformation simulation test device under rainfall condition
CN206134102U (en) * 2016-07-21 2017-04-26 浙江天煌科技实业有限公司 Ground source heat pump air condition technique teaching platform
CN106128275A (en) * 2016-08-24 2016-11-16 鞍钢集团矿业有限公司 A kind of simulation transition from open-pit well is adopted rock mass and is caving and cheats end waterproof test device and method
CN106981248A (en) * 2017-06-06 2017-07-25 石柳莹 A kind of earth movements geographic demonstration instrument

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110082284A (en) * 2019-04-09 2019-08-02 中水北方勘测设计研究有限责任公司 A kind of system and method for adjustable ice layer thickness and progress avalanche test
CN110082284B (en) * 2019-04-09 2021-06-25 中水北方勘测设计研究有限责任公司 System and method capable of adjusting ice layer thickness and performing collapse test
CN112001568A (en) * 2020-09-11 2020-11-27 新疆大学 Method for evaluating influence factors of air drilling operation efficiency in high-altitude and high-cold metal ore mining
CN116298192A (en) * 2023-02-09 2023-06-23 中国地质大学(武汉) System and method for testing frozen soil landslide model under combination of temperature, rainfall and reservoir water
CN116298192B (en) * 2023-02-09 2024-05-14 中国地质大学(武汉) System and method for testing frozen soil landslide model under combination of temperature, rainfall and reservoir water

Also Published As

Publication number Publication date
CN107798987B (en) 2020-01-07

Similar Documents

Publication Publication Date Title
CN104094693B (en) A kind of greening method of beach saline land staged control salt discharge
CN100562630C (en) Structural water resource recovery method
CN104806253B (en) A kind of construction method punched between rectangular top pipe passage
CN107100227B (en) A kind of pergola on the city road LID biology delay ditch construction method
CN105821889A (en) Loess platform landslip comprehensive treatment method based on underground water level control
CN107798987A (en) Seasonal variations runoff and underground water influence monitoring model to High aititude opencut
CN106961864A (en) The alkaline land improving system and its modification method of a kind of wells connecting with canals
CN113432322B (en) Comprehensive utilization method and test equipment for surface water, goaf and geothermal heat of coal mining subsidence area
CN110904915A (en) Reservoir engineering rock-soil body water permeation and seepage prevention design method
CN106284446B (en) Strong rainfall induced rock landslide field model test device
CN108035397A (en) A kind of collection method and irrigation system suitable for karst scar runoff
CN206448286U (en) It is a kind of to be used to reduce the radial system of grey field dam seepage line
CN210180872U (en) Test device for simulating karst fracture-pipeline water flow and solute transport rule
CN109964741B (en) Water-circulating plant salinity gradient field test field construction method
CN114397233A (en) Three-dimensional simulation test method for directional drilling grouting
CN102587399B (en) Salivary flow ice prevention and management structure in cold zone
CN206486911U (en) Strong rainfall induced rock landslide field model test device
CN114467699A (en) Sunken green land sprinkling irrigation system and implementation method
CN217038257U (en) Sunken green space sprinkling irrigation system
CN101353892A (en) Three-dimensional space water drainage method and structure of gravitational field
CN116025358B (en) Repairing method for underground aquifer of open pit
CN115839079B (en) Artificial reconstruction restoration method for underground soil layer in alpine region
CN205653674U (en) Utilize earth source heat pump cooling and melt airport road surface system that freezes
CN216771351U (en) Three-dimensional grouting simulation test system based on flowing water flow field
RU2382139C1 (en) Riverbed-diversion structure of seasonal waterway on permafrost

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200107