CN107794914A - A kind of combination post jacking and the prestressed concrete pipe pile of expanding technology and preparation method thereof - Google Patents

A kind of combination post jacking and the prestressed concrete pipe pile of expanding technology and preparation method thereof Download PDF

Info

Publication number
CN107794914A
CN107794914A CN201710986084.4A CN201710986084A CN107794914A CN 107794914 A CN107794914 A CN 107794914A CN 201710986084 A CN201710986084 A CN 201710986084A CN 107794914 A CN107794914 A CN 107794914A
Authority
CN
China
Prior art keywords
pile
prestressed concrete
pipe
concrete pipe
pilot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710986084.4A
Other languages
Chinese (zh)
Other versions
CN107794914B (en
Inventor
齐昌广
郑金辉
郑明飞
王新泉
刘干斌
郑荣跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo University
Original Assignee
Ningbo University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo University filed Critical Ningbo University
Priority to CN201710986084.4A priority Critical patent/CN107794914B/en
Publication of CN107794914A publication Critical patent/CN107794914A/en
Application granted granted Critical
Publication of CN107794914B publication Critical patent/CN107794914B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
    • E02D5/526Connection means between pile segments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/62Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/72Pile shoes

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of combination post jacking and the prestressed concrete pipe pile of expanding technology, including:Prestressed concrete pipe pile, hemispherical pile crown, mud jacking hole, valve, hinge, madjack pipe, line jet pipe, hydraulic jack, high-strength alloy blade, blade fixed plate, cube thickness steel cushion block, blade go out seam and mouth spray;Squeezing unit is provided with the prestressed concrete pipe pile, squeezing unit includes madjack pipe and mud jacking hole, and the madjack pipe port of export is provided with mud jacking hole;The prestressed concrete pipe pile both sides are provided with line jet pipe, and the line jet pipe is provided with mouth spray, valve and hinge are welded with the mouth spray, and the valve is attached via a hinge on mud jacking hole.The beneficial effects of the invention are as follows:The pile side post-grouting technology that the present invention uses, can be horizontal compared with the performance of the raising pile side friction of limits, and compared to traditional point mud-jacking technology, line mud jacking is easier to lift pile side friction, so as to lift pile body bearing capacity.

Description

Prestressed concrete pipe pile and its making of a kind of combination post jacking and expanding technology Method
Technical field
The present invention relates to a kind of novel prefabricated concrete pile tube, more particularly to a kind of combination post jacking and expanding technology Prestressed concrete pipe pile and preparation method thereof.
Background technology
Pile foundation is as a kind of ancient base form, and the building foundation form being most widely used.With science skill The development of art, particularly mechanical technique, pile foundation are also also arisen at the historic moment from simple toward complexity, the construction technology of various pile foundations, Prestressed concrete pipe pile is one of representative.Prestressed concrete pipe pile has pile strength height, resistance to compression anti-crack ability By force, batch production prefabricated construction, it ensure that pile quality, compared to having lower cost and construction work for solid prefabricated pile Phase is short, can obviously reduce time cost, therefore be widely used in pile foundation engineering.But it belongs to traditional open-end pipe pile, piling During can produce soil plug effect, influence the bearing capacity of stake, in addition, soil compaction effect is serious, close to buildings had a great influence Problem, when prestressed concrete pipe pile acts on deep soft soil foundation, piling is unrealistic also relative to uneconomical to horizon d, Now its bearing capacity of the performance of frictional resistance horizontal strong influence is horizontal.
In order to preferably play pile side friction and stake end bottom bearing, post-mud-jacking bored pile, the technique of post jacking are generated Refer to be pressed into cement grout in advance by the pressure of design by the Grouting Pipe pre-buried when steel reinforcement cage is processed using high-pressure injection pump In the pile-end soil layer or Pile side soil layer that stay injected hole, the cement grout of press-in can to the inherent shortcoming sediment of the hole bottom of drill-pouring, Osmosis, filling effect, compaction, splitting and consolidation occur for mud cake around pile and bearing course at pile end, pass through the above Effect can reach the effect of enhancing Pile side soil or pile-end soil intensity, so as to improve pile side friction or stake end bottom bearing.
In summary, although the currently research to post grouting pile technology and expanding technology is very universal, for prefabricated The document that the expanding technology and two kinds of technologies of stake are combined does not have been reported that, therefore is directed to this situation, considers current pile tube Construction the defects of existing, seek it is a kind of it is new, avoid soil plug effect, played beneficial to pile side friction, with reference to post jacking and expanding Prestressed concrete pipe pile of technology and preparation method thereof seems particularly significant.
The content of the invention
The purpose of the present invention is to overcome deficiency of the prior art, there is provided a kind of combination post jacking and the pre- of expanding technology should The preparation method of power concrete tubular pile.
It is a further object to provide a kind of combination post jacking and the prestressed concrete pipe pile of expanding technology.This The purpose of invention is achieved through the following technical solutions:
The prestressed concrete pipe pile of this combination post jacking and expanding technology, including:Prestressed concrete pipe pile, hemisphere It is shape pile crown, mud jacking hole, valve, hinge, madjack pipe, line jet pipe, hydraulic jack, high-strength alloy blade, blade fixed plate, vertical Cube thickness steel cushion block, blade go out seam and mouth spray;Squeezing unit is provided with the prestressed concrete pipe pile, squeezing unit includes Madjack pipe and mud jacking hole, the madjack pipe port of export are provided with mud jacking hole;The prestressed concrete pipe pile both sides are provided with line jet pipe, The line jet pipe is provided with mouth spray, and valve and hinge are welded with the mouth spray, and the valve is attached via a hinge to mud jacking Kong Shang;The prestressed concrete pipe pile bottom is provided with hemispherical pile crown, and expanding equipment is provided with inside the hemispherical pile crown, expands Footpath equipment includes hydraulic jack, high-strength alloy blade, blade fixed plate and cube thickness steel cushion block, the hemispherical pile crown Bottom support be provided with cube thickness steel cushion block, the cube thickness steel cushion block transverse direction two sides is provided with hydraulic jack, described Hydraulic jack both side ends are provided with blade fixed plate, and the blade fixed plate is provided with high-strength alloy blade;The hemisphere Blade has been reserved on shape pile crown and has gone out seam.
As preferred:The madjack pipe connects through mud jacking pipe connector sleeves and bolt connection, the mud jacking pipe connector sleeves Between be lined with sheet rubber.
As preferred:The line jet pipe is semicylinder structure, and line jet pipe is set centered on mud jacking hole, the square of line jet pipe The aperture in docking mud jacking hole is reserved in tee section side;The valve is triangle section formula to half opening structure.
As preferred:Pre-buried screw thread end plate at the top of the prestressed concrete pipe pile, the pre-buried company with nut in bottom Connect end plate.
As preferred:Hydraulic jack pilot, the hydraulic pressure thousand are provided with the prestressed concrete pipe pile center Pilot protection pipe is surrounded by outside the pilot of jin top, the pilot protection pipe top is provided with wire fixture;The liquid Press jack pilot one end connection hydraulic jack, the controller outside the connection of the hydraulic jack pilot other end.
As preferred:Pilot protection pipe fixing component is provided with the middle part of the prestressed concrete pipe pile.
As preferred:The length of the high-strength alloy blade arrives to the inwall of hemispherical pile crown.
As preferred:The hemispherical pile crown upper limb is provided with screw thread end plate, the prestressed concrete pipe pile and hemispherical Pile crown is connected by the connection end plate with nut with screw thread end plate.
As preferred:The madjack pipe of the prestressed concrete pipe pile end is provided with expanding reach, is lined with inside expanding reach Rubber ring.
The preparation method of a kind of combination post jacking and the prestressed concrete pipe pile of expanding technology, comprises the following steps:
Step 1: wearing hydraulic jack pilot in pilot protection pipe, make on hydraulic jack pilot Lower end is stretched out outside pilot protection pipe and fixed with wire fixture;
Step 2: preparing steel reinforcement cage, and madjack pipe, pilot protection pipe, pilot protection are welded on steel reinforcement cage Pipe fixing component and line jet pipe, upper hinge and valve are welded at the mouth spray of online jet pipe;
Step 3: the connection end plate with nut, screw thread end plate, prestress wire and the bellows of pre-buried good end, branch Template, casting concrete, maintenance complete post-stretching, after the completion of sealing off and covering anchorage, that is, prestressed concrete pipe pile is prepared;
Step 4: preparing hemispherical pile crown, good blade is reserved on hemispherical pile crown and goes out seam, and inside hemispherical pile crown Expanding equipment is arranged, is finally threaded end plate on hemispherical pile crown;
Step 5: hydraulic jack pilot is connected in hydraulic jack, pass through prestressed concrete pipe pile stake The connection end plate with nut at bottom and the screw thread end plate of hemispherical pile crown upper limb connect and compose an entirety, can enter on this basis The connection of row prestressed concrete pipe pile, that is, make and obtain a kind of combination post jacking and the prestressed concrete pipe of expanding technology Stake;
Step 6: carrying out piling after putting pile cover on this basis, madjack pipe is connected to mud jacking equipment after the completion of piling, Hydraulic jack pilot is connected to ground controller, starts mud jacking equipment and controller immediately, carries out mud jacking and expanding Operation.
The beneficial effects of the invention are as follows:
(1) the pile side post-grouting technology that the present invention uses, can be horizontal compared with the performance of the raising pile side friction of limits, And compared to traditional point mud-jacking technology, line mud jacking is easier to lift pile side friction, so as to lift pile body bearing capacity.
(2) the expanding equipment of pile crown that the present invention uses, by expanding, can effectively lift end resistance, be finally reached and carry Rise the purpose of pile body bearing capacity.
(3) present invention is avoided prestressed concrete pipe pile and produced during piling by the connection of hemispherical pile crown Soil plug effect, so as to reduce weakening of the soil plug effect to pile bearing capacity.
(4) the pilot protection pipe that the present invention uses, is in order to avoid hydraulic jack pilot and pipe of concrete Wall friction is damaged in stake.
Brief description of the drawings
Fig. 1 is the structural representation of the prestressed concrete pipe pile with reference to post jacking and expanding technology;
Fig. 2 is the structural representation of hemispherical pile crown;
Fig. 3 is the top view of hemispherical pile crown;
Fig. 4 be hemispherical pile crown it is expanding after the completion of top view;
Fig. 5 is the top view of prestressed concrete pipe pile;
Fig. 6 is the structural representation at mouth spray;
Fig. 7 is the structural representation of wire fixture;
Description of reference numerals:1 --- prestressed concrete pipe pile;2 --- hemispherical pile crown;5 --- pilot is protected Pipe fixing component;6 --- hydraulic jack pilot;7 --- mud jacking hole;8 --- valve;9 --- hinge;10 --- band spiral shell Female connection end plate;11 --- madjack pipe;12 --- line jet pipe;13 --- pilot protection pipe;14 --- bolt;15—— Hydraulic jack;16 --- high-strength alloy blade;17 --- blade fixed plate;18 --- cube thickness steel cushion block;19—— Blade goes out seam;20 --- mud jacking pipe connector sleeves;21 --- mouth spray;22 --- screw thread end plate;23 --- wire fixture.
Embodiment
The present invention is described further with reference to embodiment.The explanation of following embodiments is only intended to help and understands this Invention.It should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention, also Some improvement and modification can be carried out to the present invention, these are improved and modification also falls into the protection domain of the claims in the present invention It is interior.
As shown in Figures 1 to 7, the combination post jacking and the prestressed concrete pipe pile of expanding technology include:Prestressing force Concrete tubular pile 1, hemispherical pile crown 2, pilot protection pipe fixing component 5, hydraulic jack pilot 6, mud jacking hole 7, Valve 8, hinge 9, the connection end plate 10 with nut, madjack pipe 11, line jet pipe 12, pilot protection pipe 13, bolt 14, hydraulic pressure Jack 15, high-strength alloy blade 16, blade fixed plate 17, cube thickness steel cushion block 18, blade go out seam 19, madjack pipe connection Set 20, mouth spray 21, screw thread end plate 22, wire fixture 23, squeezing unit and expanding equipment.
As shown in figure 1,1 a diameter of 500mm of prestressed concrete pipe pile, wall thickness 300mm, the interior mud jacking that is provided with fill Put, squeezing unit includes madjack pipe 11 and mud jacking hole 7, and the internal diameter of madjack pipe 11 is 68mm, and madjack pipe 11 exports end position and set There is mud jacking hole 7, a mud jacking hole 7 is set per 3m, and the sectional dimension in the mud jacking hole 7 is about 58mm, the company of the madjack pipe 11 Connected mud jacking pipe connector sleeves 20 and bolt 14 connects, sheet rubber is padded between mud jacking pipe connector sleeves 20 to ensure sealing.
The both sides of prestressed concrete pipe pile 1 are provided with line jet pipe 12, and the line jet pipe 12 is semicylinder structure, and with Set centered on mud jacking hole 7, the aperture in docking mud jacking hole 7 has been reserved in the square-section side of line jet pipe 12.The line jet pipe 12 is grown 1420mm, internal diameter 52mm, one mouth spray 21 is set at interval of 40mm on line jet pipe 12, a width of 3mm in the section of mouth spray 21, A height of 200mm, area of section are much smaller than mud jacking hole 7.Valve 8 and hinge 9 are welded with the mouth spray 21, the valve 8 passes through Hinge 9 is connected on mud jacking hole 7, and the valve 8 is that triangle section formula ensure that piling pile to half opening structure, the structure The outer soil body be cannot be introduced into stake, and slurries can be extruded smoothly outside stake, and the structural representation at mouth spray 21 is as shown in Figure 6.
The prestressed concrete pipe pile 1 top pre-buried screw thread end plate 22, the pre-buried connection end plate with nut in bottom 10, the connection end plate 10 with nut and the external diameter of screw thread end plate 22 are 500mm, and internal diameter is 200mm.The prestressing force mixes Coagulate and hydraulic jack pilot 6 is provided with the native center of pile tube 1, the outside of hydraulic jack pilot 6 is surrounded by control and led Line protection pipe 13, the top of pilot protection pipe 13 is provided with wire fixture 23, so that hydraulic jack pilot 6 can It is fixed and stretch out pilot protection pipe 13, the connection of hydraulic jack pilot 6 when being easy to the pile tube to connect.The wire card Have 23 diameters and be slightly less than hydraulic jack pilot 6, hydraulic jack pilot 6 can be pressed into wire fixture 23 solid It is fixed.The middle part of prestressed concrete pipe pile 1 is provided with pilot protection pipe fixing component 5.
The bottom of prestressed concrete pipe pile 1 is provided with hemispherical pile crown 2,2 a diameter of 500mm of hemispherical pile crown, Inside is provided with expanding equipment, is fixed as shown in Fig. 2 expanding equipment includes hydraulic jack 15, high-strength alloy blade 16, blade Plate 17 and cube thickness steel cushion block 18, the bottom support of the hemispherical pile crown 2 is provided with cube thickness steel cushion block 18, described vertical 18 horizontal two sides of cube thickness steel cushion block is provided with hydraulic jack 15, and the both side ends of hydraulic jack 15 are provided with blade fixed plate 17, the blade fixed plate 17 is provided with high-strength alloy blade 16, and the length of the high-strength alloy blade 16 just arrives to The inwall of hemispherical pile crown 2, its top view are as shown in Figure 3.Blade has been reserved on the hemispherical pile crown 2 and has gone out seam 19, the knife Piece goes out 19 width of seam and is slightly larger than high-strength alloy blade 16, and the soil entered during such piling in hemispherical pile crown 2 can be high Strength alloys blade 16 blocks.The upper limb of hemispherical pile crown 2 is provided with screw thread end plate 22, the prestressed concrete pipe pile 1 with Hemispherical pile crown 2 is connected by the connection end plate 10 with nut and screw thread end plate 22.Described one end of hydraulic jack pilot 6 Connect hydraulic jack 15, the outside controller of one end connection, by controlling the elongation of hydraulic jack 15, ejection high intensity conjunction Golden blade 16, so as to reach expanding purpose, expanding effect is as shown in Figure 4.
The madjack pipe 11 of the end of prestressed concrete pipe pile 1 has done expansion processing, and the madjack pipe at bottom expands The prominent stake baseplane of section, length are equal to top expanded section depth, when prestressed concrete pipe pile 1 connects, can easily connected Madjack pipe 11 is connect, rubber ring is lined with inside expanding reach, to ensure the sealing of madjack pipe 11.
The preparation method of the combination post jacking and the prestressed concrete pipe pile of expanding technology, comprises the following steps:
1) hydraulic jack pilot 6 is worn in pilot protection pipe 13 first, makes hydraulic jack pilot 6 Upper and lower side stretches out outside pilot protection pipe 13 and fixed with wire fixture 23;
2) steel reinforcement cage is then prepared, and welds madjack pipe 11, pilot protection pipe 13, pilot on steel reinforcement cage and protects Pillar fixing component 5 and line jet pipe 12, upper hinge 9 and valve 8 are and then welded at the mouth spray 21 of online jet pipe 12;
3) be subsequently normal process flow that prestressed concrete pipe pile 1 makes, pre-buried good end with nut End plate 10, screw thread end plate 22, prestress wire and bellows are connected, formwork supporting plate, casting concrete, conserves and completes post-stretching, After the completion of sealing off and covering anchorage, that is, prestressed concrete pipe pile 1 is prepared;
4) hemispherical pile crown 2 is prepared, good blade is reserved and goes out seam 19, and expanding equipment is arranged inside hemispherical pile crown 2, End plate 22 is finally threaded on hemispherical pile crown 2;
5) hydraulic jack pilot 6 is connected in hydraulic jack 15, passes through 1 bottom of prestressed concrete pipe pile The connection end plate 10 with nut and the screw thread end plate 22 of the upper limb of hemispherical pile crown 2 connect and compose an entirety, can be basic herein The upper connection for carrying out prestressed concrete pipe pile 1, that is, make and obtain a kind of combination post jacking and the prestressed concrete of expanding technology Native pile tube;
6) piling is carried out after putting pile cover on this basis, madjack pipe 11 is connected to mud jacking equipment after the completion of piling, will Hydraulic jack pilot 6 is connected to ground controller, starts mud jacking equipment and controller immediately, carries out mud jacking and expanding behaviour Make.

Claims (10)

  1. A kind of 1. prestressed concrete pipe pile of combination post jacking and expanding technology, it is characterised in that including:Prestressed concrete Pile tube (1), hemispherical pile crown (2), mud jacking hole (7), valve (8), hinge (9), madjack pipe (11), line jet pipe (12), hydraulic pressure thousand Jin top (15), high-strength alloy blade (16), blade fixed plate (17), cube thickness steel cushion block (18), blade go out seam (19) and Mouth spray (21);Squeezing unit is provided with the prestressed concrete pipe pile (1), squeezing unit includes madjack pipe (11) and mud jacking Hole (7), madjack pipe (11) port of export are provided with mud jacking hole (7);Prestressed concrete pipe pile (1) both sides are provided with line jet pipe (12), the line jet pipe (12) is provided with mouth spray (21), and mouth spray (21) place is welded with valve (8) and hinge (9), described Valve (8) is connected on mud jacking hole (7) by hinge (9);Prestressed concrete pipe pile (1) bottom is provided with hemispherical pile crown (2) expanding equipment, is provided with inside the hemispherical pile crown (2), expanding equipment includes hydraulic jack (15), high-strength alloy knife Piece (16), blade fixed plate (17) and cube thickness steel cushion block (18), the bottom support of the hemispherical pile crown (2), which is provided with, stands Cube thickness steel cushion block (18), the horizontal two sides of the cube thickness steel cushion block (18) are provided with hydraulic jack (15), the hydraulic pressure thousand Jin top (15) both side ends are provided with blade fixed plate (17), and the blade fixed plate (17) is provided with high-strength alloy blade (16);Blade has been reserved on the hemispherical pile crown (2) and has gone out seam (19).
  2. 2. the prestressed concrete pipe pile of combination post jacking according to claim 1 and expanding technology, it is characterised in that:Institute That states madjack pipe (11) connects through mud jacking pipe connector sleeves (20) and bolt (14) connection, between the mud jacking pipe connector sleeves (20) It is lined with sheet rubber.
  3. 3. the prestressed concrete pipe pile of combination post jacking according to claim 1 and expanding technology, it is characterised in that:Institute It is semicylinder structure to state line jet pipe (12), and line jet pipe (12) is set centered on mud jacking hole (7), and the rectangle of line jet pipe (12) is cut The aperture in docking mud jacking hole (7) is reserved in surface side;The valve (8) is triangle section formula to half opening structure.
  4. 4. the prestressed concrete pipe pile of combination post jacking according to claim 1 and expanding technology, it is characterised in that:Institute State pre-buried screw thread end plate (22) at the top of prestressed concrete pipe pile (1), the pre-buried connection end plate (10) with nut in bottom.
  5. 5. the prestressed concrete pipe pile of combination post jacking according to claim 1 and expanding technology, it is characterised in that:Institute State and hydraulic jack pilot (6), the hydraulic jack pilot are provided with prestressed concrete pipe pile (1) center (6) outside is surrounded by pilot protection pipe (13), and pilot protection pipe (13) top is provided with wire fixture (23);It is described Hydraulic jack pilot (6) one end connection hydraulic jack (15), the connection of hydraulic jack pilot (6) other end are outer The controller in portion.
  6. 6. the prestressed concrete pipe pile of combination post jacking according to claim 1 and expanding technology, it is characterised in that:Institute State and be provided with pilot protection pipe fixing component (5) in the middle part of prestressed concrete pipe pile (1).
  7. 7. the prestressed concrete pipe pile of combination post jacking according to claim 1 and expanding technology, it is characterised in that:Institute The length for stating high-strength alloy blade (16) arrives to the inwall of hemispherical pile crown (2).
  8. 8. the prestressed concrete pipe pile of combination post jacking according to claim 1 and expanding technology, it is characterised in that:Institute State hemispherical pile crown (2) upper limb and be provided with screw thread end plate (22), the prestressed concrete pipe pile (1) is logical with hemispherical pile crown (2) Cross the connection end plate (10) with nut and screw thread end plate (22) connection.
  9. 9. the prestressed concrete pipe pile of combination post jacking according to claim 1 and expanding technology, it is characterised in that:Institute The madjack pipe (11) for stating prestressed concrete pipe pile (1) end is provided with expanding reach, and rubber ring is lined with inside expanding reach.
  10. 10. a kind of preparation method as claimed in claim 1 with reference to post jacking and the prestressed concrete pipe pile of expanding technology, It is characterised in that it includes following steps:
    Step 1: wearing hydraulic jack pilot (6) in pilot protection pipe (13), make hydraulic jack pilot (6) upper and lower side stretches out pilot protection pipe (13) outside and fixed with wire fixture (23);
    Step 2: preparing steel reinforcement cage, and madjack pipe (11), pilot protection pipe (13), pilot are welded on steel reinforcement cage Protection pipe fixing component (5) and line jet pipe (12), mouth spray (21) place welding upper hinge (9) and valve of online jet pipe (12) (8);
    Step 3: the connection end plate (10) with nut, screw thread end plate (22), prestress wire and the ripple of pre-buried good end Pipe, formwork supporting plate, casting concrete, maintenance complete post-stretching, after the completion of sealing off and covering anchorage, that is, prestressed concrete pipe pile (1) is prepared;
    Step 4: preparing hemispherical pile crown (2), good blade is reserved on hemispherical pile crown (2) and goes out seam (19), and in hemispherical stake Expanding equipment is arranged inside head (2), end plate (22) is finally threaded on hemispherical pile crown (2);
    Step 5: hydraulic jack pilot (6) is connected in hydraulic jack (15), pass through prestressed concrete pipe pile (1) the connection end plate (10) with nut at stake bottom and the screw thread end plate (22) of hemispherical pile crown (2) upper limb connect and compose one it is whole Body, the connection of prestressed concrete pipe pile (1) can be carried out on this basis, i.e. making obtains one kind and combines post jacking and expanding skill The prestressed concrete pipe pile of art;
    Step 6: carrying out piling after putting pile cover on this basis, madjack pipe (11) is connected to mud jacking equipment after the completion of piling, Hydraulic jack pilot (6) is connected to ground controller, starts mud jacking equipment and controller immediately, carries out mud jacking and expansion Footpath operates.
CN201710986084.4A 2017-10-20 2017-10-20 Prestressed concrete pipe pile combining post-grouting and diameter-expanding technology and manufacturing method thereof Active CN107794914B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710986084.4A CN107794914B (en) 2017-10-20 2017-10-20 Prestressed concrete pipe pile combining post-grouting and diameter-expanding technology and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710986084.4A CN107794914B (en) 2017-10-20 2017-10-20 Prestressed concrete pipe pile combining post-grouting and diameter-expanding technology and manufacturing method thereof

Publications (2)

Publication Number Publication Date
CN107794914A true CN107794914A (en) 2018-03-13
CN107794914B CN107794914B (en) 2023-03-17

Family

ID=61532822

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710986084.4A Active CN107794914B (en) 2017-10-20 2017-10-20 Prestressed concrete pipe pile combining post-grouting and diameter-expanding technology and manufacturing method thereof

Country Status (1)

Country Link
CN (1) CN107794914B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1043441B1 (en) * 2019-10-31 2021-07-19 Gebr De Koning Method for inserting a concrete pile into the earth.

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101575855A (en) * 2009-05-27 2009-11-11 徐汉东 Non soil taking hole guiding process for sinking prestressed pipe pile or prefabricated square pile
CN102691296A (en) * 2012-05-22 2012-09-26 广州市建筑科学研究院有限公司 Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN202767071U (en) * 2012-09-26 2013-03-06 长沙学院 Prestressed pipe pile with post-grouting for pile bottom and pile side
CN204875770U (en) * 2015-08-17 2015-12-16 建设综合勘察研究设计院有限公司 One shot forming strength core composite pile becomes stake machinery
CN105442605A (en) * 2015-11-20 2016-03-30 常州第一建筑集团有限公司 Construction method for drawing out prestress high concrete (PHC) pile and reusing PHC pile for retaining in deep excavation
CN107178081A (en) * 2017-07-10 2017-09-19 滨州学院 A kind of prestressing force post jacking variable cross-section hollow shell pill and its construction method
CN207405617U (en) * 2017-10-20 2018-05-25 宁波大学 With reference to post jacking and the prestressed concrete pipe pile of expanding technology

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101575855A (en) * 2009-05-27 2009-11-11 徐汉东 Non soil taking hole guiding process for sinking prestressed pipe pile or prefabricated square pile
CN102691296A (en) * 2012-05-22 2012-09-26 广州市建筑科学研究院有限公司 Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN202767071U (en) * 2012-09-26 2013-03-06 长沙学院 Prestressed pipe pile with post-grouting for pile bottom and pile side
CN204875770U (en) * 2015-08-17 2015-12-16 建设综合勘察研究设计院有限公司 One shot forming strength core composite pile becomes stake machinery
CN105442605A (en) * 2015-11-20 2016-03-30 常州第一建筑集团有限公司 Construction method for drawing out prestress high concrete (PHC) pile and reusing PHC pile for retaining in deep excavation
CN107178081A (en) * 2017-07-10 2017-09-19 滨州学院 A kind of prestressing force post jacking variable cross-section hollow shell pill and its construction method
CN207405617U (en) * 2017-10-20 2018-05-25 宁波大学 With reference to post jacking and the prestressed concrete pipe pile of expanding technology

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1043441B1 (en) * 2019-10-31 2021-07-19 Gebr De Koning Method for inserting a concrete pile into the earth.

Also Published As

Publication number Publication date
CN107794914B (en) 2023-03-17

Similar Documents

Publication Publication Date Title
US7201540B2 (en) Construction process for composite pile foundation
CN101298770B (en) Bottom enlarging prestress conical pipe pile and construction method thereof
CN101858079B (en) Core filling tubular pile cement composite foundation pile and construction method
CN206784372U (en) Injection forming club-footed pile
CN207405617U (en) With reference to post jacking and the prestressed concrete pipe pile of expanding technology
CN103603336A (en) Grouting precast pile and grouting method
CN107794914A (en) A kind of combination post jacking and the prestressed concrete pipe pile of expanding technology and preparation method thereof
CN202187340U (en) Socketed pile with concrete-filled steel tube core column
CN201241329Y (en) Positioner of steel pipe column
CN100532736C (en) Concrete anchor stock and construction technique thereof
CN102518129A (en) Post pressure-grouting pre-stressed hollow square pile and manufacturing method thereof
CN102286971A (en) Concrete-filled steel tube core column socketed pile
CN211340839U (en) Lamp pole base structure
CN103867219B (en) A kind of Apparatus and method for expanding the pea gravel concreten anchoring support soil body for whirlpool extrusion
CN204402496U (en) A kind of vertical shaft steel strand jack hangs slip-form lifting device
CN102304917B (en) Construction process of pressing-and-embedding special-shaped cast-in-place pile and equipment thereof
CN108018859B (en) Emergency treatment method and structure for sudden surge of foundation pit
CN110144894A (en) A kind of pile end grouting miniature steel pipe static pressed pile
CN105256793B (en) A kind of double-deck lower stake equipment
CN105178315A (en) Pouring type pile driver and pile driving method using pile driver
CN106567386A (en) Pouring type pile driver and pile driving method therefor
CN205012339U (en) Pile driver
CN205012337U (en) Pour formula pile driver
CN108468337A (en) A kind of recoverable foundation pit supporting pile and attaching/detaching apparatus and application method
CN1970892A (en) Prefabricated reinforced concrete under-reamed pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant