CN105256793B - A kind of double-deck lower stake equipment - Google Patents

A kind of double-deck lower stake equipment Download PDF

Info

Publication number
CN105256793B
CN105256793B CN201510581144.5A CN201510581144A CN105256793B CN 105256793 B CN105256793 B CN 105256793B CN 201510581144 A CN201510581144 A CN 201510581144A CN 105256793 B CN105256793 B CN 105256793B
Authority
CN
China
Prior art keywords
pile body
pile
inner tube
outer tube
crown
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510581144.5A
Other languages
Chinese (zh)
Other versions
CN105256793A (en
Inventor
张驰
王警
刘清宽
李平
李磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Li Jian
Li Lei
Zhang Fang
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510581144.5A priority Critical patent/CN105256793B/en
Publication of CN105256793A publication Critical patent/CN105256793A/en
Application granted granted Critical
Publication of CN105256793B publication Critical patent/CN105256793B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of double-deck lower stake equipment,The internal sleeve of pile body outer tube is equipped with pile body inner tube,Pile crown is connected with below pile body outer tube,The top of pile crown is provided with the interior pipe connector being connected with pile body inner tube,Described pile crown is hollow-core construction,Interior pipe connector is connected with pile crown,Plug is connected with by iron chains in the lower section of pile crown,Pile body outer tube and pile body inner tube are inter-connected via a bolt joint,The operation downwards simultaneously of pile body outer tube and pile body inner tube,After the completion of lower stake operation,By outside placing installation when pile body inner tube plays operation upwards,Cement deposit material is to blanking operation in inner tube,The cavity that the external pipe of bored pile is formed,That realizes cement pile body pours operation,Pile body be not reserved in underground,Realization is driven piles and pours to synchronously complete,Natural pile body is formed after solidification,Need not pour again,It is capable of achieving the firmly lower stake operation of the pile body that cement inserts is formed.

Description

A kind of double-deck lower stake equipment
Technical field
The present invention relates to mechanical field, and in particular to a kind of pile driving equipment, more particularly to a kind of double-deck lower stake equipment.
Background technology
Piling machine is made up of pile monkey, pile frame and auxiliary device etc..Pile monkey is attached to that anterior two of pile frame is parallel to lead vertically Bar, is commonly called as between gantry, and liter is hung with lifting hook.Pile frame is a steelwork tower truss, and portion is provided with hoist engine behind, is used to lift by crane Stake and pile monkey.The leading truck being made up of two guide rods before pile frame, is used to control direction of driving piles, and makes stake accurate according to design orientation Ground injection stratum.Pile monkey can be divided into by the power resources of motion drop hammer, steam hammer, diesel hammer, hydraulic hammer etc..Piling machine is using punching Power is hit by the piling machinery on stake injection stratum.Pylon and leading truck can deflection together, to batter piling.Pile frame can be rotated, Can divide a word with a hyphen at the end of a line.
No matter how type changes traditional piling machine, is that pile body is driven underground using power source of driving piles, and by stake Body remains into the plant equipment of underground.This piling mode needs to waste more resource and equipment.In piling work, it is subject to The limitation of pile body diameter, after the completion of an operation that falls, pile body stays in underground, and pile body diameter is unchanged, and stress point is all by pile body system Into pile body accepts uneven from top to bottom, influences building for superstructure.Pile body stays in underground as necessary reservation member, Reusability can not be had enough to meet the need, resource is wasted.Also, easily there are Defect Piles, traditional place when in use in traditional piling machine Reason method has expansion cushion cap, stake in situ multiple, pile extension, the sinking shaft of the stake heart, piling, drilling to strengthen, change construction method or modification sets Meter scheme.Some great pile accident difficult treatments, it is costly.Once there are Defect Piles, a kind of method of above-mentioned examination & verification is taken Added cost will be caused, is increased expenditure, and be likely to result in the defect problem after global design changes.Therefore, using tradition Reserved mode of the pile body in underground of piling machine easily causes the inconvenience of construction, once there are Defect Piles, can be to production and duration Bring delayed, and huge economic loss is brought to construction party, potential safety hazard is brought to superstructure.
Therefore, a kind of simple structure is produced, easy to operate, construction and operational efficiency are high, and energy-conserving and environment-protective, safety coefficient is high, Stable and firm, pile body pile rate is high, cost-effective, stake equipment under the bilayer of efficient quick, with wide market prospects.
The content of the invention
In view of the shortcomings of the prior art, the present invention provides a kind of simple structure, easy to operate, and construction and operational efficiency are high, Energy-conserving and environment-protective, safety coefficient is high, stable and firm, and pile body pile rate is high, cost-effective, stake equipment under the bilayer of efficient quick.
The technical proposal of the invention is realized in this way:A kind of double-deck lower stake equipment, including pile body outer tube, described pile body The internal sleeve of outer tube is equipped with pile body inner tube, is connected with pile crown below pile body outer tube, the top of pile crown be provided with pile body The interior pipe connector that pipe is connected, described pile crown is hollow-core construction, and interior pipe connector is connected with pile crown, in the lower section of pile crown Plug is connected with by iron chains.
Described pile body outer tube sleeve is provided with the first terminal pad mounted in the outside of pile body inner tube, the top of pile body outer tube, the The first connecting hole is offered in one terminal pad, the top of pile body inner tube is provided with the second terminal pad, is offered in the second terminal pad The second connecting hole being engaged with the first connecting hole, is installed with support connecting tube terminal pad above the second terminal pad, Support connecting tube connecting hole is offered in support connecting tube terminal pad.
Described interior pipe connector is connected by connection screw thread with pile body inner tube, in the external diameter and pile body of interior pipe connector Pipe is equal, and the external diameter of described pile crown is equal with the external diameter of pile body outer tube.
Described plug is spherical shape, and pile crown is hollow cylinder tubulose structure, and the diameter of plug is interior not less than pile crown Footpath.
The present invention has following good effect:Simple structure of the present invention, easy to operate, the internal sleeve of pile body outer tube is equipped with Pile body inner tube, is connected with pile crown below pile body outer tube, and the top of pile crown is provided with the inner tube being connected with pile body inner tube and connects Joint, described pile crown is hollow-core construction, and interior pipe connector is connected with pile crown, is flexibly connected by iron chains in the lower section of pile crown There is plug, when in use, pile body outer tube and pile body inner tube are inter-connected via a bolt joint, in lower stake operation, pile body outer tube and stake Pipe operation downwards simultaneously in vivo, after the completion of lower stake operation, by outside placing installation when pile body inner tube plays operation upwards, water To blanking operation in inner tube, the operation that pours of cement pile body is realized in the cavity that the external pipe of bored pile is formed to mud castable, and pile body is not Underground is being reserved in, is being driven piles and is poured realization and synchronously complete, after the completion of piling work, be poured into cement material while moving back In the space that pile body is formed, driven piles the space to be formed using cement material filling outer tube, natural pile body formed after solidification, it is not necessary to Pour again, you can realize the firmly lower stake operation of the pile body that cement inserts is formed.
Brief description of the drawings
Fig. 1 is pile body inner tube of the invention and pile body outer tube sleeve structure schematic diagram.
Fig. 2 is pile crown structural representation of the present invention.
Fig. 3 is pile body inner tube of the present invention and pile body outer tube and the attachment structure schematic diagram of pile crown.
Specific embodiment
As shown in Figure 1, 2, 3, a kind of double-deck lower stake equipment, including pile body outer tube 1, the internal sleeve of described pile body outer tube 1 Equipped with pile body inner tube 2, pile crown 3 is connected with the lower section of pile body outer tube 1, the top of pile crown 3 is provided with and is connected with pile body inner tube 2 Interior pipe connector 4, described pile crown 3 is hollow-core construction, and interior pipe connector 4 is connected with pile crown 3, logical in the lower section of pile crown 4 Cross iron chains 5 and be connected with plug 6.
Described pile body outer tube 1 is sleeved on the outside of pile body inner tube 2, and the top of pile body outer tube 1 is provided with the first terminal pad 7, the first connecting hole 8 is offered in the first terminal pad 7, the top of pile body inner tube 2 is provided with the second terminal pad 9, the second terminal pad 9 On offer the second connecting hole 10 being engaged with the first connecting hole 8, the top of the second terminal pad 9 be installed with support connect Adapter terminal pad 11, offers support connecting tube connecting hole 12 in support connecting tube terminal pad 11.Described interior pipe connector 4 leads to Cross connection screw thread 13 to be connected with pile body inner tube 2, the external diameter of interior pipe connector 4 is equal with pile body inner tube 2, described pile crown 3 External diameter is equal with the external diameter of pile body outer tube 1.Described plug 6 is spherical shape, and pile crown 3 is hollow cylinder tubulose structure, plug 6 Diameter not less than pile crown 4 internal diameter.
In lower stake operation, pile body outer tube and pile body inner tube are while operation downwards, after the completion of lower stake operation, is poured by outside Equipment is built when pile body outer tube and pile body inner tube play operation upwards, cement deposit material fills pile body to blanking operation in inner tube The cavity that outer tube is formed, realizes the operation that pours of cement pile body, and pile body is driven piles with to pour realization synchronous complete not being reserved in underground Into, after the completion of piling work, cement material is poured into the space of pile body formation while moving back, it is outer using cement material filling Pipe is driven piles the space to be formed, and natural pile body is formed after solidification, it is not necessary to pour again, you can realize what cement inserts was formed The firmly lower stake operation of pile body.Save metal material of body of a pile, while avoid pile body defect, the pile body of formation for bottom is big, The small round table-like structure in top, improves the stability after the completion of pile body, facilitates building and construction demand for superstructure.

Claims (1)

1. a kind of double-deck lower stake equipment, including pile body outer tube(1), it is characterised in that:Described pile body outer tube(1)Inside suit There is pile body inner tube(2), in pile body outer tube(1)Lower section be connected with pile crown(3), pile crown(3)Top be provided with and pile body inner tube (2)The interior pipe connector being connected(4), described pile crown(3)It is hollow-core construction, interior pipe connector(4)With pile crown(3)It is connected It is logical, in pile crown(3)Lower section pass through iron chains(5)It is connected with plug(6);
Described pile body outer tube(1)It is sleeved on pile body inner tube(2)Outside, pile body outer tube(1)Top be provided with the first connection Disk(7), the first terminal pad(7)On offer the first connecting hole(8), pile body inner tube(2)Top be provided with the second terminal pad (9), the second terminal pad(9)On offer and the first connecting hole(8)The second connecting hole being engaged(10), in the second terminal pad (9)Top be installed with support connecting tube terminal pad(11), support connecting tube terminal pad(11)On offer support connection Pipe connecting hole(12);
Described interior pipe connector(4)By connection screw thread(13)With pile body inner tube(2)It is connected, interior pipe connector(4)It is outer Footpath and pile body inner tube(2)Equal, described pile crown(3)External diameter and pile body outer tube(1)External diameter it is equal;
Described plug(6)It is spherical shape, pile crown(3)It is hollow cylinder tubulose structure, plug(6)Diameter be not less than pile crown (3)Internal diameter.
CN201510581144.5A 2015-09-14 2015-09-14 A kind of double-deck lower stake equipment Expired - Fee Related CN105256793B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510581144.5A CN105256793B (en) 2015-09-14 2015-09-14 A kind of double-deck lower stake equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510581144.5A CN105256793B (en) 2015-09-14 2015-09-14 A kind of double-deck lower stake equipment

Publications (2)

Publication Number Publication Date
CN105256793A CN105256793A (en) 2016-01-20
CN105256793B true CN105256793B (en) 2017-05-31

Family

ID=55096709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510581144.5A Expired - Fee Related CN105256793B (en) 2015-09-14 2015-09-14 A kind of double-deck lower stake equipment

Country Status (1)

Country Link
CN (1) CN105256793B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106567390A (en) * 2015-10-13 2017-04-19 尹瑜 Dual-layer piling device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87105352A (en) * 1987-08-07 1988-01-20 中国建筑科学研究院地基基础研究所 Special-shaped castinplace pile and pile-forming equipment thereof
CN1462827A (en) * 2003-06-21 2003-12-24 阎瑞明 Construction for making piles and tools
CN102605771A (en) * 2012-04-01 2012-07-25 贺德新 Construction method for drilling cast-in-place concrete pipe pile and drilling tool for concrete pipe pile
CN104563911A (en) * 2014-12-17 2015-04-29 贺德新 Drill rod for expanded-base threaded pile construction
CN205012326U (en) * 2015-09-14 2016-02-03 王警 A double -deck lower equipment

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040104049A1 (en) * 2002-12-02 2004-06-03 Robert Federighi Apparatus and method for forming a support column in soil

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87105352A (en) * 1987-08-07 1988-01-20 中国建筑科学研究院地基基础研究所 Special-shaped castinplace pile and pile-forming equipment thereof
CN1462827A (en) * 2003-06-21 2003-12-24 阎瑞明 Construction for making piles and tools
CN102605771A (en) * 2012-04-01 2012-07-25 贺德新 Construction method for drilling cast-in-place concrete pipe pile and drilling tool for concrete pipe pile
CN104563911A (en) * 2014-12-17 2015-04-29 贺德新 Drill rod for expanded-base threaded pile construction
CN205012326U (en) * 2015-09-14 2016-02-03 王警 A double -deck lower equipment

Also Published As

Publication number Publication date
CN105256793A (en) 2016-01-20

Similar Documents

Publication Publication Date Title
CN108330959B (en) The spiral spray that spray expansion extruding built pile and its construction method and this method use, which is expanded, squeezes drilling machine
CN203569582U (en) Connecting structure of concrete pipe pile and bearing platform
CN103628473A (en) Composite type combined piles and construction method thereof
CN210562157U (en) Post-grouting composite pile
CN103590414A (en) Structure for connecting concrete tubular pile with bearing platform
CN205135406U (en) Can dash rig of filling thick liquid
CN101942830B (en) Construction method of combined concrete soil pile with core pile
CN203200771U (en) Connection structure for pile extension top and bearing platform
CN105862899A (en) Deep-water double-sandwich-type steel pipe pile foundation and construction method thereof
CN105256793B (en) A kind of double-deck lower stake equipment
CN207846457U (en) The ductility connecting structure of assembled vertical member and basis
CN107476319A (en) Mountain area steep slope region Road Bridge Pile Foundation construction method
CN205012326U (en) A double -deck lower equipment
CN201296932Y (en) Segmentation prefabricating sunken outer wall and guide wall thereof
CN108277817B (en) Construction method of high-pile bearing platform tower crane foundation reinforcing structure
CN201746830U (en) Long screw bored concrete pile post-inserted cage tool
CN105178315A (en) Pouring type pile driver and pile driving method using pile driver
CN205012337U (en) Pour formula pile driver
CN207987921U (en) A kind of spiral spray expansion extruding drilling machine
CN106567386A (en) Pouring type pile driver and pile driving method therefor
CN202544766U (en) Threaded pile drill bit with joints
CN205012339U (en) Pile driver
CN106567390A (en) Dual-layer piling device
CN208650049U (en) A kind of cement mixing pile instant-plugging steel pipe and cement mixing pile
CN205012338U (en) Automatic double -deck lower equipment of shrink

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Chi

Inventor after: Wang Jing

Inventor after: Liu Qingkuan

Inventor after: Li Ping

Inventor after: Li Lei

Inventor before: Wang Jing

Inventor before: Li Ping

Inventor before: Li Lei

GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Lei

Inventor after: Zhang Fang

Inventor after: Li Jian

Inventor before: Zhang Chi

Inventor before: Wang Jing

Inventor before: Liu Qingkuan

Inventor before: Li Ping

Inventor before: Li Lei

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180111

Address after: Changle Wen Zhen Shi Bi Cun Xin CuO 350200 Fujian city of Fuzhou province No. 58

Co-patentee after: Zhang Fang

Patentee after: Li Lei

Co-patentee after: Li Jian

Address before: No. 106, Xinhua Zhong Road, ancient city street office of Dengzhou City, Nanyang, Henan

Co-patentee before: Li Ping

Patentee before: Wang Jing

Co-patentee before: Li Lei

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170531

Termination date: 20190914