CN203200771U - Connection structure for pile extension top and bearing platform - Google Patents

Connection structure for pile extension top and bearing platform Download PDF

Info

Publication number
CN203200771U
CN203200771U CN 201320051276 CN201320051276U CN203200771U CN 203200771 U CN203200771 U CN 203200771U CN 201320051276 CN201320051276 CN 201320051276 CN 201320051276 U CN201320051276 U CN 201320051276U CN 203200771 U CN203200771 U CN 203200771U
Authority
CN
China
Prior art keywords
pile extension
pile
concrete
steel pipe
bearing platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320051276
Other languages
Chinese (zh)
Inventor
王伟
齐瑜均
周小军
钱昀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongheng Design Group Co ltd
Original Assignee
Suzhou Industrial Park Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Industrial Park Design and Research Institute Co Ltd filed Critical Suzhou Industrial Park Design and Research Institute Co Ltd
Priority to CN 201320051276 priority Critical patent/CN203200771U/en
Application granted granted Critical
Publication of CN203200771U publication Critical patent/CN203200771U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a connection structure for a pile extension top and a bearing platform. The connection structure for the pile extension top and the bearing platform comprises a hollow pile extension, a basic bearing platform, end plates and anchor reinforcing bars; the basic bearing platform is connected on the pile extension top; the anchor reinforcing bars are arranged inside a pile body; the end plates are arranged at pier head positions of the anchor reinforcing bars; steel pipe sleeves are coated on the pile extension which is arranged above the end plates along the length direction; and the upper ends of the steel pipe sleeves extends outside the upper end surface of the pile extension to the basic bearing platform. The connection structure for the pile extension top and the bearing platform has the advantages of being good in force bearing, saving materials and being convenient to construct.

Description

Pile extension stake top and cushion cap syndeton
Technical field
The utility model relates to a kind of pile extension stake top and cushion cap syndeton.
Background technology
When pile foundation is built, make a fault when work progress, make a top mark height when the cap design of pile absolute altitude, pay the utmost attention to the design elevation that reduces cushion cap, be less than twice stake when footpath when both absolute altitudes differ, adopt the pile extension stake top of national building standard design atlas 10G409 to be connected full-page proof with cushion cap.The shortcoming of the method is, the pile extension diameter is bigger than pile tube, and concrete amount is bigger, and the pile extension concrete is than the high grade of cushion cap concrete, and constructional difficulties, construction quality are difficult to guarantee.
Summary of the invention
Bigger than pile tube in order to overcome the pile extension diameter that exists in the existing pile foundation construction, concrete amount is bigger, the pile extension concrete is than the high grade of cushion cap concrete, constructional difficulties, construction quality are difficult to shortcomings such as assurance, the utility model provide a kind of power transmission better, pile extension stake top and the cushion cap syndeton of economical with materials, easy construction.
The technical solution adopted in the utility model is:
Pile extension stake top and cushion cap syndeton, comprise hollow pile extension, foundation platform, end plate, anchor bar, the stake top of described pile extension is connected with described foundation platform, be provided with anchor bar in the described pile body, described end plate is located at the reinforcing bar pier nose place of anchor bar, it is characterized in that: the pile extension of the top of described end plate is enclosed with steel pipe socket along its length, and the upper surface of pile extension is stretched out until described foundation platform in the upper end of described steel pipe socket.
Further, described syndeton comprises that also cage of reinforcement and concrete fill out core, described cage of reinforcement is located in the cavity of described pile extension, described cage of reinforcement comprises vertical muscle, stirrup and the thin steel supporting plate of circle, the thin steel supporting plate of described circle is connected the bottom of vertical muscle, built described concrete in the cavity of the pile extension of the thin steel supporting plate of described circle top and filled out core, the end face of end plate is stretched out in the upper end of described vertical muscle.
Further, described anchor bar evenly distributes along the pile body circumference.
Length with next times pile extension diameter begins to encase pile extension to the utility model steel pipe socket from pile extension stake top, at the bottom of foundation platform or grade beam, compare with former concrete pile extension, steel pipe socket directly is enclosed within on the pile extension, reduces concrete and extends out 200mm, has saved concrete, and steel pipe socket can directly serve as template, saved template, stirrup is increased to spacing 300 from spacing 100 in the steel pipe socket, has saved amount of reinforcement.Stake arranges supporting plate and puts into cage of reinforcement in the top, and pouring stake top concrete is filled out core and pile extension concrete, and its strength grade should be than cushion cap or the high grade of grade beam concrete.Steel sleeve has than strong constraint effect and steel pipe socket the pipe inner concrete and has higher shear-carrying capacity, has strengthened node strength, makes the power transmission of pile extension connecting portion better.
The utility model anchor bar and vertical muscle evenly arrange along pile extension pile body circumference, and and supporting plate weld, pallet size should be slightly less than the pile extension internal diameter, anchor bar is selected for use by the arrangement of reinforcement table, anchorage length l aPress the current specifications value, when shockproof requirements is arranged, get l AEFor the gross area of uplift pile anchor bar A by formula s〉=Q Ct/ f nCalculate, and arrangement of reinforcement is not less than numerical value in the arrangement of reinforcement table, need checks vertical muscle and stirrup simultaneously.The height H that pile extension stake top inner concrete is filled out core is not less than 3D, and is not less than 1.5m when for pressure bearing pile, H 〉=Q by formula when for uplift pile Ct/(U mXf n) calculate, and be not less than 3m.But steel pipe socket batch production processing, the length scene is also regulated easily, and steel pipe socket can directly serve as template, so easy construction.
The beneficial effects of the utility model are embodied in:
1, stressed better: steel sleeve has stronger constraint to the pipe inner concrete, improves concrete resistance to compression supporting capacity; Steel pipe has higher shear-carrying capacity, replaces original stirrup, has strengthened the intensity of node;
2, economical with materials: steel pipe directly is enclosed within on the pile tube and reduces concrete and extend out 200mm, has saved concrete, has saved stirrup and template;
3, easy construction: but steel pipe batch production processing, and its length scene is also regulated easily, and steel pipe can directly serve as template, the poured in place concrete convenience.
Description of drawings
Fig. 1 is the utility model sectional view.
Fig. 2 is the utility model A-A generalized section.
The specific embodiment
See figures.1.and.2, pile extension stake top and cushion cap syndeton, comprise hollow pile extension 1, foundation platform 2, end plate 3, anchor bar 7, the stake top of described pile extension 1 is connected with described foundation platform 2, be provided with anchor bar 7 in the described pile body, described end plate 3 is located at the reinforcing bar pier nose place of anchor bar 7, and the pile extension 1 of the top of described end plate 3 is enclosed with steel pipe socket 4 along its length, and the upper surface of pile extension 1 is stretched out until described foundation platform 2 in the upper end of described steel pipe socket 4.
Further, described syndeton comprises that also cage of reinforcement and concrete fill out core 6, described cage of reinforcement is located in the cavity of described pile extension 1, described cage of reinforcement comprises vertical muscle 8, stirrup 9 and the thin steel supporting plate 5 of circle, the thin steel supporting plate 5 of described circle is connected the bottom of vertical muscle 8, built described concrete in the cavity of the pile extension 1 of the thin steel supporting plate of described circle 5 tops and filled out core 6, the end face of end plate 3 is stretched out in the upper end of described vertical muscle 8.
Further, described anchor bar 7 evenly distributes along the pile body circumference.
Length with next times pile extension diameter begins to encase pile extension to the utility model steel pipe socket 4 from 1 top of pile extension, at the bottom of foundation platform or grade beam, compare with former concrete pile extension, steel pipe socket 4 directly is enclosed within on the pile extension 1, reduces concrete and extends out 200mm, has saved concrete, and steel pipe socket can directly serve as template, saved template, stirrup is increased to spacing 300 from spacing 100 in the steel pipe socket, has saved amount of reinforcement.Stake arranges supporting plate 5 and puts into cage of reinforcement in the top, and pouring stake top concrete is filled out core 6 and pile extension concrete, and its strength grade should be than cushion cap or the high grade of grade beam concrete.4 pairs of pipes of steel sleeve inner concrete has than strong constraint effect and steel pipe socket and has higher shear-carrying capacity, has strengthened node strength, makes the power transmission of pile extension connecting portion better.
The utility model anchor bar 7 and vertical muscle 8 evenly arrange along pile extension pile body circumference, and and supporting plate 5 weld, pallet size should be slightly less than the pile extension internal diameter, anchor bar 7 is selected for use by the arrangement of reinforcement table, anchorage length l aPress the current specifications value, when shockproof requirements is arranged, get l AEFor the gross area of uplift pile anchor bar A by formula s〉=Q Ct/ f nCalculate, and arrangement of reinforcement is not less than numerical value in the arrangement of reinforcement table, need checks vertical muscle and stirrup simultaneously.The height H that 1 top inner concrete of pile extension is filled out core is not less than 3D, and is not less than 1.5m when for pressure bearing pile, H 〉=Q by formula when for uplift pile Ct/(U mXf n) calculate, and be not less than 3m.But steel pipe socket 4 batch production processing, the length scene is also regulated easily, and steel pipe socket can directly serve as template, so easy construction.
The described content of this manual embodiment only is enumerating the way of realization of inventive concept; protection domain of the present utility model should not be regarded as only limiting to the concrete form that embodiment states, protection domain of the present utility model also reach in those skilled in the art according to the utility model design the equivalent technologies means that can expect.

Claims (3)

1. pile extension stake top and cushion cap syndeton, comprise hollow pile extension, foundation platform, end plate, anchor bar, the stake top of described pile extension is connected with described foundation platform, be provided with anchor bar in the described pile body, described end plate is located at the reinforcing bar pier nose place of anchor bar, it is characterized in that: the pile extension of the top of described end plate is enclosed with steel pipe socket along its length, and the upper surface of pile extension is stretched out until described foundation platform in the upper end of described steel pipe socket.
2. pile extension stake top as claimed in claim 1 and cushion cap syndeton, it is characterized in that: described syndeton comprises that also cage of reinforcement and concrete fill out core, described cage of reinforcement is located in the cavity of described pile extension, described cage of reinforcement comprises vertical muscle, stirrup and the thin steel supporting plate of circle, the thin steel supporting plate of described circle is connected the bottom of vertical muscle, built described concrete in the cavity of the pile extension of the thin steel supporting plate of described circle top and filled out core, the end face of end plate is stretched out in the upper end of described vertical muscle.
3. pile extension stake top as claimed in claim 2 and cushion cap syndeton, it is characterized in that: described anchor bar evenly distributes along the pile body circumference.
CN 201320051276 2013-01-30 2013-01-30 Connection structure for pile extension top and bearing platform Expired - Lifetime CN203200771U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320051276 CN203200771U (en) 2013-01-30 2013-01-30 Connection structure for pile extension top and bearing platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320051276 CN203200771U (en) 2013-01-30 2013-01-30 Connection structure for pile extension top and bearing platform

Publications (1)

Publication Number Publication Date
CN203200771U true CN203200771U (en) 2013-09-18

Family

ID=49144895

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320051276 Expired - Lifetime CN203200771U (en) 2013-01-30 2013-01-30 Connection structure for pile extension top and bearing platform

Country Status (1)

Country Link
CN (1) CN203200771U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104110039A (en) * 2014-06-25 2014-10-22 中国电建集团华东勘测设计研究院有限公司 Fan base with pressure dispersed type arrangement high-strength pre-stressed anchor rods (cables)
CN108661045A (en) * 2018-07-20 2018-10-16 东北大学 A kind of prefabricated GFRP pipe concretes spliced pile
CN109235427A (en) * 2018-11-20 2019-01-18 中建二局第建筑工程有限公司 A kind of pile extension body, pile splicing structure and pile extension method
CN109706955A (en) * 2018-12-28 2019-05-03 江苏兴厦建设工程集团有限公司 One kind being suitable for III class stake of cast-in-situ bored pile and cushion cap connection type
CN110258608A (en) * 2019-06-12 2019-09-20 南通大学 A kind of new device that prestressed pile is connect with cushion cap or bottom plate

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104110039A (en) * 2014-06-25 2014-10-22 中国电建集团华东勘测设计研究院有限公司 Fan base with pressure dispersed type arrangement high-strength pre-stressed anchor rods (cables)
CN104110039B (en) * 2014-06-25 2016-08-31 中国电建集团华东勘测设计研究院有限公司 There is pressure dispersing type and arrange the blower foundation of high-strength prestressed anchor pole (rope)
CN108661045A (en) * 2018-07-20 2018-10-16 东北大学 A kind of prefabricated GFRP pipe concretes spliced pile
CN108661045B (en) * 2018-07-20 2023-11-24 东北大学 Precast GFRP pipe concrete spliced pile
CN109235427A (en) * 2018-11-20 2019-01-18 中建二局第建筑工程有限公司 A kind of pile extension body, pile splicing structure and pile extension method
CN109706955A (en) * 2018-12-28 2019-05-03 江苏兴厦建设工程集团有限公司 One kind being suitable for III class stake of cast-in-situ bored pile and cushion cap connection type
CN110258608A (en) * 2019-06-12 2019-09-20 南通大学 A kind of new device that prestressed pile is connect with cushion cap or bottom plate

Similar Documents

Publication Publication Date Title
CN203200771U (en) Connection structure for pile extension top and bearing platform
CN204456162U (en) A kind of pulling-resistant type prefabricated tubular pile be connected with cushion cap
CN202831402U (en) Concrete filled steel tubular column with inner-connected circular pipe and outer-sleeved concrete filled steel tube
CN201762717U (en) Structure for connecting prestressed pipe pile and cushion cap
CN103225304A (en) Marine foundation supporting structure and construction method thereof
CN204139191U (en) A kind of pile-raft foundation structure
CN203238621U (en) Grouting pile provided with double layers of tensile bars
CN202595758U (en) Batter post foundation structure for overhead transmission line
CN208235562U (en) A kind of static pressure pile structure for Collapsible Loess Stabilized
CN103758207A (en) Semi-prefabricated semi-cast-in-place type frame structure of integrated building and construction method thereof
CN203514337U (en) Large-scale steel-pipe-inserting-type foundation
CN202755362U (en) Prestressed concrete pile
CN205712736U (en) A kind of half Prefabricated concrete-filled steel tube post of built-in high-strength shaped steel
CN206408758U (en) A kind of concrete-filled circular steel tube column connecting node construction
CN203213111U (en) Cap of prefabricated static-pressure square pile
CN204098024U (en) A kind of secondary grouting concrete pipe pile construction device
CN205205847U (en) Frame construction of stake cushion cap
CN103362123A (en) Reverse Y-shaped filling pile and construction method thereof
CN206034423U (en) Concrete pile
CN202299138U (en) Grout anchor rebar connecting piece
CN103726505B (en) Offshore wind plant wind turbine foundation
CN206034421U (en) Concrete pile
CN205012326U (en) A double -deck lower equipment
CN105256793B (en) A kind of double-deck lower stake equipment
CN205918208U (en) Tubular communication tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: Suzhou City, Jiangsu province 215028 Industrial Park Suzhou Bada Street No. 111

Patentee after: Zhongheng Design Group Co.,Ltd.

Address before: Suzhou Industrial Park Suzhou City, Jiangsu province 215126 Sheng Pu Zhen Jin Sheng Lu No. 12

Patentee before: SUZHOU INDUSTRIAL PARK DESIGN & RESEARCH INSTITUTE Co.,Ltd.

CX01 Expiry of patent term

Granted publication date: 20130918

CX01 Expiry of patent term