CN103867219B - A kind of Apparatus and method for expanding the pea gravel concreten anchoring support soil body for whirlpool extrusion - Google Patents

A kind of Apparatus and method for expanding the pea gravel concreten anchoring support soil body for whirlpool extrusion Download PDF

Info

Publication number
CN103867219B
CN103867219B CN201410113643.7A CN201410113643A CN103867219B CN 103867219 B CN103867219 B CN 103867219B CN 201410113643 A CN201410113643 A CN 201410113643A CN 103867219 B CN103867219 B CN 103867219B
Authority
CN
China
Prior art keywords
whirlpool
anchor tube
steel anchor
steel
pea gravel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410113643.7A
Other languages
Chinese (zh)
Other versions
CN103867219A (en
Inventor
薛世峰
李春宝
刘晓辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum East China
Original Assignee
China University of Petroleum East China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum East China filed Critical China University of Petroleum East China
Priority to CN201410113643.7A priority Critical patent/CN103867219B/en
Publication of CN103867219A publication Critical patent/CN103867219A/en
Application granted granted Critical
Publication of CN103867219B publication Critical patent/CN103867219B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention belongs to geotechnical engineering field, particularly, relate to a kind of Apparatus and method for expanding the pea gravel concreten anchoring support soil body for whirlpool extrusion.The equipment of the anchoring support soil body is expanded in whirlpool extrusion, comprising: steel anchor tube, swing pinion, whirlpool pressure blade; Swing pinion is arranged on the top of steel anchor tube, and whirlpool pressure blades installation is in the inner side of steel anchor tube opening part.The present invention has following beneficial effect: construction is simple, and the duration is short, cheap; Steel anchor tube with pressure chamber, whirlpool can ensure that pea gravel concreten is to squeezed perpendicular to steel anchor tube direction, has taken into account compacted, cementing, drainage, can significantly improve soil body vertical transverse strength effectively, strengthens anchored force; It is squeezed that the method implements the multilayer soil body by the quantity of setting up pressure chamber, whirlpool, forms multiple wide diameter portion; Be applicable to various viscosity, sand soil.

Description

A kind of Apparatus and method for expanding the pea gravel concreten anchoring support soil body for whirlpool extrusion
Technical field
The invention belongs to geotechnical engineering field, particularly, relate to a kind of Apparatus and method for expanding the pea gravel concreten anchoring support soil body for whirlpool extrusion.
Background technology
Current anchoring support is a kind of its support reinforcement mode adopted in the earth's surface engineerings such as side slope, ground deep foundation ditch and the construction of the underground chamber such as tunnel, stope.Existing anchoring type has: pipe-seam type anchor rod, from boring precession anchor pole, the anchor metal of falling wedge-type, spin resin anchor, spin whitewashing anchor pole, spin grouted anchor bar.But all kinds of anchor pole has the drawback of oneself, such as spin anchor pole, and self tapping precession rockbolt installation wherein requires that boring accurately, and parameters coordinates appropriate, is difficult to reach requirement in construction; And self tapping extruding selects into anchor pole that it is large to rig torque demand, compliance is limited, and under individual cases, unit anchored force is little, and the anchoring of self drilling anchor is entirely with later stage anchor bolt grouting, and slip casting is poor for the slip casting anchorage reliability that is difficult to reach capacity of hole upwards.
Summary of the invention
For overcoming the above-mentioned defect existed in prior art, the object of the present invention is to provide a kind of Apparatus and method for expanding the pea gravel concreten anchoring support soil body for whirlpool extrusion; Can ensure effectively realize anchoring supports such as side slope, ground deep foundation ditch earth's surface engineering and the underground chambers such as tunnel, stope, have cheap, the cycle is short, work efficiency is high, the advantage such as the large and noise-less pollution of anchoring bearing capacity.
For achieving the above object, the technical solution adopted in the present invention is as follows:
Expand an Apparatus and method for for the pea gravel concreten anchoring support soil body for whirlpool extrusion, comprising: steel anchor tube, rotation accessory, whirlpool pressure blade; Rotate the top that accessory is arranged on steel anchor tube, whirlpool pressure blades installation is in the inner side of steel anchor tube opening part.
Relative to prior art, the present invention has following beneficial effect:
1, construction is simple, and the duration is short, cheap;
2, the steel anchor tube with pressure chamber, whirlpool can ensure that pea gravel concreten is to squeezed perpendicular to steel anchor tube direction, has taken into account compacted, cementing, drainage, can significantly improve soil body vertical transverse strength effectively, strengthens anchored force;
3, the method by set up pressure chamber, whirlpool quantity simultaneously squeezed multi-layered Soils body form multiple wide diameter portion, be applicable to various viscosity, sand soil.
Accompanying drawing explanation
Fig. 1 is the device structure schematic diagram expanding the pea gravel concreten anchoring support soil body for whirlpool extrusion;
Fig. 2 is A-A generalized section in Fig. 1;
Fig. 3 is B-B generalized section in Fig. 1;
Fig. 4 is whirlpool pressure blade construction schematic diagram;
Fig. 5 a is the top view of swing pinion;
Fig. 5 b is the lateral view of swing pinion;
Fig. 6 a is the steel anchor tube schematic diagram in place that whirlpool extrusion expands in pea gravel concreten anchoring construction process;
Fig. 6 b is that the whirlpool extrusion hammer pipe expanded in pea gravel concreten anchoring construction process buries schematic diagram;
Fig. 6 c pours into pea gravel concreten schematic diagram in whirlpool extrusion expansion pea gravel concreten anchoring construction process;
Fig. 6 d is the turn-knob sleeve pipe schematic diagram that whirlpool extrusion expands in pea gravel concreten anchoring construction process;
Fig. 6 e is that whirlpool extrusion is expanded and built anchor head schematic diagram in pea gravel concreten anchoring construction process.
Detailed description of the invention
As shown in Figure 1 and Figure 2, the equipment of the pea gravel concreten anchoring support soil body is expanded in whirlpool extrusion, comprising: steel anchor tube 2, swing pinion 4, whirlpool pressure blade 5; Swing pinion 4 is arranged on the top of steel anchor tube 2, and whirlpool pressure blade 5 is arranged on the inner side of steel anchor tube opening part; Wherein:
Steel anchor tube 2 is metal circular tube, bottom is cone 1, about 1 meter of bottom steel anchor tube 2, axial symmetry along steel anchor tube offers pressure chamber, a pair whirlpool outlet 6, as the outlet that pea gravel concreten outwards extrudes, the width (length along steel anchor tube circumferencial direction) of each opening is steel anchor tube 1/4 girth, and open height and whirlpool press the height of blade 5 identical; Whirlpool pressure blade 5 is welded by two identical semicircular ring steel plate antisymmetry, S-shaped, and the air line distance between pressure blade 5 two ends, whirlpool is identical with the diameter of steel anchor tube 2; The vertical side that the two ends of S shape whirlpool pressure blade 5 export 6 with pressure chamber, whirlpool is respectively welded and fixed, weld seam 7 is polished smooth, the steel type that whirlpool pressure blade 5 adopts, the steel type of steel plate thickness and steel anchor tube 2, steel plate thickness are identical, ensure to be connected to form smooth curved surface between whirlpool pressure blade 5 and steel anchor tube 2, be beneficial to the outside lateral extrusion of pea gravel concreten.For the steel anchor tube 2 between whirlpool pressure blade 5, the pressure upper and lower two ends of blade, whirlpool, pressure chamber, whirlpool export 6 threes and form pressure chamber, whirlpool 3.According to the demand of anchor Design bearing capacity, the quantity that pressure chamber, whirlpool is set along anchor tube axis direction can be determined.
The top of steel anchor tube 2 arranges swing pinion 4, for the light face of cylinder, outside are provided with engaging tooth inside swing pinion 4; The internal diameter of swing pinion 4 is identical with the external diameter of steel anchor tube 2, and the end face of swing pinion 4 flushes with the end face of steel anchor tube 2, and swing pinion 4 hoop is welded in the top of steel anchor tube 2, and swing pinion 4 is as the load transfer device of hammering anchor tube and turn-knob anchor tube.
The construction method of the pea gravel concreten anchoring support soil body is expanded in whirlpool extrusion, and utilize above-mentioned whirlpool to extrude and expand the equipment of the pea gravel concreten anchoring support soil body, concrete steps are as follows:
The first step: steel anchor tube is in place: steel anchor tube 2 lower end aligned will be hammered into shape the position that pipe buries;
Second step: hammer pipe buries: steel anchor tube 2 is squeezed into soil layer to precalculated position;
3rd step: perfusion pea gravel concreten: pea gravel concreten is filled in steel anchor tube from steel anchor tube 2 top;
4th step: turn-knob anchor tube: turn-knob power-equipment is connected on the swing pinion 4 at steel anchor tube top, steel anchor tube is driven together to rotate by rotating swing pinion, under the extruding driving effect of whirlpool pressure blade 5, in anchor tube, pea gravel concreten is diffused in surrounding soil through whirlpool pressure accent 6 by whirlpool extrusion, play the effect forming wide diameter portion, when wide diameter portion reaches design size, stop knob;
5th step: build anchor head: complete expanding after, continue to water pea gravel concreten on steel anchor tube top, form concrete anchor head, the whirlpool extrusion at this place is expanded the pea gravel concreten anchoring support soil body and is completed.

Claims (2)

1. expand an equipment for the pea gravel concreten anchoring support soil body for whirlpool extrusion, comprising: steel anchor tube, rotation accessory, whirlpool pressure blade; It is characterized in that: rotate the top that accessory is arranged on steel anchor tube;
Steel anchor tube about 1 meter near bottom, the outlet of pressure chamber, a pair whirlpool is offered along the axial symmetry of steel anchor tube, whirlpool pressure blades installation is in the inner side in Ya Qiang exit, steel anchor tube whirlpool, and the width of pressure chamber, each whirlpool outlet is steel anchor tube 1/4 girth, and pressure chamber, whirlpool outlet height presses the height of blade identical with whirlpool;
Whirlpool pressure blade is S-shaped, and the vertical side that the two ends of S shape whirlpool pressure blade export with pressure chamber, whirlpool is respectively welded and fixed, and the air line distance between pressure blade two ends, whirlpool is identical with the diameter of steel anchor tube;
Whirlpool pressure blade is welded by two identical semicircular ring steel plate antisymmetry;
The steel type that whirlpool pressure blade adopts, the steel type of steel plate thickness and steel anchor tube, steel plate thickness are identical;
The rotation accessory that the top of steel anchor tube is arranged is swing pinion, for the light face of cylinder, outside are provided with engaging tooth inside swing pinion; The internal diameter of swing pinion is identical with the external diameter of steel anchor tube, and the end face of swing pinion flushes with the end face of steel anchor tube, and rotary teeth rim is welded in the top of steel anchor tube;
According to requirement for bearing capacity, pressure chamber, multiple whirlpool can be set along anchor tube axis direction.
2. a construction method for the pea gravel concreten anchoring support soil body is expanded in whirlpool extrusion, and utilize the equipment expanding the pea gravel concreten anchoring support soil body for whirlpool extrusion described in claim 1, it is characterized in that, concrete steps are as follows:
The first step: steel anchor tube is in place: steel anchor tube lower end aligned will be hammered into shape the position that pipe buries;
Second step: hammer pipe buries: steel anchor tube is squeezed into soil layer to precalculated position;
3rd step: perfusion pea gravel concreten: pea gravel concreten is filled in steel anchor tube from steel anchor tube top;
4th step: turn-knob anchor tube: turn-knob power-equipment is connected on the swing pinion at steel anchor tube top, steel anchor tube is driven together to rotate by rotating swing pinion, under the extruding driving effect of whirlpool pressure blade, in anchor tube, pea gravel concreten is diffused in surrounding soil through whirlpool pressure accent by whirlpool extrusion, play the effect forming wide diameter portion, when wide diameter portion reaches design size, stop knob;
5th step: build anchor head: complete expanding after, continue to water pea gravel concreten on steel anchor tube top, form concrete anchor head, the whirlpool extrusion at this place is expanded the pea gravel concreten anchoring support soil body and is completed.
CN201410113643.7A 2014-03-25 2014-03-25 A kind of Apparatus and method for expanding the pea gravel concreten anchoring support soil body for whirlpool extrusion Expired - Fee Related CN103867219B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410113643.7A CN103867219B (en) 2014-03-25 2014-03-25 A kind of Apparatus and method for expanding the pea gravel concreten anchoring support soil body for whirlpool extrusion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410113643.7A CN103867219B (en) 2014-03-25 2014-03-25 A kind of Apparatus and method for expanding the pea gravel concreten anchoring support soil body for whirlpool extrusion

Publications (2)

Publication Number Publication Date
CN103867219A CN103867219A (en) 2014-06-18
CN103867219B true CN103867219B (en) 2015-08-05

Family

ID=50906180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410113643.7A Expired - Fee Related CN103867219B (en) 2014-03-25 2014-03-25 A kind of Apparatus and method for expanding the pea gravel concreten anchoring support soil body for whirlpool extrusion

Country Status (1)

Country Link
CN (1) CN103867219B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457616B (en) * 2018-04-18 2024-03-08 晋能控股煤业集团有限公司 Grouting device for preventing and controlling coal mine water damage
CN113047275A (en) * 2021-03-29 2021-06-29 江苏富路建设有限公司 Construction method of enlarged footing concrete anchor rod

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29611966U1 (en) * 1996-07-10 1997-11-13 Friedr. Ischebeck Gmbh, 58256 Ennepetal Core bit
JP3876645B2 (en) * 2001-05-15 2007-02-07 株式会社大林組 Structure for increasing bearing capacity of ground buried support and method for constructing the same
CN201053298Y (en) * 2007-01-26 2008-04-30 永城煤电集团有限责任公司 Dust-proof water-injection type screwy reclaiming anchor bar drill pipe
DE102008006235A1 (en) * 2008-01-25 2009-07-30 Friedr. Ischebeck Gmbh Anchor pipe and method for its production
CN201614595U (en) * 2010-04-02 2010-10-27 郭财宝 Rotation-type anchor tubular pile
CN203081475U (en) * 2013-02-21 2013-07-24 浙江普泰克金属制品有限公司 Multiple anti-corrosion type self-boring hollow grouting anchor rod

Also Published As

Publication number Publication date
CN103867219A (en) 2014-06-18

Similar Documents

Publication Publication Date Title
CN209854705U (en) Cement soil inserted PHC tubular pile bag grouting expanding pile
CN203756203U (en) Self-drilling type full-thread bolt grouting anchor rod
CN103485349B (en) Lime nail composite frame prestressed anchor tube structure and construction method for reinforcing weak slope
CN103835284A (en) Karst area drilling cast-in-place pile structure and construction method
CN204959746U (en) Expand integral type stock soon
CN105220714B (en) Built-in anchor cable fills core compound prestress pile tube float Structure construction method
CN203741820U (en) Cast-in-situ bored pile structure for karst area
CN106351585A (en) Hole collapse and shrinkage prevention bidirectional spiral extrusion and expansion drilling tool and construction technology thereof
CN105649073A (en) Static root drilling type construction method for planting piles
CN102535458A (en) Reinforced cement-soil anchor bolt and construction method thereof
CN1206419C (en) Combined rock-embedding pile and its construction method
CN103867219B (en) A kind of Apparatus and method for expanding the pea gravel concreten anchoring support soil body for whirlpool extrusion
CN106759295A (en) The quiet combined pile and its construction method for boring extruding-enlarging branch tray and pile tube
CN103343537A (en) Drilling machine of high-pressure rotary-spraying anchor rod and construction method of high-pressure rotary-spraying anchor rod
CN210315529U (en) Self-drilling high-pressure rotary-jetting bag grouting expanding anti-floating anchor rod
CN106120714A (en) A kind of device improving hollow pile bearing capacity and using method thereof
CN103711130B (en) Portal frame type bamboo joint mortar pile enclosure structure and construction method thereof
CN203639905U (en) Spinning pile, spinning pile waist and spinning pile head
WO2022134224A1 (en) Construction method for pre-stressed pull-resistant anchor rod of concrete expansion head
CN206512704U (en) One kind is repeatable to use new screw filling pile construction equipment
CN201857608U (en) Synthetic pile
RU85495U1 (en) INJECTOR DESIGN FOR INJECTION PILES
RU72986U1 (en) PILE
CN204199279U (en) Prefabricated reinforced concrete anchor pole
CN205975582U (en) Improve device of hollow pile bearing capacity

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Xue Shifeng

Inventor after: Li Chunbao

Inventor after: Liu Xiaohui

Inventor before: Li Chunbao

Inventor before: Xue Shifeng

Inventor before: Liu Xiaohui

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LI CHUNBAO XUE SHIFENG LIU XIAOHUI TO: XUE SHIFENG LI CHUNBAO LIU XIAOHUI

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150805

Termination date: 20170325

CF01 Termination of patent right due to non-payment of annual fee