CN107792085A - A kind of van-hanging pulley rail becomes rail mechanism and cableway net system - Google Patents
A kind of van-hanging pulley rail becomes rail mechanism and cableway net system Download PDFInfo
- Publication number
- CN107792085A CN107792085A CN201710984051.6A CN201710984051A CN107792085A CN 107792085 A CN107792085 A CN 107792085A CN 201710984051 A CN201710984051 A CN 201710984051A CN 107792085 A CN107792085 A CN 107792085A
- Authority
- CN
- China
- Prior art keywords
- rail
- van
- hanging
- guide rail
- change
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000003032 molecular docking Methods 0.000 claims description 29
- 238000012806 monitoring device Methods 0.000 claims description 13
- 230000007547 defect Effects 0.000 abstract description 3
- 230000000694 effects Effects 0.000 description 2
- 238000001514 detection method Methods 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61B—RAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
- B61B7/00—Rope railway systems with suspended flexible tracks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61B—RAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
- B61B12/00—Component parts, details or accessories not provided for in groups B61B7/00 - B61B11/00
Landscapes
- Engineering & Computer Science (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
A kind of van-hanging pulley rail provided by the invention becomes rail mechanism, including:Track, by located at both sides, the guide rail for connecting different estimated destinations is formed;Wherein side at least one, opposite side at least two;Support, it is arranged on the end of the guide rail;Become rail part, be at least connected with guide rail described in side, and be movably arranged at perpendicular to the bearing of trend of the guide rail on the support;Hanging parts, it is fixedly installed on the change rail part, and the clamping part of the rail end is clamped with the lower section for extending to the change rail part, the space passed through suitable for the support member of coaster is left between the clamping part and the change rail part.Change track when, become rail part slide in orbit, drive hanging parts slide into it is expected that the guide rail of destination is connected, the defects of overcoming and only docked in the prior art when becoming rail with a set cableway, and can not be selected between different cableways.
Description
Technical field
The present invention relates to cableway technical field of transportation, and in particular to a kind of van-hanging pulley rail becomes rail mechanism and cableway net
System.
Background technology
Cableway transport is a kind of mode of transportation, generally on rugged hillside, between cableway is set up in into 2 points, by cable car
It is suspended on below cableway, recycles driving machine to drive hawser drag lift, makes it along the ropeway operation being suspended in the air, from
And go down the hill on transporting passengers or goods.Traditional cableway fixed mount is located between 2 points, therefore can only be run in single track, it is impossible to
Track is changed in midway, therefore transportation range be present and is limited by hawser, the shortcomings that means of transportation underaction.
Therefore, Chinese patent literature CN204998524U discloses a kind of change convenient overhead transportation device of rail, including sky
The wirerope no less than one section of middle erection, hung by the company's of extension device be connected in loading storehouse on wirerope, with loading storehouse drive connection
Motor;The company's of extension device includes the hanger for the square shape that two time intervals are set;The top of each hanger on entablature by setting
Wheel group be connected with wirerope;The bottom of each hanger is connected by the rotation hanging scroll on sill with loading storehouse;Wheel group is included in first
Wheel, first lower whorl, second lower whorl on wheel, second;Take turns coaxially to set up separately on two and be also provided with pendulum in the both sides of entablature, the center of entablature
Dynamic peg;Two lower whorls coaxially set up separately in the both sides for the lower end for swinging peg;Above-mentioned each wheel is equipped with wheel face groove, wirerope corresponding position
It is folded in the corresponding wheel face groove of each corresponding upper and lower wheel;The output shaft of motor passes through gearbox and one of them above-mentioned
The wheel shaft drive connection of upper wheel.
This prior art still suffers from only docks with a set cableway, and what can not be selected between different cableways lacks
Fall into.
Become rail technical scheme generally to use in the track traffic facility such as train, subway.In the technology of this kind of hard track
In field, it is quite ripe that it becomes rail structure accordingly.But in this kind of soft track field of cableway, on the one hand, it is required that becoming
The work of rail mechanism can not influence the tensile force of cableway, to ensure that cableway supports and the function of leading block in itself.On the other hand,
The direct docking of cableway is there is the unstable situation of docking structure, after cableway docking, it may occur however that dislocation or other accidents
Situation, it can not such as find in time, it will the cable car in traveling is caused danger.
In addition, in the technical field of common class hard track, the car body of carrying is above the strong point.It runs
There is no any relative interference to influence with the change rail mechanism of track.And the car body of this kind of soft track field carrying of cableway is then in branch
The lower section of support point and cableway.It runs and become the influence for then existing between rail mechanism and interfering.Therefore, in the prior art also not
See the change rail mechanism having applied to this kind of soft track field of cableway.
The content of the invention
Therefore, the technical problem to be solved in the present invention be to overcome in the prior art when becoming rail only with a both standing wire
Road docks, and the defects of can not be selected between different cableways, it can make in a cableway and two cableways so as to provide one kind
Any bar docking change rail mechanism.
The design of the present invention is as follows:
A kind of van-hanging pulley rail becomes rail mechanism, including:
Track, by located at both sides, the guide rail for connecting different estimated destinations is formed;Wherein side at least one, opposite side
At least two;
Support, it is arranged on the end of the guide rail;
Become rail part, be at least connected with guide rail described in side, and movably set perpendicular to the bearing of trend of the guide rail
On the bracket;
Hanging parts, it is fixedly installed on the change rail part, and with the lower section clamping for extending to the change rail part
The clamping part of the rail end, leave what is passed through suitable for the support member of coaster between the clamping part and the change rail part
Space.
Preferably, the change rail part is connected with guide rail described in side;Guide rail described in opposite side is fixedly connected on the branch
In the hanging parts on frame, the hanging parts have the folder that the lower section for extending to the support clamps the rail end
Portion is held, the space passed through suitable for the support member of coaster is left between the clamping part and the support.
Preferably, also have and become rail power set, between the support and the change rail part, to drive the change
Rail part moves back and forth.
Preferably, the guide rail is cable.
Preferably, the hanging parts have the main body being vertically arranged, and be connected and cross out with the main body
Attachment structure;The clamping part is arranged on the external part of the attachment structure.
Preferably, the attachment structure is stretched out from the main body lower end to both sides, and is all provided with the external part of both sides
State clamping part;The guide rail is made up of two cables be arrangeding in parallel.
Preferably, the clamping part has the sleeve being fixedly installed on the external part of the attachment structure, the sleeve
Centre bore form the cable holding holes that pass through of clamping.
Preferably, the sleeve is rigidity.
Preferably, the both ends of the sleeve form the changeover portion being engaged with the cable diameter.
Preferably, the change rail power set is hydraulic cylinder or cylinders.
Preferably, in addition in place monitoring device, for detecting whether the guide rail on the change rail part is driven
To docking location, if not driving docking location, send a signal to the driving structure and continue to drive respective distance, if driving is arrived
Docking location, send a signal to the driving structure and stop driving.
Preferably, in addition to docking monitoring device, treated pair with described for detecting the hanging parts on the slip cableway
Whether the hanging parts on integrating with completely dock, if not complete docking, sends to cable car and stop drive signal, if complete right
Connect, sent to cable car and pass through signal.
A kind of van-hanging pulley rail net, there is described cableway to become rail mechanism.
Technical solution of the present invention, have the following advantages that:
1st, a kind of van-hanging pulley rail provided by the invention becomes rail mechanism, including:Track, by located at both sides, connection is not
Guide rail with estimated destination is formed;Wherein side at least one, opposite side at least two;Support, it is arranged on the guide rail
End;Become rail part, be at least connected with guide rail described in side, and institute is movably arranged at perpendicular to the bearing of trend of the guide rail
State on support;Hanging parts, it is fixedly installed on the change rail part, and with the lower section clamping for extending to the change rail part
The clamping part of the rail end, leave what is passed through suitable for the support member of coaster between the clamping part and the change rail part
Space.Change track when, become rail part slide in orbit, drive hanging parts slide into it is expected that the guide rail of destination is connected
Connect, overcome and only docked in the prior art when becoming rail with a set cableway, and what can not be selected between different cableways lacks
Fall into, there is provided a kind of change rail mechanism that a cableway can be made to be docked with any bar in two cableways.
2nd, a kind of van-hanging pulley rail provided by the invention becomes rail mechanism, and the change rail part connects with guide rail described in side
Connect;Guide rail described in opposite side is fixedly connected in the hanging parts on the bracket, and the hanging parts, which have, to be extended to
The lower section of the support clamps the clamping part of the rail end, is left between the clamping part and the support suitable for coaster
The space that support member passes through, so as to play support and guide effect simultaneously to coaster.
3rd, a kind of van-hanging pulley rail provided by the invention becomes rail mechanism, and the hanging parts, which have, is vertically arranged connection
Structure;The external part of the attachment structure is provided with the holding holes for being adapted to the cable to pass through and clamp.Cable passes through holding holes
It is connected with hanging parts, drives cable together to move when hanging parts move, due to hawser and the holding holes phase in hanging parts
Even, when hanging parts with it is expected that when guide rail is aligned, so hawser can with by the positioning of holding holes with it is expected that guide rail connects.
4th, a kind of van-hanging pulley rail provided by the invention becomes rail mechanism, the attachment structure from the main body lower end to
Both sides are stretched out, and the holding holes that the suitable cable is passed through and clamped are equipped with the external part of both sides;The guide rail is by two
The cable be arrangeding in parallel is formed.Using two cables as guide rail cable car can be made more steady, reduce cable car in the air
Wave, even if a cable is because of unexpected disconnect in addition, another cable still can prevent cable car from falling.
5th, a kind of van-hanging pulley rail provided by the invention becomes rail mechanism, in addition to monitoring device in place, for detecting
Whether the guide rail become on rail part is driven to docking location, if not driving docking location, sends a signal to institute
State driving structure to continue to drive respective distance, if docking location is arrived in driving, send a signal to the driving structure and stop driving, by
This can with automatic decision become rail mechanism whether run to it is expected that the correct position that guide rail docks.
6th, a kind of van-hanging pulley rail provided by the invention becomes rail mechanism, in addition to docking monitoring device, for detecting
Whether the hanging parts on the slip cableway completely dock with the hanging parts treated on docking orbit, if not complete right
Connect, stopping drive signal being sent to cable car, if complete docking, sends to cable car and pass through signal, so as to be moved in change rail mechanism
During precalculated position, it is ensured that it is expected that the guide rail that guide rail is moved with becoming rail mechanism according to plan is connected, prevents and become rail mechanism fortune
Row is to specified location, it is contemplated that guide rail can connect for some reason, and in place monitoring device send transitable signal and
Situation about causing the accident occurs.
Brief description of the drawings
, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art
The required accompanying drawing used is briefly described in embodiment or description of the prior art, it should be apparent that, in describing below
Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before creative work is not paid
Put, other accompanying drawings can also be obtained according to these accompanying drawings.
The van-hanging pulley rail that Fig. 1 is the present invention becomes rail mechanism structural representation;
Fig. 2 is the change rail part side structural representation of the present invention;
Fig. 3 treats docking orbit side structural representation for the present invention's;
Fig. 4 is the van-hanging pulley rail net overall schematic of the present invention.
Description of reference numerals:
1- guide rails;2- supports;3- becomes rail part;4- hanging parts;5- clamping parts;6- main bodys;7- attachment structures.
Embodiment
Technical scheme is clearly and completely described below in conjunction with accompanying drawing.
Embodiment 1
Fig. 1-Fig. 3 shows that the cableway that a kind of specific embodiment of the present invention provides becomes the structural representation of rail mechanism.Such as figure
Shown, a kind of van-hanging pulley rail becomes rail mechanism, including by connecting located at change rail joining place both sides and respectively different estimated mesh
Ground the track that forms of guide rail 1, be arranged on the support 2 of the end of guide rail 1, be connected with guide rail described in side 1 and perpendicular to
The bearing of trend of the guide rail 1 is movably arranged at the change rail part 3 on the support 2.In the present embodiment, the change of the track
Rail joining place side is provided with a guide rail 1, and opposite side is provided with two guide rails 1 for leading to two different destinations, in the present embodiment,
Every track is using two cables be arrangeding in parallel, so that cable car is more steady, reduces that cable car is skyborne to wave, this structure is
When making a wherein cable because of unexpected disconnect, another cable still can prevent cable car from falling.In the present embodiment, the change rail
Part 3 is connected with the side with a guide rail 1, and the opposite side with two guide rails 1 is fixedly connected on the support 2
On.The guide rail 1 of both sides is respectively fixedly disposed at the hanging parts 4 fixed with the change rail part 3 and consolidated with the support 2
In fixed hanging parts 4.As the hydraulic cylinder for becoming rail power set be arranged on the support 2 provided with the change rail part 3 with
Between the change rail part 3, to drive the change rail part 3 to move back and forth.One monitoring device, detection in place is connected to described
Whether the guide rail 1 become on rail part 3 aligns with the guide rail 1 being connected on the support 2.The hanging parts 4 have perpendicular
The straight main body 6 that the lower section for extending to the change rail part 3 is set, and the connection knot for being connected and crossing out with the main body 6
Structure 7, the attachment structure 7 are stretched out from the lower end of main body 6 to both sides, fixed on the external part of the both sides of attachment structure 7
It is provided with the rigid sleeve as clamping part 5, the centre bore of the sleeve forms holding holes with described in clamping and passing through
The end of cable.The sleeve and described become rail part 3 and support member suitable for coaster is respectively kept between the support 2
The space passed through, so as to play support and guide effect simultaneously to coaster, the both ends of the sleeve form straight with the cable
The changeover portion that footpath is engaged.
It is described to become rail part 3 on the support 2 to be slided perpendicular to the bearing of trend of the guide rail 1 when changing track,
Thus the hanging parts 4 being fixed on below the change rail part 3 are driven to be moved to and being fixed on towards estimated destination
One of guide rail 1 is connected described in opposite side on the support 2, overcome in the prior art when becoming rail only with a both standing wire
Road docks, and the defects of can not be selected between different cableways, there is provided it is a kind of to make in a cableway and two cableways
The change rail mechanism of any bar docking.Cable is connected through holding holes with hanging parts 4, and cable one is driven when hanging parts 4 move
With motion, because hawser is connected with the holding holes in hanging parts 4, when hanging parts 4 with it is expected that when guide rail 1 is aligned, hawser is just
Can by the positioning of holding holes with it is expected that guide rail 1 connects.
Also there is the structure that the cableway becomes rail mechanism the hydraulic cylinder on the support 2 to be used as change rail power set,
Become rail part 3 described in the Driven by Hydraulic Cylinder to move back and forth along the support 2, so as to drive the hanging parts 4 to move.Also wrap
The monitoring device in place being connected with cable car signal is included, for detecting whether the guide rail 1 on the change rail part 3 is driven to
Docking location, if docking location is arrived in driving, the circuit of monitoring device in place is connected and obtains signal, sends control signal to institute
State driving structure and stop driving, if not driving docking location, send a signal to the driving structure and continue to drive respective distance,
It is possible thereby to automatic decision become rail mechanism whether run to it is expected that the correct position that guide rail 1 docks.Also include and cable car signal
Connected docking monitoring device, for detect slide the cableway on hanging parts 4 with the track to be docked
Whether hanging parts 4 completely dock, if complete docking, the circuit of monitoring device in place, which is connected and sent to cable car, passes through letter
Number, if completely docking, sends to cable car and stop drive signal, so as to when change rail mechanism is moved to precalculated position, it is ensured that pre-
The guide rail 1 that meter guide rail 1 is moved with becoming rail mechanism according to plan is connected, and prevents change rail mechanism and runs to specified location, but
It is expected that guide rail 1 can connect for some reason, and the situation that monitoring device sends transitable signal and caused the accident in place
Occur.
It is pointed out that number of tracks to be docked is not limited to two in the present embodiment, can also be more than three.
It is pointed out that the change rail part 3 is not limited to use hydraulic cylinder, cylinder or driven by power can also be used
Mechanical actuation device moves the change rail part 3, when necessary, situation about such as breaking down, it is possible to use manual mode is come
The mobile change rail part 3.
It is pointed out that the guide rail 1 is not limited to use cable, each purpose can also be connected using other forms
Ground, and the present invention still can realize the function of switching track.
Embodiment 2
Fig. 4 shows a kind of van-hanging pulley rail net overall schematic of the present invention, as illustrated, a kind of van-hanging coaster
There is rail network described van-hanging pulley rail to become rail mechanism.By setting the van-hanging pulley rail to become in position
Rail mechanism, if so as to which interferometer destination be connected, rail mechanism is become by the van-hanging pulley rail corresponding to control, will
Coaster is progressively oriented to estimated destination, and coaster can carry out circular flow along the hanging box type pulley rail or single line is back and forth transported
OK, the function of carrying out communications and transportation using coaster within the specific limits is realized.
Obviously, above-described embodiment is only intended to clearly illustrate example, and is not the restriction to embodiment.It is right
For those of ordinary skill in the art, can also make on the basis of the above description it is other it is various forms of change or
Change.There is no necessity and possibility to exhaust all the enbodiments.And the obvious change thus extended out or
Among changing still in the protection domain of the invention.
Claims (13)
1. a kind of van-hanging pulley rail becomes rail mechanism, it is characterised in that including:
Track, by located at both sides, the guide rail (1) for connecting different estimated destinations is formed;Wherein side at least one, opposite side is extremely
It is few two;
Support (2), it is arranged on the end of the guide rail (1);
Become rail part (3), be at least connected with guide rail described in side (1), and perpendicular to the guide rail (1) bearing of trend movably
It is arranged on the support (2);
Hanging parts (4), it is fixedly installed on the change rail part (3), and with the lower section for extending to the change rail part (3)
The clamping part (5) of the guide rail (1) end is clamped, is left between the clamping part (5) and the change rail part (3) suitable for coaster
The space that passes through of support member.
2. rail mechanism is become according to the van-hanging pulley rail described in claim 1, it is characterised in that the change rail part (3)
It is connected with guide rail described in side (1);Guide rail described in opposite side (1) is fixedly connected on the hanging parts on the support (2)
(4) on, the hanging parts (4) have the clamping part that the lower section for extending to the support (2) clamps guide rail (1) end
(5), the space passed through suitable for the support member of coaster is left between the clamping part (5) and the support (2).
3. rail mechanism is become according to the van-hanging pulley rail described in claim 1 or 2, it is characterised in that also there is change rail to move
Power apparatus, between the support (2) and the change rail part (3), to drive the change rail part (3) to move back and forth.
4. the van-hanging pulley rail according to claim any one of 1-3 becomes rail mechanism, it is characterised in that the guide rail
(1) it is cable.
5. rail mechanism is become according to the van-hanging pulley rail described in claim 4, it is characterised in that the hanging parts (4)
With the main body (6) being vertically arranged, and the attachment structure (7) for being connected and crossing out with the main body (6);The clamping part
(5) it is arranged on the external part of the attachment structure (7).
6. rail mechanism is become according to the van-hanging pulley rail described in claim 5, it is characterised in that the attachment structure (7)
Stretched out from the main body (6) lower end to both sides, and the clamping part (5) is equipped with the external part of both sides;The guide rail (1) by
Two the cable be arrangeding in parallel is formed.
7. rail mechanism is become according to the van-hanging pulley rail described in claim 5 or 6, it is characterised in that the clamping part (5)
With the sleeve being fixedly installed on the external part of the attachment structure (7), the centre bore of the sleeve, which is formed, to be clamped through it
In the cable holding holes.
8. rail mechanism is become according to the van-hanging pulley rail described in claim 7, it is characterised in that the sleeve is rigidity.
9. rail mechanism is become according to the van-hanging pulley rail described in claim 8, it is characterised in that the both ends of the sleeve into
Type has the changeover portion being engaged with the cable diameter.
10. the van-hanging pulley rail according to any one of claim 1-9 becomes rail mechanism, it is characterised in that the change
Rail power set are hydraulic cylinder or cylinder or electric mechanical driving device.
11. the van-hanging pulley rail according to any one of claim 1-10 becomes rail mechanism, it is characterised in that also includes
Monitoring device in place, for detecting whether the guide rail (1) on the change rail part (3) is driven to docking location, if not
Docking location is driven, the driving structure is sent a signal to and continues to drive respective distance, if docking location is arrived in driving, send letter
Number to the driving structure stop driving.
12. the van-hanging pulley rail according to any one of claim 1-11 becomes rail mechanism, it is characterised in that also includes
Monitoring device is docked, for detecting hanging parts (4) and the hanging parts treated on docking orbit on the slip cableway
(4) whether completely dock, if not complete docking, sends to cable car and stop drive signal, if complete docking, sends to cable car and pass through
Signal.
13. a kind of van-hanging coaster cableway net, it is characterised in that there is the van-hanging described in claim any one of 1-12 to slide
Track road becomes rail mechanism.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710984051.6A CN107792085B (en) | 2017-10-20 | 2017-10-20 | Suspended carriage type pulley track rail-changing mechanism and cableway network system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710984051.6A CN107792085B (en) | 2017-10-20 | 2017-10-20 | Suspended carriage type pulley track rail-changing mechanism and cableway network system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107792085A true CN107792085A (en) | 2018-03-13 |
CN107792085B CN107792085B (en) | 2024-04-26 |
Family
ID=61532686
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710984051.6A Active CN107792085B (en) | 2017-10-20 | 2017-10-20 | Suspended carriage type pulley track rail-changing mechanism and cableway network system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107792085B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108995660A (en) * | 2018-08-15 | 2018-12-14 | 广州智网联运物流有限公司 | A kind of cableway track exchanging device |
CN109610249A (en) * | 2018-12-12 | 2019-04-12 | 中国长江电力股份有限公司 | A kind of track support component for rail changing device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2458074A1 (en) * | 1974-12-07 | 1976-06-10 | Dieter Hoffmann | Underground mine monorail track heavy load suspension mechanism - load carrier beam arrgt. attached to overhead carriages |
WO2004005101A1 (en) * | 2002-06-07 | 2004-01-15 | Ren, Hua | Light automatized elevated guideway transit system |
CN102431559A (en) * | 2011-10-17 | 2012-05-02 | 杨宗林 | Cableway train system |
CN204998524U (en) * | 2015-09-22 | 2016-01-27 | 陈鸿友 | Become convenient overhead conveyer of rail |
CN208615944U (en) * | 2017-10-20 | 2019-03-19 | 能诚集团有限公司 | A kind of van-hanging pulley rail becomes rail mechanism and cableway net system |
-
2017
- 2017-10-20 CN CN201710984051.6A patent/CN107792085B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2458074A1 (en) * | 1974-12-07 | 1976-06-10 | Dieter Hoffmann | Underground mine monorail track heavy load suspension mechanism - load carrier beam arrgt. attached to overhead carriages |
WO2004005101A1 (en) * | 2002-06-07 | 2004-01-15 | Ren, Hua | Light automatized elevated guideway transit system |
CN102431559A (en) * | 2011-10-17 | 2012-05-02 | 杨宗林 | Cableway train system |
CN204998524U (en) * | 2015-09-22 | 2016-01-27 | 陈鸿友 | Become convenient overhead conveyer of rail |
CN208615944U (en) * | 2017-10-20 | 2019-03-19 | 能诚集团有限公司 | A kind of van-hanging pulley rail becomes rail mechanism and cableway net system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108995660A (en) * | 2018-08-15 | 2018-12-14 | 广州智网联运物流有限公司 | A kind of cableway track exchanging device |
CN108995660B (en) * | 2018-08-15 | 2024-03-15 | 广东自来物智能科技有限公司 | Cableway rail changing device |
CN109610249A (en) * | 2018-12-12 | 2019-04-12 | 中国长江电力股份有限公司 | A kind of track support component for rail changing device |
CN109610249B (en) * | 2018-12-12 | 2024-05-28 | 中国长江电力股份有限公司 | Track bracket assembly for track-changing device |
Also Published As
Publication number | Publication date |
---|---|
CN107792085B (en) | 2024-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2518544C2 (en) | Overhead ropeway | |
KR102534898B1 (en) | cable transport facility | |
CN107074250B (en) | The cable car driven by the close circle rope with traction element and the method for controlling the cable car | |
US11492021B2 (en) | Hybrid cable/rail transportation system | |
CN107792085A (en) | A kind of van-hanging pulley rail becomes rail mechanism and cableway net system | |
CN101775764A (en) | Suspending carrying traffic track | |
US20190168779A1 (en) | Installation of aerial transport | |
CN102602398B (en) | Quick-transporting method and quick-transport device for foldable temporary cableways | |
CN208615944U (en) | A kind of van-hanging pulley rail becomes rail mechanism and cableway net system | |
CN102574529A (en) | An urban commuter / material carrying facility with non linear aerial ropeway | |
CN204059201U (en) | Bridge Erector | |
CN205636494U (en) | HZQY900 type fortune frame all -in -one | |
CN2889781Y (en) | Flexible mobile contact net | |
CN201646717U (en) | Cableway transporting system comprising rescue tools | |
CN103924523B (en) | A kind of single armed box beam bridge formation machine | |
CN110240076A (en) | Improved replacement system and replacing options for shunting winch wirerope | |
CN207997868U (en) | A kind of mine diesel single-rail crane vehicle break catching apparatus | |
CN212047328U (en) | Continuous open-close type connection structure of multi-cable car bearing cable | |
JPH05345563A (en) | Loop type automatic circulating ropeway | |
US20220185342A1 (en) | Ropeway self-propelled transporting equipment | |
JPH05162633A (en) | Cable stretching disposition method for suspending transport equipment for both supporting cable and track traveling | |
US1825787A (en) | Apparatus for transferring freight | |
JPH06345376A (en) | Hoist device for crane | |
KR20210011893A (en) | Cableway installation comprising a relay structure between two cable loops | |
JP2583722B2 (en) | Crane suspended load delivery mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |