CN107740592A - A kind of protection device of prestressed pore passage pore-forming - Google Patents

A kind of protection device of prestressed pore passage pore-forming Download PDF

Info

Publication number
CN107740592A
CN107740592A CN201710993665.0A CN201710993665A CN107740592A CN 107740592 A CN107740592 A CN 107740592A CN 201710993665 A CN201710993665 A CN 201710993665A CN 107740592 A CN107740592 A CN 107740592A
Authority
CN
China
Prior art keywords
pore
forming
steel strand
strand wires
passage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710993665.0A
Other languages
Chinese (zh)
Inventor
邹永泉
郭昭赢
赵飞虹
丁永全
陈雄
党作波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN201710993665.0A priority Critical patent/CN107740592A/en
Publication of CN107740592A publication Critical patent/CN107740592A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

The present invention is a kind of protection device of prestressed pore passage pore-forming; described bellows safeguard measure is that the steel strand wires of parallel steel beam in bellows pore-forming and occupy certain space with plastic tube thereon; complete to form an effective passage in steel strand wires and prestressed pore passage pore-forming after plastic tube is extracted in concreting; this passage can be tightened up deformation displacement in prestressed stretch-draw with steel strand wires, but the aisle spare minimum formed when also can guarantee that mud jacking below cement mortar pass through.This programme then just solves this short slab of protection bushing pipe, adapts to various ducts, the various operating modes of adaptation, cost is cheap, can be used in turn.When overcoming prestressed pore passage pore-forming bellows hole wall have hole, local dropout spillage, be hit it is recessed it is flat after wear to enter after steel strand wires, first steel strand tensioning can not mud jacking the defects of;Also overcome due to the defects of protecting the big accommodation of bushing pipe cost small, thus the unimpeded effect in protection duct can be played.

Description

A kind of protection device of prestressed pore passage pore-forming
Technical field
The present invention relates to the post-stressed duct of civil engineering structure, duct part spillage when preventing concreting, Squeeze it is flat cause later stage steel stranded wire penetrating adapter difficult or a kind of protection device that mud jacking is difficult, be a kind of precautionary measures, be specifically one kind The protection device of prestressed pore passage pore-forming.
Background technology
The post-stressed duct that existing civil engineering structure uses is increasingly longer, continuous structure duct put down it is curved, perpendicular Curved position is more and more, and concrete thickness is increasing;And as long as cell walls have an aperture at one or make worker one firm by ramming not It is carefully that pipeline at one is recessed flat with rod impact is made firm by ramming, it will result in that duct is obstructed, and so as to which steel wire bundle can not penetrate, tradition is done Method is to verify block part, and " belly breaking " operation is carried out to structure and is dredged, steel beam will chisel position use again after passing through mixed Solidifying grave blocks up;This way is necessarily improved in recent years, and many units in charge of construction are less than design bellows chi using a kind of diameter Very little 1cm plastic tube penetrates duct as protection bushing pipe in advance, and revolutionary work is served for short-bore road, the construction of precast beam field With.
But when must take first steel strand for operating modes such as the larger duct of long duct, bending, the ducts for having extension device Duct safeguard measure then can only be with " fortune ".And for Cast-in-situ Beam and different-diameter duct, protection bushing pipe is worn in pipeline Scheme just has a lack of power:Cost is too big, once exercises and uses, different-diameter duct will buy the pvc pipe of different-diameter.
The content of the invention
When the present invention overcomes prestressed pore passage pore-forming bellows hole wall have hole, local dropout spillage, be hit it is recessed it is flat after wear Do not enter after steel strand wires, first steel strand tensioning can not mud jacking the defects of;Also overcome because the protection big accommodation of bushing pipe cost is small The defects of, spy proposes a kind of protection device of prestressed pore passage pore-forming.
For this technical scheme is that, a kind of protection device of prestressed pore passage pore-forming, including bellows, bellows In prestressed pore passage pore-forming, it is characterised in that:Steel strand wires first penetrate pore-forming, and wear plastic tube until penetrating entirely on steel strand wires Portion's pore-forming, described bellows safeguard measure are that the steel strand wires of parallel steel beam in bellows pore-forming and account for plastic tube thereon According to certain space, formation one has in steel strand wires with prestressed pore passage pore-forming after concreting completion plastic tube is extracted The passage of effect, this passage can be tightened up deformation displacement in prestressed stretch-draw with steel strand wires, but the aisle spare formed is most Small cement mortar when also can guarantee that mud jacking below passes through.
Further improve is:The plastics pipe diameter is not only controlled less than ripple pipe diameter 1cm, it is only necessary to can be inserted in Steel strand wires.
Further improve is:The steel strand wires radical that is inserted in is one or 2-3 roots.
Further improve is:Described plastic tube is diameter 20mm pvc pipe.
Beneficial effect:
This programme then just solves this short slab of protection bushing pipe, adapt to various ducts, adapt to various operating modes, cost it is cheap, It can be used in turn.When overcoming prestressed pore passage pore-forming bellows hole wall have hole, local dropout spillage, be hit it is recessed it is flat after wear to enter After steel strand wires, first steel strand tensioning can not mud jacking the defects of;Also overcome and lacked because the protection big accommodation of bushing pipe cost is small Fall into, thus the unimpeded effect in protection duct can be played.
Steel strand wires can penetrate duct in advance, and the duct in duct and one-end tension for connector is also suitable.
A steel strand wires can be just inserted in 20mm pvc pipe, this plastic tube cost substantially reduces and market is extensive.
Prestress hole pipe protection bushing pipe described in the present apparatus is diameter about 20mm plastic tube, and a steel strand wires are penetrated in pipe Core, parallel steel beam are penetrated in bellows, due to the plastic tube uniform diameters of use, so market purchasing is convenient;Due to this modeling Expects pipe is widely used using other are used for extensively, after recovery in daily life, so wasting few;Because this plastic tube is than passing Small more of liner diameter of uniting, thus it is monovalent much low, and unit in charge of construction is happy to use.The passage of 20mm diameters can be formed in duct Area, it can ensure that any hole path pressure grouting is smooth.
Brief description of the drawings
Fig. 1 is to wear plastic tube mode cross section schematic diagram.
Fig. 2 is 12+1 casing mode schematic diagrames.
Fig. 3 is 12 direct casing mode schematic diagrames.
1 is plastic tube in figure, and 2 be steel strand wires, and 3 be bellows.
Embodiment
The present invention is as shown in Fig. 1/2/3.
A kind of protection device of prestressed pore passage pore-forming, including bellows 3, bellows 3 twist in prestressed pore passage pore-forming, steel Line 3 first penetrates pore-forming, and wears plastic tube 1 until penetrating whole pore-formings, the described safeguard measure of bellows 3 on steel strand wires 2 It is that the steel strand wires 2 of parallel steel beam in the pore-forming of bellows 3 and occupy certain space with plastic tube 1 thereon, in concreting Complete to form an effective passage in steel strand wires 2 and prestressed pore passage pore-forming after plastic tube 1 is extracted, this passage is pre- Deformation displacement can be tightened up during stress tension with steel strand wires 2, but the aisle spare minimum formed is when also can guarantee that mud jacking below Cement mortar passes through.
The diameter control of plastic tube 1 is less than the diameter 1cm of bellows 3, it is only necessary to can be inserted in steel strand wires 2.
The radical of steel strand wires 2 that is inserted in is one or 2-3 roots.
Described plastic tube 1 is diameter 20mm pvc pipe.
When specifically used
First, for overlength duct, such as porous cast-in-situ continuous beam;2 parallel plastic pipe-covered of steel strand wires is hung in into framework of steel reinforcement in advance, Using support support into rough line style, set is accurately positioned after penetrating bellows 3 with well word muscle for segmentation, after installation anchor plate, template Casting concrete, the present apparatus and steel core are extracted out, according to normal procedure tensioning mud jacking.
2nd, for the rear technique of steel strand 2, by steel strand wires 2 by root(One more than design radical)Using strand pulling machine or volume The machine of raising is fed through duct, and topmost one artificial set is penetrated into a plastic tube 1, according to being taken out after normal procedure casting concrete Go out the present apparatus and then tensioning mud jacking.
3rd, it is before casting concrete to penetrate a steel strand wires 2, Ran Hou after model sheetinstallat for connector duct more This penetrates plastic tube 1 with set on steel strand wires 2, extracts the present apparatus, normal tensioning mud jacking after the completion of concreting out.
4th, for the long duct of both ends tensioning, after steel strand wires 2 have been worn, the steel strand wires 2 relatively loosened are selected, from both ends To covering diameter 25-30mm plastic tubes 1, plastic tube 1 is extracted out from both ends after the completion of concreting, steel strand wires 2 are not extracted out, this side Formula need not wear steel strand more, and 2, it will not also waste steel strand wires 2, but 1 appropriate overstriking of plastic tube is to form the protection face of larger cavity Product.
Above-mentioned three also admissible patterns.
For there is the steel beam for compiling beam request, because sleeve pipe can not pass through at colligation, it is necessary to penetrate a steel strand wires more and cover again Plastic tube, above-mentioned four are no longer applicable.

Claims (4)

1. a kind of protection device of prestressed pore passage pore-forming, including bellows, bellows exist in prestressed pore passage pore-forming, its feature In:Steel strand wires first penetrate pore-forming, and wear plastic tube on steel strand wires and arranged until penetrating whole pore-formings, described ripple protection of pipe It is that the steel strand wires of parallel steel beam in bellows pore-forming and occupy certain space with plastic tube thereon to apply, complete in concreting An effective passage is formed after being extracted into plastic tube in steel strand wires and prestressed pore passage pore-forming, this passage is in prestressing force It can be tightened up deformation displacement during tensioning with steel strand wires, but the aisle spare minimum formed cement mortar when also can guarantee that mud jacking below Pass through.
2. according to a kind of protection device of prestressed pore passage pore-forming described in claim 1, it is characterised in that:The plastic tube Diameter is not only controlled less than ripple pipe diameter 1cm, it is only necessary to can be inserted in steel strand wires.
3. according to a kind of protection device of prestressed pore passage pore-forming described in claim 1, it is characterised in that:It is described to be inserted in steel Twisted wire radical is one or 2-3 roots.
4. according to a kind of protection device of prestressed pore passage pore-forming described in claim 1, it is characterised in that:Described plastics Manage as diameter 20mm pvc pipe.
CN201710993665.0A 2017-10-23 2017-10-23 A kind of protection device of prestressed pore passage pore-forming Pending CN107740592A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710993665.0A CN107740592A (en) 2017-10-23 2017-10-23 A kind of protection device of prestressed pore passage pore-forming

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710993665.0A CN107740592A (en) 2017-10-23 2017-10-23 A kind of protection device of prestressed pore passage pore-forming

Publications (1)

Publication Number Publication Date
CN107740592A true CN107740592A (en) 2018-02-27

Family

ID=61238135

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710993665.0A Pending CN107740592A (en) 2017-10-23 2017-10-23 A kind of protection device of prestressed pore passage pore-forming

Country Status (1)

Country Link
CN (1) CN107740592A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764302A (en) * 2019-04-02 2020-10-13 中铁十八局集团第五工程有限公司 Concrete pouring construction method under large-diameter flat hinge of swivel bridge
CN112832537A (en) * 2021-01-11 2021-05-25 中国十七冶集团有限公司 Construction method for preventing blockage and pipe blockage caused by slurry leakage of prestressed pre-buried pipeline

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006063694A (en) * 2004-08-27 2006-03-09 Sumitomo Denko Steel Wire Kk Tendon for prestressed concrete and manufacturing method of the tendon
CN203593530U (en) * 2013-12-03 2014-05-14 兖矿东华建设有限公司 Crane beam curved prestressed combined corrugated tube
CN104005340A (en) * 2014-06-12 2014-08-27 中铁六局集团天津铁路建设有限公司 Construction method for threading full-length prestressed steel strands of continuous beam
CN106758836A (en) * 2016-12-23 2017-05-31 中铁十四局集团第二工程有限公司 A kind of post stressed concrete is big apart from reeving steel strands method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006063694A (en) * 2004-08-27 2006-03-09 Sumitomo Denko Steel Wire Kk Tendon for prestressed concrete and manufacturing method of the tendon
CN203593530U (en) * 2013-12-03 2014-05-14 兖矿东华建设有限公司 Crane beam curved prestressed combined corrugated tube
CN104005340A (en) * 2014-06-12 2014-08-27 中铁六局集团天津铁路建设有限公司 Construction method for threading full-length prestressed steel strands of continuous beam
CN106758836A (en) * 2016-12-23 2017-05-31 中铁十四局集团第二工程有限公司 A kind of post stressed concrete is big apart from reeving steel strands method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764302A (en) * 2019-04-02 2020-10-13 中铁十八局集团第五工程有限公司 Concrete pouring construction method under large-diameter flat hinge of swivel bridge
CN112832537A (en) * 2021-01-11 2021-05-25 中国十七冶集团有限公司 Construction method for preventing blockage and pipe blockage caused by slurry leakage of prestressed pre-buried pipeline
CN112832537B (en) * 2021-01-11 2022-05-13 中国十七冶集团有限公司 Construction method for preventing blockage and pipe blockage caused by slurry leakage of prestressed pre-buried pipeline

Similar Documents

Publication Publication Date Title
CN103938864B (en) Infilled wall Constructional Col-umn Construction engineering method
CN105908864B (en) Fill masonry and the construction method of frame-shear wall prevention Interface Crack structure
CN109837895A (en) A kind of big pressure dispersing anchorage cable construction of depth
CN104976424B (en) Anchor cable construction method for rectangular top pipe joint connecting and strengthening
CN204983662U (en) To drawing screw rod and steel pipe framed bent combination unilateral formwork device
CN104631460A (en) Girdling splitting type integral pile breaking method
CN109024721B (en) Reinforced foundation and method for improving bending and shearing resistance of existing building rigid foundation
CN102304927B (en) Prestress anchor cable buttress-type parapet suitable for rock substrate
CN110552370A (en) Reverse construction method based annular lining wall integral single-side formwork construction method
CN110106889A (en) A kind of deep basal pit perfusion slope protection pile adds cable bolting construction
CN107740592A (en) A kind of protection device of prestressed pore passage pore-forming
CN110080454A (en) LPM light filling body Construction of Cast-in-situ Concrete Hollow
CN205557302U (en) Section section precast box girder's a seam connection structure is assembled to short line method
CN103726589A (en) H-shaped steel and steel pipe framework assembly shear wall with protruding interfaces and bent steel bars and manufacturing method
CN105256931B (en) Reinforced Concrete Slab Cracks control method
CN108999281A (en) A kind of novel precast concrete bean column node and its construction method
CN108265996A (en) A kind of masonry structure break wall punch it is pre- top restore construction
CN106351207A (en) Construction method for prefabricating underground continuous wall through U-shaped post-tensioning method
CN205875457U (en) Fill brickwork and prevent interface crack structure with frame shear force wall
CN208152598U (en) A kind of protective device of prestressed pore passage pore-forming
CN105735487A (en) Wall tied reinforcement component
CN206143608U (en) Assembled T beam bridge hogging moment district anchorage sealing system
CN112253142B (en) Construction method for short-clear-distance upward-crossing main tunnel of connecting air duct of deep and long tunnel
CN109056702A (en) The construction method of coercion underground continuous wall
CN205063136U (en) Anti structure of splitting of pre -buried spool of concrete floor department

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180227

WD01 Invention patent application deemed withdrawn after publication