CN107704643B - Simulation system semaphore simplification method based on single point and multiple phases - Google Patents

Simulation system semaphore simplification method based on single point and multiple phases Download PDF

Info

Publication number
CN107704643B
CN107704643B CN201710557983.2A CN201710557983A CN107704643B CN 107704643 B CN107704643 B CN 107704643B CN 201710557983 A CN201710557983 A CN 201710557983A CN 107704643 B CN107704643 B CN 107704643B
Authority
CN
China
Prior art keywords
phase
remote signaling
point
equipment
signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710557983.2A
Other languages
Chinese (zh)
Other versions
CN107704643A (en
Inventor
李昀
黄胜
张弛
洪道鉴
肖艳炜
王周虹
李英
洪蕾
卢敏
郑子淮
郑远德
袁楚楚
裘雨音
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Zhejiang Electric Power Co Ltd
Nari Technology Co Ltd
Taizhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Zhejiang Electric Power Co Ltd
Nari Technology Co Ltd
Taizhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Zhejiang Electric Power Co Ltd, Nari Technology Co Ltd, Taizhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Zhejiang Electric Power Co Ltd
Priority to CN201710557983.2A priority Critical patent/CN107704643B/en
Publication of CN107704643A publication Critical patent/CN107704643A/en
Application granted granted Critical
Publication of CN107704643B publication Critical patent/CN107704643B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/30Circuit design
    • G06F30/36Circuit design at the analogue level
    • G06F30/367Design verification, e.g. using simulation, simulation program with integrated circuit emphasis [SPICE], direct methods or relaxation methods

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention provides a simulation system semaphore simplification method based on single point and multiple phases, and belongs to the technical field of power system simulation. The method comprises the steps of creating a remote communication opening point and a remote communication opening point when a simulation operation model is established; establishing a corresponding relation and a corresponding phase between signals of primary equipment and secondary equipment according to the actual wiring condition of an imitated object; and a real-time library loading program in the simulation system loads the remote signaling records in the database into the real-time library, acquires the state information of the remote signaling departure point, and calls an algorithm function to generate the state information corresponding to the departure point. Through using the connected mode between primary equipment and the secondary equipment, only use two sampling points just can accomplish the signal acquisition of eight sampling points among the prior art, still use simultaneously and use the dynamic data structure based on attribute self-description, will represent the data of multiple meaning and use same data format to transmit, when guaranteeing data compatibility, still reduced the probability that produces redundant data, promoted simulation system's simulation effect.

Description

Simulation system semaphore simplification method based on single point and multiple phases
Technical Field
The invention belongs to the technical field of power system simulation, and particularly relates to a simulation system signal quantity simplification method based on single point and multiple phases.
Background
In a power grid regulation and control integrated simulation system, primary equipment such as a transformer, a circuit breaker, a disconnecting switch, a power transmission line, a voltage transformer, a current transformer, a capacitor, a reactor, a high-voltage reactor and the like and an electric loop thereof need to be simulated, most of the equipment is three-phase equipment, state quantity signals of the three-phase equipment are also three phases, and when signal acquisition and monitoring are carried out by measurement and control equipment, the state quantity signals needing to be monitored are generally acquired after being acquired independently or in series-parallel connection according to the requirements of a monitoring system and operation specifications.
Therefore, if each phase of the equipment is modeled and then simulated in the simulation system, a large number of redundant simulation signals must be generated, and the redundant simulation signals undoubtedly occupy the signal processing capacity of the simulation system and reduce the simulation effect.
Disclosure of Invention
In order to solve the defects in the prior art, the invention provides a simulation system semaphore simplification method based on single point and multiple phases, which improves the simulation effect of the simulation system by reducing the generation of redundant data.
In order to achieve the technical purpose, the invention provides a signal quantity simplification method of a simulation system based on single-point multiphase, which comprises the following steps:
when a simulation operation model is established, selecting equipment types and operation templates of primary equipment and secondary equipment, and creating a remote communication opening point and a remote communication opening point according to a preset dynamic data structure based on attribute self-description;
associating a remote signaling switching-out point on primary equipment with a remote signaling switching-in point on secondary equipment according to the actual wiring condition of an imitated object, and establishing a corresponding relation and a phase between signals of the primary equipment and the secondary equipment;
a real-time library loading program in the simulation system loads remote signaling records in a database into a real-time library, acquires state information of remote signaling departure points, and calls an algorithm function in a remote signaling calculation algorithm library to generate state information corresponding to the departure points according to a connection relation;
and sequentially starting subsequent simulation programs to finish simulation initialization.
Optionally, the dynamic data structure includes:
the status information of the device is represented by an integer number of 4 bytes,
in order to be compatible with other remote signaling signals which still adopt one Bit to represent a specific state, the 17 th Bit and the 18 th Bit represent the attribute of the state, wherein 0 represents that the signal is a single-point single-phase signal, 1 represents that the signal is a single-Bit single-phase signal, 2 represents that the signal is a double-Bit single-phase signal, and 3 represents that the signal is a triple-Bit single-phase signal.
Optionally, the associating, according to the actual wiring condition of the simulated object, a remote signaling access point on the primary device with a remote signaling access point on the secondary device, and establishing a corresponding relationship and a phase between signals of the primary device and the secondary device, include:
the method comprises the steps that auxiliary nodes used for acquiring the on-off state of the monitoring breaker equipment are arranged in the breaker equipment, wherein the auxiliary nodes comprise a breaker normally-open auxiliary node 1 and a breaker normally-open auxiliary node 2;
eight remote signaling points from a remote signaling point 1 to a remote signaling point 8 are arranged in the secondary equipment, wherein,
the remote signaling point 1 and the remote signaling point 2 are respectively used for acquiring the closing position and the separating position signals of the circuit breaker,
the remote signaling point 3 and the remote signaling point 4 are respectively used for acquiring the signals of the corresponding position and the separate position of the circuit breaker A,
the remote signaling point 5 and the remote signaling point 6 are respectively used for acquiring the signals of the corresponding position and the separate position of the breaker B,
and the remote signaling point 7 and the remote signaling point 8 are respectively used for acquiring signals of the corresponding position and the separate position of the breaker C.
Optionally, the establishing a corresponding relationship between signals of the primary device and the secondary device includes:
the circuit breaker normally open auxiliary node 1 is connected with the remote signaling point 1, the circuit breaker normally open auxiliary node 2 is connected with the remote signaling point 2, the phase information selects a three-phase total,
the circuit breaker normally open auxiliary node 1 is simultaneously connected with remote signaling points 3, 5 and 7, phase information respectively selects A phase, B phase and C phase,
the circuit breaker normally open auxiliary node 2 is connected with remote signaling point positions 4, 6 and 8 at the same time, and phase information respectively selects an A phase, a B phase and a C phase.
Optionally, the algorithm function includes a value-taking algorithm and a value-setting algorithm.
Optionally, the value-taking algorithm includes:
acquiring a remote signaling value and operand information from a remote signaling record;
and if the remote signaling value is a multi-phase signal, acquiring self-description bit information in the remote signaling value, and otherwise, returning the lowest bit information in the dynamic data structure.
Optionally, after the obtaining of the self-description bit information in the remote signaling value, the method further includes:
acquiring corresponding bit information according to the operand;
if the corresponding bit information is 1, returning the numerical value of the circuit breaker in the closed position, and if the corresponding bit information is 0, returning the numerical value of the circuit breaker in the open position;
if the corresponding bit information is 1, returning the numerical value of the circuit breaker in the closed position, and if the corresponding bit information is 0, returning the numerical value of the circuit breaker in the open position;
and if the corresponding bit information is 1, returning the numerical value of the circuit breaker in the closed position, and if the corresponding bit information is 0, returning the numerical value of the circuit breaker in the open position.
Optionally, the setting algorithm includes:
acquiring a function telecommand point value val, phase information phase, a set value set and a self-description bit des inlet parameter from a telecommand record;
when the self-describing bit is 0, if the set value set is 1, let the return value be 0x01, and if the set value set is 0, let the return value be 0;
when the self-describing bit is 1, if the set value set is 1, let the return value be val |0x10| (set < < phase), and if the set value set is 0, let the return value be val |0x10| & ((| set) < < phase), where the phase values are 0, 1, 2, representing a phase in three phases, B phase in three phases, C phase in three phases, respectively;
when the self-describing bit is 2, if the set value set is 1, let the return value be val |0x20| (set < phase x 2), and if the set value set is 0, let the return value be val |0x20| & ((| set) < < phase x 2), where the phase values are 0, 1, 2, representing phase a of the three phases, phase B of the three phases, and phase C of the three phases, respectively;
when the self-describing bit is 3, if the set value set is 1, the return value is val |0x30| (set < phase x 3), and if the set value set is 0, the return value is val |0x30| & ((| set) < < phase x 3), where the phase values are 0, 1, and 2, which represent the a phase of the three phases, the B phase of the three phases, and the C phase of the three phases, respectively.
Optionally, the signal quantity simplification method further includes:
and operating the primary equipment to obtain the phase and the state of the primary equipment by means of the entry function when the state of the primary equipment changes, and triggering the action of a secondary equipment telecommand opening point connected with the primary equipment by an algorithm function in a telecommand calculation algorithm library to finish signal acquisition and uploading.
Optionally, the signal quantity simplification method further includes:
when a remote signaling signal sent by first equipment including primary equipment and secondary equipment is received, carrying out attribute judgment on the remote signaling signal according to a dynamic data structure;
and determining the state of the first equipment according to a self-adaptive remote signaling calculation algorithm and in combination with the attribute discrimination result.
The technical scheme provided by the invention has the beneficial effects that:
through using the special connected mode between primary equipment and the secondary equipment, only use two sampling points just can accomplish the signal acquisition mode of eight sampling points among the prior art, still use simultaneously and use the dynamic data structure based on attribute self-description, will represent the data of multiple meaning and use same data format to transmit, when guaranteeing data compatibility, still reduced the probability that produces redundant data, promoted simulation system's simulation effect.
Drawings
In order to more clearly illustrate the technical solution of the present invention, the drawings needed to be used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings based on the drawings without creative efforts.
FIG. 1 is a schematic flow chart of a simulation system semaphore simplification method based on single point and multiple phases provided by the invention;
FIG. 2 is a first schematic diagram illustrating a dynamic data structure provided by the present invention;
FIG. 3 is a structural diagram of a dynamic data structure provided by the present invention;
FIG. 4 is an example of signal modeling for an existing simulation system provided by the present invention;
FIG. 5 is an example of simulation system signal modeling proposed by the present invention;
FIG. 6 is a schematic flow chart of a value-taking algorithm provided by the present invention;
FIG. 7 is a flow chart of the setting algorithm provided by the present invention.
Detailed Description
To make the structure and advantages of the present invention clearer, the structure of the present invention will be further described with reference to the accompanying drawings.
Example one
In order to increase the pressure and challenge on the operation management of a power grid along with the continuous development of the power industry in China, the power grid structure is more and more complex, the power grid regulation and control integrated operation is the inevitable choice of the power grid operation management, and a power grid regulation and control integrated simulation system is used as an auxiliary tool for the power grid dispatching operation and is also more and more applied. The power grid regulation and control integrated simulation is that the simulation operation environment from a transformer substation to a dispatching end power grid is built, the processes of generation, transmission, cooperation, control, disturbance and the like of various signals of the power grid are simulated, and simulation results are displayed in various modes such as imaging and the like, so that the support effect on personnel training and examination, operation auxiliary analysis, debugging and verification and the like is achieved.
The signal simulation is an important content of a power grid regulation and control integrated simulation system, a large number of signals need to be established for carrying out fine simulation on power grid equipment, however, the real-time performance of the system is affected due to excessive signal quantity, the engineering difficulty is greatly increased, and the problem of how to extract information contained in the signals and not generate excessive signals is a difficult problem faced by the simulation system.
Based on the above background, the present invention provides a signal quantity simplification method for a simulation system based on single-point multiple-phase, as shown in fig. 1, the signal quantity simplification method includes:
firstly, when a simulation operation model is established, selecting equipment types and operation templates of primary equipment and secondary equipment, and establishing a remote communication opening point and a remote communication opening point according to a preset dynamic data structure based on attribute self-description;
secondly, associating a remote signaling switching-out point on the primary equipment with a remote signaling switching-in point on the secondary equipment according to the actual wiring condition of the simulated object, and establishing a corresponding relation between signals of the primary equipment and the secondary equipment;
thirdly, a real-time library loading program in the simulation system loads the remote signaling records in the database into the real-time library, state information of remote signaling opening points is obtained, and algorithm functions in a remote signaling calculation algorithm library are called to generate state information corresponding to the opening points according to the connection relation;
and step four, sequentially starting subsequent simulation programs to complete simulation initialization.
In implementation, the power system equipment comprises primary equipment, secondary equipment, a monitoring system and the like, and the state and control information of the primary equipment and the secondary equipment needs to be accessed to the substation monitoring system through the secondary equipment (a measurement and control device, a merging unit, an intelligent terminal and the like) with a measurement and control function or sent to the intelligent scheduling support system through telemechanical equipment.
Taking the example that the primary and secondary equipment telemetering, remote signaling and remote control information are accessed into a transformer substation monitoring system (the access to the intelligent scheduling support system also needs telemechanical equipment). For traditional primary equipment, sampling data and state monitoring information need to be accessed into a transformer substation monitoring system through a measurement and control device, for traditional protection devices for protecting high-voltage equipment of 110kV and above 220kV, the device sampling does not generally have a monitoring function in order to meet the requirements of the protection function, signals after the equipment action are sent to a signal protection system or a transformer substation monitoring system in a protection soft message mode, and partial central signals need to be sent to the measurement and control device through a hard cable connection mode, and are finally sent to the transformer substation monitoring system through the measurement and control device.
The specific content in the step one comprises the following steps:
101. selecting the type of primary equipment, including equipment such as a transformer, a circuit breaker, a disconnecting switch, a power transmission line, a bus, a voltage transformer, a current transformer, a capacitor, a reactor, a high-voltage reactor and the like,
102. selecting the primary equipment operation template, setting a dynamic data structure definition rule according to the attribute self-description by a simulation modeling tool according to a program, and creating various monitoring signal points, namely starting points, which are consistent with the primary equipment operation template in a primary equipment remote signaling definition table, wherein the remote signaling points are phase points;
103. selecting the type of secondary equipment, including a measurement and control device, a protection and measurement integrated device and the like;
104. and selecting the secondary equipment operation template, and establishing a remote signaling opening in point and an opening point which are consistent with the secondary equipment operation template in a secondary equipment remote signaling definition table by a simulation modeling tool according to a dynamic data structure definition rule set by a program and described by attributes, wherein the remote signaling point is not a phase point.
The remote signaling proposed in this embodiment refers to a process of sending an alarm signal and a switch position signal to a monitoring system. In the process, the breaker is switched on, and the switching-off position is the remote communication quantity.
The state information in step three includes the position information of the open point and the open point on different devices, and also includes other information of each contact on the primary device and the secondary device.
In the process, by using a special connection mode between the primary equipment and the secondary equipment, a signal acquisition mode of eight sampling points in the prior art can be completed by using only two sampling points, and meanwhile, a dynamic data structure based on attribute self-description is used, so that data representing multiple meanings are transmitted by using the same data format, the data compatibility is ensured, the probability of generating redundant data is reduced, and the simulation effect of the simulation system is improved.
Optionally, the dynamic data structure includes:
the status information of the device is represented by an integer number of 4 bytes,
in order to be compatible with other remote signaling signals which still adopt one Bit to represent a specific state, the 17 th Bit and the 18 th Bit represent the attribute of the state, wherein 0 represents that the signal is a single-point single-phase signal, 1 represents that the signal is a single-Bit single-phase signal, 2 represents that the signal is a double-Bit single-phase signal, and 3 represents that the signal is a triple-Bit single-phase signal.
In the implementation, in the power grid regulation and control integrated system,remote signalling signals being of a basic data typeThe device position, signal state, and the like are mainly indicated, and generally, only two states are indicated by the switching value 0/1. In an actual medium-scale 220kV station end monitoring system, the number of remote signaling measuring points is nearly ten thousand, and the monitoring point signals of primary equipment are not included, but in a power grid regulation and control integrated simulation system, if the two parts of signals are completely modeled, the number of the remote signaling measuring points is often 20000+, so that a traditional switching value 0/1 representation method needs to be optimized, and the invention provides an attribute self-description dynamic data structure definition method.
By the proposed dynamic data structure, the modeling of the status signals such as the position of the primary device is carried out by taking the device as the object, and the status information of the device is expressed by an integer number (including 32 bits) of 4 bytes.
In order to be compatible with other remote signaling signals (hereinafter referred to as single-point single-phase signals) which still adopt one Bit to represent a specific state, the 17 th Bit and the 18 th Bit represent the attribute of the state, wherein the signal is a single-point single-phase signal, the signal is a single-Bit single-phase signal when the attribute is 0, the signal is a single-Bit single-phase signal when the attribute is 1, the signal is a double-Bit single-phase signal when the attribute is 2, the signal is a three-Bit single-phase signal when the attribute is 3, the specific data structure is shown in the following figures 2 and 3, and the like can be done by using a method of representing one state by three bits. In fig. 2, the lower 3 bits represent a, B, and C, respectively, and the 17 th and 18 th bits are attribute bits, and in fig. 3, the lower 6 bits represent a, B, and C, respectively, and the 17 th and 18 th bits are attribute bits.
In the process of implementing the semaphore simplification method described above, a correspondence relationship between the primary device and the secondary device needs to be established, and the measuring point association is not only a primary measuring point to a secondary point, but also a secondary measuring point to a secondary measuring point. In the specification, only the position signal of a certain circuit breaker is taken as an example, and actually, the monitoring output signal of one circuit breaker is up to ten types. The following description will take an example of a process for establishing a correspondence relationship:
optionally, the associating, according to the actual wiring condition of the simulated object, a remote signaling access point on the primary device with a remote signaling access point on the secondary device, and establishing a corresponding relationship and a phase between signals of the primary device and the secondary device, include:
the method comprises the steps that auxiliary nodes used for acquiring the on-off state of the monitoring breaker equipment are arranged in the breaker equipment, wherein the auxiliary nodes comprise a breaker normally-open auxiliary node 1 and a breaker normally-open auxiliary node 2;
eight remote signaling points from a remote signaling point 1 to a remote signaling point 8 are arranged in the secondary equipment, wherein,
the remote signaling point 1 and the remote signaling point 2 are respectively used for acquiring the closing position and the separating position signals of the circuit breaker,
the remote signaling point 3 and the remote signaling point 4 are respectively used for acquiring the signals of the corresponding position and the separate position of the circuit breaker A,
the remote signaling point 5 and the remote signaling point 6 are respectively used for acquiring the signals of the corresponding position and the separate position of the breaker B,
and the remote signaling point 7 and the remote signaling point 8 are respectively used for acquiring signals of the corresponding position and the separate position of the breaker C.
The establishing of the corresponding relationship between the signals of the primary equipment and the signals of the secondary equipment comprises the following steps:
the circuit breaker normally open auxiliary node 1 is connected with the remote signaling point 1, the circuit breaker normally open auxiliary node 2 is connected with the remote signaling point 2, the phase information is selected from three-phase total,
the circuit breaker normally open auxiliary node 1 is simultaneously connected with remote signaling points 3, 5 and 7, phase information respectively selects A phase, B phase and C phase,
the circuit breaker normally open auxiliary node 2 is connected with remote signaling point positions 4, 6 and 8 at the same time, and phase information respectively selects an A phase, a B phase and a C phase.
In the implementation, in order to accurately represent each phase of information of the device signal, the existing simulation signal description method represents each piece of information by using a single sampling point, and if a total signal is required to be represented, the information is represented by using a point, and then the value is assigned by using an and or equal relation, as shown in fig. 4 below. The advantage of adopting this kind of mode is that logic is realized simply, and the shortcoming is that the semaphore is big, and is possible for small system, but for regulation and control integration system, brings very big work load when the project is implemented. After the corresponding relationship between the primary device and the secondary device is established, it is necessary to obtain phase information of the primary device, where the phase information is a total of three phases, and as can be seen from the content of fig. 4, the total meaning of three phases indicates total joint position information of the primary device in fig. 4, including three phases, i.e., a phase B phase, and a phase C. And respectively receiving the three-phase total signals subjected to the combination and separation processing in the combined virtual signal by a remote signaling point 1 and a remote signaling point 2 in the secondary equipment.
A single-point multi-phase method is adopted, multi-phase signals are placed in a measuring point for representation by adopting a certain mapping relation, three-phase information is automatically contained in a single measuring point when a system is modeled, the simulation fineness is not lost, and the number of the measuring points of a database can be reduced to the minimum, as shown in figure 5. When the primary equipment access point is connected with the secondary equipment access point, the set phase difference domain is correlated, the traditional transformer substation primary and secondary equipment are connected through a secondary circuit, and some monitoring signals are connected to a signal acquisition device through the secondary circuit in a hard cable wiring mode and then sent into the integrated automation system.
However, in an actual system, the primary equipment mainly includes three phases, the number of signal openings of the acquisition device is relatively small, and in addition, monitoring personnel generally only need to monitor some important signals, so the signals of the primary equipment are usually selected or are connected to the signal acquisition device after being connected in series or in parallel at an auxiliary contact.
The remote signaling points used in the process comprise an opening point on the primary equipment and an opening point on the secondary equipment.
Comparing fig. 4 and fig. 5, it can be known that the phase splitting position signal and the total position signal acquisition simulation of one circuit breaker device are completed, and the existing simulation method needs to establish eight sampling points for the primary device and eight sampling points for the secondary device;
by adopting the method, only two sampling points are established for the primary equipment, and eight sampling points are established for the secondary equipment. In comprehensive comparison, the workload of primary equipment modeling is reduced 3/4, the total modeling amount is reduced 3/8, and the workload of comprehensive modeling can be reduced by more than half.
In particular, in actual field wiring, the switching-on position of the circuit breaker in fig. 4 is actually formed by connecting three points, namely, an a-phase normally-open auxiliary node 1, a B-phase normally-open auxiliary node 1 and a C-phase normally-open auxiliary node 1 in series; the circuit breaker opening position is actually formed by connecting three points of an A phase normally closed auxiliary node 1, a B phase normally closed auxiliary node 1 and a C phase normally closed auxiliary node 1 in parallel. For ease of comparison with fig. 5, the drawings are shown in parallel relationship. The series-parallel relationship shown in fig. 5 is realized by an internal algorithm of a program, and manual setting is not needed.
Optionally, the algorithm function includes a value-taking algorithm and a value-setting algorithm.
In the implementation, the self-adaptive remote signaling calculation algorithm is divided into a value calculation algorithm and a value setting algorithm which are both put in a unified algorithm library,
the value-taking algorithm is characterized in that a value-taking function is called when each program obtains an actual remote signaling value of equipment, the function performs self-adaptive calculation on the value of a remote signaling integer number according to operation information of a position needing to be obtained and a one-bit and two-bit algorithm, the required equipment is returned to designate a single-phase/multi-phase/total remote signaling state, the specific value-taking algorithm flow is shown in fig. 6, and the value-taking algorithm comprises the following steps:
acquiring a remote signaling value and operand information from a remote signaling record;
and if the remote signaling value is a multi-phase signal, acquiring self-description bit information in the remote signaling value, and otherwise, returning the lowest bit information in the dynamic data structure.
After the self-description bit information in the remote signaling value is acquired, the method further includes:
acquiring corresponding bit information according to the operand;
if the corresponding bit information is 1, returning the numerical value of the circuit breaker in the closed position, and if the corresponding bit information is 0, returning the numerical value of the circuit breaker in the open position;
if the corresponding bit information is 1, returning the numerical value of the circuit breaker in the closed position, and if the corresponding bit information is 0, returning the numerical value of the circuit breaker in the open position;
and if the corresponding bit information is 1, returning the numerical value of the circuit breaker in the closed position, and if the corresponding bit information is 0, returning the numerical value of the circuit breaker in the open position.
The setting algorithm is an inverse algorithm of the value-taking algorithm, and also sets the value of the corresponding bit through the phase and value information which needs to be operated, and the specific setting flow is shown as the following figure 7, and the setting algorithm comprises the following steps:
acquiring a function telecommand point value val, phase information phase, a set value set and a self-description bit des inlet parameter from a telecommand record;
when the self-describing bit is 0, if the set value set is 1, let the return value be 0x01, and if the set value set is 0, let the return value be 0;
when the self-describing bit is 1, if the set value set is 1, let the return value be val |0x10| (set < < phase), and if the set value set is 0, let the return value be val |0x10| & ((| set) < < phase), where the phase values are 0, 1, 2, representing a phase in three phases, B phase in three phases, C phase in three phases, respectively;
when the self-describing bit is 2, if the set value set is 1, let the return value be val |0x20| (set < phase x 2), and if the set value set is 0, let the return value be val |0x20| & ((| set) < < phase x 2), where the phase values are 0, 1, 2, representing phase a of the three phases, phase B of the three phases, and phase C of the three phases, respectively;
when the self-describing bit is 3, if the set value set is 1, the return value is val |0x30| (set < phase x 3), and if the set value set is 0, the return value is val |0x30| & ((| set) < < phase x 3), where the phase values are 0, 1, and 2, which represent the a phase of the three phases, the B phase of the three phases, and the C phase of the three phases, respectively.
Optionally, the signal quantity simplification method further includes:
and operating the primary equipment to obtain the phase and the state of the primary equipment by means of the entry function when the state of the primary equipment changes, and triggering the action of a secondary equipment telecommand opening point connected with the primary equipment by an algorithm function in a telecommand calculation algorithm library to finish signal acquisition and uploading.
In the implementation, a signal acquisition process is further arranged in the operation process of the simulation system, specifically, when the operation state of the primary equipment is operated or the operation state of the primary equipment is changed, the entry function can acquire the phase difference of the operation of the primary equipment, the secondary equipment related to the entry function is triggered to enter a signal point action through a self-adaptive remote signaling calculation algorithm, and the signal acquisition and uploading process is completed through a series of program processing.
Optionally, the signal quantity simplification method further includes:
when a remote signaling signal sent by first equipment including primary equipment and secondary equipment is received, carrying out attribute judgment on the remote signaling signal according to a dynamic data structure;
and determining the state of the first equipment according to a self-adaptive remote signaling calculation algorithm and in combination with the attribute discrimination result.
In the implementation, when the system is running, any program needs to execute the following when receiving a remote signaling signal:
attribute discrimination (attribute self-description) is firstly carried out according to B16 and B17 two-bit signals of the signals shown in the figures 2 and 3, and then the state of the equipment can be obtained by calling a fixed signal calculation algorithm according to the attribute values (data definition is fully dynamic).
The first device proposed above, including the primary device as the excitation device and the secondary device as the response device, is referred to as the first device for the sake of description accuracy.
By the attribute self-description dynamic data structure definition method, equipment remote signaling information required by calculation of each program is completely contained in the data structure, no processing is required to be added outside the program, and the switching principle of software design is met.
The invention provides a simulation system semaphore simplification method based on single point and multiple phases, which comprises the following steps: the method comprises the steps of creating a remote communication opening point and a remote communication opening point when a simulation operation model is established; establishing a corresponding relation and a corresponding phase between signals of primary equipment and secondary equipment according to the actual wiring condition of an imitated object; and a real-time library loading program in the simulation system loads the remote signaling records in the database into the real-time library, acquires the state information of the remote signaling departure point, and calls an algorithm function to generate the state information corresponding to the departure point. Through using the connected mode between primary equipment and the secondary equipment, only use two sampling points just can accomplish the signal acquisition of eight sampling points among the prior art, still use simultaneously and use the dynamic data structure based on attribute self-description, will represent the data of multiple meaning and use same data format to transmit, when guaranteeing data compatibility, still reduced the probability that produces redundant data, promoted simulation system's simulation effect.
The sequence numbers in the above embodiments are merely for description, and do not represent the sequence of the assembly or the use of the components.
The above description is only exemplary of the present invention and should not be taken as limiting the invention, as any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (9)

1. The simulation system signal quantity simplification method based on single point and multiple phases is characterized by comprising the following steps:
when a simulation operation model is established, selecting equipment types and operation templates of primary equipment and secondary equipment, and creating a remote communication opening point and a remote communication opening point according to a preset dynamic data structure based on attribute self-description;
associating a remote signaling switching-out point on primary equipment with a remote signaling switching-in point on secondary equipment according to the actual wiring condition of an imitated object, and establishing a corresponding relation and a phase between signals of the primary equipment and the secondary equipment;
a real-time library loading program in the simulation system loads the remote signaling records in the database into the real-time library, acquires the state information of the remote signaling departure point, and calls an algorithm function in a remote signaling calculation algorithm library to generate the state information corresponding to the departure point according to the connection relation;
sequentially starting subsequent simulation programs to complete simulation initialization;
associating a remote signaling switching-out point on primary equipment with a remote signaling switching-in point on secondary equipment according to the actual wiring condition of an imitated object, and establishing a corresponding relation and a phase between signals of the primary equipment and the secondary equipment, wherein the method comprises the following steps of:
the method comprises the steps that auxiliary nodes used for acquiring the on-off state of the monitoring breaker equipment are arranged in the breaker equipment, wherein the auxiliary nodes comprise a breaker normally-open auxiliary node 1 and a breaker normally-open auxiliary node 2;
eight remote signaling points from a remote signaling point 1 to a remote signaling point 8 are arranged in the secondary equipment, wherein,
the remote signaling point 1 and the remote signaling point 2 are respectively used for acquiring the closing position and the separating position signals of the circuit breaker,
the remote signaling point 3 and the remote signaling point 4 are respectively used for acquiring the signals of the corresponding position and the separate position of the circuit breaker A,
the remote signaling point 5 and the remote signaling point 6 are respectively used for acquiring the signals of the corresponding position and the separate position of the breaker B,
and the remote signaling point 7 and the remote signaling point 8 are respectively used for acquiring signals of the corresponding position and the separate position of the breaker C.
2. The method for simplifying the semaphore of the simulation system based on single point and multiple phases as claimed in claim 1, wherein said dynamic data structure comprises:
the status information of the device is represented by an integer number of 4 bytes,
in order to be compatible with other remote signaling signals which still adopt one Bit to represent a specific state, the 17 th Bit and the 18 th Bit represent the attribute of the state, wherein 0 represents that the signal is a single-point single-phase signal, 1 represents that the signal is a single-Bit single-phase signal, 2 represents that the signal is a double-Bit single-phase signal, and 3 represents that the signal is a triple-Bit single-phase signal.
3. The method for simplifying the signal quantity of the simulation system based on the single point and the multiple phases as claimed in claim 1, wherein the establishing the corresponding relationship between the signals of the primary equipment and the signals of the secondary equipment comprises:
the circuit breaker normally open auxiliary node 1 is connected with the remote signaling point 1, the circuit breaker normally open auxiliary node 2 is connected with the remote signaling point 2, the phase information selects a three-phase total,
the circuit breaker normally open auxiliary node 1 is simultaneously connected with remote signaling points 3, 5 and 7, phase information respectively selects A phase, B phase and C phase,
the circuit breaker normally open auxiliary node 2 is connected with remote signaling point positions 4, 6 and 8 at the same time, and phase information respectively selects an A phase, a B phase and a C phase.
4. The method for simplifying the semaphore of the simulation system based on single point and multiple phases as claimed in claim 1, wherein the algorithm function comprises a value-taking algorithm and a value-setting algorithm.
5. The method for simplifying the semaphore of the simulation system based on single point and multiple phases as claimed in claim 4, wherein the value-taking algorithm comprises:
acquiring a remote signaling value and operand information from a remote signaling record;
and if the remote signaling value is a multi-phase signal, acquiring self-description bit information in the remote signaling value, and otherwise, returning the lowest bit information in the dynamic data structure.
6. The method for simplifying the signal quantity of the simulation system based on single-point multiphase according to claim 5, after the obtaining the self-description bit information in the remote signaling value, further comprising:
acquiring corresponding bit information according to the operand;
and if the corresponding bit information is 1, returning the numerical value of the circuit breaker in the closed position, and if the corresponding bit information is 0, returning the numerical value of the circuit breaker in the open position.
7. The method for simplifying the semaphore of the simulation system based on single point and multiple phases as claimed in claim 4, wherein the setting algorithm comprises:
acquiring a function telecommand point value val, phase information phase, a set value set and a self-description bit des inlet parameter from a telecommand record;
when the self-describing bit is 0, if the set value set is 1, let the return value be 0x01, and if the set value set is 0, let the return value be 0;
when the self-describing bit is 1, if the set value set is 1, let the return value be val |0x10| (set < < phase), and if the set value set is 0, let the return value be val |0x10| & ((| set) < < phase), where the phase values are 0, 1, 2, representing a phase in three phases, B phase in three phases, C phase in three phases, respectively;
when the self-describing bit is 2, if the set value set is 1, let the return value be val |0x20| (set < phase x 2), and if the set value set is 0, let the return value be val |0x20| & ((| set) < < phase x 2), where the phase values are 0, 1, 2, representing phase a of the three phases, phase B of the three phases, and phase C of the three phases, respectively;
when the self-describing bit is 3, if the set value set is 1, the return value is val |0x30| (set < phase x 3), and if the set value set is 0, the return value is val |0x30| & ((| set) < < phase x 3), where the phase values are 0, 1, and 2, which represent the a phase of the three phases, the B phase of the three phases, and the C phase of the three phases, respectively.
8. The signal quantity simplification method for the simulation system based on single point and multiple phases as claimed in any one of claims 1 to 7, wherein the signal quantity simplification method further comprises:
and operating the primary equipment to obtain the phase and the state of the primary equipment by means of the entry function when the state of the primary equipment changes, and triggering the action of a secondary equipment telecommand opening point connected with the primary equipment by an algorithm function in a telecommand calculation algorithm library to finish signal acquisition and uploading.
9. The method for simplifying the signal quantity of the simulation system based on single point and multiple phases as claimed in claim 1, further comprising:
when a remote signaling signal sent by first equipment including primary equipment and secondary equipment is received, carrying out attribute judgment on the remote signaling signal according to a dynamic data structure;
and determining the state of the first equipment according to a self-adaptive remote signaling calculation algorithm and in combination with the attribute discrimination result.
CN201710557983.2A 2017-07-10 2017-07-10 Simulation system semaphore simplification method based on single point and multiple phases Active CN107704643B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710557983.2A CN107704643B (en) 2017-07-10 2017-07-10 Simulation system semaphore simplification method based on single point and multiple phases

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710557983.2A CN107704643B (en) 2017-07-10 2017-07-10 Simulation system semaphore simplification method based on single point and multiple phases

Publications (2)

Publication Number Publication Date
CN107704643A CN107704643A (en) 2018-02-16
CN107704643B true CN107704643B (en) 2021-09-14

Family

ID=61170653

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710557983.2A Active CN107704643B (en) 2017-07-10 2017-07-10 Simulation system semaphore simplification method based on single point and multiple phases

Country Status (1)

Country Link
CN (1) CN107704643B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116257942B (en) * 2023-05-16 2023-08-15 东方空间技术(山东)有限公司 Rocket simulation model determining method and device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102931644A (en) * 2011-12-27 2013-02-13 许继集团有限公司 Regional power grid fault isolation and recovery method
CN102957204A (en) * 2012-02-08 2013-03-06 深圳市金宏威技术股份有限公司 Intelligent simulation method and system of power distribution network terminal
CN102981118A (en) * 2011-09-06 2013-03-20 首瑞(北京)投资管理集团有限公司 Breaker state monitoring system
CN103150426A (en) * 2013-02-09 2013-06-12 国家电网公司 Unified modeling method for regulation and control integrated simulation of primary grid equipment and secondary grid equipment
CN103869190A (en) * 2014-03-17 2014-06-18 国家电网公司 Real time simulation system-based power distribution terminal automatic closed-loop test platform
CN105429291A (en) * 2015-10-26 2016-03-23 山东网聪信息科技有限公司 Correlation method of primary wiring diagram and secondary system logic connecting diagram of intelligent substation
WO2016175684A1 (en) * 2015-04-27 2016-11-03 Telefonaktiebolaget Lm Ericsson (Publ) Method for providing transmission and/or reception time coordination between piconets
CN106292576A (en) * 2016-07-18 2017-01-04 中国南方电网有限责任公司 A kind of SCL model and the mapping method of CIM

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102981118A (en) * 2011-09-06 2013-03-20 首瑞(北京)投资管理集团有限公司 Breaker state monitoring system
CN102931644A (en) * 2011-12-27 2013-02-13 许继集团有限公司 Regional power grid fault isolation and recovery method
CN102957204A (en) * 2012-02-08 2013-03-06 深圳市金宏威技术股份有限公司 Intelligent simulation method and system of power distribution network terminal
CN103150426A (en) * 2013-02-09 2013-06-12 国家电网公司 Unified modeling method for regulation and control integrated simulation of primary grid equipment and secondary grid equipment
CN103869190A (en) * 2014-03-17 2014-06-18 国家电网公司 Real time simulation system-based power distribution terminal automatic closed-loop test platform
WO2016175684A1 (en) * 2015-04-27 2016-11-03 Telefonaktiebolaget Lm Ericsson (Publ) Method for providing transmission and/or reception time coordination between piconets
CN105429291A (en) * 2015-10-26 2016-03-23 山东网聪信息科技有限公司 Correlation method of primary wiring diagram and secondary system logic connecting diagram of intelligent substation
CN106292576A (en) * 2016-07-18 2017-01-04 中国南方电网有限责任公司 A kind of SCL model and the mapping method of CIM

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
"Risk assessement of power system secondary devices for power grid operation";Yibin Sun et al;《2012 China International Conference on Electricity Distribution》;20120906;第1-5页 *
"基于动态图纸的变电站二次回路仿真培训系统";苏晓 等;《现代电力》;20141010;第31卷(第5期);第90-94页 *

Also Published As

Publication number Publication date
CN107704643A (en) 2018-02-16

Similar Documents

Publication Publication Date Title
CN105356619B (en) A kind of Anti-maloperation for Substation method based on image recognition
CN111581196A (en) Supply and distribution power grid intelligent data acquisition and arrangement system based on intelligent factory framework
CN101571845A (en) Self-description realization method of IEC61850 standard
CN103761413A (en) Substation anti-misoperation logic intelligent generating method based on topology analysis
CN110380412B (en) Main and auxiliary integrated online real-time loop closing analysis method based on CIM/SVG
CN106292576B (en) A kind of mapping method of SCL models and CIM model
CN107704643B (en) Simulation system semaphore simplification method based on single point and multiple phases
CN108388704A (en) Intelligent distribution area extension modeling based on CIM and integrated platform construction method
CN111458586A (en) Batch synchronous detection method and system for multi-interval in-situ line protection device of intelligent substation
CN108492660A (en) Substation&#39;s peace arranges analogy method, device and system
CN102375105A (en) Simulation test system of substation equipment relay protection system
Ming et al. A distributed power system fault diagnosis expert system based on fuzzy inference
CN109683571A (en) A kind of modeling method and device of Monitoring and Control System for Hydropower Station
CN109388903A (en) Real-time simulation platform modeling and simulating method based on IEC61850 standard
CN104408665A (en) Event-oriented disturbance data processing system based on SCD model
CN115473334A (en) Intelligent substation secondary safety measure checking method based on digital twinning
CN104539045A (en) Intelligent fault-analysis-prevention system and working method thereof
CN115267616A (en) Transformer running state monitoring system and method based on enterprise data middling station
RU168355U1 (en) DEVICE FOR COLLECTION, MONITORING AND CONTROL OF EQUIPMENT OF ELECTRICAL SUBSTATION
CN107528888B (en) Intelligent electronic equipment of transformer substation and data sending and receiving method and system thereof
CN105119367A (en) Digital spare power automatic switching simulation method based on dynamic topology
CN105426615A (en) Modeling method for intelligent electronic device of power monitoring management system of intelligent substation
Wu et al. Distribution network topology modelling and automatic mapping based on CIM and GIS
Jing et al. Research on automatic generation and visualization technology of optimal topology graph of distribution network
CN106557623B (en) Intelligent terminal simulation implementation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant