CN101571845A - Self-description realization method of IEC61850 standard - Google Patents

Self-description realization method of IEC61850 standard Download PDF

Info

Publication number
CN101571845A
CN101571845A CNA2008100607803A CN200810060780A CN101571845A CN 101571845 A CN101571845 A CN 101571845A CN A2008100607803 A CNA2008100607803 A CN A2008100607803A CN 200810060780 A CN200810060780 A CN 200810060780A CN 101571845 A CN101571845 A CN 101571845A
Authority
CN
China
Prior art keywords
description
self
substation
file
configuration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100607803A
Other languages
Chinese (zh)
Inventor
周华
徐嘉龙
郑海
朱炳铨
刘军
林荣东
彭宝永
许伟国
吴志力
杨卫星
宣晓华
黄晓明
阮黎翔
吴俊�
王松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Zhejiang Electric Power Test and Research Insititute
Original Assignee
Zhejiang Electric Power Test and Research Insititute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Electric Power Test and Research Insititute filed Critical Zhejiang Electric Power Test and Research Insititute
Priority to CNA2008100607803A priority Critical patent/CN101571845A/en
Publication of CN101571845A publication Critical patent/CN101571845A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention relates to a self-description realization method of an IEC61850 standard, belonging to the application field of the international substation communication network and system standard (IEC61850) to a substation automation system and solving the defects of ambiguous description, heavy workload, and the like existing in the prior art. The method comprises the steps: (1) obtaining capability self-description files of various devices from the devices of the substation; (2) systematically configuring, treating various signal descriptions of the substation according to the capability self-description files of the devices and a system scale description file and generating a substation configuration description file uniform in the whole substation; and (3) downloading the uniform substation configuration description file to the devices. The invention unifies the signal description of the devices, can definitely identify all signals, lightens the workload and facilitates the practical application of the IEC61850 standard.

Description

The self-described implementation method of IEC61850 standard
[technical field]
The present invention relates to international standard " substation communication network and system " (IEC61850) in the application of electric substation automation system, specifically is the model self-described method of a kind of IEC61850 standard in engineering construction.
[background technology]
The IEC61850 standard is a TC57 working group of International Electrotechnical Commission at " substation communication network and the system " series standard that solves the up-to-date formulation of interoperability issue that electric substation automation system faces.This standard obtains the support of domestic and international most of main flow producer, become the whole world in automation of transformation substations field unique unified standard.The IEC61850 standard definition model that can self-described, client can be obtained signal name automatically and need not go according to the traditional approach stoning communication protocol signaling point table again according to model and self-described thereof.
The model of IEC61850 standard definition has necessarily perspective, has considered the model information of all first and second equipment total digitalizations of transformer station.But, primary equipment in the present transformer station, that is that all right is ripe as digital intelligent equipment such as isolating switch, disconnector, transformers, a lot of signals can only be mapped to signal model by the measure and control device transfer, but measure and control device is difficult to determine the signal description of each engineering site connection, can only set up general input (GGIO) and universal description (remote signalling 1~n); In addition, although the description of relay protection signal is clear and definite, a lot of description do not meet the operation custom; the description of each producer also is not quite similar, and needs frequent change in the debug process, and each change all requires producer to revise model description; workload will be very big, very trouble.
[summary of the invention]
In order to overcome the above-mentioned defective that exists in the prior art, the invention provides a kind of self-described implementation method of IEC61850 standard, reduce workload to reach, be convenient to use, make that all signal descriptions are made clear, aims of standardization.
For this reason, the present invention is by the following technical solutions: the self-described implementation method of IEC61850 standard is characterized in that it may further comprise the steps:
1) obtains the ability self-described file that each installs from each device of transformer station;
2) carry out system configuration, each signal description of transformer station is handled, and generate the unified substation configuration description file in full station according to the ability self-described file and the system scale description document of each device;
3) will install under the unified substation configuration description file in each device.
The present invention's ability self-described file to each device when system configuration is handled; the substation configuration description file that obtains has comprised to be described the unified of all system signals; after will reloading each device through unified file; when system moves; institute's signal of sending and receiving of each device just can Direct Recognition; signal between relay protection signal and the relevant device also can be unified identification; do not need during application to revise repeatedly or adopt the mode of artificial his-and-hers watches to assist operation, reduced workload.
As further improving and replenishing to technique scheme, the present invention takes following technical measures: each signal description of transformer station is handled being included in the self-described attribute that configuration when carrying out the electric substation automation system configuration with the system scale description document specifically is connected to measure and control device primary equipment signal according to the ability description file of each device and system scale description document, or the unified description title of revising other signal of transformer station, it is unified that signal is obtained.
After forming the unified substation configuration description file in full station, generate several unit describe files according to this substation configuration description file earlier, again with installing under each unit describe file in each device, to be fit to the needs of each device through configuration.
Beneficial effect: the present invention will install indeterminate, non-type model self-described attribute and unify configuration when the engineering system configuration disposes, return to device again, rather than directly provide self-described information by device simply, make the signal description of each device obtain unified, all signals can clearly be discerned, reduce workload, be convenient to the practical application of IEC61850 standard.
[description of drawings]
Fig. 1 is a schematic flow sheet of the present invention.
[embodiment]
The self-described implementation method of IEC61850 standard as shown in Figure 1 earlier obtains original ability description ICD file from each device; Describe the SSD file according to system scale again and carry out system configuration, model description is configured or revises, form the unified substation configuration description SCD file in full station; At different device, generate the different unit describe CID files that has disposed then by substation configuration description SCD file; To install under the unit describe CID file at last in each device, thus the unification of realization system signal.Original ability description ICD file generally can be obtained from shop instruction separately.

Claims (3)

1, the self-described implementation method of IEC61850 standard is characterized in that it may further comprise the steps:
1) obtains the ability self-described file that each installs from each device of transformer station;
2) carry out system configuration, each signal description of transformer station is handled, and generate the unified substation configuration description file in full station according to the ability self-described file and the system scale description document of each device;
3) will install under the unified substation configuration description file in each device.
2, the self-described implementation method of IEC61850 standard according to claim 1, it is characterized in that each signal description of transformer station being handled being included in the self-described attribute that configuration when carrying out the electric substation automation system configuration with the system scale description document specifically is connected to measure and control device primary equipment signal according to the ability description file of each device and system scale description document, or the unified description title of revising other signal of transformer station.
3, the self-described implementation method of IEC61850 standard according to claim 1 and 2, after it is characterized in that forming the unified substation configuration description file in full station, generate several unit describe files according to this substation configuration description file earlier, will install under each unit describe file in each device again through configuration.
CNA2008100607803A 2008-04-29 2008-04-29 Self-description realization method of IEC61850 standard Pending CN101571845A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100607803A CN101571845A (en) 2008-04-29 2008-04-29 Self-description realization method of IEC61850 standard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100607803A CN101571845A (en) 2008-04-29 2008-04-29 Self-description realization method of IEC61850 standard

Publications (1)

Publication Number Publication Date
CN101571845A true CN101571845A (en) 2009-11-04

Family

ID=41231204

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100607803A Pending CN101571845A (en) 2008-04-29 2008-04-29 Self-description realization method of IEC61850 standard

Country Status (1)

Country Link
CN (1) CN101571845A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102495841A (en) * 2011-11-14 2012-06-13 深圳市华力特电气股份有限公司 Power supply system monitoring method and related device thereof
CN103607051A (en) * 2013-11-25 2014-02-26 国家电网公司 Method and system for expanding transformer substation
CN103887878A (en) * 2014-03-17 2014-06-25 广州供电局有限公司 Information engineering configuration method and system for wide-area protection system
CN104106056A (en) * 2012-02-10 2014-10-15 株式会社东芝 Transformer substation automation system and automatic recognition method for terminal
CN104333134A (en) * 2014-10-30 2015-02-04 国家电网公司 Substation cluster measurement and control system ICD model automatic recognition device and recognition method
CN104978391A (en) * 2014-04-11 2015-10-14 通用电气公司 System and method for automated substation design and configuration
CN107239601A (en) * 2017-05-19 2017-10-10 国电南瑞科技股份有限公司 A kind of distribution terminal flexible configuration method based on configuration technology
CN108808850A (en) * 2017-11-28 2018-11-13 电子科技大学 Intelligent substation based on IEC61850 alerts intelligent analysis method
CN109446155A (en) * 2018-11-12 2019-03-08 山东鲁能智能技术有限公司 Intelligent station describes file and imports and exports configuration method and system
CN109714445A (en) * 2018-12-06 2019-05-03 成都佰纳瑞信息技术有限公司 A kind of method that electric substation automation system and IED equipment automatically configure
CN112462645A (en) * 2020-11-10 2021-03-09 蘑菇物联技术(深圳)有限公司 Self-description method and device of universal device controller and storage medium

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102495841B (en) * 2011-11-14 2014-04-09 深圳市华力特电气股份有限公司 Power supply system monitoring method and related device thereof
CN102495841A (en) * 2011-11-14 2012-06-13 深圳市华力特电气股份有限公司 Power supply system monitoring method and related device thereof
CN104106056A (en) * 2012-02-10 2014-10-15 株式会社东芝 Transformer substation automation system and automatic recognition method for terminal
CN103607051B (en) * 2013-11-25 2015-11-18 国家电网公司 A kind of transformer station's enlargement method and system
CN103607051A (en) * 2013-11-25 2014-02-26 国家电网公司 Method and system for expanding transformer substation
CN103887878B (en) * 2014-03-17 2016-03-02 广州供电局有限公司 The information engineering collocation method of Wide area protection system and system
CN103887878A (en) * 2014-03-17 2014-06-25 广州供电局有限公司 Information engineering configuration method and system for wide-area protection system
CN104978391A (en) * 2014-04-11 2015-10-14 通用电气公司 System and method for automated substation design and configuration
CN104333134A (en) * 2014-10-30 2015-02-04 国家电网公司 Substation cluster measurement and control system ICD model automatic recognition device and recognition method
CN107239601A (en) * 2017-05-19 2017-10-10 国电南瑞科技股份有限公司 A kind of distribution terminal flexible configuration method based on configuration technology
CN107239601B (en) * 2017-05-19 2020-08-21 国电南瑞科技股份有限公司 Flexible configuration method of power distribution terminal based on configuration technology
CN108808850A (en) * 2017-11-28 2018-11-13 电子科技大学 Intelligent substation based on IEC61850 alerts intelligent analysis method
CN108808850B (en) * 2017-11-28 2021-05-14 电子科技大学 Intelligent substation alarm intelligent analysis method based on IEC61850
CN109446155A (en) * 2018-11-12 2019-03-08 山东鲁能智能技术有限公司 Intelligent station describes file and imports and exports configuration method and system
CN109714445A (en) * 2018-12-06 2019-05-03 成都佰纳瑞信息技术有限公司 A kind of method that electric substation automation system and IED equipment automatically configure
CN112462645A (en) * 2020-11-10 2021-03-09 蘑菇物联技术(深圳)有限公司 Self-description method and device of universal device controller and storage medium

Similar Documents

Publication Publication Date Title
CN101571845A (en) Self-description realization method of IEC61850 standard
CN102880792B (en) A kind of dynamic modelling method of the conventional substation based on IEC standard
CN102510127B (en) Method for unifying models of on-line monitored first and secondary equipment of power grid
CN110113220B (en) Plug and play method for electric power Internet of things end equipment
CN101964542B (en) Method for accessing IEC61970 dispatching EMS system to IEC61850 digital transformer substation
CN105162252B (en) The method of plug and play distribution terminal information realization automatic mapping based on CID files
CN104020374A (en) Intelligent substation secondary equipment site-wide simulation test system
CN105354220A (en) Application method for IED user customized configuration file of intelligent transformer substation
CN102969796A (en) Near-real-time electric quantity monitoring and dispatching management system for rural power grid
CN104601652A (en) Beidou satellite communication system based electric communication system and method
CN111030303A (en) Low-voltage transformer area topology identification system based on characteristic current
CN104580245A (en) Power distribution terminal 104 message parsing system and parsing method thereof
CN102981087A (en) Interface system for RTDS and intelligent relaying protection device
CN104104151A (en) Access method of power distribution terminal equipment information
CN110768372A (en) IEC61850 standard-based protection information system source end modeling method
CN103151840A (en) Communication method and device of IEC (international electrotechnical commission) 61850 system and non-IEC 61850 system
CN114398862A (en) Remote point table maintenance method based on terminal debugging device
CN106530112A (en) Distribution management system
CN104112183B (en) The intelligent scheduling model management system and management method of intelligent substation plug and play
CN106254124B (en) One kind being based on the improved Intelligent substation merging unit configuration method in short address
CN212483779U (en) Moulded case circuit breaker device
CN105553761A (en) IEC61850 conformance testing hardware platform
CN204291048U (en) Based on the power communication system of Beidou satellite communication system
CN103716306A (en) Seamless communication method for substation and dispatching master station
KR20150080233A (en) Microgrid capable of Dispersed Generators Plug And Play based on IEC 61850 and Plug And Play Method therefor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: TECHNICAL SERVICE CENTER OF ZHEJIANG ELECTRIC POWE

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 310012 ZHAOHUIBAQU, HANGZHOU CITY, ZHEJIANG PROVINCE TO: 310014 NO.1, HUADIAN LANE, ZHAOHUIBAQU, XIACHENG DISTRICT, HANGZHOU CITY, ZHEJIANG PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20100719

Address after: The eight district of Hangzhou city in Zhejiang province 310014 Huadian Zhaohui under No. 1 Lane

Applicant after: Zhejiang Electric Power Test And Research Insititute

Co-applicant after: The Technical Service Center of Zhejiang Electric Power Experiment Research Institute

Address before: The eight district of Hangzhou City, Zhejiang province 310012 Zhaohui

Applicant before: Zhejiang Electric Power Test And Research Insititute

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20091104