- CN107703999A CN107703999A CN201711098644.9A CN201711098644A CN107703999A CN 107703999 A CN107703999 A CN 107703999A CN 201711098644 A CN201711098644 A CN 201711098644A CN 107703999 A CN107703999 A CN 107703999A
- Authority
- CN
- China
- Prior art keywords
- connection
- switch
- tunnel
- threephase switch
- control system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004088 simulation Methods 0.000 title claims abstract description 21
- 238000012544 monitoring process Methods 0.000 claims abstract description 49
- 239000000779 smoke Substances 0.000 claims abstract description 20
- 230000005540 biological transmission Effects 0.000 claims abstract description 18
- 235000019504 cigarettes Nutrition 0.000 claims abstract description 16
- 238000010438 heat treatment Methods 0.000 claims description 23
- 101000629937 Homo sapiens Translocon-associated protein subunit alpha Proteins 0.000 claims description 18
- 101000629913 Homo sapiens Translocon-associated protein subunit beta Proteins 0.000 claims description 18
- 102100026231 Translocon-associated protein subunit alpha Human genes 0.000 claims description 18
- 102100026229 Translocon-associated protein subunit beta Human genes 0.000 claims description 18
- 230000005611 electricity Effects 0.000 claims 1
- 239000003517 fume Substances 0.000 claims 1
- 238000000034 method Methods 0.000 description 6
- 238000006243 chemical reaction Methods 0.000 description 3
- 239000003245 coal Substances 0.000 description 3
- 230000006870 function Effects 0.000 description 3
- 238000012549 training Methods 0.000 description 3
- UGFAIRIUMAVXCW-UHFFFAOYSA-N Carbon monoxide Chemical compound [O+]#[C-] UGFAIRIUMAVXCW-UHFFFAOYSA-N 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000003546 flue gas Substances 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 231100000252 nontoxic Toxicity 0.000 description 2
- 230000003000 nontoxic effect Effects 0.000 description 2
- 239000004509 smoke generator Substances 0.000 description 2
- 230000000391 smoking effect Effects 0.000 description 2
- 239000007921 spray Substances 0.000 description 2
- 238000009423 ventilation Methods 0.000 description 2
- 241001633942 Dais Species 0.000 description 1
- 238000007792 addition Methods 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000002485 combustion reaction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005485 electric heating Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 238000005286 illumination Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
- 230000032696 parturition Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 230000035807 sensation Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05D—SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
- G05D27/00—Simultaneous control of variables covered by two or more of main groups G05D1/00 - G05D25/00
- G05D27/02—Simultaneous control of variables covered by two or more of main groups G05D1/00 - G05D25/00 characterised by the use of electric means
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Alarm Systems (AREA)
Abstract
Mine rescue simulation tunnel temperature, smog control automatic control system.The present invention relates to a kind of mine rescue simulation tunnel temperature, smog control automatic control system.High temperature manoeuvre cigarette lane central control system includes tunnel monitor system, data handling system and tunnel control system;Described comprehensive monitor system includes tunnel smoke monitoring, tunnel temperature monitoring, video monitoring monitoring and the monitoring of tunnel audio;Described tunnel control system includes console, in real time monitoring, data sheet and information management, described console, in real time monitoring, data sheet and information management and video monitoring equipment two-way transmission signals, described console, in real time monitoring, data sheet and information management and audio control system two-way transmission signals, described video monitoring equipment is to large-screen monitor transmission video signal.The present invention is used for mine rescue and simulated.
Description
Technical field:
The present invention relates to a kind of mine rescue simulation tunnel temperature, smog control automatic control system.
Background technology:
Manoeuvre tunnel refers to specialize in underground passage, chamber or ground the sealing structure that mine rescue crew carries out combat exercise training
Build thing.According to《Mine rescue code》It is required that:" disliked to make mine rescue crew adapt to catastrophe period underground coal mine high temperature, dense smoke etc.
Bad disaster environment, it is necessary to carry out simulating actual combat manoeuvre ".Mine emergency rescue group in China's has built as requested mostly at present drills
Tunnel is practised, chamber is built in the tunnel of mine rescue manoeuvre at present according to confined space, and it is single to drill the condition in tunnel, and it is dense to lack high temperature
Cigarette environmental simulation system.It is existing mainly to ask there is also the raising of many problems demands even if having built high temperature dense smoke simulation facility
Topic is shown as:
(1) high temperature, the creation mean of smoky condition are original, and effect is poor.Common practice is built-in in manoeuvre tunnel at present
Combustion furnace, raise temperature by the burning of coal, timber and produce smoke simulation high temperature smoky condition, not only body of heater accounts in itself
With lane space, prepare and operating process is cumbersome, pollute environment.
(2) simulation tunnel environment can not be controlled according to drill program, rescue team member is unable to reach sensation on the spot in person, nothing
Method reaches simulating actual combat purpose.
(3) temperature and smokescope state modulator are difficult, and environment heating is easy, and temperature control is difficult;Smokescope senses at present
The precision of device can not meet that control is required, it is necessary to improve precision.
For problem above, to improve rescue team's training quality, lifting rescue team member adapts to underground coal mine high temperature, dense smoke
The ability of environment, the present invention propose a kind of mine rescue simulation tunnel temperature, smog control method and automatic control system.
The content of the invention:
It is an object of the invention to provide a kind of mine rescue to simulate tunnel temperature, smog control automatic control system, to
Solve the above problems, it is easy to use, it is applied widely.
Above-mentioned purpose is realized by following technical scheme:
A kind of mine rescue simulation tunnel temperature, smog control automatic control system, high temperature manoeuvre cigarette lane central control system bag
Include tunnel monitor system, data handling system and tunnel control system;
Described comprehensive monitor system includes tunnel smoke monitoring, tunnel temperature monitoring, video monitoring monitoring and tunnel sound
Frequency monitors;
Described tunnel control system includes tunnel smog control, tunnel temperature control, the control of tunnel video, tunnel broadcast
Control, tunnel audio frequency control and tunnel air draft control;
Described tunnel control system includes console 1, in real time monitoring, data sheet and information management, described control
Platform 1, in real time monitoring, data sheet and information management and video monitoring equipment two-way transmission signals, it is described console 1, real-time
Monitoring, data sheet and information management and audio control system two-way transmission signals, described video monitoring equipment is to giant-screen
Monitor transmission video signal;
Described console 1, in real time monitoring, data sheet and information management and PLC two-way transmission signals, described PLC
The live signal of field instrument is also received, control signal is transmitted to heating apparatus, raw cigarette device and filled with smoke evacuation by described PLC
Put, described PLC and display two-way transmission signals.
Described mine rescue simulation tunnel temperature, smog control automatic control system, in the top of described console 1
Between set one group of left end of button 2 and right-hand member that display I 3 and display II 4, the left end setting of described display I 3 are set respectively
Sound equipment I 5, the right-hand member of described display II 4 set sound equipment II 6, and the lower section of described button 2 sets wireless talkback platform 7, described
The right side of wireless talkback platform 7 intercommunication microphone 8 is set;
The lower central of described console 1 sets action bars 9, and the left side of described action bars 9 sets keyboard I 10, institute
The right side for the action bars 9 stated sets keyboard II 11.
Described mine rescue simulates tunnel temperature, smog control automatic control system, the control control of described console 1
The power on/off of cabinet, described switch board interior access general supply U lines, general supply V lines and general supply W lines, described general supply U lines connect
Connect threephase switch QF1 first end, threephase switch QF2 first end, threephase switch QF3 first end, the of threephase switch QF4
One end, threephase switch QF5 first end, single-way switch QF6 and single-way switch QF7, described threephase switch QF1 first end connect
Connect KM1 first end, described connection KM1 first end connection fuse FR1 first end, the of described fuse FR1
One end connects the first end of heating blower I, described threephase switch QF3 first end connection KM2 first end, described connection
KM2 first end connection fuse FR2 first end, the first of described fuse FR2 first end connection heating blower II
End, the connection SSR1 of described threephase switch QF2 first end first end, described SSR1 first end connection heater I
First end, the connection SSR2 of described threephase switch QF4 first end first end, described SSR2 first end connection plus
The first end of hot device II, the connection SINAMICS V20 of described threephase switch QF5 first end first end are described
The first end of SINAMICS V20 first end connection induced-draft fan;
Described general supply V lines connection threephase switch QF1 the second end, threephase switch QF2 the second end, threephase switch
QF3 the second end, threephase switch QF4 the second end, threephase switch QF5 the second end, single-way switch QF8 and single-way switch QF9,
Described threephase switch QF1 the second end connection KM1 the second end, described connection KM1 the second end connection fuse FR1's
Second end, the second end of described fuse FR1 the second end connection heating blower I, described threephase switch QF3 the second end
KM2 the second end is connected, described connection KM2 the second end connects fuse FR2 the second end, described fuse FR2's
Second end connects the second end of heating blower II, and the connection SSR1 at described threephase switch QF2 the second end the second end is described
SSR1 the second end connection heater I the second end, the second of the connection SSR2 at described threephase switch QF4 the second end
End, the second end of described SSR2 the second end connection heater II, the connection at described threephase switch QF5 the second end
SINAMICS V20 the second end, the second end of described SINAMICS V20 the second end connection induced-draft fan;
Described general supply W lines connection threephase switch QF1 the 3rd end, threephase switch QF2 the 3rd end, threephase switch
QF3 the 3rd end, threephase switch QF4 the 3rd end, threephase switch QF5 the 3rd end, single-way switch QF10, single-way switch
QF11, single-way switch QF12, single-way switch QF13, single-way switch QF14, single-way switch QF15, with single-way switch QF16, it is described
Threephase switch QF1 three-terminal link KM1 the 3rd end, the 3rd of described connection KM1 three-terminal link fuse FR1 the
End, the 3rd end of described fuse FR1 three-terminal link heating blower I, described threephase switch QF3 three-terminal link
KM2 the 3rd end, described connection KM2 three-terminal link fuse FR2 the 3rd end, the 3rd of described fuse FR2 the
3rd end of end connection heating blower II, the connection SSR1 at described threephase switch QF2 the 3rd end the 3rd end are described
3rd end of SSR1 three-terminal link heater I, the connection SSR2 at described threephase switch QF4 the 3rd end the 3rd end,
3rd end of described SSR2 three-terminal link heater II, the connection at described threephase switch QF5 the 3rd end
SINAMICS V20 the 3rd end, the 3rd end of described SINAMICS V20 three-terminal link induced-draft fan.
Beneficial effect:
1. insulation and the circular treatment environment of the invention by building high-temperature region, greatly reduce system power dissipation;Smoke evacuation row
Wet motor uses frequency conversion control technique, can not only reduce power output, also add rotating control, greatly reduces smoke evacuation
Time.
2. insulation and the circular treatment environment of the invention by building high-temperature region, greatly reduce system power dissipation;Smoke evacuation row
Wet motor uses frequency conversion control technique, can not only reduce power output, also add rotating control, greatly reduces smoke evacuation
Time.
3. the system architecture of the present invention is clear, Highgrade integration, installation operation are simple, using with all kinds of use environments, fill
Divide and consider customer personalized demand.
4. the present invention has the flexible warning function of system:In display prompts temperature alarming during overtemperature.
Brief description of the drawings:
Accompanying drawing 1 is the system general frame schematic diagram of the present invention.
Accompanying drawing 2 is the system equipment control logic structure chart of the present invention.
Accompanying drawing 3 is the operating platform front view of the present invention.
Accompanying drawing 4 is that major loop matches somebody with somebody electrograph in the switch board of the present invention.
Accompanying drawing 5 is the tunnel device distribution figure of the present invention.
Embodiment:
Embodiment 1
A kind of mine rescue simulation tunnel temperature, smog control automatic control system, high temperature manoeuvre cigarette lane central control system bag
Include tunnel monitor system, data handling system and tunnel control system;
Described comprehensive monitor system includes tunnel smoke monitoring, tunnel temperature monitoring, video monitoring monitoring and tunnel sound
Frequency monitors;
Described tunnel control system includes tunnel smog control, tunnel temperature control, the control of tunnel video, tunnel broadcast
Control, tunnel audio frequency control and tunnel air draft control such as Fig. 1;
Tunnel control system as described in Figure 2 includes console 1, in real time monitoring, data sheet and information management, described
Console 1, in real time monitoring, data sheet and information management and video monitoring equipment two-way transmission signals, described console 1,
Monitoring, data sheet and information management and audio control system two-way transmission signals in real time, described video monitoring equipment is to big
Screen monitor transmission video signal;
Described console 1, in real time monitoring, data sheet and information management and PLC two-way transmission signals, described PLC
The live signal of field instrument is also received, control signal is transmitted to heating apparatus, raw cigarette device and filled with smoke evacuation by described PLC
Put, described PLC and display two-way transmission signals.
Embodiment 2
Mine rescue simulation tunnel temperature, smog control automatic control system described in embodiment 1, control as described in Figure 3
Set one group of left end of button 2 that display I 3 and display II 4, described display are set respectively with right-hand member among the top of platform 1 processed
The left end of device I 3 sets sound equipment I 5, and the right-hand member of described display II 4 sets sound equipment II 6, and the lower section of described button 2 sets nothing
Line sets intercommunication microphone 8 to dais 7, the right side of described wireless talkback platform 7;
The lower central of described console 1 sets action bars 9, and the left side of described action bars 9 sets keyboard I 10, institute
The right side for the action bars 9 stated sets keyboard II 11.
Embodiment 3
Mine rescue simulation tunnel temperature, smog control automatic control system described in embodiment 2, described console 1
The power on/off of switch board is controlled, accesses general supply U lines, general supply V lines and general supply W lines in described switch board, described is total
Power supply U lines connection threephase switch QF1 first end, threephase switch QF2 first end, threephase switch QF3 first end, three-phase are opened
Close QF4 first end, threephase switch QF5 first end, single-way switch QF6 and single-way switch QF7, described threephase switch QF1
First end connection KM1 first end, described connection KM1 first end connects fuse FR1 first end, described fusing
The first end of device FR1 first end connection heating blower I, described threephase switch QF3 first end connection KM2 first end,
Described connection KM2 first end connection fuse FR2 first end, described fuse FR2 first end connection heating wind
The first end of machine II, the connection SSR1 of described threephase switch QF2 first end first end, described SSR1 first end connect
Connect the first end of heater I, the connection SSR2 of described threephase switch QF4 first end first end, the of described SSR2
The first end of one end connection heater II, the connection SINAMICS V20 of described threephase switch QF5 first end first end,
The first end of described SINAMICS V20 first end connection induced-draft fan;
Described general supply V lines connection threephase switch QF1 the second end, threephase switch QF2 the second end, threephase switch
QF3 the second end, threephase switch QF4 the second end, threephase switch QF5 the second end, single-way switch QF8 and single-way switch QF9,
Described threephase switch QF1 the second end connection KM1 the second end, described connection KM1 the second end connection fuse FR1's
Second end, the second end of described fuse FR1 the second end connection heating blower I, described threephase switch QF3 the second end
KM2 the second end is connected, described connection KM2 the second end connects fuse FR2 the second end, described fuse FR2's
Second end connects the second end of heating blower II, and the connection SSR1 at described threephase switch QF2 the second end the second end is described
SSR1 the second end connection heater I the second end, the second of the connection SSR2 at described threephase switch QF4 the second end
End, the second end of described SSR2 the second end connection heater II, the connection at described threephase switch QF5 the second end
SINAMICS V20 the second end, the second end of described SINAMICS V20 the second end connection induced-draft fan;
Described general supply W lines connection threephase switch QF1 the 3rd end, threephase switch QF2 the 3rd end, threephase switch
QF3 the 3rd end, threephase switch QF4 the 3rd end, threephase switch QF5 the 3rd end, single-way switch QF10, single-way switch
QF11, single-way switch QF12, single-way switch QF13, single-way switch QF14, single-way switch QF15, with single-way switch QF16, it is described
Threephase switch QF1 three-terminal link KM1 the 3rd end, the 3rd of described connection KM1 three-terminal link fuse FR1 the
End, the 3rd end of described fuse FR1 three-terminal link heating blower I, described threephase switch QF3 three-terminal link
KM2 the 3rd end, described connection KM2 three-terminal link fuse FR2 the 3rd end, the 3rd of described fuse FR2 the
3rd end of end connection heating blower II, the connection SSR1 at described threephase switch QF2 the 3rd end the 3rd end are described
3rd end of SSR1 three-terminal link heater I, the connection SSR2 at described threephase switch QF4 the 3rd end the 3rd end,
3rd end of described SSR2 three-terminal link heater II, the connection at described threephase switch QF5 the 3rd end
SINAMICS V20 the 3rd end, the 3rd end of described SINAMICS V20 three-terminal link induced-draft fan.
Embodiment 4
Mine rescue simulation tunnel temperature, smog control automatic control system described in embodiment 3, switch board operating procedure
It is as follows:
1st, the main power switch QF1 of switch board closes a floodgate;
2nd, QF12 mains lighting supplies in switch board and QF13 operating desks monitoring power supply are closed a floodgate;
3rd, QF14 is closed a floodgate to PLC power supply;
4th, QF17, QF18, QF19 power supply are closed a floodgate, respectively control PLC, instrument, control power supply;
5th, other power supplys are closed a floodgate on demand.
Embodiment 5
Mine rescue simulation tunnel temperature, smog control automatic control system described in embodiment 1, each several part detailed annotation:
1 temperature automatic control
The discrete control modes of manoeuvre tunnel heating apparatus solid-state relay PID, are added using 380V electric heating equipment
Temperature, warming-up device general power are controlled within 30KW, and temperature in tunnel can be risen to 55 DEG C by device in 30min by 20 DEG C, and
By temperature be automatically held in needed within the scope of, control accuracy is within 1 DEG C.
2 life cigarettes automatically control.
Set by smoke time and smoke interval time, temporally process indirect control scene smokescope.
3 smoke-discharging and ventilatings automatically control.
Can invert control using smoke generator as smoking device in manoeuvre tunnel, when giving birth to cigarette makes smog Quick uniform.Spray
Flue gas for smog should nontoxic, harmless, pollution-free, proportion be slightly less than air, be controlled by the configuration software of console.Smoke
Concentration be controlled by by continuous smoke time length.It can typically approach in 10 minutes the visibility in training chest
Zero.Energy frequency conversion slow-speed of revolution ventilation, controls humidity during non-manoeuvre.The flue gas that smoking device sprays is non-aggressive is nontoxic, noresidue
Gas.Raw cigarette device should possess the raw hood of multiple spot timing simultaneously.In addition, after End of Exercise, system can also control ventilation fan
Carry out the quick cleaning of smog.
4 video monitorings
Audio/video monitor and control system should support the comprehensive control of head and lens zoom function, the effective monitoring of every camera
Distance should be greater than 20m, definition should more than 600 lines, color should be colored, and should possess infrared, each camera is corresponding
1 sound pick-up is installed, sound pick-up answers that noise is small, tonequality is good, pickup is clear in the range of 6 meters.In addition, monitoring system should be able to store
The monitoring information of more than 150 hours, while should possess playback and the export processing function of monitoring information.
5 broadcast systems
Broadcast system should be able to make the personnel of every nook and cranny in manoeuvre tunnel, can clearly hear Control Room commander's
Instruction.
Embodiment 6
Such as Fig. 5, mine rescue simulation tunnel temperature, smog control automatic control system described in embodiment 1, described height
Temperature sensor 13 is set in warm manoeuvre cigarette lane, and described temperature sensor 13 is arranged on the right side of smoke generator 14, described hair
Cigarette machine 14 is arranged on the left side of passage two, and the right side of described temperature sensor 13 sets illuminance transducer 15, described illumination
Sensor 15 and 13 alternate setting of temperature sensor, the outer end in described high temperature manoeuvre cigarette lane 16 also set up air-heater 17, smoke
Machine 14 and interchanger 18;
Sound pick-up 19 and camera 20 are set in described high temperature manoeuvre cigarette lane, also set up in described high temperature manoeuvre cigarette lane
Sound equipment 21, described sound equipment 21 receive tunnel broadcast control signals, and described sound pick-up 19 is described by tunnel audio monitoring and controlling
Camera 20 by video monitoring monitoring and controlling, described temperature sensor 13 is by tunnel temperature monitor and control, described smoke
Machine 14 receives tunnel smog control.
Certainly, described above is not limitation of the present invention, and the present invention is also not limited to the example above, this technology neck
The variations, modifications, additions or substitutions that the technical staff in domain is made in the essential scope of the present invention, it should also belong to the present invention's
Protection domain.
Claims (3)
1. a kind of mine rescue simulation tunnel temperature, smog control automatic control system, it is characterized in that:High temperature manoeuvre cigarette is controlled in lane
System includes tunnel monitor system, data handling system and tunnel control system;
Described comprehensive monitor system includes tunnel smoke monitoring, tunnel temperature monitoring, video monitoring monitoring and tunnel audio prison
Survey;
Described tunnel control system includes tunnel smog control, tunnel temperature control, the control of tunnel video, tunnel broadcast control
System, tunnel audio frequency control and tunnel air draft control;
Described tunnel control system includes console (1), in real time monitoring, data sheet and information management, described console
(1), real-time monitoring, data sheet and information management and video monitoring equipment two-way transmission signals, described console (1), reality
When monitoring, data sheet and information management and audio control system two-way transmission signals, described video monitoring equipment is to large-size screen monitors
Curtain monitor transmission video signal;
Described console (1), in real time monitoring, data sheet and information management and PLC two-way transmission signals, described PLC is also
The live signal of field instrument is received, described PLC transmits control signal to heating apparatus, raw cigarette device and fume extractor,
Described PLC and display two-way transmission signals.
2. mine rescue simulation tunnel temperature according to claim 1, smog control automatic control system, it is characterized in that:
Set one group of button (2) left end that display I (3) and display are set respectively with right-hand member among the top of described console (1)
II (4), the left end of described display I (3) set sound equipment I (5), and the right-hand member of described display II (4) sets sound equipment II
(6), the lower section of described button (2) sets wireless talkback platform (7), and the right side of described wireless talkback platform (7) is set to speech
Cylinder (8);
The lower central of described console (1) sets action bars (9), and the left side of described action bars (9) sets keyboard I
(10), the right side of described action bars (9) sets keyboard II (11).
3. mine rescue simulation tunnel temperature according to claim 2, smog control automatic control system, it is characterized in that:
The power on/off of described console (1) control switch board, the interior access general supply U lines of described switch board, general supply V lines and total electricity
Source W lines, described general supply U lines connection threephase switch QF1 first end, threephase switch QF2 first end, threephase switch QF3
First end, threephase switch QF4 first end, threephase switch QF5 first end, single-way switch QF6 and single-way switch QF7, institute
The threephase switch QF1 stated first end connection KM1 first end, described connection KM1 first end connect the of fuse FR1
One end, the first end of described fuse FR1 first end connection heating blower I, described threephase switch QF3 first end connect
Connect KM2 first end, described connection KM2 first end connection fuse FR2 first end, the of described fuse FR2
One end connects the first end of heating blower II, and the connection SSR1 of described threephase switch QF2 first end first end is described
The first end of SSR1 first end connection heater I, the connection SSR2 of described threephase switch QF4 first end first end,
The first end of described SSR2 first end connection heater II, the connection of described threephase switch QF5 first end
SINAMICSV20 first end, the first end of described SINAMICSV20 first end connection induced-draft fan;
Described general supply V lines connection threephase switch QF1 the second end, threephase switch QF2 the second end, threephase switch QF3
Second end, threephase switch QF4 the second end, threephase switch QF5 the second end, single-way switch QF8 and single-way switch QF9, it is described
Threephase switch QF1 the second end connection KM1 the second end, described connection KM1 the second end connects the second of fuse FR1
End, the second end of described fuse FR1 the second end connection heating blower I, described threephase switch QF3 the second end connection
KM2 the second end, described connection KM2 the second end connection fuse FR2 the second end, the second of described fuse FR2
Second end of end connection heating blower II, the connection SSR1 at described threephase switch QF2 the second end the second end are described
Second end of SSR1 the second end connection heater I, the connection SSR2 at described threephase switch QF4 the second end the second end,
Second end of described SSR2 the second end connection heater II, the connection at described threephase switch QF5 the second end
SINAMICSV20 the second end, the second end of described SINAMICSV20 the second end connection induced-draft fan;
Described general supply W lines connection threephase switch QF1 the 3rd end, threephase switch QF2 the 3rd end, threephase switch QF3
It is 3rd end, threephase switch QF4 the 3rd end, threephase switch QF5 the 3rd end, single-way switch QF10, single-way switch QF11, unidirectional
Switch QF12, single-way switch QF13, single-way switch QF14, single-way switch QF15 and single-way switch QF16, described threephase switch
QF1 three-terminal link KM1 the 3rd end, described connection KM1 three-terminal link fuse FR1 the 3rd end are described
3rd end of fuse FR1 three-terminal link heating blower I, the 3rd of described threephase switch QF3 three-terminal link KM2 the
End, described connection KM2 three-terminal link fuse FR2 the 3rd end, described fuse FR2 three-terminal link heating
3rd end of blower fan II, the connection SSR1 at described threephase switch QF2 the 3rd end the 3rd end, described SSR1 the 3rd end
3rd end of connection heater I, the connection SSR2 at described threephase switch QF4 the 3rd end the 3rd end, described SSR2's
3rd end of three-terminal link heater II, the 3rd of the connection SINAMICSV20 at described threephase switch QF5 the 3rd end the
End, the 3rd end of described SINAMICSV20 three-terminal link induced-draft fan.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711098644.9A CN107703999A (en) | 2017-11-09 | 2017-11-09 | Mine rescue simulation tunnel temperature, smog control automatic control system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711098644.9A CN107703999A (en) | 2017-11-09 | 2017-11-09 | Mine rescue simulation tunnel temperature, smog control automatic control system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107703999A true CN107703999A (en) | 2018-02-16 |
Family
ID=61180073
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711098644.9A Pending CN107703999A (en) | 2017-11-09 | 2017-11-09 | Mine rescue simulation tunnel temperature, smog control automatic control system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107703999A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201576396U (en) * | 2009-12-28 | 2010-09-08 | 北京赛克德利科技有限公司 | Mine roadway smoke heat simulated training system |
CN102682341A (en) * | 2012-04-30 | 2012-09-19 | 山西潞安环保能源开发股份有限公司常村煤矿 | System and method for managing coal mine emergency rescue command information |
WO2013162465A1 (en) * | 2012-04-28 | 2013-10-31 | Hock Pheng Tan | A narrow space rescue training device |
CN103971556A (en) * | 2014-04-04 | 2014-08-06 | 中国矿业大学 | Mine disaster simulated training system |
CN203882466U (en) * | 2014-04-04 | 2014-10-15 | 中国矿业大学 | Mining disaster simulated training system |
CN106401650A (en) * | 2016-10-21 | 2017-02-15 | 中国矿业大学(北京) | Multi-parameter mine laneway fire monitoring and alarming system |
CN207586774U (en) * | 2017-11-09 | 2018-07-06 | 黑龙江科技大学 | Mine rescue simulation tunnel temperature, smog control automatic control system |
-
2017
- 2017-11-09 CN CN201711098644.9A patent/CN107703999A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201576396U (en) * | 2009-12-28 | 2010-09-08 | 北京赛克德利科技有限公司 | Mine roadway smoke heat simulated training system |
WO2013162465A1 (en) * | 2012-04-28 | 2013-10-31 | Hock Pheng Tan | A narrow space rescue training device |
CN102682341A (en) * | 2012-04-30 | 2012-09-19 | 山西潞安环保能源开发股份有限公司常村煤矿 | System and method for managing coal mine emergency rescue command information |
CN103971556A (en) * | 2014-04-04 | 2014-08-06 | 中国矿业大学 | Mine disaster simulated training system |
CN203882466U (en) * | 2014-04-04 | 2014-10-15 | 中国矿业大学 | Mining disaster simulated training system |
CN106401650A (en) * | 2016-10-21 | 2017-02-15 | 中国矿业大学(北京) | Multi-parameter mine laneway fire monitoring and alarming system |
CN207586774U (en) * | 2017-11-09 | 2018-07-06 | 黑龙江科技大学 | Mine rescue simulation tunnel temperature, smog control automatic control system |
Non-Patent Citations (2)
Title |
---|
孙小兰等: "矿山应急救援综合模拟演习系统的研制", 金属矿山, no. 6, pages 1 - 2 * |
秦冬冬;王曙东;: "矿井救灾模拟演练系统的研究和应用", 电脑知识与技术, no. 18, pages 1 - 2 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108361937B (en) | Intelligent central air-conditioning energy-saving control method and system | |
CN204098946U (en) | City integrated piping lane natural ventilating structure | |
CN206817708U (en) | A kind of intelligent O&M environmental control system | |
CN207586774U (en) | Mine rescue simulation tunnel temperature, smog control automatic control system | |
CN105258306B (en) | A kind of automatic demand response device and application method towards central air conditioner system | |
CN101833879A (en) | Comprehensive rescue simulation training system | |
CN209496498U (en) | A kind of training system for rail traffic automatic fire alarm system | |
CN107918289A (en) | A kind of intelligence control system of cinema's movie theater environment | |
CN208922512U (en) | A kind of municipal administration underground confined space operation practical training and test device | |
CN107703999A (en) | Mine rescue simulation tunnel temperature, smog control automatic control system | |
CN210324678U (en) | Subway fire treatment simulation training device | |
CN209227778U (en) | Prefabricated buildings | |
CN111102638A (en) | Intelligent teaching place and use method thereof | |
CN204595655U (en) | A kind of intelligent substation convergence control cabinet temperature humidity regulating system | |
CN107515583A (en) | A kind of switching station's security context monitoring integrated system based on double layer network | |
CN206247564U (en) | A kind of air handling system for the control device of VMC and containing it | |
CN110223562B (en) | Simulation training device for subway system fire prevention | |
CN205717507U (en) | A kind of container-type heat exchange station | |
CN210348864U (en) | Subway air conditioning system's simulation training set | |
CN204360616U (en) | Smart Home teaching training system | |
CN207780576U (en) | A kind of domestic gas table and pipeline telesecurity monitoring system | |
CN207689894U (en) | Mine emergency rescue exercise tunnel intelligentized control method and drilling system | |
CN204576110U (en) | The system of travelling of body-building apparatus and gymnasium | |
CN207249518U (en) | A kind of new intelligent 3D boiler-plates | |
CN109011309A (en) | Intelligent fire-pretection system is used in mechanical technique exploitation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180216 |
|
WD01 | Invention patent application deemed withdrawn after publication |