CN105258306B - A kind of automatic demand response device and application method towards central air conditioner system - Google Patents

A kind of automatic demand response device and application method towards central air conditioner system Download PDF

Info

Publication number
CN105258306B
CN105258306B CN201510638904.1A CN201510638904A CN105258306B CN 105258306 B CN105258306 B CN 105258306B CN 201510638904 A CN201510638904 A CN 201510638904A CN 105258306 B CN105258306 B CN 105258306B
Authority
CN
China
Prior art keywords
central air
demand response
air conditioner
module
conditioner system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510638904.1A
Other languages
Chinese (zh)
Other versions
CN105258306A (en
Inventor
陈宋宋
闫华光
钟鸣
熊敏
郭炳庆
李德智
何子亨
屈博
黄伟
苗常海
石坤
许高杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN201510638904.1A priority Critical patent/CN105258306B/en
Publication of CN105258306A publication Critical patent/CN105258306A/en
Application granted granted Critical
Publication of CN105258306B publication Critical patent/CN105258306B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

The present invention relates to a kind of automatic demand response device and application method towards central air conditioner system, the automatic demand response device is deployed in central air conditioner system side, between central air conditioner system and grid side demand response server;Comprising: be set to the data memory module being in communication with each other in shell with microprocessor module, human-computer interaction module, communication module, security module, isolation module, interface module, real-time clock, house dog and power management module;By executing corresponding strategy in data memory module, to realize in demand response business, the coordinated control to central air conditioner system operating load;The execution efficiency that automatic demand response business is improved using the device and methods for using them is changed the central air conditioner system load adjustment mode under traditional artificial means of intervention, has saved human resources and economic expense.

Description

A kind of automatic demand response device and application method towards central air conditioner system
Technical field
The present invention relates to a kind of responding device and application methods, and in particular to a kind of automatic need towards central air conditioner system Ask responding device and application method.
Background technique
Torridity summer, central air-conditioning load is excessively high to cause some areas power grid the phenomenon that peak of power consumption, shortage of electric power occur It occurs repeatedly, especially in central and east coastal area, this phenomenon is clearly.Implement demand response for central air conditioner system, On the one hand it can alleviate the influence caused by power grid security reliability service of power grid peak;On the other hand electric system can be improved Operational efficiency reduces the unnecessary wasting of resources.
But when central air conditioner system participates in demand response, it can not both automatically analyze the demand that demand response server is sent and ring Induction signal, and can not directly response signal is generated for air-conditioner host, pump, blower inside air-conditioner set or unit according to demand The control command of equal components.
Summary of the invention
To solve the above-mentioned problems, the present invention provides a kind of automatic demand response device towards central air conditioner system and answers With method, the support of demand response service provision technology is participated in for central air conditioner system, promotes the operation of electric system economical and efficient, subtracts The electric cost expenditure for having lacked central air conditioner system user is the important means for alleviating energy and environment problem.
The purpose of the present invention is adopt the following technical solutions realization:
A kind of automatic demand response device towards central air conditioner system, the automatic demand response device are deployed in center Air-conditioning system side, between central air conditioner system and grid side demand response server;Pass through communication network and demand on Response server is communicated;Pass through each unit host control in distributed bus or local area network and central air conditioner system to lower Molding block is in communication with each other comprising: it is set to microprocessor module in shell, data memory module, human-computer interaction module, logical Believe module, security module, isolation module, interface module, real-time clock, house dog and power management module;The interface module It is bi-directionally connected by isolation module and microprocessor module;The microprocessor module respectively with data memory module, man-machine friendship Mutual module, communication module, security module, real-time clock, house dog, isolation module, interface module and power management module are mutual Communication.
Preferably, the microprocessor module is device core, for data memory module and human-computer interaction module into Row information interaction, to realize that information receives, information is sent, information parses, strategy execution and order are sent;
The data memory module, it is for storing data and tactful;
The human-computer interaction module, the information for providing the demand response device for user is consulted and operative configuration;
The communication module for being in communication with each other by communication network and grid side demand response server, and supports heat Plug;
The security module is encrypted for the legitimacy in verification information source, and to sensitive data;Wherein, described Sensitive data, including demand response event feedback information and metrical information;
The isolation module, for interface module to be isolated with other modules;
The interface module, for establish in demand response device and central air conditioner system each unit host computer control module it Between communication;
The house dog loses monitoring capacity for preventing described device from crashing;
The real-time clock, for providing accurate system time for device, it is ensured that the time does not lose after power down;
The power management module, for being responsible for device power supply management and distribution.
Preferably, the interior of shell is coated with electro-magnetic screen layer.
Preferably, the interface module, including RS485 interface, RS232 interface, RJ45 interface, analog interface and number Measure interface.
Further, RS485, RS232, RJ45 interface and central air conditioner main machine control module and parameter detection equipment Intercommunication;Control life is assigned for obtaining the operating parameter of central air conditioner system, while to central air conditioner system host It enables;
The analog quantity, digital interface and Temperature Humidity Sensor are in communication with each other, for obtaining site environment parameter;Simultaneously It is connected with central air conditioner system associated conduit valve and damper actuator, for adjusting valve and baffle opening.
Preferably, the built-in demand response policy library for supporting real-time update of the data memory module and central air-conditioning operation Regulating strategy library;The demand response policy library and central air-conditioning operation regulating strategy library are respectively used to storage demand response strategy Regulating strategy is run with central air-conditioning.
A kind of application method of the automatic demand response device towards central air conditioner system, which comprises
Step S701: automatic demand response device receives the need that grid side demand response server issues by communication network Response events information is sought, load down amount and electricity price change information are obtained by parsing, select adaptable demand response strategy;
Step S702: according to corresponding demand response strategy and the current electrical parameter of central air conditioner system, running state parameter And environmental parameter, determine specific response plan, and send feedback signal to grid side demand response server;
Step S703: response server feedback signal based on the received, automated response piece confirmation signal;
Step S704: the automatic demand response device forms specific response grade according to the response plan after confirmation With response capacity, the regulation and control instruction for being directed to central air conditioner system is generated.
Further, the demand response strategy, for converting received demand response event to and central air-conditioning system The response plan that system running state parameter matches instructs central air conditioner system orderly to participate in demand response according to both working out a scheme;
The central air-conditioning runs regulating strategy, refers to for converting the regulation for central air conditioner system for response plan It enables;Wherein, the response plan participates in object and response time including response grade, response capacity, response.
Preferably, the method for calling the demand response strategy and central air conditioner system to run regulating strategy includes:
Step S901: the automatic demand response device receives grid side demand response server by communication network and issues Demand response event, transfer to microprocessor module to be parsed;
Step S902: according to the load down amount and electricity price change information parsed, from the need for being built in data memory module Seek matching corresponding demand response policy in response policy library;
Step S903: central air-conditioning system in central air-conditioning control module and spot sensor is obtained by downstream interface unit Electrical parameter, running state parameter and the environmental parameter of system, and it is uploaded to microprocessor module;
Step S904: response policy and received relevant parameter, determination respond the microprocessor module according to demand Grade and response capacity;
Step S905: feedback signal is sent to demand response server;
Step S906: after the confirmation signal for receiving the transmission of demand response server, according to the response grade and response Capacity executes corresponding central air conditioner system and runs regulating strategy.
Further, based on fuzzy algorithmic approach execute central air conditioner system operation regulating strategy specific method include:
Step S907: grade according to response judges whether this demand response belongs to emergency demand response;If it is not, holding Row step S808, by user selection manually or automatically mode execute control load strategy;
Step S908: being selected in a manner of automatic or manual by user, executes demand response;If selecting automated manner, after It is continuous to execute step S909;If selection manual mode, by user voluntarily response events information and demand response strategy pair as desired Central air conditioner system load is regulated and controled;
Step S909: if response capacity is greater than AKW, S910 is thened follow the steps;If being not more than AKW, then follow the steps S911;Wherein, the AKW is the maximum carrying capacity of separate unit Central air-conditioning unit in central air conditioner system;
Step S910: by central air conditioner system according to automatic demand response device execute regulating strategy after output as a result, Automatically adjust to the operating load of part Central air-conditioning unit in central air conditioner system or directly shut down element center sky Adjust unit;
Step S911: by central air conditioner system according to automatic demand response device execute regulating strategy after output as a result, It automatically adjusts to the operating load of part or separate unit Central air-conditioning unit in central air conditioner system;
Step S912: demand response event terminates, data memory module record this demand response time started, at the end of Between, the electrical parameter of response process and environmental parameter;And above- mentioned information are fed back into demand response server.
Further, the central air conditioner system runs regulating strategy, including central air conditioner system multicomputer combined regulating Instruction and the instruction of single fighter multi-part coordinated regulation;
The multicomputer combined regulating instruction, for carrying out combined regulating, the multiple units of start and stop to multicomputer central air-conditioning Or the operation power of the multiple units of adjustment;
The single fighter multi-part coordinated regulation instruction, for central air conditioner system host, chilled water system and cooling Water system associated components carry out coordinated regulation, and control is adjusted for air-conditioner host, pump, blower running speed or operating status System.
Compared with the prior art, the beneficial effect that the present invention reaches is:
1, in terms of participating in automatic demand response business, the automatic demand response device of central air conditioner system can be replaced The artificial automatic load control system for realizing central air conditioner system avoids unnecessary human resources spending;
2, demand response strategy built in the automatic demand response device of central air conditioner system, the strategy are based on fuzzy algorithmic approach, energy Enough demand response event information of the basis from grid side demand response server, operating parameter, environmental parameter in conjunction with itself, The plan arrangement for participating in automatic demand response is automatically determined, the execution efficiency of automatic demand response business is improved;
3, the built-in operation regulating strategy for being directed to central air conditioner system of the automatic demand response device of central air conditioner system, the plan It is slightly based on fuzzy algorithmic approach, the response plan information that can be confirmed according to grid side demand response server is right according to schedule Central air conditioner system executes load control automatically;
4, the automatic demand response device requires holding for binding target with the minimum environmental condition of industry and commerce user When the row operation regulating strategy, the modes such as different component coordinated regulations in different unit combined regulatings or single fighter are taken, are protected Card indoor environmental condition meets industry and commerce user demand.
Detailed description of the invention
Fig. 1 is automatic demand response apparatus structure schematic diagram provided by the invention;
Fig. 2 is automatic demand response device communication scheme provided by the invention;
Fig. 3 is automatic demand response device application schematic diagram provided by the invention;
Fig. 4 is strategy execution flow chart built in automatic demand response device provided by the invention;
Specific embodiment
As shown in Fig. 2, a kind of automatic demand response device towards central air conditioner system, the automatic demand response device It is deployed in central air conditioner system side, between the demand response server of central air conditioner system and distal end;Pass through communication on Network is communicated with demand response server;To under according to the actual situation, distrbuted bus or other local area networks are selected Network is communicated with unit host computer control module each in central air conditioner system.Central air conditioner system electrical parameter, operating status can be acquired Parameter and environmental parameter etc., and its operating status can be regulated and controled with responsive electricity grid side demand response semaphore request, comprising: setting Microprocessor module, data memory module, human-computer interaction module, communication module, security module, isolation module in shell, Interface module, real-time clock, house dog and power management module;The interface module passes through isolation module and microprocessor module It is bi-directionally connected;The microprocessor module respectively with data memory module, human-computer interaction module, communication module, security module, reality Shi Shizhong, house dog, isolation module, interface module and power management module are in communication with each other.
As shown in Figure 1, the microprocessor module is device core, it is used for and data memory module and human-computer interaction module Information exchange is carried out, to realize that information receives, information is sent, information parses, strategy execution and order are sent;
The data memory module, it is for storing data and tactful, and corresponding strategies being capable of real-time update;Specifically include electricity Parameter, central air conditioner main machine and each component running state parameter, environmental parameter, relevant historical data, demand response policy library, in Entreat operation of air conditioner regulating strategy library etc..
The built-in demand response policy library for supporting real-time update of the data memory module and central air-conditioning operation regulation plan Slightly library;The demand response policy library and central air-conditioning operation regulating strategy library are respectively used to storage demand response strategy and center Operation of air conditioner regulating strategy.
The human-computer interaction module, the information for providing the demand response device for user is consulted and operative configuration; Convenient for being debugged, being configured to device;
The communication module for being in communication with each other by communication network and grid side demand response server, and supports heat It inserts
It pulls out;Wherein, communication network includes the communication modes such as wired, wireless or hybrid network.
The security module specifically rings the configuration parameter of described device, demand for the legitimacy in verification information source It answers event information etc. to carry out parsing and legitimate verification, information is prevented to be maliciously tampered;And sensitive data is encrypted;Its In, the sensitive data, including demand response event feedback information and metrical information;
The isolation module, for interface module to be isolated with other modules;Prevent other being connected with the present apparatus Equipment is impacted and is damaged to the present apparatus, further increases device operation stability and reliability;
The interface module, for establish in demand response device and central air conditioner system each unit host computer control module it Between communication;Complete control instruction issue, each unit operational state of mainframe parameter acquisition of central air conditioner system and monitoring;While with Electrical parameter etc. acquires monitoring device connection, receives the electricity ginseng of each host and relevant components component in central air conditioner system operational process Number;In addition, connecting with environmental parameter monitoring apparatus such as temperature, humidity, relevant environmental parameter is received;
The interface module, including RS485 interface, RS232 interface, RJ45 interface, analog interface and digital interface.
The intercommunication of RS485, RS232, RJ45 interface and central air conditioner main machine control module and parameter detection equipment; Control command is assigned for obtaining the operating parameter of central air conditioner system, while to central air conditioner system host;
Analog quantity, digital interface and Temperature Humidity Sensor are in communication with each other, for obtaining site environment parameter;Simultaneously in Centre air-conditioning system associated conduit valve is connected with damper actuator, for adjusting valve and baffle opening.
The house dog loses monitoring capacity for preventing described device from crashing;
The real-time clock, for providing accurate system time for device, it is ensured that the time does not lose after power down;
The power management module, for being responsible for device power supply management and distribution.
The interior of shell is coated with electro-magnetic screen layer, and electro-magnetic screen layer is macromolecule layer.Be conducive to the electricity of lifting device Magnetic is compatible with performance, improves operational reliability of the device at the scene in complex environment.
As shown in figure 3, a kind of application method of the automatic demand response device towards central air conditioner system, this method packet It includes:
Step S701: automatic demand response device receives the need that grid side demand response server issues by communication network Response events information is sought, load down amount and electricity price change information are obtained by parsing, select adaptable demand response strategy;
Step S702: according to corresponding demand response strategy and the current electrical parameter of central air conditioner system, running state parameter And environmental parameter, determine specific response plan, and send feedback signal to grid side demand response server;
Step S703: response server feedback signal based on the received, automated response piece confirmation signal;
Step S704: the automatic demand response device forms specific response grade according to the response plan after confirmation With response capacity, the regulation and control instruction for being directed to central air conditioner system is generated.Individual units in Joint regulation central air conditioner system, or it is single The operating status of the building blocks such as host, water circulating pump in a unit.
The demand response strategy, for converting received demand response event to and running state of central air-conditioning system The response plan that parameter matches, the information such as load down demand, electricity price for parsing;Instruct central air conditioner system according to both devising a stratagem It draws and orderly participates in demand response;Wherein, the response plan participates in object and response including response grade, response capacity, response Time.Response, which participates in object, can be the different units of central air conditioner system, the associated components being also possible in single unit.
The central air-conditioning runs regulating strategy, refers to for converting the regulation for central air conditioner system for response plan It enables;Combined regulating can be carried out to multicomputer central air conditioner system, start or close down certain units;It also can be to central air-conditioning system The associated components of single unit are regulated and controled in system, such as are carried out for operating load, the chilled water output temperature of air-conditioner host Adjustment, or regulated and controled for associated cyclic water pump, blower running speed and the aperture for having closing valve, baffle etc..
The central air conditioner system runs regulating strategy, including the instruction of central air conditioner system multicomputer combined regulating and single machine Group multi-part coordinated regulation instruction;Multicomputer combined regulating instruction, for carrying out combined regulating, start and stop to multicomputer central air-conditioning The operation power of multiple units or the multiple units of adjustment;Single fighter multi-part coordinated regulation instruction, for central air-conditioning system System host, chilled water system and cooling water system associated components carry out coordinated regulation, operate speed for air-conditioner host, pump, blower Control is adjusted in degree or operating status.
As shown in figure 4, the method for calling the demand response strategy and central air conditioner system to run regulating strategy includes:
Step S901: the automatic demand response device receives grid side demand response server by communication network and issues Demand response event, transfer to microprocessor module to be parsed;
Step S902: according to the load down amount and electricity price change information parsed, from the need for being built in data memory module Seek matching corresponding demand response policy in response policy library;
Step S903: central air-conditioning system in central air-conditioning control module and spot sensor is obtained by downstream interface unit Electrical parameter, running state parameter and the environmental parameter of system, and it is uploaded to microprocessor module;
Step S904: response policy and received relevant parameter, determination respond the microprocessor module according to demand Grade and response capacity;
Step S905: feedback signal is sent to demand response server;
Step S906: after the confirmation signal for receiving the transmission of demand response server, according to the response grade and response Capacity executes corresponding central air conditioner system and runs regulating strategy.
Based on fuzzy algorithmic approach execute central air conditioner system operation regulating strategy specific method include:
Step S907: grade according to response judges whether this demand response belongs to emergency demand response;If it is not, holding Row step S808, by user selection manually or automatically mode execute control load strategy;
Step S908: being selected in a manner of automatic or manual by user, executes demand response;If selecting automated manner, after It is continuous to execute step S909;If selection manual mode, by user voluntarily response events information and demand response strategy pair as desired Central air conditioner system load is regulated and controled;
Step S909: if response capacity is greater than AKW, S910 is thened follow the steps;If being not more than AKW, then follow the steps S911;Wherein, the AKW is the maximum carrying capacity of separate unit Central air-conditioning unit in central air conditioner system;
Step S910: by central air conditioner system according to automatic demand response device execute regulating strategy after output as a result, Automatically adjust to the operating load of part Central air-conditioning unit in central air conditioner system or directly shut down element center sky Adjust unit;
Corresponding regulating strategy can be with are as follows: 1. are based on fuzzy algorithmic approach, carry out the control of air-conditioner host intelligent frequency-conversion, and adjustment is real-time Motor speed.Through actual verification, by this strategy, highest can reduce the load 30% of motor drive system.By five In the central air conditioner system that the above unit of platform links, the reducible load of this regulating strategy is greater than A kW, while will not make There is biggish temporary impact electric current at whole unit starting or when stopping, reducing the influence to power grid;
2. shutting down whole unit.This regulating strategy can be calculated when previous strategy is unable to satisfy load down demand by fuzzy Method intelligently closes one or more unit.Through actual verification, after this strategy execution, load down reaction speed is fast, and load down amount Greatly.But this strategy is related to the starting of whole unit and shuts down, and biggish temporary impact electric current will occurs, and may cause shadow to power grid It rings.
Step S911: by central air conditioner system according to automatic demand response device execute regulating strategy after output as a result, It automatically adjusts to the operating load of part or separate unit Central air-conditioning unit in central air conditioner system;Regulating object is related to list All parts of platform unit, including host, water circulating pump, blower etc.;
Corresponding regulating strategy can be with are as follows: 1. are based on fuzzy algorithmic approach, join in conjunction with air-conditioning system current state parameter, environment Number, intelligent control chilled water system, cooling water system change the flow and temperature of recirculated water using intelligent frequency-conversion control technology, Under the premise of not appreciably affecting users'comfort, load is reduced;2. being based on fuzzy algorithmic approach, join in conjunction with air-conditioning system current state Blower baffle standard-sized sheet minimizes duct resistance by number, environmental parameter, intelligent control cooling tower fan system, adjusts blower Flow and revolving speed, at this time blower still can efficient operation, under the premise of not influencing users'comfort, reduce load.
Step S912: demand response event terminates, data memory module record this demand response time started, at the end of Between, the electrical parameter of response process and environmental parameter;And above- mentioned information are fed back into demand response server.Meanwhile demand response In implementation procedure, central air conditioner system relevant parameter will also be acquired in real time, and be sent to user's control system or demand sound Answer the monitoring system etc. of executing agency.
Finally it should be noted that: the above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof, to the greatest extent Invention is explained in detail referring to above-described embodiment for pipe, it should be understood by those ordinary skilled in the art that: still It can be with modifications or equivalent substitutions are made to specific embodiments of the invention, and without departing from any of spirit and scope of the invention Modification or equivalent replacement, are intended to be within the scope of the claims of the invention.

Claims (11)

1. a kind of application method of the automatic demand response device towards central air conditioner system, which is characterized in that the method packet It includes:
Step S701: automatic demand response device receives the demand that grid side demand response server issues by communication network and rings Event information is answered, load down amount and electricity price change information are obtained by parsing, select corresponding demand response policy;
Step S702: according to corresponding demand response strategy and the current electrical parameter of central air conditioner system, running state parameter and Environmental parameter determines specific response plan, and sends feedback signal to grid side demand response server;
Step S703: response server feedback signal based on the received, automated response piece confirmation signal;
Step S704: the automatic demand response device forms specific response grade and sound according to the response plan after confirmation Capacity is answered, the regulation and control instruction for being directed to central air conditioner system is generated.
2. a kind of application method of the automatic demand response device towards central air conditioner system as described in claim 1, special Sign is, the demand response strategy, for converting received demand response event to and running state of central air-conditioning system The response plan that parameter matches instructs central air conditioner system orderly to participate in demand response according to both working out a scheme;
The central air-conditioning runs regulating strategy, for converting response plan to the regulation and control instruction for central air conditioner system; Wherein, the response plan participates in object and response time including response grade, response capacity, response.
3. a kind of application method of the automatic demand response device towards central air conditioner system as described in claim 1, special Sign is that the method for calling the demand response strategy and central air conditioner system to run regulating strategy includes:
Step S901: the automatic demand response device receives the need that grid side demand response server issues by communication network Response events are sought, microprocessor module is transferred to be parsed;
Step S902: it according to the load down amount and electricity price change information parsed, is rung from the demand for being built in data memory module Answer matching corresponding demand response policy in policy library;
Step S903: central air conditioner system in central air-conditioning control module and spot sensor is obtained by downstream interface unit Electrical parameter, running state parameter and environmental parameter, and it is uploaded to microprocessor module;
Step S904: response policy and received relevant parameter, determination respond grade to the microprocessor module according to demand With response capacity;
Step S905: feedback signal is sent to demand response server;
Step S906: after the confirmation signal for receiving the transmission of demand response server, according to the response grade and response capacity Execute corresponding central air conditioner system operation regulating strategy.
4. a kind of application method of the automatic demand response device towards central air conditioner system as claimed in claim 3, special Sign is that the specific method for executing central air conditioner system operation regulating strategy based on fuzzy algorithmic approach includes:
Step S907: grade according to response judges whether this demand response belongs to emergency demand response;If it is not, executing step Rapid S908, by user selection manually or automatically mode execute control load strategy;
Step S908: being selected in a manner of automatic or manual by user, executes demand response;If selecting automated manner, continue to hold Row step S909;If selection manual mode, by user voluntarily as desired response events information and demand response strategy to center Air-conditioning system load is regulated and controled;
Step S909: if response capacity is greater than AKW, S910 is thened follow the steps;If being not more than AKW, S911 is thened follow the steps; Wherein, the AKW is the maximum carrying capacity of separate unit Central air-conditioning unit in central air conditioner system;
Step S910: by central air conditioner system according to the output after automatic demand response device execution regulating strategy as a result, centering The operating load of part Central air-conditioning unit automatically adjusts or directly shuts down element center air conditioner in the air-conditioning system of centre Group;
Step S911: by central air conditioner system according to the output after automatic demand response device execution regulating strategy as a result, centering The operating load of part or separate unit Central air-conditioning unit automatically adjusts in the air-conditioning system of centre;
Step S912: demand response event terminates, data memory module record this demand response time started, the end time, The electrical parameter and environmental parameter of response process;And by the demand respond the time started, the end time, response process electrical parameter Demand response server is fed back to environmental parameter.
5. a kind of application method of the automatic demand response device towards central air conditioner system as claimed in claim 4, special Sign is that the central air conditioner system runs regulating strategy, including the instruction of central air conditioner system multicomputer combined regulating and single machine Group multi-part coordinated regulation instruction;
Multicomputer combined regulating instruction, for carrying out combined regulating to multicomputer central air-conditioning, the multiple units of start and stop or Adjust the operation power of multiple units;
The single fighter multi-part coordinated regulation instruction, for central air conditioner system host, chilled water system and cooling water system Associated components of uniting carry out coordinated regulation, and control is adjusted for air-conditioner host, pump, blower running speed or operating status.
6. a kind of a kind of automatic demand response device towards central air conditioner system for application method described in claim 1, It is characterized in that, the automatic demand response device is deployed in central air conditioner system side, between central air conditioner system and grid side Between demand response server;It is communicated by communication network with demand response server on;To lower by distributed total Line or local area network are in communication with each other with unit host computer control module each in central air conditioner system comprising: it is set in shell Microprocessor module, data memory module, human-computer interaction module, communication module, security module, isolation module, interface module, Real-time clock, house dog and power management module;The interface module is bi-directionally connected by isolation module and microprocessor module; The microprocessor module respectively with data memory module, human-computer interaction module, communication module, security module, real-time clock, see Door dog, isolation module are connected with power management module.
7. a kind of automatic demand response device towards central air conditioner system as claimed in claim 6, it is characterised in that:
The microprocessor module is device core, for carrying out information exchange with data memory module and communication module, with reality Existing information receives, information is sent, information parses, strategy execution and order are sent;
The data memory module, it is for storing data and tactful;
The human-computer interaction module, the information for providing the demand response device for user is consulted and operative configuration;
The communication module for being in communication with each other by communication network and grid side demand response server, and supports hot plug;
The security module is encrypted for the legitimacy in verification information source, and to sensitive data;Wherein, the sensitivity Data, including demand response event feedback information and metrical information;
The isolation module, for interface module to be isolated with other modules;
The interface module, for establishing in demand response device and central air conditioner system between each unit host computer control module Communication;
The house dog loses monitoring capacity for preventing described device from crashing;
The real-time clock, for providing accurate system time for device, it is ensured that the time does not lose after power down;
The power management module, for being responsible for device power supply management and distribution.
8. a kind of automatic demand response device towards central air conditioner system as claimed in claim 6, which is characterized in that described Interior of shell is coated with electro-magnetic screen layer.
9. a kind of automatic demand response device towards central air conditioner system as claimed in claim 6, which is characterized in that described Interface module, including RS485 interface, RS232 interface, RJ45 interface, analog interface and digital interface.
10. a kind of automatic demand response device towards central air conditioner system as claimed in claim 9, which is characterized in that institute State the intercommunication of RS485, RS232, RJ45 interface and central air conditioner main machine control module and parameter detection equipment;For obtaining The operating parameter of central air conditioner system is taken, while assigning control command to central air conditioner system host;
The analog quantity, digital interface and Temperature Humidity Sensor are in communication with each other, for obtaining site environment parameter;Simultaneously in Centre air-conditioning system associated conduit valve is connected with damper actuator, for adjusting valve and baffle opening.
11. a kind of automatic demand response device towards central air conditioner system as claimed in claim 6, which is characterized in that institute State the built-in demand response policy library for supporting real-time update of data memory module and central air-conditioning operation regulating strategy library;The need Asking response policy library and central air-conditioning to run, regulating strategy library is respectively used to storage demand response strategy and central air-conditioning operation is adjusted Control strategy.
CN201510638904.1A 2015-09-30 2015-09-30 A kind of automatic demand response device and application method towards central air conditioner system Active CN105258306B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510638904.1A CN105258306B (en) 2015-09-30 2015-09-30 A kind of automatic demand response device and application method towards central air conditioner system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510638904.1A CN105258306B (en) 2015-09-30 2015-09-30 A kind of automatic demand response device and application method towards central air conditioner system

Publications (2)

Publication Number Publication Date
CN105258306A CN105258306A (en) 2016-01-20
CN105258306B true CN105258306B (en) 2019-11-08

Family

ID=55098099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510638904.1A Active CN105258306B (en) 2015-09-30 2015-09-30 A kind of automatic demand response device and application method towards central air conditioner system

Country Status (1)

Country Link
CN (1) CN105258306B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106816878B (en) * 2017-03-09 2020-07-24 中国电力科学研究院 Demand response regulation and control device and method applied to electric power irrigation and drainage facilities
CN108826592A (en) * 2017-05-03 2018-11-16 天津大学(青岛)海洋工程研究院有限公司 A kind of multi-connected machine central air-conditioner control method based on control based on network
CN107101344A (en) * 2017-05-27 2017-08-29 珠海格力电器股份有限公司 Electric power peak regulation control method and device and air conditioning equipment
CN110231804A (en) * 2018-03-05 2019-09-13 江西清华泰豪三波电机有限公司 Method, equipment and the storage medium that a kind of pair of multicomputer carries out automatically controlling
CN109780686A (en) * 2018-12-29 2019-05-21 国网江苏省电力有限公司无锡供电分公司 Using time efficiency as the central air-conditioning flexible control method of starting point
CN116753599B (en) * 2023-06-17 2023-12-01 杭州全能星科技有限公司 Central air conditioning load regulation and control system based on cloud platform

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105321A (en) * 2007-08-03 2008-01-16 华南理工大学 Central air conditioner end environmental temperature and cold source load remote control and regulation method and system
CN201476187U (en) * 2009-06-02 2010-05-19 惠州市中林实业有限公司 Dynamic energy saving system of central air-conditioning
CN102901188A (en) * 2012-09-26 2013-01-30 中国电力科学研究院 Commercial building central air-conditioning load control system interacted with power grid and method thereof
US8397527B2 (en) * 2007-07-30 2013-03-19 Jack V. Miller Energy saving integrated lighting and HVAC system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8397527B2 (en) * 2007-07-30 2013-03-19 Jack V. Miller Energy saving integrated lighting and HVAC system
CN101105321A (en) * 2007-08-03 2008-01-16 华南理工大学 Central air conditioner end environmental temperature and cold source load remote control and regulation method and system
CN201476187U (en) * 2009-06-02 2010-05-19 惠州市中林实业有限公司 Dynamic energy saving system of central air-conditioning
CN102901188A (en) * 2012-09-26 2013-01-30 中国电力科学研究院 Commercial building central air-conditioning load control system interacted with power grid and method thereof

Also Published As

Publication number Publication date
CN105258306A (en) 2016-01-20

Similar Documents

Publication Publication Date Title
CN105258306B (en) A kind of automatic demand response device and application method towards central air conditioner system
CN113435657B (en) Data integration processing method, system, energy management system, electronic device and computer readable storage medium
CN100407652C (en) Remote monitoring central air conditioning unit and grouping control method
CN110225075A (en) A kind of building energy internet wisdom operation cloud operating system
CN201181420Y (en) Air conditioner
CN106096772A (en) Energy based on intelligent power and load corporate management system and implementation method
CN203147907U (en) Urban centralized heating linkage optimal control system
US10409234B2 (en) Power control apparatus, power control system, and power control method
CN104456842A (en) Prepayment intelligent air conditioning system
CN111795426A (en) Novel indoor intelligent heating system and method
CN201449552U (en) Power plant agc control system
CN114285159A (en) Platform district energy control system
CN207635514U (en) Air conditioner control system
CN106196512A (en) Control system for cold station of central air conditioner
CN203982142U (en) Teaching building classroom intelligent energy-saving control system
CN202813650U (en) Monitoring device for central air-conditioner fan coil energy conservation
Fan et al. An optimization management strategy for energy efficiency of air conditioning loads in smart building
CN104776607A (en) Boiler intelligent control system
CN207778553U (en) New energy is provided multiple forms of energy to complement each other intelligence control system
CN204287952U (en) A kind of cold and heat combined supply self-optimizing control equipment
CN103062863A (en) Method and system for multi-dimension ecological environment automatic adjustment based on intelligent air conditioner
CN106058875A (en) Power load control method and power load control device
CN115235050A (en) Simulation method and device for energy-saving strategy of central air-conditioning water chilling unit
CN113283649B (en) Method, device, equipment and medium for controlling energy efficiency of supply and demand cooperative operation
CN211822694U (en) Heat energy edge service system based on Internet of things technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant