CN107703926A - A kind of network system protects fast cut back multi-point control time method of testing - Google Patents

A kind of network system protects fast cut back multi-point control time method of testing Download PDF

Info

Publication number
CN107703926A
CN107703926A CN201711113799.5A CN201711113799A CN107703926A CN 107703926 A CN107703926 A CN 107703926A CN 201711113799 A CN201711113799 A CN 201711113799A CN 107703926 A CN107703926 A CN 107703926A
Authority
CN
China
Prior art keywords
control
load
cutting load
station
moment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711113799.5A
Other languages
Chinese (zh)
Inventor
樊海锋
张小易
袁宇波
李虎成
卜强生
夏杰
张刘冬
彭志强
郑明忠
周琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201711113799.5A priority Critical patent/CN107703926A/en
Publication of CN107703926A publication Critical patent/CN107703926A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0208Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the configuration of the monitoring system
    • G05B23/0213Modular or universal configuration of the monitoring system, e.g. monitoring system having modules that may be combined to build monitoring program; monitoring system that can be applied to legacy systems; adaptable monitoring system; using different communication protocols
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/24Pc safety
    • G05B2219/24065Real time diagnostics

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention discloses a kind of network system to protect fast cut back multi-point control time method of testing; when reaching cutting load condition; association's control central station issues cutting load order; cutting load order is transferred sequentially to control centre station, control sub-station and net load interaction terminal successively, and net load interaction terminal cuts off corresponding interruptible load user's branch switch according to cutting load order;During cutting load, record association control central station issues the cutting load order moment, control centre station receives the cutting load order moment, control sub-station receives the cutting load order moment, net load interaction terminal receives cutting load moment, interruptible load user's branch switch tripping moment and user side load current and falls zero moment, and the difference of corresponding event time is delay of control.The principle of the invention is simple, it is only necessary to a small amount of tester, can effectively the checking system protection control strategy of fast cut back, channel information, the accuracy of control function, optimize the cooperation between each subsystem, improve the overall operation performance of system.

Description

A kind of network system protects fast cut back multi-point control time method of testing
Technical field
The present invention relates to a kind of network system to protect fast cut back multi-point control time method of testing, belongs to electric power System protection control technology field.
Background technology
State Grid Corporation of China proposed to accelerate research high-intelligentization, the protecting electrical power system of new generation of high security in recent years Control technology, take and send end cutting machine, receiving end spatial load forecasting, more direct currents coordination control and the quick control of phase modifier, pumped storage etc. to arrange Apply, build bulk power grid safety comprehensive defense system.Jiangsu Power Grid enters the extra-high voltage epoch and welcomes great development, will form " six friendships Four is straight " general layout, operation of power networks characteristic generation profound change, there is an urgent need to innovate pipe diameter design, strengthen technical support, utilize battalion Interruptible load is sold, realizes that extra-high voltage direct-current failure fast accurate is disposed, it is ensured that the safe and stable operation of large receiving-end grid.
Extensive source net lotus close friend's interaction systems are both to realize that the indispensability of bulk power grid security developments is arranged the clean energy resource epoch Apply, the important measure that even more global energy Internet Strategy lands in provincial company.In (the important contact of extra-high voltage grid failure The locking of line failure direct current) when, by the spatial load forecasting means of " system protection level ", effectively suppress frequency and decline, it is ensured that bulk power grid Safe and stable operation;Solves the problems such as out-of-limit electric network swim and system reserve deficiency using exact load control measure, it is ensured that electricity Net orderly reliable power supply.The mode of interruptible load control " friendly interactive " is taken, bulk power grid disturbance is significantly reduced and society is produced Raw influence.
Construction for this extensive source net lotus close friend's interaction systems is brought into schedule.But lack the effective time in reality Measuring technology means fully verify the function of extensive source net lotus close friend's interaction systems construction, so as to finally meet extra-high voltage DC bipolar block failure causes the disposal requirement of power shortage.
The content of the invention
In order to solve the above-mentioned technical problem, the invention provides a kind of network system to protect fast cut back multi-point control Time test method processed.
In order to achieve the above object, the technical solution adopted in the present invention is:
A kind of network system protects fast cut back multi-point control time method of testing, it is characterised in that:Reach cut it is negative During lotus condition, association's control central station issues cutting load order, and cutting load order is transferred sequentially to control centre station, control successively Stand and net load interaction terminal, net load interaction terminal cut off corresponding interruptible load user's branch switch according to cutting load order; During cutting load, record association control central station issues cutting load order moment t1, control centre station receives the cutting load order moment T2, control sub-station receive cutting load order moment t3, net load interaction terminal receives cutting load moment t4, interruptible load user Branch switch tripping moment t5 and user side load current fall zero moment t6, and the difference of corresponding event time is delay of control.
Before cutting load, it is necessary to detect association control central station stood to control centre, control centre station arrive control sub-station and Whether control sub-station is normal to the passage between net load interaction terminal.
During cutting load, to carry out it is following test,
Whether test association control central station correctly sends cutting load order to control centre station;
Whether test control center station correctly sends cutting load order to control sub-station;
Whether testing and control substation correctly sends cutting load order to net load interaction terminal;
The cutting load order whether response control substation is sent of Test Network lotus interactive terminal;
Sent on Test Network lotus interactive terminal control sub-station can cutting load amount it is whether correct;
Testing and control substation Shang Song control centres station can cutting load amount it is whether correct;
Excision load principle be:
A, interruptible load is removed according to default priority slicing;
B, the load that definition needs to cut off is Pcut, can cutting load be divided into N layers, can cutting load amount be P=P1+…+Pi +…+PN, i is integer, 1≤i≤N;IfJ is integer, and 1≤j≤N, then what is actually cut off is negative Lotus amount is
Association's control central station, control centre station and control sub-station are using two-shipper mutually for control system.
Reception that record issues cutting load order moment t1 by association's control central station of electric B codes time service, control centre stands is cut negative Lotus order moment t2, control sub-station receive cutting load order moment t3, net load interaction terminal receives cutting load moment t4, utilize Time synchronized instrument measures interruptible load user branch switch tripping moment t5, measures user side using fault oscillograph and bears The charged zero moment t6 that pours off.
The beneficial effect that the present invention is reached:The principle of the invention is simple, it is only necessary to a small amount of tester, you can realizes safety Reliably, precision reaches Millisecond, can effectively the checking system protection control strategy of fast cut back, channel information, control function Accuracy, optimize the cooperation between each subsystem, improve the overall operation performance of system.
Brief description of the drawings
Fig. 1 is the schematic diagram of the present invention;
Fig. 2 is experiment process stage by stage;
Fig. 3 is excision load schematic diagram;
Fig. 4 is the schematic diagram that interruptible load user's branch switch tripping moment t5 is measured with time synchronized instruments;
Fig. 5 is existing extensive source net lotus close friend's interaction systems Organization Chart.
Embodiment
The invention will be further described below in conjunction with the accompanying drawings.Following examples are only used for clearly illustrating this hair Bright technical scheme, and can not be limited the scope of the invention with this.
As shown in figure 1, a kind of network system protection fast cut back multi-point control time method of testing, is specially:Reach During to cutting load condition, association's control central station issues cutting load order, cutting load order be transferred sequentially to successively control centre station, Control sub-station and net load interaction terminal, net load interaction terminal cut off corresponding interruptible load user's branch according to cutting load order Switch;During cutting load, record is controlled central station by the association of electric B codes time service and issued in cutting load order moment t1, control Center station receives cutting load order moment t2, control sub-station receives cutting load order moment t3, net load interaction terminal receives cutting load Moment t4, interruptible load user branch switch tripping moment t5 is measured using time synchronized instrument, is surveyed using fault oscillograph Obtain user side load current and fall zero moment t6, the difference of corresponding event time is delay of control, such as:T6-t1 is that system protection is cut The time required to burden functional is realized.
Before cutting load, it is necessary to detect association control central station stood to control centre, control centre station arrive control sub-station and Whether control sub-station is normal to the passage between net load interaction terminal.
During cutting load, following test is carried out:
Whether test association control central station correctly sends cutting load order to control centre station;
Whether test control center station correctly sends cutting load order to control sub-station;
Whether testing and control substation correctly sends cutting load order to net load interaction terminal;
The cutting load order whether response control substation is sent of Test Network lotus interactive terminal;
Sent on Test Network lotus interactive terminal control sub-station can cutting load amount it is whether correct;
Testing and control substation Shang Song control centres station can cutting load amount it is whether correct;
Whether test control center station can correctly have access to the action event information of each substation.
Association's control central station, control centre station and control sub-station are using two-shipper mutually for control system, two-shipper mutually standby control The Controlling principle of system can be divided into:Two take two principles and two to take a principle.Such as control centre's station two sets of control systems of A, B;Two Two principles are taken, association's control two sets of control systems of central station are working properly, mutual communication is normal, two sets of control centre station control system Working properly, mutual communication of uniting is normal, and all receives the cutting load order that association's control central station is sent, and cutting load just acts;When (assist the control a set of control system of central station different when only a set of control system receives the cutting load order that association's control central station is sent Often/stop transport, or the arbitrarily a set of stoppage in transit/abnormal obliteration of two sets of control systems), whole cutting load is failure to actuate, and can only lean on control centre Load Shedding According To Frequency of standing acts;Two take a principle, and control centre station is in any a set of stoppage in transit of two sets of control systems or abnormal obliteration feelings Under condition, only after the another set maintenance pressing plate of control system input of normal operation, the control system of normal operation, which just releases, closes Lock, Controlling principle are changed to two and take a principle, and when control centre station takes two to take a mode to run, the double sets of control sub-station control system When system is all normal, the signal of another set control system maintenance is issued control sub-station by the control system of control centre's station normal operation, Control sub-station takes a control mode to run by two immediately.
Before cutting load, two-shipper will mutually be tested stage by stage for control system, as shown in Fig. 2 such as two sets of A, B Control system, need cutting load to be divided into 6 layers, first carry out A control system experiments;B controls are carried out again after the completion of the experiment of A control systems System test;Finally A, B control system are tested simultaneously.
Excision load principle be:
A, interruptible load is removed according to default priority slicing;
B, the load that definition needs to cut off is Pcut, can cutting load be divided into N layers, can cutting load amount be P=P1+…+Pi +…+PN, i is integer, 1≤i≤N;IfJ is integer, and 1≤j≤N, then what is actually cut off is negative Lotus amount is
As shown in figure 3, can cutting load be divided into 6 layers, it is necessary to which the load of excision can cut capacity positioned at one, two, three, four layer Sum and one, two, three, four, five layer can be cut between capacity sum, then directly cut off in excision
As shown in figure 4, interruptible load user's branch switch tripping moment t5 principle is measured with time synchronized instruments Scheme, there are a pair of auxiliary contacts for being available for external time synchronized instruments on net load interaction terminal panel, corresponding internal circuit diagram is one Relay coil contact switch K, relay coil contact switch K is normally opened when not receiving cutting load instruction, when net load interaction terminal Relay coil contact switch K is just closed when receiving cutting load instruction, by external time synchronized instrument (soe precision), Can measures the time signal length (an of short duration trigger pulse rising edge, precision ms).
In order to further illustrate the above method, so that wood shows disrespect on central station as an example, the extensive source net lotus of East China is friendly mutually Dynamic system concrete structure is as shown in Figure 5.Extensive source net lotus close friend interaction systems include friendly interactive precisely cutting load and system Two big system of fast cut back is protected, wherein system protection fast cut back system includes East China association control central station, the Suzhou change of current Stand, the flat current conversion station of political affairs, wood show disrespect on central station (control centre station), Mu Du substations, granary substation, Yushan substation, Wujiang substation (four Individual control sub-station), transformer station, 2M special data channels, user side net load interaction terminal etc. nearby, realize that Millisecond (protect by system Protect level) fast cut back ability.
Use the detailed process of the above method for:
1) check whether the passage that East China association control central station and wood are shown disrespect between central station is normal, check that wood shows disrespect on central station point Whether the passage not between Mu Du substations, granary substation, Yushan substation, Wujiang substation is normal;Check wood show disrespect on, granary, jade Whether mountain, Wujiang substation and passage between each net load interaction terminal are normal;
2) when reaching cutting load condition, East China association control central station issues cutting load order and stood to Mu Du control centres, and wood is shown disrespect on Control centre station issues cutting load order to Mu Du substations, granary substation, Yushan substation and Wujiang substation, Mu Du substations, granary Substation, Yushan substation and Wujiang substation issue cutting load order and give each net load interaction terminal respectively, net load interaction terminal according to The corresponding interruptible load user's branch switch of cutting load order excision;During cutting load, record passes through electric B codes time service Association's control central station issues cutting load order moment t1, control centre station receives cutting load order moment t2, control sub-station is received and cut Load command moment t3, net load interaction terminal receive cutting load moment t4, and measuring interruptible load using time synchronized instrument uses Family branch switch tripping moment t5, measure user side load current using fault oscillograph and fall zero moment t6, corresponding event time Difference be delay of control, t6-t1 is the time required to system protection cutting load function is realized.
In the example exemplified by cutting 5 layers of load (totally 6 layers of load), during cutting load, test Mu Du substations, granary Stand, sent on Yushan substation and Wujiang substation wood show disrespect on central station can cutting load amount it is whether correct, as a result such as following table one and the institute of table two Show:
One each layer of table can cutting load amount
That send that wood shows disrespect on central station on the substation of table two can cutting load amount
Conclusion:That send that wood shows disrespect on central station on Mu Du substations, granary substation, Yushan substation and Wujiang substation can cutting load amount Correctly.
Test wood show disrespect on central station whether correctly sent to Mu Du substations, granary substation, Yushan substation and Wujiang substation cut it is negative Lotus is ordered, as a result as shown in following table three:
The wood of table three shows disrespect on central station and sends cutting load order to substation
Numbering Project Whether central station action is correct
6.32 17:03:14:061 moment acted
6.33 Issued to Mu Du substations and cut 5 layers of load command
6.34 Issued to granary substation and cut 5 layers of load command
6.35 Issued to Yushan substation and cut 5 layers of load command
6.36 Issued to Wujiang substation and cut 5 layers of load command
Conclusion:Wood show disrespect on central station correctly sent to Mu Du substations, granary substation, Yushan substation and Wujiang substation cut 5 layers it is negative Lotus excision order, each substation also correctly responds the order.
Brief summary:According to actual operating mode be 4 levels of substation the 1st can cutting load amount 18.01MW, the 2nd level can cut it is negative Lotus amount 27.3MW, the 3rd level can cutting load amount 7.25MW, the 4th level can cutting load amount 5.72MW, the 5th level can cutting load amount 24.81MW, the 6th level can cutting load amount 11.76MW, and it is all can cutting load amount 94.85MW, and set need cutting load Capacity 70MW, meetFinal actual excision 83.09MW loads, fast cut back instruction issue correct, net lotus Interactive terminal response substation cutting load instruction is correct.
Test is shown disrespect on central station since wood and received East China association control central station issues cutting load order to interruptible load user The time t5-t2 of branch switch tripping, as a result as shown in following table four:
Table four arrives the time of interruptible load user's branch switch tripping
Four substations choose second line of a couplet user and complete the test of whole group actuation time respectively, and the testing time is to show disrespect on central station from wood Reception East China association control central station issues cutting load order and starts the time to interruptible load user's branch switch tripping:Yushan Substation 78ms, Mu Du substation 68ms, Wujiang substation 57ms, granary substation 69ms.
34 user's branch switches tripping operation average motion time that accurate cutting load is cut in fact is 63ms, while according to system Overall plan, the control Central Policy generation of East China association and instruction transmission time 150ms are built, so system protection fast cut back Whole group actuation time is most less than 300ms soon, meets system protection fast cut back system whole group actuation time less than 650ms's Technical requirements.
In summary, above method principle is simple, it is only necessary to a small amount of tester, you can realizes that securely and reliably precision reaches Millisecond, can effectively the checking system protection control strategy of fast cut back, channel information, the accuracy of control function, optimization Cooperation between each subsystem, improve the overall operation performance of system.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, some improvement and deformation can also be made, these improve and become Shape also should be regarded as protection scope of the present invention.

Claims (6)

1. a kind of network system protects fast cut back multi-point control time method of testing, it is characterised in that:Reach cutting load During condition, association's control central station issues cutting load order, cutting load order be transferred sequentially to successively control centre station, control sub-station and Net load interaction terminal, net load interaction terminal cut off corresponding interruptible load user's branch switch according to cutting load order;It is negative cutting During lotus, record association control central station issues cutting load order moment t1, control centre station receives cutting load order moment t2, control System station receives cutting load order moment t3, net load interaction terminal receives cutting load moment t4, interruptible load user's branch is opened Close tripping moment t5 and user side load current falls zero moment t6, the difference of corresponding event time is delay of control.
2. a kind of network system protection fast cut back multi-point control time method of testing according to claim 1, its It is characterised by:Before cutting load, it is necessary to detect association control central station stood to control centre, control centre station arrive control sub-station and Whether control sub-station is normal to the passage between net load interaction terminal.
3. a kind of network system protection fast cut back multi-point control time method of testing according to claim 1, its It is characterised by:During cutting load, to carry out it is following test,
Whether test association control central station correctly sends cutting load order to control centre station;
Whether test control center station correctly sends cutting load order to control sub-station;
Whether testing and control substation correctly sends cutting load order to net load interaction terminal;
The cutting load order whether response control substation is sent of Test Network lotus interactive terminal;
Sent on Test Network lotus interactive terminal control sub-station can cutting load amount it is whether correct;
Testing and control substation Shang Song control centres station can cutting load amount it is whether correct.
4. a kind of network system protection fast cut back multi-point control time method of testing according to claim 1, its It is characterised by:Excision load principle be:
A, interruptible load is removed according to default priority slicing;
B, the load that definition needs to cut off is Pcut, can cutting load be divided into N layers, can cutting load amount be P=P1+…+Pi+…+PN, I is integer, 1≤i≤N;IfJ is integer, 1≤j≤N, then the load actually cut off is
5. a kind of network system protection fast cut back multi-point control time method of testing according to claim 1, its It is characterised by:Association's control central station, control centre station and control sub-station are using two-shipper mutually for control system.
6. a kind of network system protection fast cut back multi-point control time method of testing according to claim 1, its It is characterised by:Reception that record issues cutting load order moment t1 by association's control central station of electric B codes time service, control centre stands is cut negative Lotus order moment t2, control sub-station receive cutting load order moment t3, net load interaction terminal receives cutting load moment t4, during utilization Between synchronized instruments measure interruptible load user branch switch tripping moment t5, using fault oscillograph measure user side load electricity Zero moment of pouring off t6.
CN201711113799.5A 2017-11-13 2017-11-13 A kind of network system protects fast cut back multi-point control time method of testing Pending CN107703926A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711113799.5A CN107703926A (en) 2017-11-13 2017-11-13 A kind of network system protects fast cut back multi-point control time method of testing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711113799.5A CN107703926A (en) 2017-11-13 2017-11-13 A kind of network system protects fast cut back multi-point control time method of testing

Publications (1)

Publication Number Publication Date
CN107703926A true CN107703926A (en) 2018-02-16

Family

ID=61178495

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711113799.5A Pending CN107703926A (en) 2017-11-13 2017-11-13 A kind of network system protects fast cut back multi-point control time method of testing

Country Status (1)

Country Link
CN (1) CN107703926A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109639466A (en) * 2018-11-28 2019-04-16 国网江苏省电力有限公司南京供电分公司 One kind being based on the electric power industrial control system network security detection system of " source net lotus "
CN109713701A (en) * 2019-02-01 2019-05-03 国网江苏省电力有限公司 Battery energy storage net load interaction method, terminal, system and the medium of superposing control
CN110299764A (en) * 2019-07-03 2019-10-01 广东石油化工学院 A kind of load control system and implementation method based on net lotus close friend's interactive
CN110829419A (en) * 2019-11-15 2020-02-21 国网湖南省电力有限公司 Substation selection method of accurate load shedding system based on routing
CN112186782A (en) * 2020-09-30 2021-01-05 山东大学 Accurate low-frequency load shedding system and method proportional to frequency offset
CN112769123A (en) * 2019-11-01 2021-05-07 南京南瑞继保电气有限公司 Actual measurement method and device for source-network-load accurate control system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101299532A (en) * 2007-11-08 2008-11-05 江苏省电力公司 Closed-loop self-adaption emergency control method for large electric network ''('centralized coordination, demixing control') ''
CN105375501A (en) * 2015-09-18 2016-03-02 北京北变微电网技术有限公司 Multi-time scale micro-grid layered stability control method
CN105743094A (en) * 2016-04-22 2016-07-06 国网江苏省电力公司连云港供电公司 Power grid demand response control system
CN106094495A (en) * 2016-06-15 2016-11-09 国网江苏省电力公司电力科学研究院 Intelligent electronic equipment of transformer substation timing tracking accuracy and the method for testing of punctual precision
CN106340951A (en) * 2016-09-26 2017-01-18 贵州电网有限责任公司遵义供电局 Hierarchical distributed intelligent regional bus-bar automatic transfer switch system
CN106877342A (en) * 2017-03-14 2017-06-20 许继集团有限公司 A kind of cutting load control method
CN107085190A (en) * 2017-05-16 2017-08-22 沃太能源南通有限公司 A kind of and off-network switching time test device and method
CN107134787A (en) * 2017-06-23 2017-09-05 国网江苏省电力公司电力科学研究院 Urgent accurate cutting load control system and cutting load method based on distributed feeder automation

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101299532A (en) * 2007-11-08 2008-11-05 江苏省电力公司 Closed-loop self-adaption emergency control method for large electric network ''('centralized coordination, demixing control') ''
CN105375501A (en) * 2015-09-18 2016-03-02 北京北变微电网技术有限公司 Multi-time scale micro-grid layered stability control method
CN105743094A (en) * 2016-04-22 2016-07-06 国网江苏省电力公司连云港供电公司 Power grid demand response control system
CN106094495A (en) * 2016-06-15 2016-11-09 国网江苏省电力公司电力科学研究院 Intelligent electronic equipment of transformer substation timing tracking accuracy and the method for testing of punctual precision
CN106340951A (en) * 2016-09-26 2017-01-18 贵州电网有限责任公司遵义供电局 Hierarchical distributed intelligent regional bus-bar automatic transfer switch system
CN106877342A (en) * 2017-03-14 2017-06-20 许继集团有限公司 A kind of cutting load control method
CN107085190A (en) * 2017-05-16 2017-08-22 沃太能源南通有限公司 A kind of and off-network switching time test device and method
CN107134787A (en) * 2017-06-23 2017-09-05 国网江苏省电力公司电力科学研究院 Urgent accurate cutting load control system and cutting load method based on distributed feeder automation

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109639466A (en) * 2018-11-28 2019-04-16 国网江苏省电力有限公司南京供电分公司 One kind being based on the electric power industrial control system network security detection system of " source net lotus "
CN109639466B (en) * 2018-11-28 2022-04-08 国网江苏省电力有限公司南京供电分公司 Power engineering control system network safety detection system based on' source network load
CN109713701A (en) * 2019-02-01 2019-05-03 国网江苏省电力有限公司 Battery energy storage net load interaction method, terminal, system and the medium of superposing control
WO2020155303A1 (en) * 2019-02-01 2020-08-06 国网江苏省电力有限公司 Battery energy storage network load interaction method, terminal, system and medium
US11081885B2 (en) 2019-02-01 2021-08-03 State Grid Jiangsu Electric Power Co., Ltd. Battery energy storage grid-load interactive method, terminal, system and medium for superimposed control
CN110299764A (en) * 2019-07-03 2019-10-01 广东石油化工学院 A kind of load control system and implementation method based on net lotus close friend's interactive
CN112769123A (en) * 2019-11-01 2021-05-07 南京南瑞继保电气有限公司 Actual measurement method and device for source-network-load accurate control system
CN110829419A (en) * 2019-11-15 2020-02-21 国网湖南省电力有限公司 Substation selection method of accurate load shedding system based on routing
CN112186782A (en) * 2020-09-30 2021-01-05 山东大学 Accurate low-frequency load shedding system and method proportional to frequency offset

Similar Documents

Publication Publication Date Title
CN107703926A (en) A kind of network system protects fast cut back multi-point control time method of testing
Liu et al. The control and analysis of self-healing urban power grid
CN102495850A (en) Method for splicing multi-stage multi-region interconnected power grid relay protection model
CN103618385B (en) One puies forward high-precision state estimation data correction system and method
CN104076228B (en) A kind of bus criticality based on voltage dip and fragile degree appraisal procedure
CN105205740A (en) Power distribution network power supply capacity evaluation method considering effective extension of interconnections of main transformers
CN106026108A (en) Load shedding method of stability control system of considering power grid safety accident risk
CN201805272U (en) Intelligent incoming line standby power self-input device for regions having rich small hydropower stations
CN105590164B (en) The power transmission and transformation system fail-safe analysis device being automatically integrating based on power-off event
Zhou et al. An overview on distribution automation system
CN104977474A (en) System for measuring transmission loss in a hvdc system
CN204333890U (en) The long-range verification adjusting system of a kind of relay protection constant value
CN202093096U (en) Low-voltage short-circuit impedance test device of transformer
CN103647279B (en) A kind of forecast failure set creation method based on plant stand wiring information
CN202957666U (en) Network structure for power dispatching
CN105656037B (en) The integrated safe method of calibration of high pressure power distribution network
CN203787789U (en) T and pi mixed net rack wiring structure applied to high voltage distribution
CN202772658U (en) Power supply system for sensitive equipment
CN102508015B (en) Three-in-one real-time load curve construction method for railway power supply system
CN103956743A (en) Method and device for optimizing 10KV power distribution network based on phase difference
Xuedong et al. The research and application of stability control system operated on qipanjing industrial park isolated power system
CN220325337U (en) Data center electrical architecture
CN203135460U (en) Power station energy-storing system
CN103683278A (en) Power distribution network load calibration method applied to on-line loop closing trend optimization analysis
Jun et al. Research on critical technologies of power supply reliability improvement in Shanghai

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180216

RJ01 Rejection of invention patent application after publication