CN103683278A - Power distribution network load calibration method applied to on-line loop closing trend optimization analysis - Google Patents
Power distribution network load calibration method applied to on-line loop closing trend optimization analysis Download PDFInfo
- Publication number
- CN103683278A CN103683278A CN201310537551.7A CN201310537551A CN103683278A CN 103683278 A CN103683278 A CN 103683278A CN 201310537551 A CN201310537551 A CN 201310537551A CN 103683278 A CN103683278 A CN 103683278A
- Authority
- CN
- China
- Prior art keywords
- load
- feeder
- distribution transformer
- head end
- distribution
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 10
- 238000013433 optimization analysis Methods 0.000 title claims abstract description 8
- 238000004364 calculation method Methods 0.000 claims abstract description 15
- 238000005457 optimization Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 5
- 238000005259 measurement Methods 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明公开了一种应用于在线合环潮流优化分析的配电网负荷校准方法,包括如下步骤:步骤一,将配电网的所有负荷值调节为配电变压器的额定负荷;步骤二,得到馈线满载的电流值;步骤三,得到馈线的实际负载率;步骤四,计算:Scap、Sload、Tcap、Tload1、Tload2、Tcap;步骤五,在同一次迭代计算中刷新所有的配变负荷值后,重新计算得到馈线首端的新的负荷值,比较新的负荷值与馈线首端的实际量测值差是否相等,如果不满足要求就重新计算调整配变负荷,直到满足收敛精度要求。本发明通过馈线首端的量计算变压器的负荷并对电网负荷进行校准,从而保证在线合环潮流优化分析结果的准确性。
The invention discloses a distribution network load calibration method applied to the optimization analysis of the online closed-loop power flow, which comprises the following steps: step 1, adjusting all load values of the distribution network to the rated load of the distribution transformer; step 2, obtaining The current value of the feeder at full load; step 3, get the actual load rate of the feeder; step 4, calculate: Scap, S load , Tcap, T load1 , T load2 , Tcap; step 5, refresh all distribution transformers in the same iterative calculation After the load value, recalculate the new load value at the head end of the feeder, and compare whether the difference between the new load value and the actual measured value at the head end of the feeder is equal. If the requirements are not met, recalculate and adjust the distribution transformer load until the convergence accuracy requirements are met. The invention calculates the load of the transformer and calibrates the load of the power grid through the quantity at the head end of the feeder, so as to ensure the accuracy of the analysis result of the online loop closing power flow optimization.
Description
技术领域technical field
本发明涉及一种应用于在线合环潮流优化分析的配电网负荷校准方法。The invention relates to a distribution network load calibration method applied to online loop closing power flow optimization analysis.
背景技术Background technique
为简化电网运行方式,抑制短路电流水平,提高电网的供电可靠性,维持电网的安全经济运行,我国110kV及以下供、配电网一般采用环网设计、开环运行的模式。当需要转移负荷或检修完毕拟恢复供电时,一般采用先合环后解环的操作模式以避免用户停电,提高用户的供电可靠性。In order to simplify the operation mode of the power grid, suppress the level of short-circuit current, improve the reliability of the power supply of the power grid, and maintain the safe and economic operation of the power grid, the power supply and distribution networks of 110kV and below in my country generally adopt the ring network design and open-loop operation mode. When the load needs to be transferred or the power supply is to be restored after maintenance, the operation mode of closing the loop first and then releasing the loop is generally adopted to avoid power outages for users and improve the reliability of power supply for users.
由于合环操作时可能产生较大的合环潮流,引起设备过载或继电保护动作,导致合环操作失败或停电。如果保护拒动,可能造成设备损坏或上一级保护动作,扩大停电范围。由于合环后电网的运行状况对调度运行人员是不透明的,调度运行人员很难凭经验预先判断合环操作的可靠性,很可能由于合环潮流过大导致合环后设备过载或保护跳闸,最终导致合环操作失败,造成用户停电或电气设备损坏等。由于合环潮流大小难以直接预测,为了防止设备损坏,有时是采用先断后通原则进行操作,造成用户短时停电,这牺牲了电网供电可靠性,在市区等重要负荷供电区域内是不能接受的。因此,在进行合环操作前,应该进行合环潮流预算,对合环后的情况做到心中有数,保证合环操作成功,提高供电可靠性。在有条件的情况下,应通过对合环潮流的在线监视,跟踪合环潮流大小随时间变化的情况,选择在合环潮流较小的时刻进行合环解操作,提高合环操作的成功率。Due to the large loop closing power flow may be generated during the loop closing operation, which may cause equipment overload or relay protection action, resulting in loop closing operation failure or power failure. If the protection refuses to operate, it may cause damage to the equipment or the protection action of the upper level, expanding the scope of power failure. Since the operation status of the power grid after the loop is closed is opaque to the dispatching operators, it is difficult for the dispatching and operating personnel to judge the reliability of the loop closing operation in advance based on experience. Ultimately, the loop closing operation fails, causing power outages for users or damage to electrical equipment. Due to the difficulty of directly predicting the power flow of the closed loop, in order to prevent equipment damage, sometimes the principle of break before make is used to operate, resulting in short-term power outages for users, which sacrifices the reliability of power grid power supply, which is unacceptable in important load power supply areas such as urban areas of. Therefore, before the loop closing operation, the loop closing power flow budget should be carried out, and the situation after the loop closing should be well known to ensure the success of the loop closing operation and improve the reliability of power supply. If conditions permit, the online monitoring of the loop closure power flow should be used to track the change of the loop closure power flow with time, and the loop closure solution operation should be performed at the moment when the loop closure flow is small, so as to improve the success rate of the loop closure operation .
输电网通常状况下有全面的量测系统,对于设备的电气量存在冗余的情况,但配电网缺监测手段,运行电气数据不足,对配电网进行较为精确分析带来困难,需要进行状态估计等分析。The transmission network usually has a comprehensive measurement system, and there is redundancy in the electrical quantity of the equipment. However, the distribution network lacks monitoring means and insufficient operating electrical data. It is difficult to conduct a more accurate analysis of the distribution network. State estimation and other analysis.
发明内容Contents of the invention
本发明所要解决的技术问题就是提供一种应用于在线合环潮流优化分析的配电网负荷校准方法,保证在线合环潮流优化分析结果的准确性。The technical problem to be solved by the present invention is to provide a distribution network load calibration method applied to the optimization analysis of the online loop closing power flow, so as to ensure the accuracy of the online loop closing power flow optimization analysis results.
为解决上述技术问题,本发明采用如下技术方案:一种应用于在线合环潮流优化分析的配电网负荷校准方法,包括如下步骤:In order to solve the above-mentioned technical problems, the present invention adopts the following technical solution: a distribution network load calibration method applied to online closed-loop power flow optimization analysis, including the following steps:
步骤一,将配电网的所有负荷值调节为配电变压器的额定负荷;
步骤二,进行潮流计算后得到馈线首端的电流值就是馈线满载的电流值;Step 2: After the power flow calculation, the current value at the head end of the feeder is obtained as the full-load current value of the feeder;
步骤三,用馈线实测电流与馈线满载电流进行计算得到馈线的实际负载率;
步骤四,在得到馈线的实际负载率后计算:Scap馈线满载时首端量测负荷、Sload馈线实际量测负荷、Tcap配变额定容量、Tload1配变当前负荷、Tload2配变计算得到的新负荷、Tcap配变的负荷;Step 4: After obtaining the actual load rate of the feeder, calculate: the measured load at the head end when the Scap feeder is fully loaded, the actual measured load of the S load feeder, the rated capacity of the Tcap distribution transformer, the current load of the T load1 distribution transformer, and the calculation of the T load2 distribution transformer The new load of Tcap distribution transformer load;
步骤五,在同一次迭代计算中刷新所有的配变负荷值后,重新计算得到馈线首端的新的负荷值,比较新的负荷值与馈线首端的实际量测值差是否相等,如果不满足要求就重新计算调整配变负荷,直到满足收敛精度要求。Step 5: After refreshing all the distribution transformer load values in the same iterative calculation, recalculate to obtain the new load value at the head end of the feeder, and compare whether the difference between the new load value and the actual measured value at the head end of the feeder line is equal, and if it does not meet the requirements Recalculate and adjust the distribution transformer load until the convergence accuracy requirements are met.
优选的,配变计算得到的新负荷计算公式为:Preferably, the new load calculation formula obtained from distribution transformer calculation is:
本发明通过馈线首端的量计算变压器的负荷并对电网负荷进行校准,从而保证在线合环潮流优化分析结果的准确性。The invention calculates the load of the transformer and calibrates the load of the power grid through the quantity at the head end of the feeder, so as to ensure the accuracy of the analysis result of the online loop closing power flow optimization.
附图说明Description of drawings
下面结合附图和具体实施方式对本发明作进一步描述:The present invention will be further described below in conjunction with accompanying drawing and specific embodiment:
图1是配电网负荷校准的过程和结果图;Figure 1 is a diagram of the process and results of distribution network load calibration;
图2是馈线潮流分布图;Figure 2 is a distribution diagram of feeder power flow;
图3为负荷校准电流分布图。Figure 3 is a load calibration current distribution diagram.
具体实施方式Detailed ways
在配电网中为了进行潮流计算必须的数据有:各个配变的负荷的3相有功无功值和馈线出口的母线电压、线路所有元件的电气参数。In the distribution network, the data necessary for power flow calculation include: the 3-phase active and reactive power values of the loads of each distribution transformer, the bus voltage at the feeder outlet, and the electrical parameters of all components of the line.
对于实际的配电网采集所有负荷的精确负荷值是很困难的事情,而对于配电网所有馈线的出口量测均有采集,即馈线出口的有功、无功、功率因数、馈线电流。因此,需要通过馈线首端的量计算变压器的负荷。It is very difficult to collect accurate load values of all loads in the actual distribution network, but all feeder outlet measurements of the distribution network are collected, that is, active power, reactive power, power factor, and feeder current at the feeder outlet. Therefore, it is necessary to calculate the load of the transformer by the amount at the head end of the feeder.
馈线首端的功率(有功、无功)就等于馈线上所有负荷功率及其线路损耗功率之和,即:The power (active power and reactive power) at the head end of the feeder is equal to the sum of all load powers on the feeder and their line loss power, namely:
其中S:为视在功率S=P+jQ;I是电流的复数,具有幅度和相角。Among them, S: is the apparent power S=P+jQ; I is the complex number of the current, which has amplitude and phase angle.
下面以图1为例说明配电网负荷校准的过程和结果。The following takes Figure 1 as an example to illustrate the process and results of distribution network load calibration.
量测的数据有:配变2#的负荷每相P+jQ=200+j100;馈线出口量测的电流和功率因数为I=96.18A(换算成功率)、COS=0.9、馈线母线电压U=10.5kV;配变1#负荷未知;根据这些数据负荷进行状态估计得到如图2所示的馈线潮流分布图。The measured data are:
从图3所示的负荷校准电流分布图可以看出:1#配变的负荷被自动化调整为319+j140了,而馈线首端的有功功率等于负荷功率和线路损耗功率之和。From the load calibration current distribution diagram shown in Figure 3, it can be seen that the load of the 1# distribution transformer is automatically adjusted to 319+j140, and the active power at the head end of the feeder is equal to the sum of the load power and the line loss power.
具体计算时,首先将配电网的所有负荷值调节为配电变压器的额定负荷,这样进行潮流计算后得到的馈线首端的电流值就是馈线满载的电流值,用馈线实测电流与馈线满载电流进行计算得到馈线的实际负载率。In the specific calculation, first adjust all the load values of the distribution network to the rated load of the distribution transformer, so that the current value at the head end of the feeder obtained after the power flow calculation is the full-load current value of the feeder, and the actual measured current of the feeder and the full-load current of the feeder are used Calculate the actual load rate of the feeder.
馈线的负载率反映的是整条馈线配变负载率状况,在没有其它数据的情况下,按照整条馈线上配电变压器负载率均衡为默认条件,进行状态估计。The load rate of the feeder reflects the distribution transformer load rate of the entire feeder. In the absence of other data, the state estimation is carried out according to the default condition of distribution transformer load rate balance on the entire feeder.
在得到负载率后计算:Calculate after getting the load rate:
Scap馈线满载时首端量测负荷; When the Scap feeder is fully loaded, the load is measured at the head end;
Sload馈线实际量测负荷; S load The actual measured load of the feeder;
Tcap配变额定容量; Tcap distribution transformer rated capacity;
Tload1配变当前负荷; T load1 distribution transformer current load;
Tload2配变计算得到的新负荷; T load2 is the new load calculated by distribution transformer;
Tcap配变的负荷。 Load of Tcap distribution transformer.
注:这里所有的负荷值都是复数形式。Note: All load values here are plural.
在得知馈线满载负荷和实际量测负荷后计算某一台配变的公式为:The formula for calculating a distribution transformer after knowing the full load of the feeder and the actual measured load is:
在同一次迭代计算中刷新所有的配变负荷值后,重新计算得到馈线首端的新的负荷值,比较新的负荷值与馈线首端的实际量测值差是否相等(差小于收敛精度),如果不满足要求就重新计算调整配变负荷,直到满足收敛精度要求。After refreshing all the distribution transformer load values in the same iterative calculation, recalculate the new load value at the head end of the feeder, and compare whether the difference between the new load value and the actual measured value at the head end of the feeder is equal (the difference is less than the convergence accuracy), if If the requirements are not met, recalculate and adjust the distribution transformer load until the convergence accuracy requirements are met.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310537551.7A CN103683278B (en) | 2013-11-04 | 2013-11-04 | A kind of distribution network load calibration steps being applied to online closed loop power flow optimization analysis |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310537551.7A CN103683278B (en) | 2013-11-04 | 2013-11-04 | A kind of distribution network load calibration steps being applied to online closed loop power flow optimization analysis |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103683278A true CN103683278A (en) | 2014-03-26 |
CN103683278B CN103683278B (en) | 2017-01-04 |
Family
ID=50319953
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310537551.7A Active CN103683278B (en) | 2013-11-04 | 2013-11-04 | A kind of distribution network load calibration steps being applied to online closed loop power flow optimization analysis |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103683278B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108923540A (en) * | 2018-08-28 | 2018-11-30 | 云南电网有限责任公司电力科学研究院 | A kind of distribution feeder Load obtaining method and device measured based on segmentation |
CN113489005A (en) * | 2021-07-22 | 2021-10-08 | 云南电网有限责任公司昆明供电局 | Distribution transformer load estimation method and system for power distribution network load flow calculation |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101192754A (en) * | 2007-12-11 | 2008-06-04 | 中国电力科学研究院 | A Realization Method Considering the Comprehensive Load Model of Distribution Network in Power System |
CN101777765A (en) * | 2010-01-27 | 2010-07-14 | 中国电力科学研究院 | On-line load simulation method of power system |
CN101860026A (en) * | 2010-05-28 | 2010-10-13 | 北京中恒博瑞数字电力科技有限公司 | Analysis method of electromagnetic loop closing and power reversing operation of urban distribution network |
CN102545218A (en) * | 2012-02-17 | 2012-07-04 | 广东电网公司电力科学研究院 | Online load modeling parallel computing method based on electric energy quality monitoring system |
CN102542360A (en) * | 2012-01-10 | 2012-07-04 | 国电南瑞科技股份有限公司 | Method for processing unmodeled unit in process of forecasting bus load |
US20130054987A1 (en) * | 2011-08-29 | 2013-02-28 | Clemens Pfeiffer | System and method for forcing data center power consumption to specific levels by dynamically adjusting equipment utilization |
-
2013
- 2013-11-04 CN CN201310537551.7A patent/CN103683278B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101192754A (en) * | 2007-12-11 | 2008-06-04 | 中国电力科学研究院 | A Realization Method Considering the Comprehensive Load Model of Distribution Network in Power System |
CN101777765A (en) * | 2010-01-27 | 2010-07-14 | 中国电力科学研究院 | On-line load simulation method of power system |
CN101860026A (en) * | 2010-05-28 | 2010-10-13 | 北京中恒博瑞数字电力科技有限公司 | Analysis method of electromagnetic loop closing and power reversing operation of urban distribution network |
US20130054987A1 (en) * | 2011-08-29 | 2013-02-28 | Clemens Pfeiffer | System and method for forcing data center power consumption to specific levels by dynamically adjusting equipment utilization |
CN102542360A (en) * | 2012-01-10 | 2012-07-04 | 国电南瑞科技股份有限公司 | Method for processing unmodeled unit in process of forecasting bus load |
CN102545218A (en) * | 2012-02-17 | 2012-07-04 | 广东电网公司电力科学研究院 | Online load modeling parallel computing method based on electric energy quality monitoring system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108923540A (en) * | 2018-08-28 | 2018-11-30 | 云南电网有限责任公司电力科学研究院 | A kind of distribution feeder Load obtaining method and device measured based on segmentation |
CN108923540B (en) * | 2018-08-28 | 2022-11-25 | 云南电网有限责任公司电力科学研究院 | A distribution network feeder load acquisition method and device based on segment measurement |
CN113489005A (en) * | 2021-07-22 | 2021-10-08 | 云南电网有限责任公司昆明供电局 | Distribution transformer load estimation method and system for power distribution network load flow calculation |
CN113489005B (en) * | 2021-07-22 | 2023-07-25 | 云南电网有限责任公司昆明供电局 | Distribution transformer load estimation method and system for power flow calculation of distribution network |
Also Published As
Publication number | Publication date |
---|---|
CN103683278B (en) | 2017-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109031000B (en) | A kind of method and system based on non-faulting disturbance In situ Measurement grid short circuit capacity | |
CN107317345A (en) | It is a kind of to be electrolysed the method that type load participates in island network FREQUENCY CONTROL | |
CN103219727B (en) | Partition power grid structure dynamics method of adjustment based on PMU actual measurement | |
CN104269809B (en) | Method for on-line verification of relay protection setting value of regional power grid | |
CN101447671B (en) | Automatic integrating and adjusting method for flow data | |
WO2015176564A1 (en) | Method of transformer internal fault diagnosis based on monitoring on virtual parameter changes | |
CN105429137B (en) | The method that distribution network closed loop turns power supply | |
CN102593737B (en) | Test method for relay protection vector inspection before commissioning of substation with capacitance compensation | |
CN106558876B (en) | Operation control method of alternating current-direct current hybrid active power distribution network | |
CN105826908B (en) | Rapid distance protection method for power transmission line containing UPFC and device | |
CN109873443A (en) | Prediction method of DC continuous commutation failure under grid fault based on critical voltage | |
CN104330669B (en) | Load moment based low-voltage early-warning method for rural distribution network | |
CN102983594A (en) | Control method of grid closed loop operation impact current | |
CN105098777A (en) | Low-voltage assistant decision method for rural distribution network | |
CN104078956A (en) | Self-adaption current quick breaking protection method suitable for power distribution network containing distributed power supplies | |
CN102879699B (en) | Method for estimating position of branching joint of transformer in transformer substation | |
CN104269854A (en) | Voltage control method based on direct current inverter station stability measurement indexes | |
CN109787266A (en) | Method and system for online analysis and decision-making of complex UHV DC faults | |
CN103762593B (en) | A Real-time Quantification Method of Coordinated Control Measures for Safety and Stability of Interregional AC and DC Networking | |
CN110445123A (en) | A kind of network reconfiguration control method expanding power distribution network power supply capacity | |
CN103178554B (en) | Method for evaluating exchange capacity limit among large regional grids based on multiple restrictions | |
CN103683278B (en) | A kind of distribution network load calibration steps being applied to online closed loop power flow optimization analysis | |
CN103427427A (en) | Power grid source steady state voltage regulating optimization method for improving transient voltage support capability of power grid | |
CN105226666B (en) | To the check method of reactive apparatus running status in transformer station's automatism voltage control | |
CN102868177B (en) | Automatic identification and correction method of grid-connected point system impedance of wind farm |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |