CN103683278B - A kind of distribution network load calibration steps being applied to online closed loop power flow optimization analysis - Google Patents
A kind of distribution network load calibration steps being applied to online closed loop power flow optimization analysis Download PDFInfo
- Publication number
- CN103683278B CN103683278B CN201310537551.7A CN201310537551A CN103683278B CN 103683278 B CN103683278 B CN 103683278B CN 201310537551 A CN201310537551 A CN 201310537551A CN 103683278 B CN103683278 B CN 103683278B
- Authority
- CN
- China
- Prior art keywords
- load
- feeder line
- distribution
- head end
- value
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000013433 optimization analysis Methods 0.000 title abstract description 5
- 230000001131 transforming effect Effects 0.000 claims description 17
- 238000004364 calculation method Methods 0.000 claims description 6
- 238000005457 optimization Methods 0.000 claims description 2
- 238000004458 analytical method Methods 0.000 abstract description 4
- 238000005259 measurement Methods 0.000 description 4
- 238000007363 ring formation reaction Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 238000012795 verification Methods 0.000 description 3
- 208000033999 Device damage Diseases 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000036962 time dependent Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The invention discloses a kind of distribution network load calibration steps being applied to online closed loop power flow optimization analysis, comprise the steps: step one, all load values of power distribution network are adjusted to the rated load of distribution transformer;Step 2, obtains the current value that feeder line is fully loaded;Step 3, obtains the actual loading rate of feeder line;Step 4, calculates: Scap, Sload、Tcap、Tload1、Tload2、Tcap;Step 5, after refreshing all of distribution transformer load value in an iterative computation, recalculate the new load value obtaining feeder line head end, the newest load value is poor the most equal with the actual amount measured value of feeder line head end, if being unsatisfactory for requiring just to recalculate adjustment distribution transformer load, until meeting convergence precision requirement.Network load by the load of the amount calculating transformer of feeder line head end and is calibrated by the present invention, thus ensures that online closed loop power flow optimizes precision of analysis.
Description
Technical field
The present invention relates to a kind of distribution network load calibration steps being applied to online closed loop power flow optimization analysis.
Background technology
For simplifying power system operating mode, suppress short circuit current level, improve the power supply reliability of electrical network, maintain the peace of electrical network
Full economical operation, China 110kV and following supply and distribution net typically use looped network design, the pattern of open loop operation.When needs shift
Load or overhaul complete plan when restoring electricity, general use first cyclization after the operator scheme unlinked to avoid user to have a power failure, improve
The power supply reliability of user.
Owing to bigger closed loop power flow may be produced during Loop Closing Operation, cause apparatus overload or relay protection action, cause
Loop Closing Operation failure or power failure.If relay fail, it is likely to result in device damage or upper level protection act, expands power failure model
Enclose.Due to after cyclization the operation conditions of electrical network to scheduling operations staff be opaque, management and running personnel be difficult to the most pre-
First judge the reliability of Loop Closing Operation, it is likely that cause apparatus overload or trip protection after cyclization owing to closed loop power flow is excessive,
Cause Loop Closing Operation failure eventually, cause user to have a power failure or electrical equipment damage etc..Owing to closed loop power flow size is difficult to directly predict,
In order to prevent device damage, being to use break-before-make principle to operate sometimes, cause user to have a power failure in short-term, this sacrifices electrical network
Power supply reliability, is unacceptable in the important load power supply areas such as urban district.Therefore, before carrying out Loop Closing Operation, it should
Carrying out closed loop power flow budget, the situation after involutive ring accomplishes to know what's what, it is ensured that Loop Closing Operation success, improves power supply reliability.
In the case of with good conditionsi, the time dependent situation of closed loop power flow size should be followed the tracks of by the in-service monitoring of involutive ring trend,
Select to carry out cyclization solution operation in the moment that closed loop power flow is less, improve the success rate of Loop Closing Operation.
There is comprehensive measurement system under power transmission network usual condition, when redundancy is existed for the electric parameters of equipment, but join
Electrical network lacks monitoring means, runs electric data not enough, power distribution network is carried out more Accurate Analysis and brings difficulty, need to carry out state
Estimations etc. are analyzed.
Summary of the invention
The technical problem to be solved is just to provide a kind of distribution being applied to online closed loop power flow optimization analysis
Net load verification method, it is ensured that online closed loop power flow optimizes precision of analysis.
For solving above-mentioned technical problem, the present invention adopts the following technical scheme that one is applied to online closed loop power flow optimization
The distribution network load calibration steps analyzed, comprises the steps:
All load values of power distribution network are adjusted to the rated load of distribution transformer by step one;
Step 2, the current value obtaining feeder line head end after carrying out Load flow calculation is exactly the fully loaded current value of feeder line;
Step 3, carries out being calculated the actual loading rate of feeder line with feeder line measured current and feeder line full-load current;
Step 4, calculates after obtaining the actual loading rate of feeder line: Scap feeder line full load head end measures load, SloadFeedback
Line is actual measures load, Tcap distribution transforming rated capacity, Tload1Distribution transforming current loads, Tload2The calculated new load of distribution transforming;
Step 5, after refreshing all of distribution transformer load value, recalculates and obtains feeder line head end in an iterative computation
New load value, relatively newer load value is poor the most equal with the actual amount measured value of feeder line head end, if being unsatisfactory for just requiring
Recalculate adjustment distribution transformer load, until meeting convergence precision requirement.
Preferably, the calculated new carry calculation formula of distribution transforming is:
Network load by the load of the amount calculating transformer of feeder line head end and is calibrated by the present invention, thus ensures
Line closed loop power flow optimizes precision of analysis.
Accompanying drawing explanation
The invention will be further described with detailed description of the invention below in conjunction with the accompanying drawings:
Fig. 1 is process and the result figure of distribution network load calibration;
Fig. 2 is feeder line trend scattergram;
Fig. 3 is load verification current distributing figure.
Detailed description of the invention
Power distribution network has to carry out the necessary data of Load flow calculation: 3 phase active reactive values of the load of each distribution transforming
Busbar voltage, the electric parameter of all elements of circuit with feeder line outlet.
The exact load value actual power distribution network being gathered to all loads is highly difficult thing, and for power distribution network institute
The outlet having feeder line measures all collection, i.e. meritorious, idle, power factor, the feeder current of feeder line outlet.Accordingly, it would be desirable to it is logical
Cross the load of the amount calculating transformer of feeder line head end.
The power of feeder line head end (meritorious, idle) be equal on feeder line all load powers and line loss power thereof it
With, it may be assumed that
Wherein S: for apparent energy S=P+jQ;I is the plural number of electric current, has amplitude and phase angle.
Process and the result of distribution network load calibration are described below as a example by Fig. 1.
The data measured have: every phase P+jQ=200+j100 of load of distribution transforming 2#;The electric current of feeder line outlet measurement and power
Factor is I=96.18A (being converted into power), COS=0.9, feeder line busbar voltage U=10.5kV;Distribution transforming 1# load is unknown;Root
Carry out state estimation according to these data load and obtain feeder line trend scattergram as shown in Figure 2.
From the load verification current distributing figure shown in Fig. 3 it can be seen that the load of 1# distribution transforming is automated and is adjusted to 319+
J140, and the active power of feeder line head end is equal to load power and line loss power sum.
When specifically calculating, the first all load values by power distribution network are adjusted to the rated load of distribution transformer, so enter
The current value of the feeder line head end obtained after row Load flow calculation is exactly the current value that feeder line is fully loaded, full with feeder line with feeder line measured current
Carry electric current and carry out being calculated the actual loading rate of feeder line.
The load factor reflection of feeder line is whole piece feeder line distribution transforming load factor situation, in the case of not having other data, presses
It is implied terms according to distribution transformer load factor equilibrium on whole piece feeder line, carries out state estimation.
Calculate after obtaining load factor:
Scap feeder line full load head end measures load;
SloadFeeder line actual measurement load;
Tcap distribution transforming rated capacity;
Tload1Distribution transforming current loads;
Tload2The calculated new load of distribution transforming.
Note: the most all of load value is all plural form.
The formula calculating a certain distribution transforming after learning feeder line full load and actual measurement load is:
After refreshing all of distribution transformer load value in an iterative computation, recalculate new the bearing obtaining feeder line head end
Charge values, the newest load value poor with the actual amount measured value of feeder line head end the most equal (difference is less than convergence precision), if discontented
Foot requires just to recalculate adjustment distribution transformer load, until meeting convergence precision requirement.
Claims (1)
1. one kind is applied to the distribution network load calibration steps that online closed loop power flow optimization is analyzed, it is characterised in that include walking as follows
Rapid:
All load values of power distribution network are adjusted to the rated load of distribution transformer by step one;
Step 2, the current value obtaining feeder line head end after carrying out Load flow calculation is exactly the fully loaded current value of feeder line;
Step 3, carries out being calculated the actual loading rate of feeder line with feeder line measured current and feeder line full-load current;
Step 4, calculates after obtaining the actual loading rate of feeder line: Scap feeder line full load head end measures load, SloadFeeder line is real
Border measures load, Tcap distribution transforming rated capacity, Tload1Distribution transforming current loads, Tload2The calculated new load of distribution transforming;
Step 5, after refreshing all of distribution transformer load value, recalculates and obtains the new of feeder line head end in an iterative computation
Load value, relatively newer load value is the most equal with the actual amount measured value of feeder line head end, if being unsatisfactory for requiring the most again to count
Calculate and adjust distribution transformer load, until meeting convergence precision requirement;
The calculated new carry calculation formula of distribution transforming is:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310537551.7A CN103683278B (en) | 2013-11-04 | 2013-11-04 | A kind of distribution network load calibration steps being applied to online closed loop power flow optimization analysis |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310537551.7A CN103683278B (en) | 2013-11-04 | 2013-11-04 | A kind of distribution network load calibration steps being applied to online closed loop power flow optimization analysis |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103683278A CN103683278A (en) | 2014-03-26 |
CN103683278B true CN103683278B (en) | 2017-01-04 |
Family
ID=50319953
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310537551.7A Active CN103683278B (en) | 2013-11-04 | 2013-11-04 | A kind of distribution network load calibration steps being applied to online closed loop power flow optimization analysis |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103683278B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108923540B (en) * | 2018-08-28 | 2022-11-25 | 云南电网有限责任公司电力科学研究院 | Power distribution network feeder load acquisition method and device based on segmented measurement |
CN113489005B (en) * | 2021-07-22 | 2023-07-25 | 云南电网有限责任公司昆明供电局 | Distribution transformer load estimation method and system for power flow calculation of distribution network |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101192754A (en) * | 2007-12-11 | 2008-06-04 | 中国电力科学研究院 | A realization method for integrated load model of distribution network in power system |
CN101777765B (en) * | 2010-01-27 | 2012-06-20 | 中国电力科学研究院 | On-line load simulation method of power system |
CN101860026B (en) * | 2010-05-28 | 2013-03-06 | 北京中恒博瑞数字电力科技有限公司 | Analysis method of electromagnetic loop closing and power reversing operation of urban distribution network |
US20130054987A1 (en) * | 2011-08-29 | 2013-02-28 | Clemens Pfeiffer | System and method for forcing data center power consumption to specific levels by dynamically adjusting equipment utilization |
CN102542360B (en) * | 2012-01-10 | 2014-12-10 | 国电南瑞科技股份有限公司 | Method for processing unmodeled unit in process of forecasting bus load |
CN102545218A (en) * | 2012-02-17 | 2012-07-04 | 广东电网公司电力科学研究院 | Online load modeling parallel computing method based on electric energy quality monitoring system |
-
2013
- 2013-11-04 CN CN201310537551.7A patent/CN103683278B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN103683278A (en) | 2014-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11346868B2 (en) | Method of determining mutual voltage sensitivity coefficients between a plurality of measuring nodes of an electric power network | |
Salehi et al. | Laboratory-based smart power system, part II: Control, monitoring, and protection | |
Papic | Simulation model for discharging a lead-acid battery energy storage system for load leveling | |
CN101777765B (en) | On-line load simulation method of power system | |
CN101505061B (en) | Computation method capable of tracking Davinan equivalence parameter base on time domain simulation | |
CN108448568B (en) | Power distribution network hybrid state estimation method based on multiple time period measurement data | |
CN108363009A (en) | A method of realizing lithium ion battery maximum allowable power online Prediction | |
CN105429137B (en) | The method that distribution network closed loop turns power supply | |
Choi et al. | Feasibility study: Autonomous state estimation in distribution systems | |
Chen et al. | Modelling of lithium-ion battery for online energy management systems | |
CN105305438B (en) | New energy power station model verification method based on impedance and controlled AC voltage source | |
RU2665700C2 (en) | Device and method for controlling the stability of a local network using an adjustable local network transformer | |
CN104993478A (en) | Offline operation control method suitable for user-side microgrid | |
TW201506412A (en) | Method for estimating voltage stability | |
CN103592528A (en) | Photovoltaic inverter model parameter identification method based on dynamic locus sensitivity | |
KR20170010002A (en) | Energy storage system and method for estimating characteristic parameters | |
CN102651049A (en) | Method for calculating loss reducing rate of newly built transformer station of electric power system | |
Taylor et al. | Optimal operation of grid-tied energy storage systems considering detailed device-level battery models | |
CN103683278B (en) | A kind of distribution network load calibration steps being applied to online closed loop power flow optimization analysis | |
CN105223470B (en) | A kind of Distribution Network Failure localization method based on failure high-frequency information | |
CN105678640A (en) | AC power grid direct current distribution prediction method giving consideration to impact of transformer saturation | |
CN103605871A (en) | Large power system emulation analysis method based on direct-current external characteristic fitting | |
Rudion et al. | Non-linear load modeling—Requirements and preparation for measurement | |
Varma et al. | Load flow analysis in IEEE 14 Bus system using facts device in MATLAB | |
Cui et al. | Design and performance testing of lead-acid battery experimental platform in energy storage power station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |