The computing method of loss rate fall in the newly-built transformer station of electric system
Technical field
The present invention relates to the newly-built transformer station of a kind of electric system and fall the computing method of loss rate.
Background technology
Electric system returns of investment performance assessment criteria comprises the newly-built and investment for trnasforming urban land proceeds indicatior of main electrical network; Major network (110/220kV) is newly-built to comprise single construction gain on investments index with index content investment for trnasforming urban land, single construction returns of investment examination scope: extremely examine the completely project of transmitting and converting electricity in 1 year of year operation in the end of the year from the engineering operation.The examination standard data are for putting into operation day the service data in 1 anniversary from engineering.Loss rate=Theoretical Calculation zone line loss electric quantity change value/block supply amount (calculating by project operation sequential) falls in the theory of newly-built transformer station.
The annual major network of electric system (110/220kV) is newly-built very big with the workload of transforming.According to the examination requirement, the Theoretical Calculation cycle is that engineering load is cut to change to accomplish and day risen 1 month, if the newly-built loss rate of falling that causes of each transformer station is carried out hand computation, the generating that then need add up one month, load condition, workload are very big.
Summary of the invention
Technical matters to be solved by this invention provides the computing method that loss rate falls in the newly-built transformer station of a kind of electric system.
The technical solution adopted for the present invention to solve the technical problems:
Step of the present invention is following:
(1) confirm newly-built transformer station:
At first confirm putting into operation constantly of newly-built transformer station, select the time period of statistics,, download all data sections of said time period from the database server of net damage system according to the said time period; With the zero-time section is benchmark, compares with all data sections, judges whether newly-increased circuit and transformer, thereby judges whether newly-built transformer station was arranged in the said time period;
(2) confirm to calculate the numerical procedure that loss rate falls in newly-built transformer station:
According to the change information of transformer station, to confirm to calculate the numerical procedure that loss rate falls in newly-built transformer station, said numerical procedure is following two kinds: old data, new model and new data, old model; Said old data, new model are promptly got the new electrical network computation model of old service data model and the transformer station of transformer station before putting into operation after putting into operation; Said new data, old model are promptly got the old electrical network computation model of new service data model and the transformer station of transformer station after putting into operation before putting into operation.
(3) confirm the operation scheme of computation model and data model:
New electrical network that loading will be researched and analysed or old electrical network computation model are to research attitude 1; The operation scheme of said electrical network computation model is set; Load historical section service data to research attitude 2; The operation scheme of the service data model of this section is set, and said operation scheme comprises that meritorious or idle, the load of running status setting, the resistance of regulating circuit or reactance value, regulator generator shift setting, and said running status setting comprises putting into operation, withdrawing from of circuit; Confirm from the load transfer scheme of research attitude 1 and research attitude 2, shown in research attitude 1, research attitude 2 be net damage system for two states that convenience of calculation is provided with, be used to store data;
(4) calculate the interior net loss rate of select time section:
Submit to said operation scheme to service end; Service end is obtained client research attitude of submitting to 1 and the operation scheme of studying attitude 2; Section computing time is set, once carries out the interior said operation scheme of said section computing time, the service data model that loads this section according to the loading data section time is to research attitude 2; Generate the E form and measure mapped file, and obtain the load value that will shift in research attitude 2 operation schemes; Be mapped to the historical data measurement in the electrical network computation model of the research attitude 1 that will study, and carry out the operation scheme of research attitude 1; Electrical network computation model to the research attitude 1 that will study calculates, and preserves result of calculation;
(5) show result of calculation:
Output results to the interface, and the storage computation result data.
Principle of the present invention is following:
Adopt 61970 XML/CIM/CIS standards, and state's net incorporated business's standard " operation of power networks exchanges data standard ", province transfers and the operation of power networks data of the EMS system that ground is transferred through obtaining, and carries out the calculating that loss rate falls in theory.Net before and after promptly transformer station being put into operation decreases and carries out analytical calculation, and both get difference, is Theoretical Calculation zone line loss electric quantity change value, and the ratio of Theoretical Calculation zone line loss electric quantity change value and block supply amount is the theory of newly-built transformer station and falls loss rate.
The zone that loss rate falls in the theory of computation is the 110kV network in electric system 220kV network and the service area.The Theoretical Calculation cycle is that engineering load is cut to change to accomplish and day risen 1 month.Theoretical Calculation data basis is a SCADA system log (SYSLOG) flow data.Bulk density is per 15 minutes 1 sections.Line loss electric weight and block supply amount are theoretical integration data.Computing method adopt and have or not pairing comparision; Respectively by the former method of operation (not having newly-built transformer station) with cut the method for operation (newly-built transformer station is arranged) the computational grid loss after changing; Ask difference; Be Theoretical Calculation zone line loss electric quantity change value, the ratio of Theoretical Calculation zone line loss electric quantity change value and block supply amount is the theory of newly-built transformer station and falls loss rate.
Electric system major network (110kV/220kV) is newly-built to fall loss rate with theory investment for trnasforming urban land in order to calculate; Need to download project cutting and change the new electric network model data section after accomplishing; The situation of computational grid loss according to the change information of transformer station in the new electric network model, is excised the transformer and the circuit of newly-built transformer station again; The load of newly-built transformer station is transferred to adjacent substations; The data section is reverted to the state of project cutting before changing, and the situation of computational grid loss is asked both difference; Be Theoretical Calculation zone line loss electric quantity change value, the ratio of Theoretical Calculation zone line loss electric quantity change value and block supply amount is the theory of newly-built transformer station and falls loss rate (being new model, old data).Or the download project cutting changes old electric network model data section before; The situation of computational grid loss again according to the change information of transformer station in the old electric network model, increases the transformer and the circuit of newly-built transformer station; Size according to newly-built substation on-load in the new data; To newly-built transformer station, the situation of computational grid loss is asked both difference with the duty values such as load transfer around the newly-built transformer station; Be Theoretical Calculation zone line loss electric quantity change value, the ratio of Theoretical Calculation zone line loss electric quantity change value and block supply amount is the theory of newly-built transformer station and falls loss rate (being old model, new data).
The invention has the beneficial effects as follows that using this method can decrease benefit to falling of operation project and carry out analytical calculation, investing with Electric Power Network Planning for the grid net loss management provides the aid decision making foundation; Alleviated simultaneously related personnel's workload greatly.
Description of drawings
The calculation procedure overall design flow chart of loss rate falls in the newly-built transformer station of Fig. 1 theory.
The main interface of Fig. 2 calculation procedure.
Fig. 3 searches the flow chart of newly-built transformer station.
Fig. 4 searches the interface that increases transformer station in the electric network model newly.
Fig. 5 calculates the flow chart of the net loss rate of electric network model in the select time section.
Fig. 6 operation scheme is provided with the interface.
Fig. 7 loads and shifts the interface.
Embodiment
The step of present embodiment is following:
(1) confirm newly-built transformer station:
Search putting into operation constantly of newly-built transformer station according to Fig. 3.
(2) confirm to calculate the numerical procedure that loss rate falls in newly-built transformer station:
For the numerical procedure of old data, new model, loading the computation model time is the time after newly-built transformer station puts into operation, and the time of loading data model is the time before putting into operation for newly-built transformer station.
For the numerical procedure of old model, new data, loading the computation model time is the time before newly-built transformer station puts into operation, and the time of loading data model is the time after putting into operation for newly-built transformer station.
(3) confirm the operation scheme of computation model and data model:
For the numerical procedure of old data, new model, the new electric network model that loading will be researched and analysed is provided with the operation scheme of this electric network model to research attitude 1.Load historical profile data to research attitude 2, the operation scheme of this section is set.Confirm from the load transfer scheme of research attitude 1 and research attitude 2.
For the numerical procedure of old model, new data, the old electric network model that loading will be researched and analysed is provided with the operation scheme of this electric network model to research attitude 1.Load historical profile data to research attitude 2, the operation scheme of this section is set.Confirm from the load transfer scheme of research attitude 2 and research attitude 1.
(4) calculate the loss rate of falling of newly-built transformer station:
For the numerical procedure of old data, new model, need to download project cutting and change the new model data section after accomplishing, the situation of computational grid loss.Again according to the change information of transformer station in the new electric network model; Excise the transformer and the circuit of newly-built transformer station, the load of newly-built transformer station is transferred to adjacent substations, the data section is reverted to the state before project cutting changes; The situation of computational grid loss; Ask both differences, be Theoretical Calculation zone line loss electric quantity change value, the ratio of Theoretical Calculation zone line loss electric quantity change value and block supply amount is the theory of newly-built transformer station and falls loss rate.
For the numerical procedure of old model, new data, need to download project cutting and change old model data section before, the situation of computational grid loss.Again according to the change information of transformer station in the old electric network model; Increase the transformer and the circuit of newly-built transformer station,, the duty values such as load transfer around the newly-built transformer station are arrived newly-built transformer station according to the size of newly-built substation on-load in the new data; The situation of computational grid loss; Ask both differences, be Theoretical Calculation zone line loss electric quantity change value, the ratio of Theoretical Calculation zone line loss electric quantity change value and block supply amount is the theory of newly-built transformer station and falls loss rate.