CN107654248A - Base plate tunnel active anti-burst method and structure - Google Patents

Base plate tunnel active anti-burst method and structure Download PDF

Info

Publication number
CN107654248A
CN107654248A CN201711208922.1A CN201711208922A CN107654248A CN 107654248 A CN107654248 A CN 107654248A CN 201711208922 A CN201711208922 A CN 201711208922A CN 107654248 A CN107654248 A CN 107654248A
Authority
CN
China
Prior art keywords
anchor cable
coal seam
drilling
base plate
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711208922.1A
Other languages
Chinese (zh)
Inventor
李辉
魏建平
程磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201711208922.1A priority Critical patent/CN107654248A/en
Publication of CN107654248A publication Critical patent/CN107654248A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0006Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by the bolt material

Abstract

The invention discloses a kind of base plate tunnel active anti-burst method and structure, and base plate tunnel is opened up in the lower rock stratum below coal seam or below lower rock stratum, forms one layer of palisades layer;Pierce multiple drillings upwards from base plate tunnel, after each drilling through the palisades layer and coal seam, the end of drilling is located in the mantlerock on the upside of coal seam;After the traction of anchor cable head root has fibre hawser, anchor cable head depth to enter foot of hole, then cement mortar will be filled with drilling and forms cement layer.The present invention, as the brace foundation for drawing anchor cable, is processed and draw using the rock stratum of the upper and lower side in coal seam using the multiple rows of anchor cable for passing across coal seam to coal seam.From the intensity that can improve coal seam.It effectively ensure that the security of mining operations.Used anchor cable head and anchor cable can be made using glass fibre material, and work is normally exploited so as to not influence mining machines.

Description

Base plate tunnel active anti-burst method and structure
Technical field
The present invention relates to seam mining to put prominent processing technique field, and in particular to a kind of base plate tunnel active anti-burst method With structure.
Background technology
Because coal seam is than relatively soft, easily changes coal seam force structure in tunneling process, cause prominent accident.Generally, Firstly the need of borehole discharging methane gas in recovery process.But because coal seam is chronically at underground, compaction rate is high, often bores Hole exhaust can not thoroughly prevent to protrude accident.Exploitation currently for reinforcing soft broken coal rock to pre- production section, it is necessary to enter Row grouting and reinforcing, but known grouting mode is simply diagonally to punch and inject high strength reinforcement slurries to form caking Layer, and the process exploited destroys the coal seam of caking, this grouting mode causes the waste of a large amount of costly slurries, and increase is opened Adopt cost.
The content of the invention
It is an object of the invention to provide a kind of base plate tunnel active anti-burst method and structure, for improving coal strength, While pump drainage methane gas, coal seam is firmly fixed with both sides rock stratum and is integrated, reaching thoroughly prevents from protruding accident Purpose.
To achieve the above object, adopt the following technical scheme that:A kind of base plate tunnel active anti-burst method, under coal seam In the lower rock stratum of side or below lower rock stratum, base plate tunnel is opened up, so as to form one layer of palisades between coal seam and base plate tunnel Layer;Pierce the drilling groups that multiple drillings form arrangement upwards from base plate tunnel, each drill through the palisades layer and coal seam it Afterwards, the end of drilling is located in the mantlerock on the upside of coal seam;Move back and anchor cable head is squeezed into the backward drilling of brill, the traction of anchor cable head root has Fibre hawser, after anchor cable head depth enters foot of hole, then hell is sealed and is inwardly filled with cement mortar and its solidification is formed water Mud layer.The plastic bushing of matching is first passed in the drilling, then by anchor cable head and anchor cable insertion plastic bushing.The anchor cable Head and anchor cable are fibre hawser head and fibre hawser.
A kind of anti-lug structure of base plate tunnel active, bottom is opened up in the lower rock stratum below coal seam or below lower rock stratum Plate tunnel forms one layer of palisades layer, has multiple drillings to form the drilling group arranged, the end of the drilling through palisades layer and coal seam End is in the mantlerock on the upside of coal seam;Run through in the drilling and be set with anchor cable head and anchor cable;Positioned at anchor cable head and anchor cable There is cement layer in outside.In the plastic bushing for drilling and being matched between anchor cable, cement layer is located in plastic bushing.
Beneficial effect:The present invention using the rock stratum of the upper and lower side in coal seam as the brace foundation for drawing anchor cable, using passing across Multiple rows of anchor cable in coal seam is processed and draw to coal seam.Design a kind of artificial barrier tape, isolation or reduction coal body position Move, increase coal mass strength, one or multi-channel artificial barrier tape is formed between the working space of miner and unknown coal seam.It is this Artificial barrier tape can be reduced and poured out caused by gravity, can also stop small-sized Gas Outburst.Running into caused by exploitation In the case of external and internal pressure difference, the draw of multiple rows of anchor cable can be utilized to keep coal seam not protrude accident.Effectively it ensure that The security of mining operations.Used anchor cable head and anchor cable can be made using glass fibre material, so as to not influence to exploit Mechanical normal exploitation work.
Brief description of the drawings
Fig. 1 be the present invention realize view.
Fig. 2 is Fig. 1 operating procedure enlarged drawing.
In figure, label 1 is mantlerock, and 2 be development end, and 3 be coal seam, and 4 be glass fibre anchor cable, and 5 be lower rock stratum, and 6 be bottom Plate tunnel, 7 be drilling, and 8 be glass fibre anchor cable head, and 9 be cement layer.
Embodiment
Embodiment 1:A kind of base plate tunnel active anti-burst method, it is shown in Figure 1, on the upper side and lower side of coal seam 3 has respectively Rock stratum 1 and lower rock stratum 5.Again in the lower rock stratum 5 below coal seam 3 or below lower rock stratum 5, base plate tunnel 6 is opened up, so as to One layer of palisades layer is formed between coal seam 3 and base plate tunnel 6.
Then, multiple drillings 7 are pierced upwards from base plate tunnel 6, form the drilling group containing more row hole drillings, contain per row hole drilling It is a row to have every 4 drilling 7 in multiple drillings 7, such as Fig. 1, and two rows are one group, front and rear two groups, can also be multigroup.
Each drilling 7 be located at mantlerock 1 on the upside of coal seam 3 through 7 end of after the palisades layer and coal seam 3, drilling It is interior.
Move back and anchor cable head is squeezed into the backward drilling 7 of brill, the traction of anchor cable head root has fibre hawser, and anchor cable head depth enters 7 bottoms of drilling Behind portion, then hell is sealed and is inwardly filled with cement mortar and its solidification is formed cement layer 9.Its stream line head and anchor cable are glass Glass fibre hawser first 8 and glass fibre anchor cable 4.
Embodiment 2:On the basis of embodiment 1, and be first passed in drilling 7 plastic bushing of matching, then by anchor cable head and In anchor cable insertion plastic bushing.
Embodiment 3:A kind of base plate tunnel actively anti-lug structure, referring to Fig. 1, in the lower rock stratum 5 below coal seam 3 or The lower section of rock stratum 5 opens up base plate tunnel 6 and forms one layer of palisades layer under person, has multiple drillings to form arrangement through palisades layer and coal seam 3 Drilling group.Wherein, drill 7 end is located in the mantlerock 1 of the upside of coal seam 3.
Referring to Fig. 2, run through in drilling 7 and be set with anchor cable head and anchor cable.There is cement layer on the outside of anchor cable head and anchor cable 9。
Embodiment 4:On the basis of embodiment 3, the plastic bushing that matches between drilling 7 and anchor cable, cement layer 9 is located at In plastic bushing.

Claims (5)

1. a kind of base plate tunnel active anti-burst method, it is characterized in that:In the lower rock stratum below coal seam or under lower rock stratum Side, opens up base plate tunnel, so as to form one layer of palisades layer between coal seam and base plate tunnel;Pierced upwards from base plate tunnel multiple Drilling forms the drilling group of arrangement, and after each drilling through the palisades layer and coal seam, the end of drilling is located on the upside of coal seam Mantlerock in;Move back and anchor cable head is squeezed into the backward drilling of brill, the traction of anchor cable head root has fibre hawser, and anchor cable head depth enters the bottom that drills Behind portion, then hell is sealed and is inwardly filled with cement mortar and its solidification is formed cement layer.
2. base plate tunnel active anti-burst method according to claim 1, it is characterized in that:Matching is first passed in the drilling Plastic bushing, then by anchor cable head and anchor cable insertion plastic bushing in.
3. base plate tunnel active anti-burst method according to claim 1, it is characterized in that:The anchor cable head and anchor cable are fiber Anchor cable head and fibre hawser.
4. a kind of anti-lug structure of base plate tunnel active, it is characterized in that:In the lower rock stratum below coal seam or under lower rock stratum Fang Kaishe base plate tunnels form one layer of palisades layer, have multiple drillings to form the drilling group arranged through palisades layer and coal seam, described The end of drilling is located in the mantlerock on the upside of coal seam;Run through in the drilling and be set with anchor cable head and anchor cable;Positioned at anchor cable There is cement layer on the outside of head and anchor cable.
5. the anti-lug structure of base plate tunnel active according to claim 1, it is characterized in that:It is described drilling anchor cable between The plastic bushing matched somebody with somebody, cement layer are located in plastic bushing.
CN201711208922.1A 2017-11-27 2017-11-27 Base plate tunnel active anti-burst method and structure Pending CN107654248A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711208922.1A CN107654248A (en) 2017-11-27 2017-11-27 Base plate tunnel active anti-burst method and structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711208922.1A CN107654248A (en) 2017-11-27 2017-11-27 Base plate tunnel active anti-burst method and structure

Publications (1)

Publication Number Publication Date
CN107654248A true CN107654248A (en) 2018-02-02

Family

ID=61119736

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711208922.1A Pending CN107654248A (en) 2017-11-27 2017-11-27 Base plate tunnel active anti-burst method and structure

Country Status (1)

Country Link
CN (1) CN107654248A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101603431A (en) * 2009-07-14 2009-12-16 中国矿业大学 A kind of method for reinforcing outburst-prone coal seam cross-cut coal uncovering
CN102226405A (en) * 2011-05-25 2011-10-26 河北同成矿业科技有限公司 Method for reinforcing working surface of loose and soft coal bed by utilizing nonmetal grouting anchor cable
CN103306713A (en) * 2013-05-20 2013-09-18 中国矿业大学 Networking reinforcement method for cross drilling holes of outburst coal seam
WO2014086297A1 (en) * 2012-12-07 2014-06-12 中国矿业大学 Resin cartridge filling method for roadway roof bolt drill hole
CN105715297A (en) * 2016-01-26 2016-06-29 山东科技大学 Method for treating heavy inclined seam gob-side entry retaining gangue
CN108590739A (en) * 2018-04-11 2018-09-28 中国平煤神马能源化工集团有限责任公司 A kind of prominent tunnel regionality energy divides source to control anti-burst method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101603431A (en) * 2009-07-14 2009-12-16 中国矿业大学 A kind of method for reinforcing outburst-prone coal seam cross-cut coal uncovering
CN102226405A (en) * 2011-05-25 2011-10-26 河北同成矿业科技有限公司 Method for reinforcing working surface of loose and soft coal bed by utilizing nonmetal grouting anchor cable
WO2014086297A1 (en) * 2012-12-07 2014-06-12 中国矿业大学 Resin cartridge filling method for roadway roof bolt drill hole
CN103306713A (en) * 2013-05-20 2013-09-18 中国矿业大学 Networking reinforcement method for cross drilling holes of outburst coal seam
CN105715297A (en) * 2016-01-26 2016-06-29 山东科技大学 Method for treating heavy inclined seam gob-side entry retaining gangue
CN108590739A (en) * 2018-04-11 2018-09-28 中国平煤神马能源化工集团有限责任公司 A kind of prominent tunnel regionality energy divides source to control anti-burst method

Similar Documents

Publication Publication Date Title
WO2020192055A1 (en) Two-step grouting modified water-protective coal mining method for roof aquifers
AU2013358812B2 (en) Solid-filling coal mining method with two pre-excavated tunnels for advancing
CN103557000B (en) Method for preventing gob-side entry rock burst through side-drawing filling
CN105736022B (en) The layering method for protecting support of rectangular shape coal roadway based on deep weakness compound roof
CN105909246B (en) A kind of chemical weakening method of high seam moderate heat diagenesis horizontal fragmentation blast cracking
CN105804786B (en) A kind of weak seam bottom plate layer-through drilling pressure rushes anti-reflection method
CN107355226A (en) TBM construction tunnel fault belts hole section processing structure
CN101608552A (en) The seat earth aquifer reinforces and protects the method for water barrier in reinforcing process
CN202882966U (en) Recoverable soft rock self-tapping anchor rod
CN108678772A (en) A kind of multilevel hierarchy suspension device and its construction method for rich water sandy gravel stratum tunnel
CN106223897B (en) A kind of broken coal petrography deep hole segmenting slip casting method of fully-mechanized mining working
CN102777185A (en) Inclined well shaft construction technology
CN103032086A (en) Method for filling resin explosive cartridge in drilled hole of tunnel roof anchor rod
CN102877858A (en) Reinforcing method for crushed top plate of coal face
CN103147734A (en) Method for multi-section hydraulic fracture along coal layer of underground coal mine
CN105909225A (en) Fully mechanized caving face inter-frame oriented hydraulic fracturing top-coal weakening method
CN109236297A (en) Split the coal-mining method filled and leave coal seam in conjunction with the residual exploiting field of uplink second mining tool post
CN108691508A (en) A kind of driving method of solid rock weakening strength
CN106930766A (en) Great burying TBM construction tunnel rock burst processing structures
CN102678166B (en) Method for increasing gas extraction rate by permeability increasing of single thick coal seam
CN104612729B (en) A kind of asymmetric anchor beam structure and its method for protecting support for gob side entry top plate
CN115749713A (en) Rock stratum frequency conversion pulse fracture network fracturing method and equipment
CN108868769A (en) A kind of construction method for reinforcing coal column based on swollen locking-type anchor cable
CN108930536A (en) A kind of method of gob side entry retaining first advance high pressure water injection fracturing tight roof
CN208605162U (en) A kind of shield tunnel geological prospecting borehole hole sealing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination