CN102226405A CN2011101357370A CN201110135737A CN102226405A CN 102226405 A CN102226405 A CN 102226405A CN 2011101357370 A CN2011101357370 A CN 2011101357370A CN 201110135737 A CN201110135737 A CN 201110135737A CN 102226405 A CN102226405 A CN 102226405A
Authority
CN
China
Prior art keywords
grouting
anchor
cable
anchor cable
nonmetal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101357370A
Other languages
Chinese (zh)
Other versions
CN102226405B (en
Inventor
宋彦波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEBEI TONGCHENG MINING TECHNOLOGY Co Ltd
Original Assignee
HEBEI TONGCHENG MINING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI TONGCHENG MINING TECHNOLOGY Co Ltd filed Critical HEBEI TONGCHENG MINING TECHNOLOGY Co Ltd
Priority to CN 201110135737 priority Critical patent/CN102226405B/en
Publication of CN102226405A publication Critical patent/CN102226405A/en
Application granted granted Critical
Publication of CN102226405B publication Critical patent/CN102226405B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a method for reinforcing a working surface of a loose and soft coal bed by utilizing a nonmetal grouting anchor cable. The grouting anchor cable is made of a high-strength composite material carbon fiber/glass fiber. The reinforcement of the working surface of the loose and soft coal bed is realized through the processes of surveying and lofting, drilling holes in a coal body, manufacturing and arranging the grouting anchor cable, sealing an anchor cable hole, and grouting chemical grout in the hole and the like. As the grouting anchor cable is made of nonmetal materials, no sparks are generated when a coal-winning machine cuts, and the grouting anchor cable has the characteristics of flame retardancy, anti-static electricity, safety and reliability in use and high tensile strength, higher breaking force, light weight, and capability of being bent and coiled, and is higher than steel and convenient in transportation; and by utilizing the method, deep hole reinforcement and support on the working face can be carried out under the condition that the coal face can not be supported by using a metal anchor cable, the grouting support operation can be carried out on the working surface on site by combining a chemical grouting method, and the coal body of the working surface can be reinforced at the upper and lower tunnels of the working face by combining the chemical grouting in advance.

Description

The method that the nonmetal grouting cable anchor of a kind of usefulness is reinforced the weak seam work plane
Technical field
The present invention relates to the method for with grouting cable anchor the weak seam work plane being reinforced under a kind of mine, the method that the nonmetal grouting cable anchor of particularly a kind of usefulness is reinforced in exploitation process in advance to coal-face under the soft broken wall rock condition.
Background technology
At present, along with the superficial part coal resources reduce day by day, enter the resource deep mining in succession, because the increase of the coal mining degree of depth and geostatic stress, make increasing coal mine work area be in soft broken country rock state, wall caving, roof fall appear in work plane easily in exploitation process, even cause work plane to stop production, according to statistics, because of causing work plane, working face wall wall caving or roof collapse stop production, its off-time can reach 40%~60% of total off-time, and China has 18% fully-mechanized mining working to be trapped in the low yield state because of the Surrounding Rock Control state is undesirable every year approximately.Current domestic normal employing solves work plane wall caving roof fall problem with chemical grouting in conjunction with the method for metal bolt support in working surface hydraulic support, but this method cost height, control range are little, and when coal-winning machine cutting coal body, can run into anchor metal unavoidably, be easy to produce spark, blast, cause potential safety hazard, in addition, because anchor metal or anchor cable all have higher shear strength, damage coal winning machine cutting bit easily.
Summary of the invention
Technical problem to be solved by this invention is to overcome existingly with anchor metal, anchor cable the soft broken country rock to be carried out the drawback of reinforcement means, and provide a kind of and can guarantee when coal-winning machine cutting coal body, not produce spark, flame-retardant and anti-static, tensile strength height, in light weight, flexiblely coil, convenient transportation, the safe and reliable nonmetal grouting cable anchor of a kind of usefulness are reinforced the weak seam work plane, to the breaking surrounding rock condition under the coal-face method of in exploitation process, reinforcing in advance.
The present invention solves the technical scheme that its technical problem takes: the method that the nonmetal grouting cable anchor of this usefulness is reinforced the weak seam work plane is characterized in that: it can be undertaken by following five steps:
A, at first loose coal is surveyed,, then measured setting-out, implement bore operation, finish boring according to the degree of depth of the Thickness Design boring of loose coal;
B, make the respective length grouting cable anchor, and it is inserted in the boring according to drilling depth;
C, between downward 0.5~1 meter of distance drilling orifice hole sealing device is set, it is made of the rope made of hemp, cotton and other braids, injects chemical grout then in it, chemical grout at the hole sealing device internal reaction, expand, solidify, to port closing;
D, finish sealing of hole after, the Grouting Pipe by grouting cable anchor is usefulness slip casting facility pressure injection chemical slip casting material in boring, chemical slip casting material is full of boring, and spread in the crack in loose coal, solidify to chemical slip casting material, grouting cable anchor is contained to live, become one;
E, anchor cable is applied prestressing force, the anchor cable tail end can be unloaded, expose anchor cable and carry out stretch-draw,, finish reinforcing to designing the anchoring value as need.
The present invention solves another technical scheme that its technical problem takes: the method that the nonmetal grouting cable anchor of this usefulness is reinforced the weak seam work plane, be characterized in: when the nonmetal grouting cable anchor of described usefulness was reinforced loose coal, its layout had dual mode:
A, work plane are directly reinforced loose coal;
B, loose coal is reinforced from crossheading side up and down.
The present invention solves the technical scheme that its technical problem takes: the employed equipment of method that the nonmetal grouting cable anchor of this usefulness is reinforced the weak seam work plane, described nonmetal grouting cable anchor includes guiding cap, be characterized in: it also includes anchor cable, Grouting Pipe, slurry outlet, the Grouting Pipe joint, the anchor cable tail end, anchor cable is formed a branch of being arranged in the Grouting Pipe by three, the Grouting Pipe tube wall is provided with a plurality of slurry outlets, and the evenly distribution that becomes to interlock, Grouting Pipe one end is provided with guiding cap, the other end is provided with the Grouting Pipe joint, the Grouting Pipe joint links to each other with the anchor cable tail end, the anchor cable tail end is provided with screw thread, links to each other with the slurry filling machine pipeline by screw thread.
The present invention solves the another technical scheme that its technical problem takes: the employed equipment of method that the nonmetal grouting cable anchor of this usefulness is reinforced the weak seam work plane, be characterized in: described anchor cable is made with carbon fibre of composite material/glass fiber.
The present invention solves another technical scheme that its technical problem takes: the employed equipment of method that the nonmetal grouting cable anchor of this usefulness is reinforced the weak seam work plane, be characterized in: described Grouting Pipe is made with aluminium plastic material.
The method that the nonmetal grouting cable anchor of this usefulness provided by the present invention is reinforced the weak seam work plane, grouting cable anchor is to make with the high strength composite carbon fibers/fiberglass, owing to adopt non-metallic material, do not produce spark during the coal-winning machine cutting, fire-retardant, antistatic, safe and reliable, the tensile strength height, be higher than steel, higher Fracture Force is arranged, in light weight, be 1/4th of unidimensional steel weight, bend radius is 1 meter, flexible coiling, convenient transportation has realized that can not use the metal anchor cable to carry out under the situation of supporting work plane being carried out deep hole at coal-face reinforces and supporting, not only can carry out the grouting support operation in conjunction with the chemical grouting method, and can reinforce in advance the work plane coal body in conjunction with chemical grouting in the lane up and down at work plane at the work plane scene.
Description of drawings
Fig. 1 directly carries out the structural representation of reinforcement means to the weak seam work plane for the nonmetal grouting cable anchor of the usefulness that the embodiment of the invention provided.
Fig. 2 carries out the structural representation of reinforcement means from crossheading side up and down to the weak seam work plane for the nonmetal grouting cable anchor of the usefulness that the embodiment of the invention provided.
One of employed nonmetal grouting cable anchor structural representation of method that Fig. 3 reinforces the weak seam work plane for the nonmetal grouting cable anchor of the usefulness that the embodiment of the invention provided.
Two of the employed nonmetal grouting cable anchor structural representation of method that Fig. 4 reinforces the weak seam work plane for the nonmetal grouting cable anchor of the usefulness that the embodiment of the invention provided.
The specific embodiment
With reference to Fig. 1~4, the method that the nonmetal grouting cable anchor of this usefulness that the embodiment of the invention provided is reinforced the weak seam work plane, it can be undertaken by following five steps:
A, at first loose coal 1 is surveyed,, then measured setting-out, implement bore operation, finish boring 2 according to the degree of depth of the Thickness Design boring 2 of loose coal 1;
B, make respective length grouting cable anchor 3, and it is inserted in the boring 2 according to boring 2 degree of depth;
C, apart between downward 0.5~1 meter of 2 apertures of boring hole sealing device 4 is being set, it is made of the rope made of hemp, cotton and other braids, injects chemical grout then in it, chemical grout at hole sealing device 4 internal reactions, expand, solidify, to port closing;
D, finish sealing of hole after, with slip casting facility pressure injection chemical slip casting material 5, chemical slip casting material 5 is full of holes 2 to the Grouting Pipe 8 by grouting cable anchor 3 in boring 2, and spread in the crack in loose coal 1, solidify to chemical slip casting material 5, grouting cable anchor 3 is contained to live, become one;
E, anchor cable is applied prestressing force, anchor cable tail end 11 can be unloaded, expose anchor cable 7 and carry out stretch-draw,, finish reinforcing to designing the anchoring value as need.
When 3 pairs of loose coals 1 of the nonmetal grouting cable anchor of described usefulness were reinforced, its layout had dual mode:
A, work plane are directly reinforced loose coal 1;
B, loose coal 1 is reinforced from crossheading side up and down.
Described nonmetal grouting cable anchor 3 includes guiding cap 6, anchor cable 7, Grouting Pipe 8, slurry outlet 9, Grouting Pipe joint 10, anchor cable tail end 11, anchor cable 7 usefulness high strength composite carbon fibers/fiberglass are made, form a branch of being arranged in the Grouting Pipe 8 by three, Grouting Pipe 8 tube walls are provided with a plurality of slurry outlets 9, and the evenly distribution that becomes to interlock, Grouting Pipe 8 usefulness aluminium plastic materials are made, Grouting Pipe 8 one ends are provided with guiding cap 6, the other end is provided with Grouting Pipe joint 10, Grouting Pipe joint 10 links to each other with anchor cable tail end 11, anchor cable tail end 11 is provided with screw thread 12, links to each other with the slurry filling machine pipeline by screw thread 12.
Described chemical grout is a ripple thunder sound, it is that effluent north is with becoming the development of mining industry Science and Technology Ltd., these slurries have higher mechanical properties, with the rock stratum affinity is preferably arranged, the flexility of induration bears certain stratum deformation, after material injected the rock stratum, low viscosity mixtures kept several seconds, penetrated into tiny crack and expanded; This product has been done evaluation in 2005, at the beginning of 2006 beginning for sale, be applied under the coal mine, its ripple thunder sound chemical grout performance indications are as follows:
1. emulsification times 10~15S
2. time 50~60S does not touch with one's hand
3. induration density 400~1250Kg/m 3
4. compressive strength 30~50MPa
5. the fire-retardant oxygen index (OI) of fire resistance is greater than 26%
6. adhesive strength 30~50MPa
7. serum density 1200Kg/m 3
8. slurry viscosity 225~300mPa.S
9. the biliquid mixing ratio is 1: 1
10. expansion multiple 1~3

Claims (5)

1. method of the weak seam work plane being reinforced with nonmetal grouting cable anchor, it is characterized in that: it can be undertaken by following five steps:
A, at first loose coal (1) is surveyed,, then measured setting-out, implement bore operation, finish boring (2) according to the degree of depth of the Thickness Design boring (2) of loose coal (1);
B, make respective length grouting cable anchor (3), and it is inserted in the boring (2) according to boring (2) degree of depth;
C, apart between downward 0.5~1 meter of (2) aperture of boring hole sealing device (4) is being set, it is made of the rope made of hemp, cotton and other braids, injects chemical grout then in it, chemical grout at hole sealing device (4) internal reaction, expand, solidify, to port closing;
D, finish sealing of hole after, Grouting Pipe (8) by grouting cable anchor (3) is used slip casting facility pressure injection chemical slip casting materials (5) in boring (2), chemical slip casting material (5) is full of boring (2), and spread in the crack in loose coal (1), solidify to chemical slip casting material (5), grouting cable anchor (3) is contained to live, become one;
E, anchor cable is applied prestressing force, anchor cable tail end (11) can be unloaded, expose anchor cable (7) and carry out stretch-draw,, finish reinforcing to designing the anchoring value as need.
2. the method that the nonmetal grouting cable anchor of usefulness according to claim 1 is reinforced the weak seam work plane is characterized in that: when reinforcing, its layout has dual mode to the nonmetal grouting cable anchor of described usefulness (3) to loose coal (1):
A, work plane are directly reinforced loose coal (1);
B, loose coal (1) is reinforced from crossheading side up and down.
3. for implementing the employed equipment of method step of claim 1, it is characterized in that: described nonmetal grouting cable anchor (3) includes guiding cap, it is characterized in that: it also includes anchor cable (7), Grouting Pipe (8), slurry outlet (9), Grouting Pipe joint (10), anchor cable tail end (11), anchor cable (7) is formed a branch of being arranged in the Grouting Pipe (8) by three, Grouting Pipe (8) tube wall is provided with a plurality of slurry outlets (9), and the evenly distribution that becomes to interlock, Grouting Pipe (8) one ends are provided with guiding cap (6), the other end is provided with Grouting Pipe joint (10), Grouting Pipe joint (10) links to each other with anchor cable tail end (11), anchor cable tail end (11) is provided with screw thread (12), links to each other with the slurry filling machine pipeline by screw thread (12).
4. the equipment of the method for the weak seam work plane being reinforced with nonmetal grouting cable anchor according to claim 3, it is characterized in that: described anchor cable (7) is made with carbon fibre of composite material/glass fiber.
5. the equipment of the method for the weak seam work plane being reinforced with grouting cable anchor according to claim 3, it is characterized in that: described Grouting Pipe (8) is made with aluminium plastic material.
CN 201110135737 2011-05-25 2011-05-25 Method for reinforcing working surface of loose and soft coal bed by utilizing nonmetal grouting anchor cable Active CN102226405B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110135737 CN102226405B (en) 2011-05-25 2011-05-25 Method for reinforcing working surface of loose and soft coal bed by utilizing nonmetal grouting anchor cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110135737 CN102226405B (en) 2011-05-25 2011-05-25 Method for reinforcing working surface of loose and soft coal bed by utilizing nonmetal grouting anchor cable

Publications (2)

Publication Number Publication Date
CN102226405A true CN102226405A (en) 2011-10-26
CN102226405B CN102226405B (en) 2013-04-10

Family

ID=44807399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110135737 Active CN102226405B (en) 2011-05-25 2011-05-25 Method for reinforcing working surface of loose and soft coal bed by utilizing nonmetal grouting anchor cable

Country Status (1)

Country Link
CN (1) CN102226405B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102635327A (en) * 2012-04-01 2012-08-15 天地科技股份有限公司 Grouting method and system of cracked coal rock mass
CN102852532A (en) * 2012-10-09 2013-01-02 冀中能源股份有限公司东庞矿 Grouting method for preventing rib walk caving
CN103174444A (en) * 2013-02-26 2013-06-26 中国矿业大学(北京) Support method and support structure for soft coal/ rock stratum alley
CN103244157A (en) * 2013-05-24 2013-08-14 焦作煤业(集团)新乡能源有限公司 Spalling prevention method through full-length anchoring of rib with soft bolt
CN103352711A (en) * 2013-05-31 2013-10-16 淮北市平远软岩支护工程技术有限公司 Method for consolidating rock coal body through deeply sealed holes and naked grouting cementing
CN108727779A (en) * 2018-04-04 2018-11-02 中国建筑股份有限公司 A kind of recoverable prestressed anchor cable insulating heat-conductive fibrous composite and preparation method thereof
CN110159305A (en) * 2019-04-12 2019-08-23 平顶山天安煤业股份有限公司 A kind of compound top working face wall grouting parameter optimization method of large mining depth high working face
CN111257203B (en) * 2020-04-13 2022-06-14 安徽理工大学 Simulation test device and test method considering effective overlapping circles for grouting reinforcement

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1926487A1 (en) * 1968-05-24 1969-12-04 Cementation Company Ltd Anchoring or holding cables
CN2443999Y (en) * 2000-06-27 2001-08-22 同济大学(沪西校区) Anchor chock integrated tube type anchorage cable
AU2006200094A1 (en) * 2003-11-20 2007-07-26 Fci Holdings Delaware, Inc. Cable bolt
CN201236718Y (en) * 2008-08-08 2009-05-13 中国矿业大学 Inner slip-casting anchor cable
CN201507317U (en) * 2009-09-15 2010-06-16 济南澳科矿山工程技术有限公司 Anchoring-grouting anchor rope
CN101871353A (en) * 2010-06-22 2010-10-27 宋彦波 Method for soft rock roadway grouting and full-length prestress baseboard anchor cable comprehensive support
CN201650323U (en) * 2010-03-27 2010-11-24 中国矿业大学 Grouting anchor rope
CN202064978U (en) * 2011-05-25 2011-12-07 河北同成矿业科技有限公司 Non-metal grouting anchor cable

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1926487A1 (en) * 1968-05-24 1969-12-04 Cementation Company Ltd Anchoring or holding cables
CN2443999Y (en) * 2000-06-27 2001-08-22 同济大学(沪西校区) Anchor chock integrated tube type anchorage cable
AU2006200094A1 (en) * 2003-11-20 2007-07-26 Fci Holdings Delaware, Inc. Cable bolt
CN201236718Y (en) * 2008-08-08 2009-05-13 中国矿业大学 Inner slip-casting anchor cable
CN201507317U (en) * 2009-09-15 2010-06-16 济南澳科矿山工程技术有限公司 Anchoring-grouting anchor rope
CN201650323U (en) * 2010-03-27 2010-11-24 中国矿业大学 Grouting anchor rope
CN101871353A (en) * 2010-06-22 2010-10-27 宋彦波 Method for soft rock roadway grouting and full-length prestress baseboard anchor cable comprehensive support
CN202064978U (en) * 2011-05-25 2011-12-07 河北同成矿业科技有限公司 Non-metal grouting anchor cable

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吴陶等: "非金属锚索的研究应用现状", 《探矿工程》 *
牛栋: "注浆锚索在大断面硐室中的应用", 《山西煤炭》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102635327A (en) * 2012-04-01 2012-08-15 天地科技股份有限公司 Grouting method and system of cracked coal rock mass
CN102635327B (en) * 2012-04-01 2015-04-22 天地科技股份有限公司 Grouting method and system of cracked coal rock mass
CN102852532A (en) * 2012-10-09 2013-01-02 冀中能源股份有限公司东庞矿 Grouting method for preventing rib walk caving
CN102852532B (en) * 2012-10-09 2015-06-17 冀中能源股份有限公司东庞矿 Grouting method for preventing rib walk caving
CN103174444A (en) * 2013-02-26 2013-06-26 中国矿业大学(北京) Support method and support structure for soft coal/ rock stratum alley
CN103174444B (en) * 2013-02-26 2014-12-10 中国矿业大学(北京) Support method and support structure for soft coal/ rock stratum alley
CN103244157B (en) * 2013-05-24 2015-04-22 焦作煤业(集团)新乡能源有限公司 Spalling prevention method through full-length anchoring of rib with soft bolt
CN103244157A (en) * 2013-05-24 2013-08-14 焦作煤业(集团)新乡能源有限公司 Spalling prevention method through full-length anchoring of rib with soft bolt
CN103352711A (en) * 2013-05-31 2013-10-16 淮北市平远软岩支护工程技术有限公司 Method for consolidating rock coal body through deeply sealed holes and naked grouting cementing
CN108727779A (en) * 2018-04-04 2018-11-02 中国建筑股份有限公司 A kind of recoverable prestressed anchor cable insulating heat-conductive fibrous composite and preparation method thereof
CN108727779B (en) * 2018-04-04 2021-03-09 中国建筑股份有限公司 Insulating and heat-conducting fiber composite material for recyclable prestressed anchor cable and preparation method thereof
CN110159305A (en) * 2019-04-12 2019-08-23 平顶山天安煤业股份有限公司 A kind of compound top working face wall grouting parameter optimization method of large mining depth high working face
CN110159305B (en) * 2019-04-12 2020-10-20 平顶山天安煤业股份有限公司 Method for optimizing coal wall grouting parameters of composite roof working surface with large mining depth and large mining height
CN111257203B (en) * 2020-04-13 2022-06-14 安徽理工大学 Simulation test device and test method considering effective overlapping circles for grouting reinforcement

Also Published As

Publication number Publication date
CN102226405B (en) 2013-04-10

Similar Documents

Publication Publication Date Title
CN102226405B (en) Method for reinforcing working surface of loose and soft coal bed by utilizing nonmetal grouting anchor cable
EP2801697B1 (en) Longwall working face, non-pillared mining method
CN102937030B (en) Bolting-grouting integrated support method for zonal disintegration of deep roadway surrounding rock
CN101871353B (en) Method for soft rock roadway grouting and full-length prestress baseboard anchor cable comprehensive support
Sun et al. Numerical simulation of the effect of coupling support of bolt-mesh-anchor in deep tunnel
CN104763428A (en) Method of classified divisional grouting reinforcement of collapse columns to enable fully mechanized coal face to directly pass soft collapse column
CN102704965B (en) One prevents violent mining influence back to collapse method for leakage
CN202064978U (en) Non-metal grouting anchor cable
CN102587915A (en) Induction caving mining method under artificial false roof
CN107143338B (en) A kind of coal mine roadway driving and method for protecting support
CN108590723A (en) Gob side entry driving fender erosion control release is to drawing anchoring integral structure and construction method
CN101899837A (en) Active anti-shear concrete supporting structure for reinforcing deep sliding surfaces of rock slopes
CN103032086A (en) Method for filling resin explosive cartridge in drilled hole of tunnel roof anchor rod
Zhang et al. Patterns and security technologies for co-extraction of coal and gas in deep mines without entry pillars
CN204327134U (en) A kind of prestressing force balance anchor cable
Yuan et al. A study on the mechanism and controlling techniques of roadway deformations under high in situ stress conditions
CN105350993B (en) A kind of roadway full-fracture-surfacanchoring-rod anchor cable beam spray Combined Support Technology
Wang et al. Large-deformation failure mechanism of coal-feeder chamber and construction of wall-mounted coal bunker in underground coal mine with soft, swelling floor rocks
Zenti et al. Technical solutions for soil nails in tunnel face reinforcement and drainage
CN109184752A (en) A kind of coal mine supporting construction and its method for protecting support for passing through old kiln goaf
Wang et al. Novel application of the roof-cutting-type gob-side entry retaining in coal mine
Zang et al. Numerical Investigation on the Ground Response of a Gob-Side Entry in an Extra-Thick Coal Seam
Wang et al. Study on the Lagging Support Mechanism of Anchor Cable in Coal Roadway Based on FLAC3D Modified Model
CN204371383U (en) A set of glass fibre reinforced plastics rockbolts controls the ruggedized construction of high working face coal wall caving
He et al. Unsymmetrical load effect of geologically inclined bedding strata on tunnels of passenger dedicated lines

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: Three Jiangdong Road, Xingtai Development Zone, Hebei 054001, China

Applicant after: Hebei Tongcheng Technology Co., Ltd.

Address before: Three Jiangdong Road, Xingtai Development Zone, Hebei 054001, China

Applicant before: Hebei Tongcheng Mining Technology Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: HEBEI TONGCHENG MINING TECHNOLOGY CO., LTD. TO: HEBEI TONGCHENG TECHNOLOGY CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 054001 No. 1666, main street, Xingtai Economic Development Zone, Hebei

Patentee after: Hebei Tongcheng Technology Co., Ltd.

Address before: Three Jiangdong Road, Xingtai Development Zone, Hebei 054001, China

Patentee before: Hebei Tongcheng Technology Co., Ltd.