CN107642226A - A kind of climbing frame - Google Patents

A kind of climbing frame Download PDF

Info

Publication number
CN107642226A
CN107642226A CN201711065390.0A CN201711065390A CN107642226A CN 107642226 A CN107642226 A CN 107642226A CN 201711065390 A CN201711065390 A CN 201711065390A CN 107642226 A CN107642226 A CN 107642226A
Authority
CN
China
Prior art keywords
cross bar
frame
column
welded
oblique
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711065390.0A
Other languages
Chinese (zh)
Inventor
顾志勇
陈永继
黎炳灼
樊洁峰
顾晓鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711065390.0A priority Critical patent/CN107642226A/en
Publication of CN107642226A publication Critical patent/CN107642226A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a kind of climbing frame, it is related to construction machine field, the technical problem for the stress for being inconvenient to transport and assembling and each position of climbing frame can not be perceived in lifting process is weighed for the big weight of prior art volume, using modular construction, head tree, secondary column, cross-brace frame, frame of marking time, guide rail, anti-fall seat in the plane lock, cat ladder, protective frame, column link etc. are made to the state for being capable of independent disassembling, bolt connection is carried out beneficial to the positioning hole opened up on head tree and secondary column, is advantageous to transport and the assembling at scene;The invention can monitor the stress of climbing frame at any time, effectively avoid the accident caused by unbalance stress in lifting process by setting up pulling force sensor on lifting cucurbit.The inventive structure science, it is reasonable in design, in light weight, be readily transported and assemble, by actual combat test effect highly significant, there is extensive market prospects and application value.

Description

A kind of climbing frame
Technical field
The present invention relates to construction machine field, more particularly to a kind of climbing frame.
Background technology
Scaffold is always the essential construction equipment of construction, since the 1980s mid-term, with The high speed development of economic construction of China, high level, high-rise building are more and more, traditional console mode scaffold are set up, using steel The locating steel frame of pipe overlap joint, it is not only uneconomical but also very dangerous.Although there is Integral climbing scaffold in the market, but adopt more With unilateral single road wheel, when anti-fall, support force is small, and vibration is big, and safety coefficient is small, and noise is big, and sealing-off easily occurs in support, Weld seam easily ftractures, due to being made more of ferrous materials, the big weight weight of volume, it has not been convenient to and transport and assembling, in the process of climbing In can not perceive the stressing conditions at each position, easily cause accident.
The content of the invention
The present invention provides a kind of climbing frame, to solve the big weight weight of prior art volume be inconvenient to transport and assemble and The technical problem of the stress of each position of climbing frame can not be perceived in lifting process.
To solve the above problems, the present invention adopts the following technical scheme that realization:
A kind of climbing frame, including head tree, secondary column, cross-brace frame, frame of marking time, guide rail, anti-fall seat in the plane lock, cat ladder, protective frame, Column link;
Column support, the column support are connected and composed by least one column link between the head tree and secondary column Set perpendicular to ground, the climbing frame includes that multiple column supports are arranged in parallel forms, and passes through transverse direction between each column support Support frame connects with frame of marking time;
Being set up above the column link has the frame of marking time;
Cat ladder is provided between every layer of frame of marking time;
Connected between head tree by cross-brace frame;
Guide rail is fixed with behind secondary column, anti-fall seat in the plane lock is provided with above guide rail;
Protective frame is provided with the outside of head tree.
Preferably, the head tree and secondary column are made of rectangular steel tube material, are offered on rectangular steel tube multiple vertical Post connecting hole, the purpose of quick connection and uniform force can be realized by the way of connecting hole is opened up in square tube;
The cross-brace frame includes the first cross bar, the second cross bar, vertical connecting, oblique connecting rod, cross bar fixed ear, first Cross bar reinforced sheet, the second cross bar reinforced sheet and the 3rd cross bar reinforced sheet;Reinforced sheet further ensures the stabilization of horizontal support Property;
First cross bar and the second cross bar be arranged in parallel, are connected between the first cross bar and the second cross bar by a vertical connecting Connect, the vertical connecting both sides are respectively arranged with oblique connecting rod, oblique connecting rod one end extended line and vertical connection Bar one end extended line cross-coincidence simultaneously forms " individual " character form structure;
Oblique connecting rod and vertical connecting junction are welded with the first cross bar reinforced sheet, and the first cross bar reinforced sheet is by oblique company Extension bar is further strengthened being connected with vertical connecting;
Oblique connecting rod is welded with the second cross bar reinforced sheet, vertical connecting and the first cross bar junction with the first cross bar junction It is welded with the 3rd cross bar reinforced sheet;
Cross bar fixed ear is respectively welded at the both ends of the first cross bar and the second cross bar, and offering cross bar in cross bar fixed ear fixes Hole, cross bar fixed ear are connected by bolt with head tree.
Preferably, the frame of marking time includes the rectangle underframe formed by square tubes soldering, and more reinforcement sides are welded with underframe Pipe, underframe are fixed on pedal, pedal holes are offered on pedal;Using perforate on tubing and pedal, stress is not being influenceed In the case of reduce further the weight of whole climbing frame, reduce cost of transportation and the power needed for lifting;
The frame side of marking time offers frame fixing hole of marking time, and frame of marking time is connected by bolt with cross-brace frame.
Preferably, the cat ladder is welded using square tube and iron plate, and both sides montant is made of square tube, and cross bar uses iron Plate is made, and iron plate both ends are welded with montant;
The cat ladder upper end is provided with hook, convenient and swift using hook connects for being connected with frame of marking time, and can either meet assembling just Prompt requirement, also disclosure satisfy that the requirement of construction safety;
Preferably, the protective frame includes protecting housing, intermediate stiffener, oblique bracing piece, housing reinforcing plate, housing to fix Ear;
The protection housing is welded into rectangular configuration successively end to end by square tube, in being welded between two frames in protection housing centre Between bracing piece, intermediate stiffener both sides are provided with oblique bracing piece, and oblique bracing piece one end is connected with intermediate stiffener one end, tiltedly To the bracing piece other end with protecting the angle of housing to be connected;
Intermediate stiffener is welded with housing reinforcing plate with oblique bracing piece junction;
Protection housing both sides are provided with housing fixed ear, and housing fixing hole is offered in housing fixed ear;Protective frame is made whole Body structure, it is readily transported and assembles;
Preferably, the column link includes head rod, the second connecting rod, oblique extension bar, the first connector, the second company Joint, joint among three members, the 4th connector;
Described head rod one end is welded with the first connector, and the head rod other end and the second connector weld, and second Connector also welds with oblique extension bar one end, the oblique extension bar other end and joint among three members welding, and joint among three members is also with second Connecting rod one end is welded, and the second connecting rod other end is welded with the 4th connector.
Preferably, the head rod, oblique extension bar, the second connecting rod form " Z " character form structure, the first connection Bar and the second connecting rod equal length;
First connector, the second connector, joint among three members, the 4th connector are "U" shaped structure, the "U" shaped Fixing hole is offered in structure, column link is connected by the fixing hole with head tree and secondary upstanding studs;Column link Be made of one structure, not only meet force request, also can convenience in transport and dismounting, assembling, due to using fixed " Z " font Structure, both ends are both provided with "U" shaped connector, in assembling with the function of calibrating automatically, it is not necessary in addition using ruler To measure, operating efficiency is substantially increased.
Preferably, the bottom of the secondary column is additionally provided with assembly pulley, and the assembly pulley is fixed with head tree, secondary column to be connected Connect, steel wire rope is equipped with assembly pulley, steel wire rope one end is connected with electric block one end, and the steel wire rope other end is locked with anti-fall seat in the plane Connection, the electric block other end are connected by pulling force sensor with being arranged on the hanger on column support top;
The hanger is " T " character form structure, and its both upper ends thereof is connected by bolt with head tree, secondary column respectively, and lower end is set Pulling force sensor is equipped with, electric block is provided below in pulling force sensor;After being provided with pulling force sensor, it can at any time check and climb The stress of frame, if it find that wherein a certain electric block discontinuity, then stop climb operation and checked immediately, Avoid the accident caused by unbalance stress.
Preferably, the anti-fall seat in the plane lock includes base, guide wheel, dead bolt, push rod, and base is consolidated with constructure body structure Fixed connection, guide wheel are arranged in guide rail, and guide rail can be locked relative to anti-fall seat in the plane to be moved up and down, and can be made after setting guide wheel It is more steady safer when climbing frame is run, be not in because of the asymmetric inclined risk of center of gravity.
Preferably, the head tree and secondary column are built in sections using square tube, it is necessary to when increasing length, will be opened up porose Iron plate is arranged in column, is then fixedly connected by bolt;Using segmental structure can further reduce manufacture into This, is also beneficial to entrucking or unloading during transport, arrived behind scene can extending length in any combination, improve operating efficiency.
The present invention is by using modular construction, by head tree, secondary column, cross-brace frame, frame of marking time, guide rail, anti-fall Seat in the plane lock, cat ladder, protective frame, column link etc. make the state for being capable of independent disassembling, beneficial to being opened on head tree and secondary column If positioning hole carry out bolt connection, be advantageous to transport and scene assembling;The invention on lifting cucurbit by setting up pulling force Sensor, the stress of climbing frame can be monitored at any time, effectively avoids the accident caused by unbalance stress in lifting process.The hair Bright scientific structure, it is reasonable in design, in light weight, be readily transported and assemble, by actual combat test effect highly significant, have extensive Market prospects and application value.
Brief description of the drawings
Fig. 1 is embodiment general structure schematic diagram provided by the invention;
Fig. 2 is cross-brace frame structural representation in embodiment provided by the invention;
Fig. 3 is frame structural representation of being marked time in embodiment provided by the invention;
Fig. 4 is protective frame structural representation in embodiment provided by the invention;
Fig. 5 is protective frame structural representation in embodiment provided by the invention;
Fig. 6 is the relative position figure of secondary column in embodiment provided by the invention, guide rail and anti-fall seat in the plane lock;
Each label represents respectively in figure:
1:Head tree;
2:Secondary column;
3:Cross-brace frame;30:First cross bar;31:Second cross bar;32:Vertical connecting;33:Oblique connecting rod;34:Cross bar Fixed ear;35:First cross bar reinforced sheet;36:Second cross bar reinforced sheet;37:3rd cross bar reinforced sheet;
4:Mark time frame;40:Underframe;41:Pedal;42:Pedal holes;
5:Guide rail;
6:Anti-fall seat in the plane lock;
7:Cat ladder;
8:Protective frame;80:Housing;81:Intermediate stiffener; 82:Oblique bracing piece;83:Housing reinforcing plate;84:Housing is fixed Ear;
9:Column link;90:Head rod;91:Second connecting rod;92:Oblique extension bar;93:First connector;94:The One connector fixing hole;95:Second connector;96:Joint among three members;97:Second connector fixing hole;98:4th connector.
Embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with Fig. 1 in the embodiment of the present invention ~ 6, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is the present invention Part of the embodiment, rather than whole embodiments.The embodiments of the invention being generally described and illustrated herein in the accompanying drawings The scope for being not intended to limit claimed invention is described in detail, but is merely representative of the selected embodiment of the present invention.Base Embodiment in the present invention, those of ordinary skill in the art obtained under the premise of creative work is not made it is all its His embodiment, belongs to the scope of protection of the invention.
Fig. 1 is embodiment general structure schematic diagram provided by the invention, as shown in figure 1, a kind of climbing frame, including head tree 1, Secondary column 2, cross-brace frame 3, frame 4 of marking time, guide rail 5, anti-fall seat in the plane lock 6, cat ladder 7, protective frame 8, column link 9.
Column support, the He of head tree 1 are connected and composed by least one column link 9 between head tree 1 and secondary column 2 Secondary column 2 is made of rectangular steel tube material, and multiple column connecting holes are offered on rectangular steel tube, for being realized with other mechanisms Bolt connection, column support are set perpendicular to ground, and climbing frame includes that multiple column supports are arranged in parallel forms, each column support Between connected by cross-brace frame 3 and frame 4 of marking time.
As shown in Fig. 2 cross-brace frame 3 includes the first cross bar 30, the second cross bar 31, vertical connecting 32, oblique connection Bar 33, cross bar fixed ear 34, the first cross bar reinforced sheet 35, the second cross bar reinforced sheet 36 and the 3rd cross bar reinforced sheet 37;
First cross bar 30 and the second cross bar 31 be arranged in parallel, pass through a vertical connection between the first cross bar 30 and the second cross bar 31 Bar 32 connects, and the both sides of vertical connecting 32 are respectively arranged with oblique connecting rod 33, the oblique one end extended line of connecting rod 33 with it is vertical One end extended line cross-coincidence of connecting rod 32 simultaneously forms " individual " character form structure;
Oblique connecting rod 33 is welded with the first cross bar reinforced sheet 35 with the junction of vertical connecting 32, the first cross bar reinforced sheet 35 Oblique connecting rod 33 and vertical connecting 32 are further strengthened connecting;
The oblique junction of 33 and first cross bar of connecting rod 30 is welded with the second cross bar reinforced sheet 36, and vertical connecting 32 and first is horizontal The junction of bar 30 is welded with the 3rd cross bar reinforced sheet 37;
Cross bar fixed ear 34 is respectively welded at the both ends of the first cross bar 30 and the second cross bar 31, is offered in cross bar fixed ear 34 Cross bar fixing hole, cross bar fixed ear 34 are connected by bolt with head tree 1;
Column link 9 sets up frame 4 of marking time above, and in order to further reinforce frame 4 of marking time, the lower section for frame 4 of marking time is additionally provided with Mark time frame diagonal brace, frame diagonal brace one end of marking time is fixedly connected with the bolt of head tree 1, mark time the frame diagonal brace other end and the bottom of frame 4 of marking time Bolt connection;Frame 4 of marking time is set according to the height of building floor on climbing frame, it is general to set 5 layers or so.
As shown in figure 3, frame 4 of marking time includes the rectangle underframe 40 formed by square tubes soldering, being welded with more in underframe 40 adds Strong square tube, underframe 40 are fixed on pedal 41, pedal holes 42 are offered on pedal 41;It should be noted that:In order to anti- Only falling object from high altitude, the frame 4 of marking time of first layer is not provided with pedal holes 42, and can connect turnover panel marking time to be provided with frame 4 Hinge means, turnover panel are for reducing, stopping climbing frame and the direct space pendant thing of building.
The side of frame 4 of marking time offers frame fixing hole of marking time, and frame 4 of marking time is connected by bolt with cross-brace frame 3;
Cat ladder 7 is provided between every layer of frame 4 of marking time, cat ladder 7 is welded using square tube and iron plate, and both sides montant uses square tube system Into cross bar is made of iron plate, and iron plate both ends are welded with montant;The upper end of cat ladder 7 is provided with hook, for being connected with frame 4 of marking time.
As shown in fig. 6, secondary column 2 is fixed with guide rail 5 below, guide rail 5 is provided with anti-fall seat in the plane lock 6 above;Anti-fall seat in the plane Lock 6 includes base, guide wheel, dead bolt, push rod, and base is fixedly connected with constructure body structure, and guide wheel is arranged on guide rail 5 Interior, guide rail 5 can lock 6 relative to anti-fall seat in the plane and move up and down.
In order to ensure construction safety, the outside of head tree 1 is provided with protective frame 8, as shown in figure 4, protective frame 8 is included outside protection Frame 80, intermediate stiffener 81, oblique bracing piece 82, housing reinforcing plate 83, housing fixed ear 84;
Protection housing 80 is welded into rectangular configuration successively end to end by square tube, in being welded between two frames in centre of protection housing 80 Between bracing piece 81, the both sides of intermediate stiffener 81 are provided with oblique bracing piece 82, oblique one end of bracing piece 82 and intermediate stiffener 81 One end connects, and the oblique other end of bracing piece 82 is with protecting the angle of housing 80 to be connected;
Intermediate stiffener 81 is welded with housing reinforcing plate 83 with the oblique junction of bracing piece 82;
Protection housing 80 both sides are provided with housing fixed ear 84, and housing fixing hole is offered in housing fixed ear 84, and protective frame 8 is logical Cross housing fixing hole and be bolted to the outside of head tree 1.
Column link 9 in above-mentioned is specially designed structure, is connected as shown in figure 5, the column link 9 includes first Extension bar 90, the second connecting rod 91, oblique extension bar 92, the first connector 93, the second connector 95, joint among three members the 96, the 4th connect Joint 98;
The one end of head rod 90 is welded with the first connector 93, and the other end of head rod 90 welds with the second connector 95, Second connector 95 also welds with oblique one end of extension bar 92, and the oblique other end of extension bar 92 welds with joint among three members 96, and the 3rd connects Joint 96 also welds with the one end of the second connecting rod 91, and the other end of the second connecting rod 91 is welded with the 4th connector 98;
Head rod 90, oblique extension bar 92, the second connecting rod 91 form " Z " character form structure, head rod 90 and the The equal length of two connecting rod 91;
First connector 93, the second connector 95, joint among three members 96, the 4th connector 98 are "U" shaped structure, are somebody's turn to do " U " Fixing hole is offered on character form structure, column link 9 passes through the fixing hole and head tree 1 and the bolt connection of secondary column 2.
Similar with other automatic climbing frames, this climbing frame is also required to set draw-gear, and cunning is additionally provided with the bottom of secondary column 2 Wheel group, assembly pulley are fixedly connected with head tree 1, secondary column 2, and steel wire rope, steel wire rope one end and electronic calabash are equipped with assembly pulley Lu Yiduan connections, the steel wire rope other end are connected with anti-fall seat in the plane lock 6, and the electric block other end is by pulling force sensor with being arranged on The hanger connection on column support top;
Hanger is " T " character form structure, and its both upper ends thereof is connected by bolt with head tree 1, secondary column 2 respectively, and lower end is set There is pulling force sensor, electric block is provided below in pulling force sensor.
In order to easy to operate, electric block and pulling force sensor are connected with host computer, coordinate to control by host computer, real The safe and stable lifting of existing climbing frame.Host computer can be common PC and its operation software or PLC system, selection Which kind of host computer is depending on field working conditions.
The present invention is by using modular construction, by head tree, secondary column, cross-brace frame, frame of marking time, guide rail, anti-fall Seat in the plane lock, cat ladder, protective frame, column link etc. make the state for being capable of independent disassembling, beneficial to being opened on head tree and secondary column If positioning hole carry out bolt connection, be advantageous to transport and scene assembling;The invention on lifting cucurbit by setting up pulling force Sensor, the stress of climbing frame can be monitored at any time, effectively avoids the accident caused by unbalance stress in lifting process.The hair Bright scientific structure, it is reasonable in design, in light weight, be readily transported and assemble, by actual combat test effect highly significant, have extensive Market prospects and application value.

Claims (10)

1. a kind of climbing frame, it is characterised in that including head tree(1), secondary column(2), cross-brace frame(3), frame of marking time(4), lead Rail(5), anti-fall seat in the plane lock(6), cat ladder(7), protective frame(8), column link(9);
The head tree(1)With secondary column(2)Between pass through at least one column link(9)Column support is connected and composed, institute Column support is stated to set perpendicular to ground, the climbing frame includes that multiple column supports are arranged in parallel forms, each column support it Between pass through cross-brace frame(3)With frame of marking time(4)Connection;
The column link(9)Setting up above has the frame of marking time(4);
Every layer of frame of marking time(4)Between be provided with cat ladder(7);
Head tree(1)Between pass through cross-brace frame(3)Connection;
Secondary column(2)Guide rail is fixed with below(5), guide rail(5)Anti-fall seat in the plane lock is provided with above(6);
Head tree(1)Outside is provided with protective frame(8).
2. climbing frame according to claim 1, it is characterised in that:
The head tree(1)With secondary column(2)It is made of rectangular steel tube material, multiple column connections is offered on rectangular steel tube Hole;
The cross-brace frame(3)Including the first cross bar(30), the second cross bar(31), vertical connecting(32), oblique connecting rod (33), cross bar fixed ear(34), the first cross bar reinforced sheet(35), the second cross bar reinforced sheet(36)And the 3rd cross bar reinforced sheet (37);
First cross bar(30)With the second cross bar(31)It is arranged in parallel, the first cross bar(30)With the second cross bar(31)Between pass through A piece vertical connecting(32)Connection, the vertical connecting(32)Both sides are respectively arranged with oblique connecting rod(33), it is described oblique To connecting rod(33)One end extended line and vertical connecting(32)One end extended line cross-coincidence simultaneously forms " individual " character form structure;
Oblique connecting rod(33)With vertical connecting(32)Junction is welded with the first cross bar reinforced sheet(35), first cross bar adds Strong piece(35)By oblique connecting rod(33)With vertical connecting(32)Further strengthen connection;
Oblique connecting rod(33)With the first cross bar(30)Junction is welded with the second cross bar reinforced sheet(36), vertical connecting(32) With the first cross bar(30)Junction is welded with the 3rd cross bar reinforced sheet(37);
Cross bar fixed ear(34)It is respectively welded at the first cross bar(30)And second cross bar(31)Both ends, cross bar fixed ear(34) On offer cross bar fixing hole, cross bar fixed ear(34)Pass through bolt and head tree(1)Connection.
3. climbing frame according to claim 1, it is characterised in that:
The frame of marking time(4)Including the rectangle underframe formed by square tubes soldering(40), underframe(40)Inside it is welded with more reinforcement sides Pipe, underframe(40)It is fixed on pedal(41), pedal(41)On offer pedal holes(42);
The frame of marking time(4)Side offers frame fixing hole of marking time, frame of marking time(4)Pass through bolt and cross-brace frame(3)Connection.
4. climbing frame according to claim 1, it is characterised in that:
The cat ladder(7)It is welded using square tube and iron plate, both sides montant is made of square tube, and cross bar is made of iron plate, Welded with montant at iron plate both ends;
The cat ladder(7)Upper end is provided with hook, for frame of marking time(4)Connection.
5. climbing frame according to claim 1, it is characterised in that:
The protective frame(8)Including protecting housing(80), intermediate stiffener(81), oblique bracing piece(82), housing reinforcing plate (83), housing fixed ear(84);
The protection housing(80)Rectangular configuration is welded into by square tube successively end to end, protects housing(80)Between middle two frames It is welded with intermediate stiffener(81), intermediate stiffener(81)Both sides are provided with oblique bracing piece(82), oblique bracing piece(82)One End and intermediate stiffener(81)One end connects, oblique bracing piece(82)The other end and protection housing(80)Angle connection;
Intermediate stiffener(81)With oblique bracing piece(82)Junction is welded with housing reinforcing plate(83);
Protect housing(80)Both sides are provided with housing fixed ear(84), housing fixed ear(84)On offer housing fixing hole.
6. climbing frame according to claim 1, it is characterised in that:
The column link(9)Including head rod(90), the second connecting rod(91), oblique extension bar(92), first connection Head(93), the second connector(95), joint among three members(96), the 4th connector(98);
The head rod(90)One end is welded with the first connector(93), head rod(90)The other end is connected with second Head(95)Welding, the second connector(95)Also with oblique extension bar(92)One end is welded, oblique extension bar(92)The other end and the 3rd connects Joint(96)Welding, joint among three members(96)Also with the second connecting rod(91)One end is welded, the second connecting rod(91)The other end welds It is connected to the 4th connector(98).
7. climbing frame according to claim 6, it is characterised in that:
The head rod(90), oblique extension bar(92), the second connecting rod(91)" Z " character form structure is formed, first connects Extension bar(90)With the second connecting rod(91)Equal length;
First connector(93), the second connector(95), joint among three members(96), the 4th connector(98)It is " U " word Shape structure, fixing hole, column link are offered in the "U" shaped structure(9)Pass through the fixing hole and head tree(1)Stood with pair Post(2)Bolt connection.
8. climbing frame according to claim 1, it is characterised in that:
The secondary column(2)Bottom be additionally provided with assembly pulley, the assembly pulley and head tree(1), secondary column(2)It is fixed to connect Connect, steel wire rope is equipped with assembly pulley, steel wire rope one end is connected with electric block one end, and the steel wire rope other end is locked with anti-fall seat in the plane (6)Connection, the electric block other end are connected by pulling force sensor with being arranged on the hanger on column support top;
The hanger is " T " character form structure, and its both upper ends thereof passes through bolt and head tree respectively(1), secondary column(2)Connection, Lower end is provided with pulling force sensor, and electric block is provided below in pulling force sensor.
9. climbing frame according to claim 1, it is characterised in that:
The anti-fall seat in the plane lock(6)Including base, guide wheel, dead bolt, push rod, base is fixedly connected with constructure body structure, Guide wheel is arranged on guide rail(5)It is interior, guide rail(5)It can be locked relative to anti-fall seat in the plane(6)Move up and down.
10. climbing frame according to claim 1, it is characterised in that:
The head tree(1)With secondary column(2)Be built in sections using square tube, it is necessary to when increasing length, porose iron plate will be opened up It is arranged in column, is then fixedly connected by bolt.
CN201711065390.0A 2017-11-02 2017-11-02 A kind of climbing frame Pending CN107642226A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711065390.0A CN107642226A (en) 2017-11-02 2017-11-02 A kind of climbing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711065390.0A CN107642226A (en) 2017-11-02 2017-11-02 A kind of climbing frame

Publications (1)

Publication Number Publication Date
CN107642226A true CN107642226A (en) 2018-01-30

Family

ID=61124123

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711065390.0A Pending CN107642226A (en) 2017-11-02 2017-11-02 A kind of climbing frame

Country Status (1)

Country Link
CN (1) CN107642226A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680917A (en) * 2018-12-17 2019-04-26 筑梦高科建筑有限公司 A kind of anti-fall climbing frame

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202611215U (en) * 2012-03-05 2012-12-19 黄立根 Square tube all-steel scaffold
KR101364198B1 (en) * 2013-01-10 2014-02-20 주식회사 엘에스폼웍 Variable scaffold for vuilding outer wall construction
CN104278830A (en) * 2014-07-28 2015-01-14 黄开友 Integrated combined scaffold
CN105484485A (en) * 2016-01-14 2016-04-13 中亿丰建设集团股份有限公司 Attached lifting scaffold
CN105888229A (en) * 2016-05-31 2016-08-24 中国冶集团有限公司 All-steel attached scaffold mounting method
CN107090968A (en) * 2017-04-17 2017-08-25 甘肃第六建设集团股份有限公司 Integrated form attached lifting scaffold and its elevating method
CN207553567U (en) * 2017-11-02 2018-06-29 顾志勇 A kind of climbing frame

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202611215U (en) * 2012-03-05 2012-12-19 黄立根 Square tube all-steel scaffold
KR101364198B1 (en) * 2013-01-10 2014-02-20 주식회사 엘에스폼웍 Variable scaffold for vuilding outer wall construction
CN104278830A (en) * 2014-07-28 2015-01-14 黄开友 Integrated combined scaffold
CN105484485A (en) * 2016-01-14 2016-04-13 中亿丰建设集团股份有限公司 Attached lifting scaffold
CN105888229A (en) * 2016-05-31 2016-08-24 中国冶集团有限公司 All-steel attached scaffold mounting method
CN107090968A (en) * 2017-04-17 2017-08-25 甘肃第六建设集团股份有限公司 Integrated form attached lifting scaffold and its elevating method
CN207553567U (en) * 2017-11-02 2018-06-29 顾志勇 A kind of climbing frame

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680917A (en) * 2018-12-17 2019-04-26 筑梦高科建筑有限公司 A kind of anti-fall climbing frame

Similar Documents

Publication Publication Date Title
CN101967886B (en) Assembly and installation methods of steel containment vessel of nuclear power station
CN107100187B (en) Tower crane steel girder erection structure and installation method
CN205558304U (en) Hoist and mount system of large -scale steel gallery truss
CN107642226A (en) A kind of climbing frame
CN207553567U (en) A kind of climbing frame
CN205908004U (en) Special hoist and mount fixing device of hanging flower basket
CN206680096U (en) One kind is used for restricted clearance hanging apparatus
CN206289999U (en) A kind of new attaching scaffold
CN206722373U (en) People's platform on a kind of welding for steel structure
CN206172871U (en) Movable jack -up machines
CN102322136B (en) Full-module-assembly adhesion type lifting scaffold
CN205555855U (en) Set up promotion support on steel structure platform
CN211638772U (en) Cage is hung in high altitude welding of large cross-section box girder
CN109838099B (en) Method for mounting double-span bolt ball net frame walking frame
CN209482687U (en) A kind of Super High exterior frame column construction operation platform
CN208122242U (en) A kind of shrinkable steel building platform device for high-altitude operation
CN208122257U (en) A kind of new steel structure building platform device for high-altitude operation
CN207597852U (en) Lower suspension centre structure
CN206779778U (en) Draw and insert-type overhead welding platform
CN215441540U (en) Subway sound barrier installation is with operation platform that can fast assembly remove
CN201778498U (en) Safe escape device for super-high-rise building core wall construction
CN220100694U (en) General turnover stiffening steel concrete column core filling protection platform
CN213415973U (en) Be used for off-the-shelf hoist of rectangle utility tunnel
CN218759682U (en) Portable ladder stand for welding steel bridge
CN106285017B (en) Thermal control boiler steel vertical shaft installation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180130