CN107642226A - A kind of climbing frame - Google Patents
A kind of climbing frame Download PDFInfo
- Publication number
- CN107642226A CN107642226A CN201711065390.0A CN201711065390A CN107642226A CN 107642226 A CN107642226 A CN 107642226A CN 201711065390 A CN201711065390 A CN 201711065390A CN 107642226 A CN107642226 A CN 107642226A
- Authority
- CN
- China
- Prior art keywords
- cross bar
- frame
- column
- welded
- oblique
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000009194 climbing Effects 0.000 title claims abstract description 34
- 230000001681 protective effect Effects 0.000 claims abstract description 17
- 241000282326 Felis catus Species 0.000 claims abstract description 13
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 22
- 229910000831 Steel Inorganic materials 0.000 claims description 17
- 239000010959 steel Substances 0.000 claims description 17
- 239000003351 stiffener Substances 0.000 claims description 14
- 229910052742 iron Inorganic materials 0.000 claims description 11
- 230000003014 reinforcing effect Effects 0.000 claims description 7
- 239000000463 material Substances 0.000 claims description 4
- 238000005476 soldering Methods 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 10
- 238000000034 method Methods 0.000 abstract description 6
- 230000009286 beneficial effect Effects 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000007306 turnover Effects 0.000 description 2
- 240000009087 Crescentia cujete Species 0.000 description 1
- 235000005983 Crescentia cujete Nutrition 0.000 description 1
- CWYNVVGOOAEACU-UHFFFAOYSA-N Fe2+ Chemical compound [Fe+2] CWYNVVGOOAEACU-UHFFFAOYSA-N 0.000 description 1
- 235000009797 Lagenaria vulgaris Nutrition 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
Abstract
The invention discloses a kind of climbing frame, it is related to construction machine field, the technical problem for the stress for being inconvenient to transport and assembling and each position of climbing frame can not be perceived in lifting process is weighed for the big weight of prior art volume, using modular construction, head tree, secondary column, cross-brace frame, frame of marking time, guide rail, anti-fall seat in the plane lock, cat ladder, protective frame, column link etc. are made to the state for being capable of independent disassembling, bolt connection is carried out beneficial to the positioning hole opened up on head tree and secondary column, is advantageous to transport and the assembling at scene;The invention can monitor the stress of climbing frame at any time, effectively avoid the accident caused by unbalance stress in lifting process by setting up pulling force sensor on lifting cucurbit.The inventive structure science, it is reasonable in design, in light weight, be readily transported and assemble, by actual combat test effect highly significant, there is extensive market prospects and application value.
Description
Technical field
The present invention relates to construction machine field, more particularly to a kind of climbing frame.
Background technology
Scaffold is always the essential construction equipment of construction, since the 1980s mid-term, with
The high speed development of economic construction of China, high level, high-rise building are more and more, traditional console mode scaffold are set up, using steel
The locating steel frame of pipe overlap joint, it is not only uneconomical but also very dangerous.Although there is Integral climbing scaffold in the market, but adopt more
With unilateral single road wheel, when anti-fall, support force is small, and vibration is big, and safety coefficient is small, and noise is big, and sealing-off easily occurs in support,
Weld seam easily ftractures, due to being made more of ferrous materials, the big weight weight of volume, it has not been convenient to and transport and assembling, in the process of climbing
In can not perceive the stressing conditions at each position, easily cause accident.
The content of the invention
The present invention provides a kind of climbing frame, to solve the big weight weight of prior art volume be inconvenient to transport and assemble and
The technical problem of the stress of each position of climbing frame can not be perceived in lifting process.
To solve the above problems, the present invention adopts the following technical scheme that realization:
A kind of climbing frame, including head tree, secondary column, cross-brace frame, frame of marking time, guide rail, anti-fall seat in the plane lock, cat ladder, protective frame,
Column link;
Column support, the column support are connected and composed by least one column link between the head tree and secondary column
Set perpendicular to ground, the climbing frame includes that multiple column supports are arranged in parallel forms, and passes through transverse direction between each column support
Support frame connects with frame of marking time;
Being set up above the column link has the frame of marking time;
Cat ladder is provided between every layer of frame of marking time;
Connected between head tree by cross-brace frame;
Guide rail is fixed with behind secondary column, anti-fall seat in the plane lock is provided with above guide rail;
Protective frame is provided with the outside of head tree.
Preferably, the head tree and secondary column are made of rectangular steel tube material, are offered on rectangular steel tube multiple vertical
Post connecting hole, the purpose of quick connection and uniform force can be realized by the way of connecting hole is opened up in square tube;
The cross-brace frame includes the first cross bar, the second cross bar, vertical connecting, oblique connecting rod, cross bar fixed ear, first
Cross bar reinforced sheet, the second cross bar reinforced sheet and the 3rd cross bar reinforced sheet;Reinforced sheet further ensures the stabilization of horizontal support
Property;
First cross bar and the second cross bar be arranged in parallel, are connected between the first cross bar and the second cross bar by a vertical connecting
Connect, the vertical connecting both sides are respectively arranged with oblique connecting rod, oblique connecting rod one end extended line and vertical connection
Bar one end extended line cross-coincidence simultaneously forms " individual " character form structure;
Oblique connecting rod and vertical connecting junction are welded with the first cross bar reinforced sheet, and the first cross bar reinforced sheet is by oblique company
Extension bar is further strengthened being connected with vertical connecting;
Oblique connecting rod is welded with the second cross bar reinforced sheet, vertical connecting and the first cross bar junction with the first cross bar junction
It is welded with the 3rd cross bar reinforced sheet;
Cross bar fixed ear is respectively welded at the both ends of the first cross bar and the second cross bar, and offering cross bar in cross bar fixed ear fixes
Hole, cross bar fixed ear are connected by bolt with head tree.
Preferably, the frame of marking time includes the rectangle underframe formed by square tubes soldering, and more reinforcement sides are welded with underframe
Pipe, underframe are fixed on pedal, pedal holes are offered on pedal;Using perforate on tubing and pedal, stress is not being influenceed
In the case of reduce further the weight of whole climbing frame, reduce cost of transportation and the power needed for lifting;
The frame side of marking time offers frame fixing hole of marking time, and frame of marking time is connected by bolt with cross-brace frame.
Preferably, the cat ladder is welded using square tube and iron plate, and both sides montant is made of square tube, and cross bar uses iron
Plate is made, and iron plate both ends are welded with montant;
The cat ladder upper end is provided with hook, convenient and swift using hook connects for being connected with frame of marking time, and can either meet assembling just
Prompt requirement, also disclosure satisfy that the requirement of construction safety;
Preferably, the protective frame includes protecting housing, intermediate stiffener, oblique bracing piece, housing reinforcing plate, housing to fix
Ear;
The protection housing is welded into rectangular configuration successively end to end by square tube, in being welded between two frames in protection housing centre
Between bracing piece, intermediate stiffener both sides are provided with oblique bracing piece, and oblique bracing piece one end is connected with intermediate stiffener one end, tiltedly
To the bracing piece other end with protecting the angle of housing to be connected;
Intermediate stiffener is welded with housing reinforcing plate with oblique bracing piece junction;
Protection housing both sides are provided with housing fixed ear, and housing fixing hole is offered in housing fixed ear;Protective frame is made whole
Body structure, it is readily transported and assembles;
Preferably, the column link includes head rod, the second connecting rod, oblique extension bar, the first connector, the second company
Joint, joint among three members, the 4th connector;
Described head rod one end is welded with the first connector, and the head rod other end and the second connector weld, and second
Connector also welds with oblique extension bar one end, the oblique extension bar other end and joint among three members welding, and joint among three members is also with second
Connecting rod one end is welded, and the second connecting rod other end is welded with the 4th connector.
Preferably, the head rod, oblique extension bar, the second connecting rod form " Z " character form structure, the first connection
Bar and the second connecting rod equal length;
First connector, the second connector, joint among three members, the 4th connector are "U" shaped structure, the "U" shaped
Fixing hole is offered in structure, column link is connected by the fixing hole with head tree and secondary upstanding studs;Column link
Be made of one structure, not only meet force request, also can convenience in transport and dismounting, assembling, due to using fixed " Z " font
Structure, both ends are both provided with "U" shaped connector, in assembling with the function of calibrating automatically, it is not necessary in addition using ruler
To measure, operating efficiency is substantially increased.
Preferably, the bottom of the secondary column is additionally provided with assembly pulley, and the assembly pulley is fixed with head tree, secondary column to be connected
Connect, steel wire rope is equipped with assembly pulley, steel wire rope one end is connected with electric block one end, and the steel wire rope other end is locked with anti-fall seat in the plane
Connection, the electric block other end are connected by pulling force sensor with being arranged on the hanger on column support top;
The hanger is " T " character form structure, and its both upper ends thereof is connected by bolt with head tree, secondary column respectively, and lower end is set
Pulling force sensor is equipped with, electric block is provided below in pulling force sensor;After being provided with pulling force sensor, it can at any time check and climb
The stress of frame, if it find that wherein a certain electric block discontinuity, then stop climb operation and checked immediately,
Avoid the accident caused by unbalance stress.
Preferably, the anti-fall seat in the plane lock includes base, guide wheel, dead bolt, push rod, and base is consolidated with constructure body structure
Fixed connection, guide wheel are arranged in guide rail, and guide rail can be locked relative to anti-fall seat in the plane to be moved up and down, and can be made after setting guide wheel
It is more steady safer when climbing frame is run, be not in because of the asymmetric inclined risk of center of gravity.
Preferably, the head tree and secondary column are built in sections using square tube, it is necessary to when increasing length, will be opened up porose
Iron plate is arranged in column, is then fixedly connected by bolt;Using segmental structure can further reduce manufacture into
This, is also beneficial to entrucking or unloading during transport, arrived behind scene can extending length in any combination, improve operating efficiency.
The present invention is by using modular construction, by head tree, secondary column, cross-brace frame, frame of marking time, guide rail, anti-fall
Seat in the plane lock, cat ladder, protective frame, column link etc. make the state for being capable of independent disassembling, beneficial to being opened on head tree and secondary column
If positioning hole carry out bolt connection, be advantageous to transport and scene assembling;The invention on lifting cucurbit by setting up pulling force
Sensor, the stress of climbing frame can be monitored at any time, effectively avoids the accident caused by unbalance stress in lifting process.The hair
Bright scientific structure, it is reasonable in design, in light weight, be readily transported and assemble, by actual combat test effect highly significant, have extensive
Market prospects and application value.
Brief description of the drawings
Fig. 1 is embodiment general structure schematic diagram provided by the invention;
Fig. 2 is cross-brace frame structural representation in embodiment provided by the invention;
Fig. 3 is frame structural representation of being marked time in embodiment provided by the invention;
Fig. 4 is protective frame structural representation in embodiment provided by the invention;
Fig. 5 is protective frame structural representation in embodiment provided by the invention;
Fig. 6 is the relative position figure of secondary column in embodiment provided by the invention, guide rail and anti-fall seat in the plane lock;
Each label represents respectively in figure:
1:Head tree;
2:Secondary column;
3:Cross-brace frame;30:First cross bar;31:Second cross bar;32:Vertical connecting;33:Oblique connecting rod;34:Cross bar
Fixed ear;35:First cross bar reinforced sheet;36:Second cross bar reinforced sheet;37:3rd cross bar reinforced sheet;
4:Mark time frame;40:Underframe;41:Pedal;42:Pedal holes;
5:Guide rail;
6:Anti-fall seat in the plane lock;
7:Cat ladder;
8:Protective frame;80:Housing;81:Intermediate stiffener; 82:Oblique bracing piece;83:Housing reinforcing plate;84:Housing is fixed
Ear;
9:Column link;90:Head rod;91:Second connecting rod;92:Oblique extension bar;93:First connector;94:The
One connector fixing hole;95:Second connector;96:Joint among three members;97:Second connector fixing hole;98:4th connector.
Embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with Fig. 1 in the embodiment of the present invention
~ 6, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is the present invention
Part of the embodiment, rather than whole embodiments.The embodiments of the invention being generally described and illustrated herein in the accompanying drawings
The scope for being not intended to limit claimed invention is described in detail, but is merely representative of the selected embodiment of the present invention.Base
Embodiment in the present invention, those of ordinary skill in the art obtained under the premise of creative work is not made it is all its
His embodiment, belongs to the scope of protection of the invention.
Fig. 1 is embodiment general structure schematic diagram provided by the invention, as shown in figure 1, a kind of climbing frame, including head tree 1,
Secondary column 2, cross-brace frame 3, frame 4 of marking time, guide rail 5, anti-fall seat in the plane lock 6, cat ladder 7, protective frame 8, column link 9.
Column support, the He of head tree 1 are connected and composed by least one column link 9 between head tree 1 and secondary column 2
Secondary column 2 is made of rectangular steel tube material, and multiple column connecting holes are offered on rectangular steel tube, for being realized with other mechanisms
Bolt connection, column support are set perpendicular to ground, and climbing frame includes that multiple column supports are arranged in parallel forms, each column support
Between connected by cross-brace frame 3 and frame 4 of marking time.
As shown in Fig. 2 cross-brace frame 3 includes the first cross bar 30, the second cross bar 31, vertical connecting 32, oblique connection
Bar 33, cross bar fixed ear 34, the first cross bar reinforced sheet 35, the second cross bar reinforced sheet 36 and the 3rd cross bar reinforced sheet 37;
First cross bar 30 and the second cross bar 31 be arranged in parallel, pass through a vertical connection between the first cross bar 30 and the second cross bar 31
Bar 32 connects, and the both sides of vertical connecting 32 are respectively arranged with oblique connecting rod 33, the oblique one end extended line of connecting rod 33 with it is vertical
One end extended line cross-coincidence of connecting rod 32 simultaneously forms " individual " character form structure;
Oblique connecting rod 33 is welded with the first cross bar reinforced sheet 35 with the junction of vertical connecting 32, the first cross bar reinforced sheet 35
Oblique connecting rod 33 and vertical connecting 32 are further strengthened connecting;
The oblique junction of 33 and first cross bar of connecting rod 30 is welded with the second cross bar reinforced sheet 36, and vertical connecting 32 and first is horizontal
The junction of bar 30 is welded with the 3rd cross bar reinforced sheet 37;
Cross bar fixed ear 34 is respectively welded at the both ends of the first cross bar 30 and the second cross bar 31, is offered in cross bar fixed ear 34
Cross bar fixing hole, cross bar fixed ear 34 are connected by bolt with head tree 1;
Column link 9 sets up frame 4 of marking time above, and in order to further reinforce frame 4 of marking time, the lower section for frame 4 of marking time is additionally provided with
Mark time frame diagonal brace, frame diagonal brace one end of marking time is fixedly connected with the bolt of head tree 1, mark time the frame diagonal brace other end and the bottom of frame 4 of marking time
Bolt connection;Frame 4 of marking time is set according to the height of building floor on climbing frame, it is general to set 5 layers or so.
As shown in figure 3, frame 4 of marking time includes the rectangle underframe 40 formed by square tubes soldering, being welded with more in underframe 40 adds
Strong square tube, underframe 40 are fixed on pedal 41, pedal holes 42 are offered on pedal 41;It should be noted that:In order to anti-
Only falling object from high altitude, the frame 4 of marking time of first layer is not provided with pedal holes 42, and can connect turnover panel marking time to be provided with frame 4
Hinge means, turnover panel are for reducing, stopping climbing frame and the direct space pendant thing of building.
The side of frame 4 of marking time offers frame fixing hole of marking time, and frame 4 of marking time is connected by bolt with cross-brace frame 3;
Cat ladder 7 is provided between every layer of frame 4 of marking time, cat ladder 7 is welded using square tube and iron plate, and both sides montant uses square tube system
Into cross bar is made of iron plate, and iron plate both ends are welded with montant;The upper end of cat ladder 7 is provided with hook, for being connected with frame 4 of marking time.
As shown in fig. 6, secondary column 2 is fixed with guide rail 5 below, guide rail 5 is provided with anti-fall seat in the plane lock 6 above;Anti-fall seat in the plane
Lock 6 includes base, guide wheel, dead bolt, push rod, and base is fixedly connected with constructure body structure, and guide wheel is arranged on guide rail 5
Interior, guide rail 5 can lock 6 relative to anti-fall seat in the plane and move up and down.
In order to ensure construction safety, the outside of head tree 1 is provided with protective frame 8, as shown in figure 4, protective frame 8 is included outside protection
Frame 80, intermediate stiffener 81, oblique bracing piece 82, housing reinforcing plate 83, housing fixed ear 84;
Protection housing 80 is welded into rectangular configuration successively end to end by square tube, in being welded between two frames in centre of protection housing 80
Between bracing piece 81, the both sides of intermediate stiffener 81 are provided with oblique bracing piece 82, oblique one end of bracing piece 82 and intermediate stiffener 81
One end connects, and the oblique other end of bracing piece 82 is with protecting the angle of housing 80 to be connected;
Intermediate stiffener 81 is welded with housing reinforcing plate 83 with the oblique junction of bracing piece 82;
Protection housing 80 both sides are provided with housing fixed ear 84, and housing fixing hole is offered in housing fixed ear 84, and protective frame 8 is logical
Cross housing fixing hole and be bolted to the outside of head tree 1.
Column link 9 in above-mentioned is specially designed structure, is connected as shown in figure 5, the column link 9 includes first
Extension bar 90, the second connecting rod 91, oblique extension bar 92, the first connector 93, the second connector 95, joint among three members the 96, the 4th connect
Joint 98;
The one end of head rod 90 is welded with the first connector 93, and the other end of head rod 90 welds with the second connector 95,
Second connector 95 also welds with oblique one end of extension bar 92, and the oblique other end of extension bar 92 welds with joint among three members 96, and the 3rd connects
Joint 96 also welds with the one end of the second connecting rod 91, and the other end of the second connecting rod 91 is welded with the 4th connector 98;
Head rod 90, oblique extension bar 92, the second connecting rod 91 form " Z " character form structure, head rod 90 and the
The equal length of two connecting rod 91;
First connector 93, the second connector 95, joint among three members 96, the 4th connector 98 are "U" shaped structure, are somebody's turn to do " U "
Fixing hole is offered on character form structure, column link 9 passes through the fixing hole and head tree 1 and the bolt connection of secondary column 2.
Similar with other automatic climbing frames, this climbing frame is also required to set draw-gear, and cunning is additionally provided with the bottom of secondary column 2
Wheel group, assembly pulley are fixedly connected with head tree 1, secondary column 2, and steel wire rope, steel wire rope one end and electronic calabash are equipped with assembly pulley
Lu Yiduan connections, the steel wire rope other end are connected with anti-fall seat in the plane lock 6, and the electric block other end is by pulling force sensor with being arranged on
The hanger connection on column support top;
Hanger is " T " character form structure, and its both upper ends thereof is connected by bolt with head tree 1, secondary column 2 respectively, and lower end is set
There is pulling force sensor, electric block is provided below in pulling force sensor.
In order to easy to operate, electric block and pulling force sensor are connected with host computer, coordinate to control by host computer, real
The safe and stable lifting of existing climbing frame.Host computer can be common PC and its operation software or PLC system, selection
Which kind of host computer is depending on field working conditions.
The present invention is by using modular construction, by head tree, secondary column, cross-brace frame, frame of marking time, guide rail, anti-fall
Seat in the plane lock, cat ladder, protective frame, column link etc. make the state for being capable of independent disassembling, beneficial to being opened on head tree and secondary column
If positioning hole carry out bolt connection, be advantageous to transport and scene assembling;The invention on lifting cucurbit by setting up pulling force
Sensor, the stress of climbing frame can be monitored at any time, effectively avoids the accident caused by unbalance stress in lifting process.The hair
Bright scientific structure, it is reasonable in design, in light weight, be readily transported and assemble, by actual combat test effect highly significant, have extensive
Market prospects and application value.
Claims (10)
1. a kind of climbing frame, it is characterised in that including head tree(1), secondary column(2), cross-brace frame(3), frame of marking time(4), lead
Rail(5), anti-fall seat in the plane lock(6), cat ladder(7), protective frame(8), column link(9);
The head tree(1)With secondary column(2)Between pass through at least one column link(9)Column support is connected and composed, institute
Column support is stated to set perpendicular to ground, the climbing frame includes that multiple column supports are arranged in parallel forms, each column support it
Between pass through cross-brace frame(3)With frame of marking time(4)Connection;
The column link(9)Setting up above has the frame of marking time(4);
Every layer of frame of marking time(4)Between be provided with cat ladder(7);
Head tree(1)Between pass through cross-brace frame(3)Connection;
Secondary column(2)Guide rail is fixed with below(5), guide rail(5)Anti-fall seat in the plane lock is provided with above(6);
Head tree(1)Outside is provided with protective frame(8).
2. climbing frame according to claim 1, it is characterised in that:
The head tree(1)With secondary column(2)It is made of rectangular steel tube material, multiple column connections is offered on rectangular steel tube
Hole;
The cross-brace frame(3)Including the first cross bar(30), the second cross bar(31), vertical connecting(32), oblique connecting rod
(33), cross bar fixed ear(34), the first cross bar reinforced sheet(35), the second cross bar reinforced sheet(36)And the 3rd cross bar reinforced sheet
(37);
First cross bar(30)With the second cross bar(31)It is arranged in parallel, the first cross bar(30)With the second cross bar(31)Between pass through
A piece vertical connecting(32)Connection, the vertical connecting(32)Both sides are respectively arranged with oblique connecting rod(33), it is described oblique
To connecting rod(33)One end extended line and vertical connecting(32)One end extended line cross-coincidence simultaneously forms " individual " character form structure;
Oblique connecting rod(33)With vertical connecting(32)Junction is welded with the first cross bar reinforced sheet(35), first cross bar adds
Strong piece(35)By oblique connecting rod(33)With vertical connecting(32)Further strengthen connection;
Oblique connecting rod(33)With the first cross bar(30)Junction is welded with the second cross bar reinforced sheet(36), vertical connecting(32)
With the first cross bar(30)Junction is welded with the 3rd cross bar reinforced sheet(37);
Cross bar fixed ear(34)It is respectively welded at the first cross bar(30)And second cross bar(31)Both ends, cross bar fixed ear(34)
On offer cross bar fixing hole, cross bar fixed ear(34)Pass through bolt and head tree(1)Connection.
3. climbing frame according to claim 1, it is characterised in that:
The frame of marking time(4)Including the rectangle underframe formed by square tubes soldering(40), underframe(40)Inside it is welded with more reinforcement sides
Pipe, underframe(40)It is fixed on pedal(41), pedal(41)On offer pedal holes(42);
The frame of marking time(4)Side offers frame fixing hole of marking time, frame of marking time(4)Pass through bolt and cross-brace frame(3)Connection.
4. climbing frame according to claim 1, it is characterised in that:
The cat ladder(7)It is welded using square tube and iron plate, both sides montant is made of square tube, and cross bar is made of iron plate,
Welded with montant at iron plate both ends;
The cat ladder(7)Upper end is provided with hook, for frame of marking time(4)Connection.
5. climbing frame according to claim 1, it is characterised in that:
The protective frame(8)Including protecting housing(80), intermediate stiffener(81), oblique bracing piece(82), housing reinforcing plate
(83), housing fixed ear(84);
The protection housing(80)Rectangular configuration is welded into by square tube successively end to end, protects housing(80)Between middle two frames
It is welded with intermediate stiffener(81), intermediate stiffener(81)Both sides are provided with oblique bracing piece(82), oblique bracing piece(82)One
End and intermediate stiffener(81)One end connects, oblique bracing piece(82)The other end and protection housing(80)Angle connection;
Intermediate stiffener(81)With oblique bracing piece(82)Junction is welded with housing reinforcing plate(83);
Protect housing(80)Both sides are provided with housing fixed ear(84), housing fixed ear(84)On offer housing fixing hole.
6. climbing frame according to claim 1, it is characterised in that:
The column link(9)Including head rod(90), the second connecting rod(91), oblique extension bar(92), first connection
Head(93), the second connector(95), joint among three members(96), the 4th connector(98);
The head rod(90)One end is welded with the first connector(93), head rod(90)The other end is connected with second
Head(95)Welding, the second connector(95)Also with oblique extension bar(92)One end is welded, oblique extension bar(92)The other end and the 3rd connects
Joint(96)Welding, joint among three members(96)Also with the second connecting rod(91)One end is welded, the second connecting rod(91)The other end welds
It is connected to the 4th connector(98).
7. climbing frame according to claim 6, it is characterised in that:
The head rod(90), oblique extension bar(92), the second connecting rod(91)" Z " character form structure is formed, first connects
Extension bar(90)With the second connecting rod(91)Equal length;
First connector(93), the second connector(95), joint among three members(96), the 4th connector(98)It is " U " word
Shape structure, fixing hole, column link are offered in the "U" shaped structure(9)Pass through the fixing hole and head tree(1)Stood with pair
Post(2)Bolt connection.
8. climbing frame according to claim 1, it is characterised in that:
The secondary column(2)Bottom be additionally provided with assembly pulley, the assembly pulley and head tree(1), secondary column(2)It is fixed to connect
Connect, steel wire rope is equipped with assembly pulley, steel wire rope one end is connected with electric block one end, and the steel wire rope other end is locked with anti-fall seat in the plane
(6)Connection, the electric block other end are connected by pulling force sensor with being arranged on the hanger on column support top;
The hanger is " T " character form structure, and its both upper ends thereof passes through bolt and head tree respectively(1), secondary column(2)Connection,
Lower end is provided with pulling force sensor, and electric block is provided below in pulling force sensor.
9. climbing frame according to claim 1, it is characterised in that:
The anti-fall seat in the plane lock(6)Including base, guide wheel, dead bolt, push rod, base is fixedly connected with constructure body structure,
Guide wheel is arranged on guide rail(5)It is interior, guide rail(5)It can be locked relative to anti-fall seat in the plane(6)Move up and down.
10. climbing frame according to claim 1, it is characterised in that:
The head tree(1)With secondary column(2)Be built in sections using square tube, it is necessary to when increasing length, porose iron plate will be opened up
It is arranged in column, is then fixedly connected by bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711065390.0A CN107642226A (en) | 2017-11-02 | 2017-11-02 | A kind of climbing frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711065390.0A CN107642226A (en) | 2017-11-02 | 2017-11-02 | A kind of climbing frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107642226A true CN107642226A (en) | 2018-01-30 |
Family
ID=61124123
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711065390.0A Pending CN107642226A (en) | 2017-11-02 | 2017-11-02 | A kind of climbing frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107642226A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109680917A (en) * | 2018-12-17 | 2019-04-26 | 筑梦高科建筑有限公司 | A kind of anti-fall climbing frame |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202611215U (en) * | 2012-03-05 | 2012-12-19 | 黄立根 | Square tube all-steel scaffold |
KR101364198B1 (en) * | 2013-01-10 | 2014-02-20 | 주식회사 엘에스폼웍 | Variable scaffold for vuilding outer wall construction |
CN104278830A (en) * | 2014-07-28 | 2015-01-14 | 黄开友 | Integrated combined scaffold |
CN105484485A (en) * | 2016-01-14 | 2016-04-13 | 中亿丰建设集团股份有限公司 | Attached lifting scaffold |
CN105888229A (en) * | 2016-05-31 | 2016-08-24 | 中国冶集团有限公司 | All-steel attached scaffold mounting method |
CN107090968A (en) * | 2017-04-17 | 2017-08-25 | 甘肃第六建设集团股份有限公司 | Integrated form attached lifting scaffold and its elevating method |
CN207553567U (en) * | 2017-11-02 | 2018-06-29 | 顾志勇 | A kind of climbing frame |
-
2017
- 2017-11-02 CN CN201711065390.0A patent/CN107642226A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202611215U (en) * | 2012-03-05 | 2012-12-19 | 黄立根 | Square tube all-steel scaffold |
KR101364198B1 (en) * | 2013-01-10 | 2014-02-20 | 주식회사 엘에스폼웍 | Variable scaffold for vuilding outer wall construction |
CN104278830A (en) * | 2014-07-28 | 2015-01-14 | 黄开友 | Integrated combined scaffold |
CN105484485A (en) * | 2016-01-14 | 2016-04-13 | 中亿丰建设集团股份有限公司 | Attached lifting scaffold |
CN105888229A (en) * | 2016-05-31 | 2016-08-24 | 中国冶集团有限公司 | All-steel attached scaffold mounting method |
CN107090968A (en) * | 2017-04-17 | 2017-08-25 | 甘肃第六建设集团股份有限公司 | Integrated form attached lifting scaffold and its elevating method |
CN207553567U (en) * | 2017-11-02 | 2018-06-29 | 顾志勇 | A kind of climbing frame |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109680917A (en) * | 2018-12-17 | 2019-04-26 | 筑梦高科建筑有限公司 | A kind of anti-fall climbing frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101967886B (en) | Assembly and installation methods of steel containment vessel of nuclear power station | |
CN107100187B (en) | Tower crane steel girder erection structure and installation method | |
CN205558304U (en) | Hoist and mount system of large -scale steel gallery truss | |
CN107642226A (en) | A kind of climbing frame | |
CN207553567U (en) | A kind of climbing frame | |
CN205908004U (en) | Special hoist and mount fixing device of hanging flower basket | |
CN206680096U (en) | One kind is used for restricted clearance hanging apparatus | |
CN206289999U (en) | A kind of new attaching scaffold | |
CN206722373U (en) | People's platform on a kind of welding for steel structure | |
CN206172871U (en) | Movable jack -up machines | |
CN102322136B (en) | Full-module-assembly adhesion type lifting scaffold | |
CN205555855U (en) | Set up promotion support on steel structure platform | |
CN211638772U (en) | Cage is hung in high altitude welding of large cross-section box girder | |
CN109838099B (en) | Method for mounting double-span bolt ball net frame walking frame | |
CN209482687U (en) | A kind of Super High exterior frame column construction operation platform | |
CN208122242U (en) | A kind of shrinkable steel building platform device for high-altitude operation | |
CN208122257U (en) | A kind of new steel structure building platform device for high-altitude operation | |
CN207597852U (en) | Lower suspension centre structure | |
CN206779778U (en) | Draw and insert-type overhead welding platform | |
CN215441540U (en) | Subway sound barrier installation is with operation platform that can fast assembly remove | |
CN201778498U (en) | Safe escape device for super-high-rise building core wall construction | |
CN220100694U (en) | General turnover stiffening steel concrete column core filling protection platform | |
CN213415973U (en) | Be used for off-the-shelf hoist of rectangle utility tunnel | |
CN218759682U (en) | Portable ladder stand for welding steel bridge | |
CN106285017B (en) | Thermal control boiler steel vertical shaft installation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180130 |