CN107630718A - Bored tunnel assembled two serves as a contrast assembled equipment vertical shaft originating method - Google Patents

Bored tunnel assembled two serves as a contrast assembled equipment vertical shaft originating method Download PDF

Info

Publication number
CN107630718A
CN107630718A CN201710720358.5A CN201710720358A CN107630718A CN 107630718 A CN107630718 A CN 107630718A CN 201710720358 A CN201710720358 A CN 201710720358A CN 107630718 A CN107630718 A CN 107630718A
Authority
CN
China
Prior art keywords
loop wheel
wheel machine
way
transverse passage
transported
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710720358.5A
Other languages
Chinese (zh)
Inventor
李嵩
占有志
周冉
黄齐武
孟园
杨义
陈琪
董振江
李星海
安长红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Sixth Group Co Ltd
Beijing Railway Construction Co of China Railway Sixth Group Co Ltd
Beijing MTR Construction Administration Corp
Original Assignee
China Railway Sixth Group Co Ltd
Beijing Railway Construction Co of China Railway Sixth Group Co Ltd
Beijing MTR Construction Administration Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Sixth Group Co Ltd, Beijing Railway Construction Co of China Railway Sixth Group Co Ltd, Beijing MTR Construction Administration Corp filed Critical China Railway Sixth Group Co Ltd
Priority to CN201710720358.5A priority Critical patent/CN107630718A/en
Publication of CN107630718A publication Critical patent/CN107630718A/en
Pending legal-status Critical Current

Links

Abstract

Bored tunnel assembled two serves as a contrast assembled equipment vertical shaft originating method and belongs to railway traffic engineering technical field of construction, and equipment, which is transported, includes crawler body → car body → mechanical arm → duct piece assembling machine → rear supporting trailer and relevant device → locomotive → beans gravel pack pot transport vehicle → section of jurisdiction → beans gravel pack pot.This equipment can realize that assembled machinery is originated and the bushing pipe piece of quick-assembling two by tunneling vertical shaft, avoid conventional shield-tunneling construction and take up an area mechanization and the automatization level for greatly to urban transportation and the burden of environment, significantly improving subway work.This equipment is in the assembled of Metro vertical shaft and originates, and equipment components are sequentially transported to vertical shaft and transverse passage-way by loop wheel machine, by portion's assembly and originates to the lining assembling constructions of transit tunnel progress two.

Description

Bored tunnel assembled two serves as a contrast assembled equipment vertical shaft originating method
Technical field
The invention belongs to railway traffic engineering technical field of construction, has been applied to Bored Section of Metro more particularly to one kind The running tunnel of just branch structure is completed in construction, is assembled secondly lining structure serves as a contrast assembled equipment handling using assembled two.
Background technology
It is domestic at present to study Shield-bored tunnels fabricated construction comparative maturity, but bored tunnel assembled two is served as a contrast Research is also in the starting stage.Assembled two serves as a contrast the research and development (publication number 106761819A) of assembled equipment to be domestic the first, external Rarely has case, equipment can realize that assembled machinery originates the simultaneously bushing pipe piece of quick-assembling two by tunneling vertical shaft, avoid conventional shield and apply Work takes up an area mechanization and the automatization level for greatly to urban transportation and the burden of environment, significantly improving subway work.
The content of the invention
In order to solve the above problems, it is an object of the invention to how assembled two serve as a contrast assembled equipment handling, it is assembled extremely To specified location and originate.
1) after the completion of vertical shaft and transverse passage-way preliminary bracing are constructed, remove interim inverted arch, perform secondary lining, on transverse passage-way Portion sets loop wheel machine running track, sets jacking device in vertical shaft bottom, jacking device is made up of wooden handcart and propelling cylinder;
2) set main loop wheel machine, transverse passage-way running track that loop wheel machine is set in pit mouth, above equipment is used to fill bored tunnel Assembled equipment is served as a contrast with formula two and is hoisted to transverse passage-way according to assembled order Divisional, and assembly to bored tunnel originates position.
Crawler body handling:
1) after crawler body is overturn vertically with loop wheel machine, it is placed on wooden handcart;
2) wooden handcart is promoted into transverse passage-way entrance with oil cylinder or pulling equipment;
3) crawler body is transported inside transverse passage-way with loop wheel machine;
Car body handling is assembled:
1) car body is placed on wooden handcart with loop wheel machine and promotes transverse passage-way entrance;
2) car body is transported into transverse passage-way with loop wheel machine;
3) car body and balancing weight are arranged on crawler body with loop wheel machine;
4) tunnel is driven into by transverse passage-way;
Mechanical arm is gone into the well:
1) after mechanical arm is overturn vertically with loop wheel machine, it is placed on wooden handcart, and is pushed into transverse passage-way entrance;
2) mechanical arm is transported into transverse passage-way with loop wheel machine;
3) mechanical arm is transported into tunnel and on car body with loop wheel machine;
Duct piece assembling machine is gone into the well:
1) duct piece assembling machine is placed on wooden handcart with loop wheel machine and is pushed into transverse passage-way entrance;
2) duct piece assembling machine is transported into transverse passage-way with loop wheel machine;
3) assembling machine is transported into tunnel and on car body with loop wheel machine;
Trailer is gone into the well:
1) motorcycle side frame is turned over vertically with loop wheel machine and turn 90 degrees, be placed on vertical shaft wooden handcart and promote entrance;
2) motorcycle side frame is transported into transverse passage-way with loop wheel machine;
3) motorcycle side frame level is turn 90 degrees with loop wheel machine and transports tunnel;
4) motorcycle middle frame is turned over loop wheel machine and turn 90 degrees, is placed on shaft floor;
5) motorcycle middle frame is transported into transverse passage-way with loop wheel machine;
6) motorcycle middle frame level is turn 90 degrees with loop wheel machine and transports tunnel again;
7) motorcycle middle frame and roller are installed;
Locomotive is gone into the well:
1) locomotive main frame is placed on vertical shaft wooden handcart with loop wheel machine and promotes transverse passage-way entrance;
2) locomotive main frame is transported into transverse passage-way with loop wheel machine;
3) locomotive driving cabin is placed on vertical shaft wooden handcart with loop wheel machine and promotes entrance;
4) locomotive driving cabin is transported into transverse passage-way and on locomotive main frame with loop wheel machine;
5) locomotive level is turn 90 degrees with loop wheel machine and transports tunnel again;
Beans gravel pack pot transport vehicle is gone into the well:
1) beans gravel pack pot transport vehicle is placed on vertical shaft wooden handcart with loop wheel machine and promotes transverse passage-way entrance;
2) beans gravel pack pot transport vehicle is transported into transverse passage-way with loop wheel machine;
3) beans gravel pack pot transport vehicle level is turn 90 degrees with loop wheel machine and transports tunnel again;
Segment car is gone into the well:
1) segment car is placed on vertical shaft wooden handcart with loop wheel machine and promotes transverse passage-way entrance;
2) segment car is transported into transverse passage-way with loop wheel machine;
3) segment car level is turn 90 degrees with loop wheel machine and transports tunnel again;
Section of jurisdiction, beans gravel pack pot are gone into the well:
1) section of jurisdiction is placed on vertical shaft wooden handcart with loop wheel machine and promotes entrance;
2) transverse passage-way is transported into section of jurisdiction with loop wheel machine;
3) section of jurisdiction is rotated horizontally 90 ° in transverse passage-way and tunnel entrance with loop wheel machine;
4) beans gravel pack pot is placed on shaft floor with loop wheel machine;
5) beans gravel pack pot is transported into transverse passage-way with loop wheel machine;
6) beans gravel pack pot is rotated horizontally 90 ° in transverse passage-way and tunnel entrance with loop wheel machine;
7) section of jurisdiction, beans gravel pack pot are transported in push trolley with loop wheel machine.
It is in completed subway tunnel vertical shaft and horizontal logical that assembled two provided by the invention, which serves as a contrast assembled equipment originating method, In road, it is sequentially simultaneously assembled to the setting position of the equipment such as originating location, loop wheel machine, jacking by portion's handling that assembled two is served as a contrast into assembled equipment It is that two originating for lining assembly equipment provide safeguard to put, and each part of the two assembled equipment of lining is prefabricated, on-site consolidation, it is ensured that Splicing accuracy.
Brief description of the drawings
Fig. 1 crawler body handling schematic diagrames:
Fig. 2 car body handling assembly schematic diagrames:
Fig. 3 mechanical arms are gone into the well schematic diagram:
Fig. 4 duct piece assembling machines are gone into the well schematic diagram:
Fig. 5 trailers are gone into the well schematic diagram:
Fig. 6 locomotives are gone into the well schematic diagram:
Fig. 7 beans gravel pack pot transport vehicles are gone into the well schematic diagram:
Fig. 8 segment cars are gone into the well schematic diagram:
Fig. 9 goes into the well section of jurisdiction schematic diagram:
Figure 10 beans gravel pack pots are gone into the well schematic diagram:
A kind of tunnel duct piece quick-assembling equipment schematic diagrams of Figure 11
The meaning of digitized representation in figure:
1 walking main frame, 101 support arms, 102 support cylinders, 103 revolving dials, 2 cross hinge ears, 3 duct piece assembling machines, 4 push away Enter oil cylinder, 5 main frame large arm, 6 trailers, 7 electric hydraulic control systems, 8 note beans gravel systems, 81 beans gravel pumps, 82 beans gravel skins Lining, 13 sections of jurisdiction at the beginning of band machine, 83 beans gravel pack pots, 9 filling systems, 10 segment crane beams, 11 section of jurisdiction person's machines, 12.
Embodiment
Assembled two serves as a contrast assembled equipment handling flow:
Crawler body → car body → mechanical arm → duct piece assembling machine → rear supporting trailer and relevant device → locomotive → beans gravel Stone tank transport vehicle → section of jurisdiction → beans gravel pack pot.
Fig. 1 crawler body handling schematic diagrames:
1) after crawler body is flipped an angle vertically with loop wheel machine, it is placed on wooden handcart;
2) wooden handcart is promoted into transverse passage-way entrance with oil cylinder or pulling equipment;
3) crawler body is transported inside transverse passage-way with loop wheel machine.
Fig. 2 car body handling assembly schematic diagrames:
1) car body is placed on wooden handcart with loop wheel machine and promotes transverse passage-way entrance;
2) car body is transported into transverse passage-way with loop wheel machine;
3) car body and balancing weight are arranged on crawler body with loop wheel machine;
4) equipment is driven into tunnel by transverse passage-way.
Fig. 3 mechanical arms are gone into the well schematic diagram:
1) after mechanical arm is flipped an angle vertically with loop wheel machine, it is placed on wooden handcart, and is pushed into transverse passage-way entrance;
2) mechanical arm is transported into transverse passage-way with loop wheel machine;
3) mechanical arm is transported into tunnel and on car body with loop wheel machine.
Fig. 4 duct piece assembling machines are gone into the well schematic diagram:
1) duct piece assembling machine is placed on wooden handcart with loop wheel machine and is pushed into transverse passage-way entrance;
2) duct piece assembling machine is transported into transverse passage-way with loop wheel machine;
3) assembling machine is transported into tunnel and on car body with loop wheel machine.
Fig. 5 trailers are gone into the well schematic diagram:
1) motorcycle side frame is turned over vertically with loop wheel machine and turn 90 degrees, be placed on vertical shaft wooden handcart and promote entrance;
2) motorcycle side frame is transported into transverse passage-way with loop wheel machine;
3) motorcycle side frame level is turn 90 degrees with loop wheel machine and transports tunnel;
4) motorcycle middle frame is turned over loop wheel machine and turn 90 degrees, is placed on shaft floor;
5) motorcycle middle frame is transported into transverse passage-way with loop wheel machine;
6) motorcycle middle frame level is turn 90 degrees with loop wheel machine and transports tunnel again;
7) motorcycle middle frame and roller are installed.
Fig. 6 locomotives are gone into the well schematic diagram:
1) locomotive main frame is placed on vertical shaft wooden handcart with loop wheel machine and promotes transverse passage-way entrance;
2) locomotive main frame is transported into transverse passage-way with loop wheel machine;
3) locomotive driving cabin is placed on vertical shaft wooden handcart with loop wheel machine and promotes entrance;
4) locomotive driving cabin is transported into transverse passage-way and on locomotive main frame with loop wheel machine;
5) locomotive level is turn 90 degrees with loop wheel machine and transports tunnel again.
Fig. 7 beans gravel pack pot transport vehicles are gone into the well schematic diagram:
1) beans gravel pack pot transport vehicle is placed on vertical shaft wooden handcart with loop wheel machine and promotes transverse passage-way entrance;
2) beans gravel pack pot transport vehicle is transported into transverse passage-way with loop wheel machine;
3) beans gravel pack pot transport vehicle level is turn 90 degrees with loop wheel machine and transports tunnel again.
Fig. 8 segment cars are gone into the well schematic diagram:
1) segment car is placed on vertical shaft wooden handcart with loop wheel machine and promotes transverse passage-way entrance;
2) segment car is transported into transverse passage-way with loop wheel machine;
3) segment car level is turn 90 degrees with loop wheel machine and transports tunnel again.
Fig. 9 sections of jurisdiction, beans gravel pack pot are gone into the well schematic diagram:
1) section of jurisdiction is placed on vertical shaft wooden handcart with loop wheel machine and promotes entrance;
2) transverse passage-way is transported into section of jurisdiction with loop wheel machine;
3) section of jurisdiction is rotated horizontally 90 ° in transverse passage-way and tunnel entrance with loop wheel machine;
4) beans gravel pack pot is placed on shaft floor with loop wheel machine;
5) beans gravel pack pot is transported into transverse passage-way with loop wheel machine;
6) beans gravel pack pot is rotated horizontally 90 ° in transverse passage-way and tunnel entrance with loop wheel machine;
7) section of jurisdiction, beans gravel pack pot are transported in push trolley with loop wheel machine.
Some other equipment is finally added, is assembled into a kind of tunnel duct piece quick-assembling equipment, it is characterised in that:Including Walking main frame (1), support arm (101), duct piece assembling machine (3), main frame large arm (5), segment crane (11) and trailer (6), it is described Main frame large arm (5) is connected by cross hinge ear (2) with support arm (101) upper end, support arm (101) lower end and walking main frame (1) It is articulated and connected, support arm (101) upper end is connected by support cylinder (102) with walking main frame (1), and duct piece assembling machine (3) is set In in main frame large arm (5), trailer (6) front end is connected with main frame large arm (5), and segment crane (11) is arranged on segment crane beam (10) Lower section, segment crane beam (10) both ends are connected with main frame large arm (5) and trailer (6) respectively.

Claims (1)

1. bored tunnel assembled two serves as a contrast assembled equipment vertical shaft originating method, it is characterised in that:
After the completion of vertical shaft and transverse passage-way preliminary bracing construction, remove interim inverted arch, perform secondary lining, set in transverse passage-way top Loop wheel machine running track, jacking device is set in vertical shaft bottom, jacking device is made up of wooden handcart and propelling cylinder;
Equipment, which is transported, includes crawler body → car body → mechanical arm → duct piece assembling machine → rear supporting trailer and relevant device → machine Car → beans gravel pack pot transport vehicle → section of jurisdiction → beans gravel pack pot;
Set main loop wheel machine, transverse passage-way running track that loop wheel machine is set in pit mouth, above equipment is used for bored tunnel assembled two Serve as a contrast assembled equipment and be hoisted to transverse passage-way according to assembled order Divisional, assembly to bored tunnel originates position;
Crawler body handling:
1) after crawler body is overturn vertically with loop wheel machine, it is placed on wooden handcart;
2) wooden handcart is promoted into transverse passage-way entrance with oil cylinder or pulling equipment;
3) crawler body is transported inside transverse passage-way with loop wheel machine;
Car body handling is assembled:
1) car body is placed on wooden handcart with loop wheel machine and promotes transverse passage-way entrance;
2) car body is transported into transverse passage-way with loop wheel machine;
3) car body and balancing weight are arranged on crawler body with loop wheel machine;
4) tunnel is driven into by transverse passage-way;
Mechanical arm is gone into the well:
1) after mechanical arm is overturn vertically with loop wheel machine, it is placed on wooden handcart, and is pushed into transverse passage-way entrance;
2) mechanical arm is transported into transverse passage-way with loop wheel machine;
3) mechanical arm is transported into tunnel and on car body with loop wheel machine;
Duct piece assembling machine is gone into the well:
1) duct piece assembling machine is placed on wooden handcart with loop wheel machine and is pushed into transverse passage-way entrance;
2) duct piece assembling machine is transported into transverse passage-way with loop wheel machine;
3) assembling machine is transported into tunnel and on car body with loop wheel machine;
Trailer is gone into the well:
1) motorcycle side frame is turned over vertically with loop wheel machine and turn 90 degrees, be placed on vertical shaft wooden handcart and promote entrance;
2) motorcycle side frame is transported into transverse passage-way with loop wheel machine;
3) motorcycle side frame level is turn 90 degrees with loop wheel machine and transports tunnel;
4) motorcycle middle frame is turned over loop wheel machine and turn 90 degrees, is placed on shaft floor;
5) motorcycle middle frame is transported into transverse passage-way with loop wheel machine;
6) motorcycle middle frame level is turn 90 degrees with loop wheel machine and transports tunnel again;
7) motorcycle middle frame and roller are installed;
Locomotive is gone into the well:
1) locomotive main frame is placed on vertical shaft wooden handcart with loop wheel machine and promotes transverse passage-way entrance;
2) locomotive main frame is transported into transverse passage-way with loop wheel machine;
3) locomotive driving cabin is placed on vertical shaft wooden handcart with loop wheel machine and promotes entrance;
4) locomotive driving cabin is transported into transverse passage-way and on locomotive main frame with loop wheel machine;
5) locomotive level is turn 90 degrees with loop wheel machine and transports tunnel again;
Beans gravel pack pot transport vehicle is gone into the well:
1) beans gravel pack pot transport vehicle is placed on vertical shaft wooden handcart with loop wheel machine and promotes transverse passage-way entrance;
2) beans gravel pack pot transport vehicle is transported into transverse passage-way with loop wheel machine;
3) beans gravel pack pot transport vehicle level is turn 90 degrees with loop wheel machine and transports tunnel again;
Segment car is gone into the well:
1) segment car is placed on vertical shaft wooden handcart with loop wheel machine and promotes transverse passage-way entrance;
2) segment car is transported into transverse passage-way with loop wheel machine;
3) segment car level is turn 90 degrees with loop wheel machine and transports tunnel again;
Section of jurisdiction, beans gravel pack pot are gone into the well:
1) section of jurisdiction is placed on vertical shaft wooden handcart with loop wheel machine and promotes entrance;
2) transverse passage-way is transported into section of jurisdiction with loop wheel machine;
3) section of jurisdiction is rotated horizontally 90 ° in transverse passage-way and tunnel entrance with loop wheel machine;
4) beans gravel pack pot is placed on shaft floor with loop wheel machine;
5) beans gravel pack pot is transported into transverse passage-way with loop wheel machine;
6) beans gravel pack pot is rotated horizontally 90 ° in transverse passage-way and tunnel entrance with loop wheel machine;
7) section of jurisdiction, beans gravel pack pot are transported in push trolley with loop wheel machine.
CN201710720358.5A 2017-08-21 2017-08-21 Bored tunnel assembled two serves as a contrast assembled equipment vertical shaft originating method Pending CN107630718A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710720358.5A CN107630718A (en) 2017-08-21 2017-08-21 Bored tunnel assembled two serves as a contrast assembled equipment vertical shaft originating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710720358.5A CN107630718A (en) 2017-08-21 2017-08-21 Bored tunnel assembled two serves as a contrast assembled equipment vertical shaft originating method

Publications (1)

Publication Number Publication Date
CN107630718A true CN107630718A (en) 2018-01-26

Family

ID=61100182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710720358.5A Pending CN107630718A (en) 2017-08-21 2017-08-21 Bored tunnel assembled two serves as a contrast assembled equipment vertical shaft originating method

Country Status (1)

Country Link
CN (1) CN107630718A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108316934A (en) * 2018-04-18 2018-07-24 中铁二院工程集团有限责任公司 A kind of shield machine of the assembled prefabricated secondary lining function of band
CN116493920A (en) * 2023-06-26 2023-07-28 中建交通建设集团有限公司 Segment erector and screw conveyor integrated disassembling and transporting device and use method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001159293A (en) * 1999-12-03 2001-06-12 Taisei Corp Shield machine and method of digging
JP2001280058A (en) * 2000-03-31 2001-10-10 Toda Constr Co Ltd Shaft base
CN105569671A (en) * 2016-02-02 2016-05-11 中铁十九局集团轨道交通工程有限公司 System and method for conveying residual soil in T-shaped underground excavation tunnel shield construction
CN105626088A (en) * 2016-02-02 2016-06-01 中铁十九局集团轨道交通工程有限公司 Well-descending translation method of T-shaped bored tunnel shield tunneling machine
CN206129300U (en) * 2016-09-06 2017-04-26 中铁六局集团有限公司 Shield constructs to start uses section of jurisdiction conveyer
CN106761819A (en) * 2016-12-30 2017-05-31 中铁工程装备集团有限公司 A kind of tunnel duct piece quick-assembling equipment and its assembling method
CN106930777A (en) * 2017-04-14 2017-07-07 中铁六局集团有限公司 The construction method of the lining of Bored Section of Metro main track assembled two

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001159293A (en) * 1999-12-03 2001-06-12 Taisei Corp Shield machine and method of digging
JP2001280058A (en) * 2000-03-31 2001-10-10 Toda Constr Co Ltd Shaft base
CN105569671A (en) * 2016-02-02 2016-05-11 中铁十九局集团轨道交通工程有限公司 System and method for conveying residual soil in T-shaped underground excavation tunnel shield construction
CN105626088A (en) * 2016-02-02 2016-06-01 中铁十九局集团轨道交通工程有限公司 Well-descending translation method of T-shaped bored tunnel shield tunneling machine
CN206129300U (en) * 2016-09-06 2017-04-26 中铁六局集团有限公司 Shield constructs to start uses section of jurisdiction conveyer
CN106761819A (en) * 2016-12-30 2017-05-31 中铁工程装备集团有限公司 A kind of tunnel duct piece quick-assembling equipment and its assembling method
CN106930777A (en) * 2017-04-14 2017-07-07 中铁六局集团有限公司 The construction method of the lining of Bored Section of Metro main track assembled two

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108316934A (en) * 2018-04-18 2018-07-24 中铁二院工程集团有限责任公司 A kind of shield machine of the assembled prefabricated secondary lining function of band
CN108316934B (en) * 2018-04-18 2024-01-23 中铁二院工程集团有限责任公司 Shield tunneling machine with splicing and prefabricating secondary lining functions
CN116493920A (en) * 2023-06-26 2023-07-28 中建交通建设集团有限公司 Segment erector and screw conveyor integrated disassembling and transporting device and use method
CN116493920B (en) * 2023-06-26 2023-09-26 中建交通建设集团有限公司 Segment erector and screw conveyor integrated disassembling and transporting device and use method

Similar Documents

Publication Publication Date Title
CN101230785B (en) Construction method for large section and multiple sections tunnel lining
CN103422866B (en) Underground folding start method for assorted trolleys after shielding
CN106930772B (en) One kind being based on the lateral separate launching construction method of mining sectbn shield and equipment
CN104195952A (en) Steel box girder erection method applied to steel and concrete hybrid girder cable-stayed bridge
CN107100639B (en) Shield transportation system for large-particle-size sand pebbles
CN104775825B (en) Shield machine individual well integrally originates construction method
CN109441459B (en) Earth pressure balance type shield split starting side unearthing construction method
CN106930777A (en) The construction method of the lining of Bored Section of Metro main track assembled two
CN108590745B (en) Transportation method and transportation structure for shield tunnel construction
CN108756934A (en) Run disease tunnel assembled treatment structures construction operation trolley
CN107476815A (en) Carry the laneway temporary support support and application method of handling track
CN106761808A (en) A kind of track traffic bored tunnel electric railcar transports corollary system
CN107630718A (en) Bored tunnel assembled two serves as a contrast assembled equipment vertical shaft originating method
CN102409616B (en) Construction method of bridge girder with ultra-small radius and bridge erecting machine used in same
CN105569671A (en) System and method for conveying residual soil in T-shaped underground excavation tunnel shield construction
CN106837376B (en) Bind module turnover device for subway tunnel section of jurisdiction
CN205775792U (en) Large span self-propelled trestle
CN104533471A (en) Trackless carrier of heavy hydraulic support and trackless caging method of support
CN107255188A (en) A kind of lifting pipeline method suitable at pipe gallery intersection node
CN204662270U (en) A kind of case girder transferring system
CN205445650U (en) A crawler -type hydraulic support carloader for colliery in pit
CN209444345U (en) A kind of tunnel arch prefabricated pipe section constructing device
CN207761671U (en) A kind of girder formula built tunnel piping equipment
CN205955749U (en) Tunnel invert construction equipment
CN206636581U (en) A kind of shield tunnel Second Lining Construction chassis

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180126