CN106761808A - A kind of track traffic bored tunnel electric railcar transports corollary system - Google Patents

A kind of track traffic bored tunnel electric railcar transports corollary system Download PDF

Info

Publication number
CN106761808A
CN106761808A CN201611239605.1A CN201611239605A CN106761808A CN 106761808 A CN106761808 A CN 106761808A CN 201611239605 A CN201611239605 A CN 201611239605A CN 106761808 A CN106761808 A CN 106761808A
Authority
CN
China
Prior art keywords
track
transports
steelframe
bored tunnel
electric railcar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611239605.1A
Other languages
Chinese (zh)
Inventor
吴宝华
陈树禹
刘春宇
张天泽
张万里
袁柯柯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 16th Bureau Group Co Ltd
Original Assignee
China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 16th Bureau Group Co Ltd filed Critical China Railway 16th Bureau Group Co Ltd
Priority to CN201611239605.1A priority Critical patent/CN106761808A/en
Publication of CN106761808A publication Critical patent/CN106761808A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/12Devices for removing or hauling away excavated material or spoil; Working or loading platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention relates to subway work technical field, there is provided a kind of track traffic bored tunnel electric railcar transports corollary system, including track, leather belt reshipment machine, energy storage type tractor, mine trolley, drag conveyor;Leather belt reshipment machine includes steelframe, belt conveyor, Cinder Machine;Can pass through mine trolley inside steelframe, and steelframe one end connection Cinder Machine, other end bottom is provided with road wheel, and steelframe is collectively forming with Cinder Machine can walking mechanism;Steelframe top is provided with belt conveyor;Track is used for energy storage type tractor traction mine trolley and advances, and mine trolley is multiple, is linked in sequence;Drag conveyor is used for transport of the dregs by the scope of operation to vertical shaft.Beneficial effects of the present invention are:, in tunnel side, occupation of land is small, and the laying of track is not influenceed by property for the system.Meeting is not needed, risk is low;Single transporter amount, travelling speed, run time lifting are notable, and efficiency is greatly improved;System service life increases;Artificial outfit is reduced;Strong applicability, has a extensive future.

Description

A kind of track traffic bored tunnel electric railcar transports corollary system
Technical field
The present invention relates to subway work technical field, more particularly to a kind of track traffic bored tunnel electric railcar transport is matched somebody with somebody Set system.
Background technology
Current metro built by mining method length focuses mostly in 1Km or so, and the dregs that construction material requested and excavation are produced need to enter Transported in row hole, by the investigation to metro built by mining method construction status, construction transportation system early stage uses artificial loading, manpower Two-wheel car is transported;It is many at this stage to be loaded using artificial or internal combustion mini-excavator, agricultural self-unloading internal combustion tricycle transport;Beijing Provided against in 2015 and constructed using diesel machine in tunneling track engineering, it is now to use artificial loading, electronic self-unloading three more Wheel car transport.
Electric power rail travel, shield conveying worm dress slag, dragon are used in subway shield tunnel construction Tunnel transportation system more Gantry crane car slag dumping.The system is higher to construction shaft headroom size and the requirement of ground construction site area.
Prior art one:The existing transportation system of boring construction:Project in Beijing by people's fixture vehicle+electronic self-unloading tricycle+ Bridge crane is constituted;Beijing-based projects are made up of small-sized internal combustion excavator entrucking+internal combustion self-unloading tricycle+bridge crane.
The shortcoming of prior art one:Project in Beijing, first, people's frock slag effect is low, and existing electric self-unloading car need to frequently fill Electricity, halfway loss of power situation is more during use;Secondly, labor strength is big;Again, labour is taken during operation(Driver) It is more.Beijing-based projects:Tail gas is produced to have a strong impact on operating worker during internal combustion apparatus operation healthy.
Prior art two:Rail mounted transport system in shield-tunneling construction hole:By screw conveyer of shield machine+railway+storage Battery type tractor+mine trolley+portal jib crane composition.
The shortcoming of prior art two:Rail mounted transport system has the following disadvantages in shield-tunneling construction hole:First, supporting shield is needed In conveying worm provide dress slag function;Secondly, the system slag bucket car is higher to the requirement of existing engineering structure, stops after must having well Fare arrives vertical shaft center so as to mine trolley in place, and vertical shaft headroom size requirements are big, and to facilitate mine trolley to lift by crane, straddle truck configuration will Ask high;Again, the system need to be lifted above track circuit, so when being used in urban district, it is desirable to which land used is flexible, floor space It is larger.
Prior art three:Rail mounted transport system in mining hole:It is made up of Mars Miner+belt conveyor, or is passed through Mars Miner+railway+battery-type tractor+mine trolley+discharging pylon composition.
The shortcoming of prior art three:Rail mounted transport system has the following disadvantages in mining hole, first, needs supporting mining Machine provides dress slag function;Secondly, need to be lifted built on stilts during the system discharge operation, so when being used in urban district, land used requirement is not Enough flexible, occupation of land difficulty is larger, and airborne dust is serious, it is impossible to accomplish totally-enclosed operation.
The content of the invention
The purpose of the present invention is exactly to overcome the deficiencies in the prior art, there is provided a kind of track traffic bored tunnel electric railcar Transport corollary system, solve in metro built by mining method the hole in transport effect it is low, charge the stand-by period it is long, fault rate is high, occupancy labor The problems such as power is more, labour intensity is big and improves process air environment in hole.
A kind of track traffic bored tunnel electric railcar transport corollary system of the present invention, including track, leather belt reshipment machine, storage Electric-type tractor, mine trolley, drag conveyor;
The leather belt reshipment machine is filling place, including steelframe, belt conveyor, Cinder Machine;The steelframe inside is to pass through The hollow structure of the mine trolley, described steelframe one end connects the Cinder Machine, and other end bottom is provided with road wheel, the steel Frame is collectively forming with the Cinder Machine can walking mechanism;The steelframe top is provided with belt conveyor;The earthwork goes out through Cinder Machine Mouth is unloaded to the belt of the belt conveyor, is unloaded to the mine trolley through the belt conveyor;
The track is used for the energy storage type tractor and draws the mine trolley traveling, and the mine trolley is multiple, is linked in sequence;
The drag conveyor is used for transport of the dregs by the scope of operation to vertical shaft.
Further, the steelframe is welded by shaped steel or bolt connection is formed, and field fabrication or factory's making, scene are filled Match somebody with somebody.
Further, on the hopper side dumping material of the mine trolley to the drag conveyor, the drag conveyor will Dregs is scraped to vertical shaft;The drag conveyor is chain-type drag conveyor.
Further, the energy storage type tractor model CY5/6GB types.
Further, the mine trolley quantity is 4, and the volume of the single mine trolley is 1.5m3
Further, the track is railway, and travel route is changed using double track track switch.
Further, the railway is using using the laying of 15# lightweight rail double track, channel-section steel sleeper.
Further, the track is heavy track, monorail transit road or suspention track.
Beneficial effects of the present invention are:This Orbital Transport Systems takes up an area less in tunnel side, and the laying of track does not influence It is any by property.Meeting is not needed, risk is reduced;Single transporter amount, travelling speed, run time lifting are notable, effect Rate is greatly improved;System service life increases;Artificial outfit is reduced;Strong applicability, has a extensive future.
Brief description of the drawings
Fig. 1 show a kind of track traffic bored tunnel electric railcar transport corollary system structural representation of the embodiment of the present invention Figure.
Fig. 2 show drag conveyor and orbital position relation schematic diagram.
Fig. 3 show drag conveyor structural representation.
Wherein:1- mine trolleys, 2- steelframes, 3- belt conveyers, 4, Cinder Machine, 5 tracks, 6- leather belt reshipment machines road wheel, 7- energy storage types tractor, 11- drag conveyors, 12- driving chains, 13- scraper plates, 14- motors and decelerator.
Specific embodiment
The specific embodiment of the invention is described in detail below in conjunction with specific accompanying drawing.It should be noted that in following embodiments The combination of the technical characteristic or technical characteristic of description is not construed as isolated, and they can be mutually combined so as to reach To superior technique effect.In the accompanying drawing of following embodiments, the identical label that each accompanying drawing occurs represent identical feature or Person's part, in can be applied to different embodiments.
As shown in figure 1, a kind of track traffic bored tunnel electric railcar transport corollary system of the embodiment of the present invention, including rail Road 5, leather belt reshipment machine, energy storage type tractor 7, mine trolley 1, drag conveyor 11;Energy storage type tractor 7 is the vehicle group Driving dynamics part;Mine trolley 1 is the system material bearing part.
The leather belt reshipment machine is filling place(Because bored tunnel section is universal smaller, and mine trolley group is more long, so It is accomplished by the built on stilts conveying of mine feeding bucket car 1 successively of leather belt reshipment machine), including steelframe 2, belt conveyor 3, Cinder Machine 4;The steelframe 2 inside are the hollow structure of the mine trolley 1 that can pass through, and the one end of the steelframe 2 connects the Cinder Machine 4, and other end bottom sets Road wheel 6 is equipped with, the steelframe 2 is collectively forming with the Cinder Machine 4 can walking mechanism;The top of the steelframe 2 is provided with belt Transporter 3;The earthwork is unloaded to the belt of the belt conveyer 3 through the outlet of Cinder Machine 4, is unloaded to institute through the belt conveyer 3 State in mine trolley 1;
The track 5 draws the mine trolley 1 and advances for the energy storage type tractor 7, and the mine trolley 1 is multiple, order Connection;
As shown in Figure 2,3, the drag conveyor 11 be used for dregs by the scope of operation to vertical shaft transport, including driving chain 12, Scraper plate 13, motor and decelerator 14;The motor and decelerator 14 are located at the one end of the track 5, are the drag conveyor 11 Power is provided, the driving chain 12 drives the scraper plate 13 to transport dregs;The length of the drag conveyor 11 is according to The quantity of mine trolley 1 determines;The effect of the drag conveyor:After the mine trolley 1 is in place, its hopper side dumping material is to described On drag conveyor, the drag conveyor scrapes to vertical shaft dregs;Preferably, the drag conveyor is chain-type scraper plate The conveyer, -12m of length 10.
The steelframe 2 is welded by shaped steel or bolt connection is formed, and makes or factory's making, assembled in situ.
Preferably, the model CY5/6GB types of the energy storage type tractor 7, are the driving dynamics part of the vehicle group.
Preferably, the quantity of the mine trolley 1 is 4, and the volume of the single mine trolley 1 is 1.5m3
The track 5 is preferably railway, and travel route is changed using double track track switch;For energy storage type tractor 7 and The traveling of mine trolley 1 is used;The railway is laid using 15# lightweight rail double track, channel-section steel sleeper.The track 5 can also Selection heavy track, monorail transit road suspend alternative solution of the track as railway in midair.
Safety analysis of the invention:
Orbital Transport Systems take up an area little in tunnel side, and the laying of track 5 does not influence any by property;Do not need meeting, Reduce risk.Brake employs mechanical braking pattern, changes travel route using double track track switch, it is not necessary to turn around, forward All wheeled backward;Traditional tricycle is heavier, and inertia ratio is larger, and brake quality does not catch up with, and road conditions are poor in hole, and tire holds Easily blow out, cause danger to greatly increase.Steering is heavy, causes to turn round and easily hits wall.Place is long and narrow in hole, it has not been convenient to adjust Head traveling, to vertical shaft, if security protection is not in place, it is extremely to endanger that tricycle crashes into vertical shaft for driver for native process needs reversing Danger.
Economic analysis of the invention:
1)Single transporter amount is lifted:Rail transport fills soil using mine trolley 1, is equipped with four mine trolleys 1, per vehicle volume 1.5m3, Each 6m3.Traditional three-wheel vehicle volume 1.05m3.
2)The lifting of speed and run time:The speed 11.4km/h of rail transport.It is per minute according to statistics to travel 200 meters of left sides The right side, continuous work 6 is more than hour;Traditional three-wheel vehicle speed 10km/h.It is long in this bid section zone distance and have 2.85 ‰ slope Degree, tricycle cell runtime 1 hour or so(Fully loaded upward slope electric quantity consumption is than larger).It is normal to excavate three electricity of unearthed time Dynamic three-wheel do not stop transport it is defeated need or so 2 hours, so traditional tricycle wants to meet construction needs, must just make a big purchase electricity in large quantities Dynamic tricycle, causes the waste of fund.
3)Service life increases, and reduces fund input:Traditional electro-tricycle use time is typically adhered to 6 months or so Scrap.Orbital Transport Systems battery can typically ensure normally to use 2 years, 7 service life of energy storage type tractor more than 5 years.
4)Artificial outfit is reduced:One face of traditional tricycle means of transportation needs three driver's muck haulage;Rail transport System only needs to a people can just be completed transport task and can meet the transport simultaneously of two faces, that is to say, that the past 6 6 tricycles of name workman the dry present people of work can just complete.Driving safety is convenient easily simple.Greatly reduce labor Fatigue resistance, and taking up room of saving that many tricycles charge.
Beneficial effects of the present invention are:This Orbital Transport Systems takes up an area less in tunnel side, and the laying of track does not influence It is any by property.Meeting is not needed, risk is reduced;Single transporter amount, travelling speed, run time lifting are notable, effect Rate is greatly improved;System service life increases;Artificial outfit is reduced;Strong applicability, has a extensive future.
Although having been presented for several embodiments of the present invention herein, it will be appreciated by those of skill in the art that Without departing from the spirit of the invention, the embodiments herein can be changed.Above-described embodiment be it is exemplary, no Should be using the embodiments herein as the restriction of interest field of the present invention.

Claims (8)

1. a kind of track traffic bored tunnel electric railcar transports corollary system, it is characterised in that including track, belt transfer Machine, energy storage type tractor, mine trolley, drag conveyor;
The leather belt reshipment machine is filling place, including steelframe, belt conveyor, Cinder Machine;The steelframe inside is to pass through The hollow structure of the mine trolley, described steelframe one end connects the Cinder Machine, and other end bottom is provided with road wheel, the steel Frame is collectively forming with the Cinder Machine can walking mechanism;The steelframe top is provided with belt conveyor;The earthwork goes out through Cinder Machine Mouth is unloaded to the belt of the belt conveyor, is unloaded to the mine trolley through the belt conveyor;
The track is used for the energy storage type tractor and draws the mine trolley traveling, and the mine trolley is multiple, is linked in sequence;
The drag conveyor is used for transport of the dregs by the scope of operation to vertical shaft.
2. track traffic bored tunnel electric railcar as claimed in claim 1 transports corollary system, it is characterised in that the steel Frame is welded by shaped steel or bolt connection is formed, and makes or factory's making, assembled in situ.
3. track traffic bored tunnel electric railcar as claimed in claim 1 transports corollary system, it is characterised in that the ore deposit On the hopper side dumping material of trolley to the drag conveyor, the drag conveyor scrapes to vertical shaft dregs;The scraper plate Conveyer is chain-type drag conveyor.
4. track traffic bored tunnel electric railcar as claimed in claim 1 transports corollary system, it is characterised in that the storage Electric-type tractor model CY5/6GB types.
5. track traffic bored tunnel electric railcar as claimed in claim 1 transports corollary system, it is characterised in that the ore deposit Trolley quantity is 4, and the volume of the single mine trolley is 1.5m3
6. the track traffic bored tunnel electric railcar as described in claim any one of 1-5 transports corollary system, and its feature exists In the track is railway, and travel route is changed using double track track switch.
7. track traffic bored tunnel electric railcar as claimed in claim 6 transports corollary system, it is characterised in that described light Type track is using using the laying of 15# lightweight rail double track, channel-section steel sleeper.
8. the track traffic bored tunnel electric railcar as described in claim any one of 1-5 transports corollary system, and its feature exists In the track is heavy track, monorail transit road or suspention track.
CN201611239605.1A 2016-12-28 2016-12-28 A kind of track traffic bored tunnel electric railcar transports corollary system Pending CN106761808A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611239605.1A CN106761808A (en) 2016-12-28 2016-12-28 A kind of track traffic bored tunnel electric railcar transports corollary system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611239605.1A CN106761808A (en) 2016-12-28 2016-12-28 A kind of track traffic bored tunnel electric railcar transports corollary system

Publications (1)

Publication Number Publication Date
CN106761808A true CN106761808A (en) 2017-05-31

Family

ID=58924057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611239605.1A Pending CN106761808A (en) 2016-12-28 2016-12-28 A kind of track traffic bored tunnel electric railcar transports corollary system

Country Status (1)

Country Link
CN (1) CN106761808A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107902329A (en) * 2017-12-22 2018-04-13 齐艳华 A kind of suspension type transportation resources for heading end
CN109458190A (en) * 2018-10-25 2019-03-12 中铁二十二局集团轨道工程有限公司 It is a kind of to turn over slag construction method and its application in TBM construction
CN110344860A (en) * 2019-08-05 2019-10-18 辽宁三三工业有限公司 A kind of secondary handling apparatus of shield duct piece
CN111305895A (en) * 2020-02-20 2020-06-19 浙江八达隧道工程股份有限公司 Stable transportation system of small-section extra-long tunnel and operation method thereof
CN113338956A (en) * 2021-05-31 2021-09-03 中国葛洲坝集团市政工程有限公司 TBM shield follow-up type ferry trolley and using method
CN116201563A (en) * 2023-04-27 2023-06-02 中建交通建设集团有限公司 Rapid soil discharging and feeding method for lateral vertical shaft of transverse passage for shield construction

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4798279A (en) * 1986-01-24 1989-01-17 Consolication Coal Company Mine haulage method and apparatus
CN1719001A (en) * 2005-05-03 2006-01-11 山东科技大学 Stereo operation fast fragments discharging method in mine drifting
CN101525090A (en) * 2008-03-06 2009-09-09 王书铭 Underground track transportation tailings-excavating wagon bridge
CN201354647Y (en) * 2008-12-31 2009-12-02 新汶矿业集团有限责任公司鄂庄煤矿 Stone-drift tunneling movable gangue synchronic loading and unloading station
CN201777630U (en) * 2010-08-03 2011-03-30 枣庄矿业(集团)有限责任公司柴里煤矿 Belt mining pneumatic transfer conveyor
CN203740486U (en) * 2014-04-07 2014-07-30 王书铭 Bridge equipment of slag discharge belt for underground mine transportation
US20150075949A1 (en) * 2012-04-03 2015-03-19 Dw Technologies Pty Ltd Conveyor system
CN106089231A (en) * 2016-07-23 2016-11-09 车新宁 The device slagged tap continuously for subway work and the slag tapping method using this device
CN205805554U (en) * 2016-07-05 2016-12-14 中铁六局集团有限公司 Shield launching stage dregs transportation device
CN206409240U (en) * 2016-12-28 2017-08-15 中铁十六局集团有限公司 A kind of track traffic bored tunnel electric railcar transports corollary system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4798279A (en) * 1986-01-24 1989-01-17 Consolication Coal Company Mine haulage method and apparatus
CN1719001A (en) * 2005-05-03 2006-01-11 山东科技大学 Stereo operation fast fragments discharging method in mine drifting
CN101525090A (en) * 2008-03-06 2009-09-09 王书铭 Underground track transportation tailings-excavating wagon bridge
CN201354647Y (en) * 2008-12-31 2009-12-02 新汶矿业集团有限责任公司鄂庄煤矿 Stone-drift tunneling movable gangue synchronic loading and unloading station
CN201777630U (en) * 2010-08-03 2011-03-30 枣庄矿业(集团)有限责任公司柴里煤矿 Belt mining pneumatic transfer conveyor
US20150075949A1 (en) * 2012-04-03 2015-03-19 Dw Technologies Pty Ltd Conveyor system
CN203740486U (en) * 2014-04-07 2014-07-30 王书铭 Bridge equipment of slag discharge belt for underground mine transportation
CN205805554U (en) * 2016-07-05 2016-12-14 中铁六局集团有限公司 Shield launching stage dregs transportation device
CN106089231A (en) * 2016-07-23 2016-11-09 车新宁 The device slagged tap continuously for subway work and the slag tapping method using this device
CN206409240U (en) * 2016-12-28 2017-08-15 中铁十六局集团有限公司 A kind of track traffic bored tunnel electric railcar transports corollary system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
马剑: "《选煤技术》", 30 September 2015 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107902329A (en) * 2017-12-22 2018-04-13 齐艳华 A kind of suspension type transportation resources for heading end
CN109458190A (en) * 2018-10-25 2019-03-12 中铁二十二局集团轨道工程有限公司 It is a kind of to turn over slag construction method and its application in TBM construction
CN110344860A (en) * 2019-08-05 2019-10-18 辽宁三三工业有限公司 A kind of secondary handling apparatus of shield duct piece
CN111305895A (en) * 2020-02-20 2020-06-19 浙江八达隧道工程股份有限公司 Stable transportation system of small-section extra-long tunnel and operation method thereof
CN111305895B (en) * 2020-02-20 2021-04-30 浙江八达隧道工程股份有限公司 Stable transportation system of small-section extra-long tunnel and operation method thereof
CN113338956A (en) * 2021-05-31 2021-09-03 中国葛洲坝集团市政工程有限公司 TBM shield follow-up type ferry trolley and using method
CN116201563A (en) * 2023-04-27 2023-06-02 中建交通建设集团有限公司 Rapid soil discharging and feeding method for lateral vertical shaft of transverse passage for shield construction
CN116201563B (en) * 2023-04-27 2023-07-25 中建交通建设集团有限公司 Rapid soil discharging and feeding method for lateral vertical shaft of transverse passage for shield construction

Similar Documents

Publication Publication Date Title
CN106761808A (en) A kind of track traffic bored tunnel electric railcar transports corollary system
US8428796B2 (en) Rail conveyance system for mining
CN107100639B (en) Shield transportation system for large-particle-size sand pebbles
US20160186566A1 (en) Apparatus, system and method for material extraction in underground hard rock mining
AU2014202712C1 (en) Ore removal production line, twin ramps and ground support installation method
CN101434346A (en) Scraper bucket type transloader
CN103702887A (en) Railway work vehicle
CN102518008A (en) Movable turnout platform used for shield tunnel
CN206409240U (en) A kind of track traffic bored tunnel electric railcar transports corollary system
CN210087337U (en) Intelligent economical segment construction tool
CN203382232U (en) Large ultra-long single-arm material discharging and distributing machine
CN105173673A (en) Soil dumping process for multi-directional transferring and machine head dead zone eliminating by waste soil field rubber belt machines
CN103043077B (en) Quick shunting system for tunneling slag discharge mining cars in underground roadway of mine
US20220162941A1 (en) Vehicle and Process for Moving Coarse Ore
CN209875170U (en) Rail-mounted slurry spraying mine car for primary support of large-slope inclined shaft
CN103332503B (en) Large-scale over-long single armed row material distributing machine
CN216198131U (en) Underground mine waste rock loading roadway structure
CN203382233U (en) Large ultra-long double-arm material discharging and distributing machine
CN115743187B (en) Distributed driving type mining track transportation system and method thereof
CN207554107U (en) A kind of underground coal mine bastard coal total system
CN103342236B (en) Large-scale over-long both arms row material distributing machine
CN204452458U (en) Tunnel rail mounted concrete tank
SU633970A1 (en) Repair train for railway bridges
Chunhui et al. for Longitudinal Incline Shafts in Extra-long Tunnels
CN110255102A (en) A kind of rack rail road railer track transport vehicle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531

RJ01 Rejection of invention patent application after publication