CN110344860A - A kind of secondary handling apparatus of shield duct piece - Google Patents
A kind of secondary handling apparatus of shield duct piece Download PDFInfo
- Publication number
- CN110344860A CN110344860A CN201910718314.8A CN201910718314A CN110344860A CN 110344860 A CN110344860 A CN 110344860A CN 201910718314 A CN201910718314 A CN 201910718314A CN 110344860 A CN110344860 A CN 110344860A
- Authority
- CN
- China
- Prior art keywords
- double
- rail beam
- handling apparatus
- tracks
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000000725 suspension Substances 0.000 claims description 12
- 230000003014 reinforcing effect Effects 0.000 claims description 7
- 230000005611 electricity Effects 0.000 claims description 3
- 230000001360 synchronised effect Effects 0.000 claims description 3
- 238000009434 installation Methods 0.000 abstract description 10
- 238000012423 maintenance Methods 0.000 abstract description 5
- 238000010276 construction Methods 0.000 description 3
- 230000013011 mating Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 239000004567 concrete Substances 0.000 description 2
- 208000010086 Hypertelorism Diseases 0.000 description 1
- 206010020771 Hypertelorism of orbit Diseases 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 210000005239 tubule Anatomy 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/40—Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/0607—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
- E21D9/126—Loading devices or installations
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The present invention provides a kind of secondary handling apparatus of shield duct piece, including the dregs transportation belt feeder set gradually along handling direction, first double-rail beam and the second double-rail beam, in first double-rail beam and section of jurisdiction handling apparatus is mounted in the second double-rail beam, the projection of two tracks of the second double-rail beam in the horizontal plane is located at the inside of the projection of two tracks of the first double-rail beam in the horizontal plane, the distance between two tracks of first double-rail beam are greater than the width of dregs transportation belt feeder, dregs transportation belt feeder includes horizontal segment and tilting section, gap of the lower end of the tilting section of dregs transportation belt feeder across two tracks of the first double-rail beam reaches the lower section of the first double-rail beam.The secondary handling apparatus of shield duct piece of the present invention will not interfere with dregs transportation belt feeder, be particularly suitable for 4 meters of piping lane class shield machines below, save installation space, rationally distributed, and installation and maintenance are convenient.
Description
Technical field
The invention belongs to tunnelling device fields, and in particular to a kind of secondary handling apparatus of shield duct piece.
Background technique
Shield method is the Fully-mechanized construction method of one of shallow mining method, it is to promote Shield-type machinery in ground,
Surrounding country rock is supported by shield shell and section of jurisdiction and prevents the collapsing in tunnel, while with cutting dress in front of excavation face
Carry out soil excavation is set, by being unearthed, machinery is transported outside hole, by jack in rear pressurization jacking, and assembled precast concrete pipe
Piece forms a kind of mechanized construction method of tunnel structure.
Section of jurisdiction conveying is to guarantee the important link of tunnel-liner assembly.This link claimed apparatus can match section of jurisdiction after being located at
The place that duct piece assembling machine grabbing device can grab is transported on section of jurisdiction trolley at the first section trolley of set.Publication No.
The Chinese patent of CN102381635A discloses a kind of shield machine segment handling and trolley traction integrated apparatus, including one double
The walking dolly and connection frame that beam-and-rail, a pair of of the electric block being installed below double-rail beam, traction electric block are run, connection frame
It is installed on above double-rail beam, double-rail beam is installed between duct piece assembling machine walking beam and rear mating first section trolley, before double-rail beam
It is inclined beams that both ends, which are horizontal beam middle section, afterwards, and double-rail beam front height is less than double-rail beam rear height.
Above-mentioned apparatus is although quick and convenient, but is only applicable to 6 meters or more of middle Large Diameter Pipeline shield machine, is not suitable for 4 meters
Piping lane class shield machine below.Because the dregs transportation belt feeder for transporting the dregs cut down need to be inclined at double track
The top of beam, and 4 meters or less piping lane class tunnel arrangement spaces are small, after arranging dregs transportation belt feeder, leave the sky of double-rail beam for
Between it is just smaller, cause double-rail beam to be easy and the interference of dregs transportation belt feeder, and the installation and maintenance of double-rail beam are difficult.
Summary of the invention
In view of this, the present invention is directed to propose a kind of secondary handling apparatus of shield duct piece, the device will not interfere with dregs
Equipment of conveyer, is particularly suitable for 4 meters of piping lane class shield machines below, and installation and maintenance are convenient.
In order to achieve the above objectives, the technical scheme of the present invention is realized as follows:
A kind of secondary handling apparatus of shield duct piece, including set gradually along handling direction dregs transportation belt feeder,
One double-rail beam and the second double-rail beam, the second double-rail beam are located at below the tail end of the first double-rail beam, in the first double-rail beam and second pair
It is mounted on section of jurisdiction handling apparatus on beam-and-rail, the first double-rail beam and the second double-rail beam include there are two parallel track second
The projection of two tracks of double-rail beam in the horizontal plane is located at the interior of the projection of two tracks of the first double-rail beam in the horizontal plane
Side, the distance between two tracks of the first double-rail beam are greater than the width of dregs transportation belt feeder, and dregs transportation belt feeder includes
Horizontal segment and tilting section, gap of the lower end of the tilting section of dregs transportation belt feeder across two tracks of the first double-rail beam
Reach the lower section of the first double-rail beam.
Further, the height of the horizontal segment of the first double track depth of beam and dregs transportation belt feeder is equal.
Further, the distance between two tracks of the second double-rail beam are greater than the width of dregs transportation belt feeder, dregs
Gap of the lower end of the tilting section of equipment of conveyer across two tracks of the second double-rail beam reaches under the second double-rail beam
Side.
Further, the distance between two tracks of the first double-rail beam are 1700mm, two tracks of the second double-rail beam
The distance between be 1400mm.
Further, the length of the first double-rail beam is 1.5~2 times of the length of the second double-rail beam.
Further, two tracks of the first double-rail beam and two tracks of the second double-rail beam are I-beam.
Further, connecting rod is connected between the tail end of the first double-rail beam and the head end of the second double-rail beam, connecting rod
Inclined reinforcing rib is connected between top and the head end of the second double-rail beam.
Further, the first double-rail beam and the second double-rail beam are horizontal positioned, are equipped with and use below the front end of the first double-rail beam
In the segment car for transporting section of jurisdiction.
Further, section of jurisdiction handling apparatus includes the first electric block and the second electric block of synchronous operation, the first electricity
It is equipped with suspension hook below the lower section of dynamic cucurbit and the second electric block, the suspension hook below the first electric block passes through cable wire and the
One electric block connects, and the suspension hook below the second electric block is connect by cable wire with the second electric block, and two suspension hooks are hung oneself
Equipped with the suspender for slinging section of jurisdiction.
Compared with the existing technology, the secondary handling apparatus of shield duct piece of the present invention has the advantage that
(1) the secondary handling apparatus of shield duct piece of the present invention will not interfere with dregs transportation belt feeder, especially suitable
In 4 meters of piping lane class shield machines below, installation space is saved, rationally distributed, installation and maintenance are convenient, and pass through higher the
One double-rail beam and lower second double-rail beam intermediate haulage section of jurisdiction, so that section of jurisdiction transport is steady;
(2) the secondary handling apparatus of shield duct piece of the present invention, the first double track depth of beam and dregs transportation belt
The height of the horizontal segment of machine is equal and the lower end of the tilting section of dregs transportation belt feeder pass through the second double-rail beam two tracks it
Between gap reach the second double-rail beam lower section so that dregs transportation belt feeder is not only located in two tracks of the first double-rail beam
Side and it is located on the inside of two tracks of the second double-rail beam, saves installation space to greatest extent, effective solution tubule
The problem being obstructed between diameter shield machine air;
(3) tail end of the first double-rail beam of the secondary handling apparatus of shield duct piece of the present invention and the second double-rail beam
It is connected with connecting rod between head end, inclined reinforcing rib is connected between the top of connecting rod and the head end of the second double-rail beam, even
The setting of extension bar and reinforcing rib is so that overall structure is more stable.
Detailed description of the invention
The attached drawing for constituting a part of the invention is used to provide further understanding of the present invention, schematic reality of the invention
It applies example and its explanation is used to explain the present invention, do not constitute improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the main view of the secondary handling apparatus of shield duct piece described in the embodiment of the present invention;
Fig. 2 is the left view of the secondary handling apparatus of shield duct piece described in the embodiment of the present invention.
Description of symbols:
1, dregs transportation belt feeder;2, the first double-rail beam;11, connecting rod;12, reinforcing rib;3, the second double-rail beam;4, section of jurisdiction
Handling apparatus;41, the first electric block;42, the second electric block;43, suspension hook;44, suspender;5, segment car;6, section of jurisdiction.
Specific embodiment
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase
Mutually combination.
In the description of the present invention, it is to be understood that, term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower",
The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is
It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark
Show that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as pair
Limitation of the invention.In addition, term " first ", " second " etc. are used for description purposes only, it is not understood to indicate or imply phase
To importance or implicitly indicate the quantity of indicated technical characteristic.The feature for defining " first ", " second " etc. as a result, can
To explicitly or implicitly include one or more of the features.In the description of the present invention, unless otherwise indicated, " multiple "
It is meant that two or more.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase
Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can
To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary
Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood by concrete condition
Concrete meaning in the present invention.
The present invention will be described in detail below with reference to the accompanying drawings and embodiments.
A kind of secondary handling apparatus of shield duct piece, as shown in Figure 1, including the dregs transportation set gradually along handling direction
Belt feeder 1, the first double-rail beam 2 and the second double-rail beam 3.First double-rail beam 2 and the second double-rail beam 3 are horizontal positioned, the second double track
Beam 3 is located at below the tail end of the first double-rail beam 2, is mounted on section of jurisdiction handling apparatus in the first double-rail beam 2 and in the second double-rail beam 3
4。
As shown in Fig. 2, section of jurisdiction handling apparatus 4 includes the first electric block 41 and the second electric block 42. of synchronous operation
The lower section of first electric block 41 and the lower section of the second electric block 42 are equipped with suspension hook 43, and 41 lower section of the first electric block is hung
Hook 43 is connect by cable wire with the first electric block 41, and the suspension hook 43 of 42 lower section of the second electric block is electronic by cable wire and second
Cucurbit 42 connects.Two suspension hooks 43 are hung oneself equipped with the suspender 44 for slinging section of jurisdiction 6, as shown in Figure 1, before the first double-rail beam 2
End lower section is equipped with the segment car 5 for transporting section of jurisdiction 6.First double-rail beam 2 includes that there are two parallel rails with the second double-rail beam 3
Road, two tracks of the first double-rail beam 2 and two tracks of the second double-rail beam 3 are I-beam.
To avoid dregs transportation belt feeder 1 from stopping the handling of section of jurisdiction 6, section of jurisdiction 6 is hoisted to the from the head end of the first double-rail beam 2
During the overlapping of one double-rail beam 2 and the second double-rail beam 3, cable wire is lengthening always.To avoid being hoisted to first when section of jurisdiction 6
When the overlapping of double-rail beam 2 and the second double-rail beam 3, as 44 the first double-rail beam of distance 2 of suspender hypertelorism and caused by manage
6 handling of piece is unstable, uses secondary girder construction, i.e., the second double-rail beam 3 is provided on the basis of the first double-rail beam 2.Pass through
Handling twice, avoid as cable wire is too long and caused by 6 handling of section of jurisdiction it is unstable so that the handling of section of jurisdiction 6 is more steady.
As shown in Fig. 2, the projection of two tracks of the second double-rail beam 3 in the horizontal plane is located at two of the first double-rail beam 2
The inside of the projection of track in the horizontal plane, specifically, the distance between two tracks of the first double-rail beam 2 are 1700mm, the
The distance between two tracks of two double-rail beams 3 are 1400mm.So set, the section of jurisdiction handling in the first double-rail beam 2 is facilitated to fill
Set 4 section of jurisdiction 6 is hoisted to the overlapping of the first double-rail beam 2 and the second double-rail beam 3 after, section of jurisdiction handling in the second double-rail beam 3 dress
4 continuation handling sections of jurisdiction 6 are set, to be connected the transport of section of jurisdiction 6.In addition, the length of the first double-rail beam 2 is the length of the second double-rail beam 3
1.5~2 times (see Fig. 1).
Referring to figs. 1 and 2, dregs transportation belt feeder 1 includes along the sequentially connected horizontal segment in handling direction and inclination
Section, the distance between two tracks of the second double-rail beam 3 are greater than the width of dregs transportation belt feeder 1.The height of first double-rail beam 2
Equal with the height of the horizontal segment of dregs transportation belt feeder 1, the lower end of the tilting section of dregs transportation belt feeder 1 sequentially passes through first
Gap between two tracks of double-rail beam 2, the gap between two tracks of the second double-rail beam 3 reach the second double-rail beam 3
Lower section.So set, being not only located at dregs transportation belt feeder 1 on the inside of two tracks of the first double-rail beam 2 and being located at the
On the inside of two tracks of two double-rail beams 3, installation space is saved to greatest extent, the first double-rail beam 2 and the second double-rail beam 3 will not
Interfere dregs transportation belt feeder 1, rationally distributed, installation and maintenance are convenient.
Connecting rod 11, the top of connecting rod 11 are connected between the tail end of first double-rail beam 2 and the head end of the second double-rail beam 3
Inclined reinforcing rib 12 is connected between the head end of the second double-rail beam 3, the setting of connecting rod 11 and reinforcing rib 12 is so that entirety
Structure is more stable.
The course of work of the invention:
First double-rail beam 2 and the second double-rail beam 3 are located between rear mating first section trolley and duct piece assembling machine walking beam, and first
The head end of double-rail beam 2 is connect with rear mating first section trolley, and the tail end of the second double-rail beam 3 is connect with duct piece assembling machine walking beam.Work
When making, the first electric block 41 and the second electric block 42 in the first double-rail beam 2 move to the top of segment car 5, and suspender 44 is hung
Section of jurisdiction 6 is played, then, the first electric block 41 and the second electric block 42 in the first double-rail beam 2 run to 2 He of the first double-rail beam
The overlapping of second double-rail beam 3, puts down section of jurisdiction 6.The first electric block 41 and the second electric block 42 in second double-rail beam 3 open
Dynamic, suspender 44 slings section of jurisdiction 6, and section of jurisdiction 6 is delivered to by the first electric block 41 and the second electric block 42 in the second double-rail beam 3
The lower section of duct piece assembling machine.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.
Claims (9)
1. a kind of secondary handling apparatus of shield duct piece, it is characterised in that: including the dregs transportation set gradually along handling direction
Belt feeder (1), the first double-rail beam (2) and the second double-rail beam (3), the second double-rail beam (3) are located under the tail end of the first double-rail beam (2)
Side is mounted on section of jurisdiction handling apparatus (4) in the first double-rail beam (2) and on the second double-rail beam (3), the first double-rail beam (2) and the
Two double-rail beams (3) include there are two parallel track, and the projection of two tracks of the second double-rail beam (3) in the horizontal plane is located at
The inside of the projection of two tracks of the first double-rail beam (2) in the horizontal plane, between two tracks of the first double-rail beam (3) away from
From the width for being greater than dregs transportation belt feeder (1), dregs transportation belt feeder (1) includes horizontal segment and tilting section, dregs transportation skin
Gap of the lower end of tilting section with machine (1) across two tracks of the first double-rail beam (2) reaches the first double-rail beam (2)
Lower section.
2. the secondary handling apparatus of shield duct piece according to claim 1, it is characterised in that: the height of the first double-rail beam (2)
It spends equal with the height of horizontal segment of dregs transportation belt feeder (1).
3. the secondary handling apparatus of shield duct piece according to claim 2, it is characterised in that: the two of the second double-rail beam (3)
The distance between a track is greater than the width of dregs transportation belt feeder (1), and the lower end of the tilting section of dregs transportation belt feeder (1) is worn
Cross the lower section that the gap between two tracks of the second double-rail beam (3) reaches the second double-rail beam (3).
4. the secondary handling apparatus for the shield duct piece stated according to claim 1, it is characterised in that: two of the first double-rail beam (2)
The distance between track is 1700mm, and the distance between two tracks of the second double-rail beam (3) are 1400mm.
5. the secondary handling apparatus of shield duct piece according to claim 1, it is characterised in that: the length of the first double-rail beam (2)
Degree is 1.5~2 times of the length of the second double-rail beam (3).
6. the secondary handling apparatus of shield duct piece described in any one according to claim 1~5, it is characterised in that: first pair
Two tracks of beam-and-rail (2) and two tracks of the second double-rail beam (3) are I-beam.
7. according to the secondary handling apparatus of shield duct piece described in claim 1, it is characterised in that: the tail end of the first double-rail beam (2)
It is connected between the head end of the second double-rail beam (3) connecting rod (11), the top of connecting rod (11) and the head of the second double-rail beam (3)
Inclined reinforcing rib (12) are connected between end.
8. the secondary handling apparatus of shield duct piece according to claim 1, it is characterised in that: the first double-rail beam (2) and
Two double-rail beams (3) are horizontal positioned, and the segment car (5) for transporting section of jurisdiction (5) is equipped with below the front end of the first double-rail beam (2).
9. the secondary handling apparatus of shield duct piece according to claim 1, it is characterised in that: section of jurisdiction handling apparatus (4) packet
Include the first electric block (41) and the second electric block (42) of synchronous operation, the lower section of the first electric block (41) and the second electricity
It is equipped with suspension hook (43) below dynamic cucurbit (42), the suspension hook (43) below the first electric block (41) passes through cable wire and the first electricity
Dynamic cucurbit (41) connect, and the suspension hook (43) below the second electric block (42) is connect by cable wire with the second electric block (42),
Two suspension hooks (43) are hung oneself equipped with the suspender (44) for slinging section of jurisdiction (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910718314.8A CN110344860B (en) | 2019-08-05 | 2019-08-05 | Secondary overhead hoist of shield segment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910718314.8A CN110344860B (en) | 2019-08-05 | 2019-08-05 | Secondary overhead hoist of shield segment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110344860A true CN110344860A (en) | 2019-10-18 |
CN110344860B CN110344860B (en) | 2024-09-24 |
Family
ID=68183997
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910718314.8A Active CN110344860B (en) | 2019-08-05 | 2019-08-05 | Secondary overhead hoist of shield segment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110344860B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117465907A (en) * | 2023-12-28 | 2024-01-30 | 中铁工程服务有限公司 | Continuous conveying device and shield system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004238898A (en) * | 2003-02-05 | 2004-08-26 | Ishikawajima Harima Heavy Ind Co Ltd | Segment feeder |
CN101922298A (en) * | 2010-08-20 | 2010-12-22 | 上海市第一市政工程有限公司 | Self-walking shield translation station-crossing system |
CN102381635A (en) * | 2011-06-22 | 2012-03-21 | 北京市三一重机有限公司 | Tube segment shipping and trolley towing integrated device of shield machine |
CN106761808A (en) * | 2016-12-28 | 2017-05-31 | 中铁十六局集团有限公司 | A kind of track traffic bored tunnel electric railcar transports corollary system |
CN108825251A (en) * | 2018-08-17 | 2018-11-16 | 中铁工程装备集团有限公司 | The compound shield of assembling combination section of jurisdiction |
CN210370720U (en) * | 2019-08-05 | 2020-04-21 | 辽宁三三工业有限公司 | Secondary hoisting device for shield segment |
-
2019
- 2019-08-05 CN CN201910718314.8A patent/CN110344860B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004238898A (en) * | 2003-02-05 | 2004-08-26 | Ishikawajima Harima Heavy Ind Co Ltd | Segment feeder |
CN101922298A (en) * | 2010-08-20 | 2010-12-22 | 上海市第一市政工程有限公司 | Self-walking shield translation station-crossing system |
CN102381635A (en) * | 2011-06-22 | 2012-03-21 | 北京市三一重机有限公司 | Tube segment shipping and trolley towing integrated device of shield machine |
CN106761808A (en) * | 2016-12-28 | 2017-05-31 | 中铁十六局集团有限公司 | A kind of track traffic bored tunnel electric railcar transports corollary system |
CN108825251A (en) * | 2018-08-17 | 2018-11-16 | 中铁工程装备集团有限公司 | The compound shield of assembling combination section of jurisdiction |
CN210370720U (en) * | 2019-08-05 | 2020-04-21 | 辽宁三三工业有限公司 | Secondary hoisting device for shield segment |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117465907A (en) * | 2023-12-28 | 2024-01-30 | 中铁工程服务有限公司 | Continuous conveying device and shield system |
CN117465907B (en) * | 2023-12-28 | 2024-03-19 | 中铁工程服务有限公司 | Continuous conveying device and shield system |
Also Published As
Publication number | Publication date |
---|---|
CN110344860B (en) | 2024-09-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102381635B (en) | Tube segment shipping and trolley towing integrated device of shield machine | |
CN106194211B (en) | TBM tunnels tunnel rail mounted wet shotcreting lining cutting composed bogie | |
CN107255188B (en) | A kind of lifting pipeline method suitable at pipe gallery intersection node | |
CN109372529B (en) | In-tunnel dismantling device and method for hard rock heading machine | |
CN105569671A (en) | System and method for conveying residual soil in T-shaped underground excavation tunnel shield construction | |
CN110344860A (en) | A kind of secondary handling apparatus of shield duct piece | |
CN211422666U (en) | Supporting structure for excavation of side slope at inlet and outlet of diversion water delivery tunnel | |
CN207245715U (en) | Material and dregs transportation system in shield separate launching tunnel | |
CN106121248A (en) | The installation method of sintering large flue in a kind of restricted area | |
CN210370720U (en) | Secondary hoisting device for shield segment | |
CN206156620U (en) | Movable track hoisting trolley of usefulness is demolishd with temporary track to shield tunnel construction | |
CN109356603B (en) | Rear supporting trailer suspension device of tunnel boring machine and construction method thereof | |
JP2017115316A (en) | Shield tunnel inside construction method | |
CN109519199B (en) | Shield tunnel segment supporting trolley | |
CN105152004B (en) | Hoisting device for reinforcing beam of top surface inside box-shaped coal conveying gallery road | |
CN113602963B (en) | Monorail crane installation method | |
CN110145317A (en) | A kind of technique on shield machine's station-crossing construction method | |
CN204677214U (en) | First Zhi Lianti bis-serves as a contrast the device of free-standing tunnel transporting material | |
CN111472795B (en) | Cutter replacing device and method for hard rock dual-mode shield | |
CN110980519B (en) | Dual-mode duct piece lifting system and lifting method | |
CN111472783A (en) | Shield tunneling machine split initial lengthened pipeline extending device and application method | |
CN105366576A (en) | Underground monorail crane | |
CN204980977U (en) | A promote hoist for colliery underground transportation | |
CN216889994U (en) | Movable inclined shaft excavator lifting platform | |
CN205668879U (en) | A kind of monorail crane lifting beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20240829 Address after: Room B565, 5th Floor, Building 2, No. 200 Xizhang Road, Gushan Town, Jiangyin City, Jiangsu Province, China 214400 Applicant after: Wuxi Huineng Kerry Equipment Technology Co.,Ltd. Country or region after: China Address before: 111200 Xiangyang Industrial Park, Liaoyang County, Liaoyang City, Liaoning Province Applicant before: LIAONING CENSCIENCE INDUSTRY Co.,Ltd. Country or region before: China |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |