CN207554107U - A kind of underground coal mine bastard coal total system - Google Patents

A kind of underground coal mine bastard coal total system Download PDF

Info

Publication number
CN207554107U
CN207554107U CN201721569821.2U CN201721569821U CN207554107U CN 207554107 U CN207554107 U CN 207554107U CN 201721569821 U CN201721569821 U CN 201721569821U CN 207554107 U CN207554107 U CN 207554107U
Authority
CN
China
Prior art keywords
storehouse
waste bin
coal
connection roadway
filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721569821.2U
Other languages
Chinese (zh)
Inventor
管清向
王新坤
赵艳鹏
王振伟
申世豹
李贝贝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linyi Mining Group Heze Coal Power Co Ltd
Original Assignee
Linyi Mining Group Heze Coal Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Linyi Mining Group Heze Coal Power Co Ltd filed Critical Linyi Mining Group Heze Coal Power Co Ltd
Priority to CN201721569821.2U priority Critical patent/CN207554107U/en
Application granted granted Critical
Publication of CN207554107U publication Critical patent/CN207554107U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of underground coal mine bastard coal total systems, solve the problems, such as coal-gangue separation and gangue utilization, the system includes comprehensive cash body storehouse, waste bin silo roof chamber, waste bin connection roadway, fill connection roadway, silo roof chamber connection roadway, air inlet hole and track main entry, comprehensive cash body storehouse includes bastard coal storehouse, waste bin and filling waste rock storehouse, bastard coal storehouse is identical with waste bin absolute altitude, filling waste rock storehouse is arranged under bastard coal storehouse and waste bin, bastard coal storehouse is connected by spoil silo roof chamber with waste bin entrance, the outlet of bastard coal storehouse and waste bin is arranged at the top of waste bin connection roadway, waste bin connection roadway connects two track main entrys, the entrance in filling waste rock storehouse is arranged in waste bin connection roadway, outlet is arranged in filling connection roadway, air inlet hole connection filling connection roadway and waste bin connection roadway.Underground coal mine bastard coal total system also has spoil storage and transportation ability strong, the advantages of alleviating coal and conflict with the transport of spoil, improve coal quality, collect and utilize spoil.

Description

A kind of underground coal mine bastard coal total system
Technical field
The utility model is related to bastard coal total system, especially a kind of bastard coal integrated treatments applied to underground coal mine System.
Background technology
During underground coal mine coal working face passing fault and during stone drifting, the spoil of extraction and development work driving The spoil of output is generally all mixed into transporting coal system, by main shaft hooist to ground.The washing ability of coal mine ground coal washery at present Generally saturation is tended to, these factors seriously restrict mine coal production and coal quality, influence the promotion of coal mine economic benefit.This Outside, coal mine is likely encountered spoil amount deficiency when carrying out underground filling exploitation, collects spoil difficulty, working face and each developing lane The spoil of road boring head output is difficult to leave concentratedly.Spoil is promoted on well from underground and is sent again to pack builder by washing Cause transporting coal system pressure big, and cause the wasting of resources as face, can shorten travelling belt etc. mixed with spoil in transporting coal system The service life of equipment, how to complete the transhipment of downhole gangue and processing is the technical issues of this field is urgently to be resolved hurrily.
Utility model content
To solve the problems, such as that downhole gangue influences coal quality, the restriction transport capacity of transporting coal system and filling mining process Middle spoil collects the problem of difficult, and the utility model provides a kind of underground coal mine bastard coal total system, technical solution It is as follows:
A kind of underground coal mine bastard coal total system, including comprehensive cash body storehouse, waste bin silo roof chamber, waste bin contact Lane, filling connection roadway, silo roof chamber connection roadway, air inlet hole and track main entry;The comprehensive cash body storehouse includes bastard coal storehouse, waste bin With filling waste rock storehouse, bastard coal storehouse entrance is arranged on the waste bin silo roof chamber below Belt transport main entry, the setting of waste bin entrance Waste bin silo roof chamber in silo roof chamber connection roadway, the outlet of bastard coal storehouse and waste bin are arranged at waste bin connection roadway It is interior;The filling waste rock storehouse is arranged under bastard coal storehouse and waste bin, and the entrance in filling waste rock storehouse is arranged on waste bin connection roadway Interior, outlet is arranged in filling connection roadway;The waste bin silo roof chamber on silo roof chamber connection roadway connection bastard coal storehouse top and Waste bin entrance;The waste bin connection roadway connects two track main entrys;Return air connection roadway connection return air main entry enters with waste bin Waste bin silo roof chamber at mouthful;The air inlet hole connection filling connection roadway and waste bin connection roadway.
Preferably, filling connection roadway is directly connected with exploiting field connection roadway.
It is also preferred that pass through milling coal hole or connection between the top plate of waste bin silo roof chamber and the bottom plate of Belt transport main entry Network lane is connected.
It may further be preferable that the center line in filling waste rock storehouse is overlapped with the center line in bastard coal storehouse, the setting of filling waste rock storehouse In the lower section in bastard coal storehouse.
Preferably, a point coal device is provided in Belt transport main entry, feeder is respectively installed in waste bin bottom.
It is also preferred that movable belt machine is installed in waste bin connection roadway.
Preferably, the side wall construction in comprehensive cash body storehouse includes:Bolting and rope support layer, gunite layer and block arch prick muscle layer.
Preferably, waste bin silo roof chamber concrete structure is bolting and rope support layer, I-steel welding layer and block arch mix Solidifying soil layer.
It is also preferred that the lower necking assembly in comprehensive cash body storehouse is welded with abrasion-proof manganese steel plate.
The beneficial effects of the utility model include:
(1) bastard coal storehouse and waste bin can be used for storing spoil, and coal storage can also be used for when main shaft hooist pressure is larger In order to use mine car transporting coal through track main entry and auxiliary shaft hoisting to ground;
(2) spoil of top bastard coal storehouse and waste bin decentralization is accepted in filling waste rock storehouse, and spoil is stored in filling waste rock In storehouse or directly decentralization is used to filling connection roadway for filling mining, and filling waste rock storehouse completes the collection and storage of spoil, It is poor to solve the problems, such as that spoil generates the existence time between use;
(3) waste bin loading chamber combines the construction method for building arch concrete, the party using solid matter welding mining i beam Method improves construction quality and shortens the construction time;
(4) necking using splicing welding abrasion-proof manganese steel plate, can effectively mitigate warehouse entry spoil under waste bin under waste bin The impact of necking promotes necking intensity under waste bin, and extends waste bin service life;
(5) downhole gangue total system provided by the utility model, which also has, mitigates transporting coal system transfer pressure, carries Coal quality is risen, ground coal washery Cleaning capacity is improved, filling guarantee is provided for filling mining and reduces spoil and pollute environmental protection.
Description of the drawings
Fig. 1 is a kind of underground coal mine bastard coal total system tunnel floor map;
Fig. 2 is a kind of underground coal mine bastard coal total system structural profile structure diagram;
Fig. 3 is a kind of specific cross-sectional view of underground coal mine bastard coal total system structure;
Fig. 4 is waste bin side wall construction schematic diagram;
Fig. 5 is chamber side wall construction schematic diagram;
In figure:1- synthesis cash bodies storehouse, 11- bastard coals storehouse;12- waste bins;13- filling waste rocks storehouse;14- feeders;15- spoils Necking under storehouse;21- waste bin silo roof chambers;22- transports chamber;31- waste bin connection roadways;32- silo roof chamber connection roadways;33- Fill connection roadway;34- return air connection roadways;35- milling coal holes;36- movable belt machines;4 Belt transport main entrys;41- divides coal device;5- Return air main entry;6- track main entrys;7- stope fillings lane;8- air inlet holes;91- bolting and rope support layers;92- gunite layers;93- builds arch Prick muscle layer;94- I-steel welding layers;95- builds arch concrete layer.
Specific embodiment
With reference to shown in Fig. 1 to Fig. 5, specific embodiment of the present utility model is as follows:
Embodiment 1
As shown in Figure 1 and Figure 2, a kind of underground coal mine bastard coal total system, including comprehensive cash body storehouse 1, waste bin silo roof Chamber 21, waste bin connection roadway 31, filling connection roadway 33, silo roof chamber connection roadway 32, air inlet hole 8 and track main entry 6, Yi Jian Mounted in tunnel or the indoor equipment of cave.3 waste bins of construction, specially bastard coal storehouse 11, waste bin 12 and filling waste rock storehouse 13, For the transhipment storage of spoil or coal, filling waste rock storehouse 13 is used to collect the suitable spoil of diameter for middle bastard coal storehouse 11 and waste bin 12 For filling mining.Comprehensive 1 side wall construction of cash body storehouse, which specifically includes bolting and rope support layer 91, gunite layer 92 and builds arch, pricks muscle Layer 93, wherein 11 entrance of bastard coal storehouse are arranged on the waste bin silo roof chamber 21 of 4 lower section of Belt transport main entry, and 12 entrance of waste bin is set It puts in the waste bin silo roof chamber 21 of waste bin connection roadway 31 and 34 infall of return air connection roadway;Bastard coal storehouse 11 and waste bin 12 Outlet be arranged at waste bin contact 31 in.Bastard coal storehouse 11 and waste bin 12 can be used for storing spoil, can also be in main shaft For coal storage in order to using mine car transporting coal through track main entry 6 and auxiliary shaft hoisting to ground when adherence pressure is larger.Filling waste rock Storehouse 13 is arranged under bastard coal storehouse 11 and waste bin 12, and the entrance in filling waste rock storehouse 13 is arranged in transhipment chamber 22, and outlet is set It puts in filling connection roadway 33.The spoil that top bastard coal storehouse 11 and waste bin 12 are transferred is accepted in 13 storehouse of filling waste rock, and by spoil It is stored in filling waste rock storehouse 13 or directly decentralization is used to filling connection roadway 33 for filling mining, filling waste rock storehouse is completed It is poor to solve the problems, such as that spoil generates the existence time between use for the collection and storage of spoil.
As shown in Figure 4 and Figure 5, chamber includes waste bin silo roof chamber 21 and transhipment chamber 22, wherein waste bin silo roof cave It is connected between the top plate of room 21 and the bottom plate of Belt transport main entry by milling coal hole 35 or connection roadway, waste bin silo roof chamber 21 specific supporting construction are bolting and rope support layer 91, I-steel welding layer 94 and build arch concrete layer 95, which uses Solid matter welding mining i beam combines the construction method for building arch concrete, when shortening construction the method increase construction quality Between.Silo roof chamber connection roadway 32 connects the waste bin silo roof chamber 21 on bastard coal storehouse top and the waste bin silo roof of waste bin inlet Chamber 21.Waste bin connection roadway 31 connects two track main entrys 6, the connection of air inlet hole 8 filling connection roadway 33 and waste bin connection roadway 31, filling connection roadway 33 is directly connected with stope filling lane 7.A point coal device 41 is provided in Belt transport main entry 4, at waste bin bottom Portion is respectively equipped with feeder 14.Movable belt is installed in waste bin connection roadway 31 between bastard coal storehouse 11 and waste bin 12 Machine 36.The center line in filling waste rock storehouse 13 is overlapped with the center line in bastard coal storehouse 11, and filling waste rock storehouse 13 is arranged on bastard coal storehouse 11 Lower section.Comprehensive 1 side wall construction of cash body storehouse includes:Bolting and rope support layer 91, gunite layer 92 and block arch prick muscle layer 93.Under waste bin 15 assembly of necking is welded with abrasion-proof manganese steel plate, and splicing welding abrasion-proof manganese steel plate can effectively mitigate warehouse entry spoil under waste bin The impact of necking promotes necking intensity under waste bin, and extends waste bin service life.
Embodiment 2
The present embodiment joins underground coal mine bastard coal total system concrete structure a kind of in embodiment 1 with reference to shown in Fig. 3 Number is described further.Comprehensive cash body storehouse 1 includes bastard coal storehouse 11, waste bin 12 and filling waste rock storehouse 13, design parameter: 11 a diameter of 7m of bastard coal storehouse, is highly 21m, and center line is less than 1.5m with 4 inner belt machine horizontal distance of Belt transport main entry;Waste bin A diameter of 7m is highly 21m;13 a diameter of 7m of filling waste rock storehouse, is highly 20m.3 waste bin side wall constructions and supporting parameter It is as follows:12 anchor pole suitable for reading of waste bin be 20 × 2400mm of Φ, array pitch be 700 × 700mm, cable parameters for Φ 22 × 6000mm, array pitch are 700 × 700mm, and 100~150mm of shotcrete thickness, individual layer bundle muscle, it is 300~500mm to build arch thickness, Preferably 400mm;Middle part column body segment side wall anchor pole is 20 × 2400mm of Φ, and array pitch is 800 × 800mm, and anchor cable is anchor cable Φ 17.8 × 4000mm, array pitch are 2400 × 2400mm, 80~110mm of shotcrete thickness;Lower necking anchor pole is 20 × 2400mm of Φ, Between array pitch be 800 × 800mm, 80~110mm of shotcrete thickness, lower necking inclination angle be 50 °~65 °, preferably 60 °, bilayer prick Muscle, it is 300~500mm, preferably 400mm to build arch thickness.
Embodiment 3
To further illustrate the structure of underground coal mine bastard coal total system, the present embodiment is in above-described embodiment one The construction method of kind underground coal mine bastard coal total system is further illustrated.Underground coal mine bastard coal integrated treatment system The construction method of system is specially:
A. chamber is constructed with connection roadway:Waste bin connection roadway 31 is constructed in waste bin along 6 same absolute altitude of track main entry Waste bin transhipment chamber 22, constructs along return air main entry 5 under connection roadway or milling coal hole 35 to Belt transport main entry at exit construction 2 The waste bin silo roof chamber 21 of side, construction silo roof chamber connection roadway 32 connects waste bin silo roof chamber 21 at two, from stope filling The construction of lane 7 forms filling connection roadway 33,33 lanes of filling contact connection filling waste rock storehouse 13 and stope filling lane 7, in filling waste rock Chamber is transported at storehouse exit construction 1;
B. the construction of cash body storehouse is integrated:Construction bastard coal storehouse 11 and waste bin 12, while in the top plate of waste bin silo roof chamber 21 Milling coal hole 35 or connection roadway are opened up between the bottom plate of Belt transport main entry 4;Construction filling waste rock storehouse 13;Comprehensive waste bin 1 is helped Portion is according to bolting and rope support layer, gunite layer and builds arch bundle muscle layer sequence construction;The construction procedure of waste bin is specially:A. it utilizes Anti- well is bored according to coal bunker discharge refuse hole at the design coal bunker center line of field calibration construction two, and discharge refuse bore dia is 1.2m;B. it utilizes Necking famine section under coal bunker warehouse and coal bunker is tunneled in discharge refuse hole from top to bottom;The two of brush expansion coal bunker loading chamber help;C. basis is set Meter pricks muscle in two load-bearing wall displacements and builds two load bearing wall of arch with concrete, and solid matter mining i beam is pricked muscle and built on the basis of load bearing wall Arch chamber top plate;D. to necking position under comprehensive cash body storehouse using muscle is pricked, abrasion-proof manganese steel plate is welded in splicing, and builds arch with concrete Necking under coal bunker;E. bundle muscle is carried out according to cycle to coal bunker warehouse, warehouse shape is controlled, and arch is built with concrete using wood mould Coal bunker warehouse;F. coal bunker assembled solder up beam suitable for reading, and the splicing sealing steel plate on sealing beam;
C. rigging up and debugging:Installation divides coal device 41 in the Belt transport main entry 4, for by Belt transport main entry belt The spoil of transport is further separated into milling coal hole 35 or connection roadway enters underground coal mine bastard coal total system, is set in waste bin bottom Transhipment chamber has been equipped with, each self installation feeder 14 in transhipment chamber, the waste bin contact between bastard coal storehouse and waste bin Movable belt machine 36 is installed, feeder 14 send spoil to movable belt 36, and spoil is transported to by movable belt in lane Rail transport main entry 6, then through auxiliary shaft hoisting to ground.
Certainly, the above description is not intended to limit the present invention, and the utility model is also not limited to the example above, The variations, modifications, additions or substitutions that those skilled in the art are made in the essential scope of the utility model also should Belong to the scope of protection of the utility model.

Claims (10)

1. a kind of underground coal mine bastard coal total system, which is characterized in that including comprehensive cash body storehouse, waste bin silo roof chamber, Waste bin connection roadway, filling connection roadway, silo roof chamber connection roadway, air inlet hole and track main entry;
The comprehensive cash body storehouse includes bastard coal storehouse, waste bin and filling waste rock storehouse, and bastard coal storehouse entrance is arranged on Belt transport main entry The waste bin silo roof chamber of lower section, waste bin entrance are arranged on the waste bin silo roof chamber in silo roof chamber connection roadway, bastard coal storehouse Outlet with waste bin is arranged in waste bin connection roadway;
The filling waste rock storehouse is arranged under bastard coal storehouse and waste bin, and the entrance in filling waste rock storehouse is arranged on waste bin connection roadway Interior, outlet is arranged in filling connection roadway;
The silo roof chamber connection roadway connection bastard coal storehouse entrance and waste bin entrance;The waste bin connection roadway connects two tracks Main entry;Return air connection roadway connects return air main entry and the waste bin silo roof chamber of waste bin inlet.
2. a kind of underground coal mine bastard coal total system according to claim 1, which is characterized in that the air inlet hole connects Connect filling connection roadway and waste bin connection roadway.
A kind of 3. underground coal mine bastard coal total system according to claim 1, which is characterized in that the filling contact Lane is directly connected with exploiting field connection roadway.
A kind of 4. underground coal mine bastard coal total system according to Claims 2 or 3, which is characterized in that the spoil It is connected between the top plate of storehouse silo roof chamber and the bottom plate of Belt transport main entry by milling coal hole or connection roadway.
A kind of 5. underground coal mine bastard coal total system according to claim 4, which is characterized in that the filling waste rock The center line in storehouse is overlapped with the center line in bastard coal storehouse, and filling waste rock storehouse is arranged on the lower section in bastard coal storehouse.
A kind of 6. underground coal mine bastard coal total system according to claim 5, which is characterized in that the Belt transport A point coal device is provided in main entry, feeder is respectively installed in comprehensive cash body orlop portion.
A kind of 7. underground coal mine bastard coal total system according to claim 6, which is characterized in that the waste bin connection Movable belt machine is installed in network lane.
A kind of 8. underground coal mine bastard coal total system according to claim 6, which is characterized in that the comprehensive cash body The side wall construction in storehouse includes:Bolting and rope support layer, gunite layer and block arch prick muscle layer.
A kind of 9. underground coal mine bastard coal total system according to claim 6, which is characterized in that the waste bin storehouse Pushing up chamber concrete structure is:Bolting and rope support layer, I-steel welding layer and block arch concrete layer.
A kind of 10. underground coal mine bastard coal total system according to claim 8 or claim 9, which is characterized in that the synthesis The lower necking assembly in cash body storehouse is welded with abrasion-proof manganese steel plate.
CN201721569821.2U 2017-11-22 2017-11-22 A kind of underground coal mine bastard coal total system Expired - Fee Related CN207554107U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721569821.2U CN207554107U (en) 2017-11-22 2017-11-22 A kind of underground coal mine bastard coal total system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721569821.2U CN207554107U (en) 2017-11-22 2017-11-22 A kind of underground coal mine bastard coal total system

Publications (1)

Publication Number Publication Date
CN207554107U true CN207554107U (en) 2018-06-29

Family

ID=62680593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721569821.2U Expired - Fee Related CN207554107U (en) 2017-11-22 2017-11-22 A kind of underground coal mine bastard coal total system

Country Status (1)

Country Link
CN (1) CN207554107U (en)

Similar Documents

Publication Publication Date Title
WO2021068691A1 (en) Strong-weak-strong clean mining and full filling method for coal mine
CN102562065B (en) Sublevel open-stop and delayed filling mining method
CN1932240B (en) Full-seam cutting, retreating, separate moving and full-caving comprehensive mechanized coal mining method
CN102661169B (en) Gob-side entry retaining method for anchor bolt network gangue bag wall body for coal mining without pillars
CN106761808A (en) A kind of track traffic bored tunnel electric railcar transports corollary system
CN111980709B (en) Continuous mining method for high-inclination-angle thick coal seam slope coal
CN105464678A (en) Rapid roadway tunneling method and system
CN113738367A (en) Sublevel caving downward filling mining method for complex broken and steeply inclined thin vein
CN112593939A (en) Method for mining 'three lower' coal seam by replacing all coal pillars through gangue double filling
CN202703579U (en) Large slope inclined shaft rail transport construction apparatus
CN107905837A (en) A kind of underground coal mine bastard coal total system
CN207554107U (en) A kind of underground coal mine bastard coal total system
CN109225410B (en) Mounting process of rotary crushing station
CN103244121A (en) Track and trackless coupled bottom ore removal system
CN206409240U (en) A kind of track traffic bored tunnel electric railcar transports corollary system
CN102322290A (en) Adhesive tape inclined shaft exploitation way for large-scale underground metal mine
CN212837943U (en) Double-hole separately-repaired tunnel construction production vertical shaft bottom trackless transport vehicle yard structure
CN107218077B (en) Rock gangway multimode combines cash technique out
CN111173560A (en) Filling replacement mining method for 'three lower' coal pressing area
CN103332503B (en) Large-scale over-long single armed row material distributing machine
CN216198131U (en) Underground mine waste rock loading roadway structure
CN112459833B (en) Gangue conveying backfill system and method for laying transmission rubber belt under rail
CN104929682A (en) Method for discharging downhole gangue in coal mine
CN220581093U (en) Underground coal mine scraper conveyor transportation trench
CN114809762B (en) Totally-enclosed coal storage yard under complex terrain and geological conditions and enclosing method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180629