CN107630455A - A kind of free of contamination equipment for building - Google Patents
A kind of free of contamination equipment for building Download PDFInfo
- Publication number
- CN107630455A CN107630455A CN201710870359.8A CN201710870359A CN107630455A CN 107630455 A CN107630455 A CN 107630455A CN 201710870359 A CN201710870359 A CN 201710870359A CN 107630455 A CN107630455 A CN 107630455A
- Authority
- CN
- China
- Prior art keywords
- runner
- transmission cavity
- hammering
- elongation
- tip
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
The invention discloses a kind of free of contamination equipment for building, the runner of base bottom is arranged on including matrix and convolution, tank is provided with matrix bottom surface, tank inner roof wall leads to provided with the longitudinal chute that elongation is set upwards, the first transmission cavity that left and right elongation is set is provided with matrix above longitudinal chute, lead on the right side of longitudinal chute in inwall provided with the second transmission cavity, lead at the top of longitudinal chute inner left wall provided with the first guide runner, it is relative with elongation tip bottom on the left of the first transmission cavity at the top of first guide runner, the first screw rod that elongation is set up and down is provided with first guide runner, elongation tip and the first engine are connected at the top of first screw rod, first engine outer surface is arranged in the first guide runner inner roof wall and is fixedly connected;The present invention is simple in construction, easy to operate, improves the accuracy and stability of hammering, alleviates the labor intensity of worker, reduces the cost of transport.
Description
Technical field
The present invention relates to building field, is specifically a kind of free of contamination equipment for building.
Background technology
, it is necessary to which pile body is sunk into designed elevation in architectural process, now just need to utilize the jump repeatedly using various pile monkeys
The deadweight of dynamic impulsive force and pile body, the side friction power of pile body and the resistance hammering of pile-end soil layer is overcome to realize.At present with cartridge type
Diesel hammer is the most widely used one kind, and it is using light diesel as fuel, has pollution to environment, and vibration is big, makes an uproar
Sound pitch, disturb residents seriously, and be manually difficult to control Mechanical Moving and move.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of free of contamination equipment for building, and it can solve the problem that above-mentioned existing
In the art the problem of.
The present invention is achieved through the following technical solutions:A kind of free of contamination equipment for building of the present invention, including
Matrix and convolution are arranged on the runner of described matrix bottom, are provided with tank in described matrix bottom surface, the tank inner roof wall leads to
The longitudinal chute that elongation is set upwards is provided with, be provided with that left and right elongation sets in the described matrix above the longitudinal chute the
One transmission cavity, lead in inwall on the right side of the longitudinal chute provided with the second transmission cavity, at the top of the longitudinal chute inner left wall in
Lead to and be provided with the first guide runner, relative with elongation tip bottom on the left of first transmission cavity at the top of first guide runner, institute
State and the first screw rod that upper and lower elongation is set is provided with the first guide runner, elongation tip and first moves at the top of first screw rod
Power machine is connected, and the first engine outer surface is arranged in the first guide runner inner roof wall and is fixedly connected, described
Spiral lamination is connected with the slider guide being connected with the first guide runner neat fit, the longitudinal chute on first screw rod
Interior neat fit is connected with hammering sliding block, and the hammering sliding block left end roof is fixedly connected with tip on the right side of the slider guide, institute
State and hammering chute is provided with hammering sliding block bottom surface, neat fit connects hammering sliding bar in the hammering chute, and the hammering is slided
Lead on the right side of groove in inwall and provided the second guide runner, neat fit is connected with pushing away for left and right elongation setting in second guide runner
Slide bar, sliding bar left side elongation tip are fixedly connected with the hammering sliding bar right hand top, stretched on the right side of the sliding bar
Long tip is probeed into second transmission cavity and neat fit connects, and is provided with second transmission cavity on the downside of the sliding bar
Circled round the first swing arm being connected with the hammering sliding block right flank, and deflection is fixedly installed on the first swing arm outer surface
Wheel, elongation tip is fixedly installed the first cone runner on the right side of first swing arm, is provided with first transmission cavity and described the
The transmitting device that one engine is connected, the second transmission cavity right side inwall is provided with to be connected to coordinate with the transmitting device
The power set connect, described matrix left upper portion are fixedly installed electric lamp holder, and the electric lamp holder left surface ring is fixedly installed
Lampshade, lighting lamp is installed on the electric lamp holder, the lighting lamp is arranged on the lampshade home position, and described first is dynamic
Optimization device is provided with power machine.
Preferably technical scheme, the transmitting device include being arranged on the left of first transmission cavity in extension and
The second swing arm set is extended up and down and is arranged on be provided with the right side of first transmission cavity in extension and extend setting up and down
The 3rd swing arm, be connected at the top of the second swing arm bottom extended tip and first engine, first transmission
The second swing arm outer surface of intracavitary is provided with the first transmission and taken turns, the base on the right side of first transmission cavity below extension
Slide guide chamber is provided with internal wall, the slide guide intracavitary neat fit is connected with slider guide, and the slider guide top surface inside spin line is matched somebody with somebody
Close the second screw rod for being connected with that elongation is set upwards, the second screw rod top elongation tip and the 3rd swing arm bottom
Elongation tip is fixedly connected, and the second transmission wheel is fixedly installed on the 3rd swing arm outer surface in first transmission cavity,
Transmission belt is connected between the second transmission wheel and the first transmission wheel, tip convolution in the slider guide bottom coordinates
It is connected with connection cone runner.
Preferably technical scheme, the power set include being arranged in the described matrix below the slide guide chamber
3rd transmission cavity, convolution mating connection are arranged on transmission assembly and fixed setting institute in the 3rd transmission cavity inner left wall
The speed changer in inwall on the right side of the 3rd transmission cavity is stated, the speed changer left surface, which is connected with, to be probeed into the 3rd transmission cavity
The 4th cone runner, tip is connected with the second engine on the right side of the speed changer, and tip is matched somebody with somebody on the right side of second engine
The the second tooth runner for being connected with and visiting to outside described matrix right flank is closed, leads between the 3rd transmission cavity and the slide guide chamber and provides
Have to lead to and pass through groove, the transmission assembly is arranged on described matrix between second transmission cavity and the 3rd transmission cavity including convolution
The 4th interior swing arm and the second cone runner and third hand tap runner being respectively fixedly disposed at left and right sides of the 4th swing arm, institute
The second cone runner is stated in second transmission cavity below the described first cone runner, the third hand tap runner is positioned at described the
Leftward position in three transmission cavities.
Preferably technical scheme, the first tooth runner is fixedly installed on the runner of front side on the right side of described matrix, it is described
Chain is connected between first tooth runner and the second tooth runner.
Preferably technical scheme, neat fit is connected with hammering block in the tank, at the top of the hammering block and institute
State and be provided with the slow part that shakes between the tip of hammering sliding bar bottom.
Preferably technical scheme, the hammering chute of the hammering sliding bar over top is interior to be provided with elastic component.
Preferably technical scheme, the optimization device include being fixedly installed on the first engine left and right side
Slow vibration plate and the drop backing for being fixedly installed on the first engine front and back sides.
The beneficial effects of the invention are as follows:
1. by the way that elongation tip is probeed into the second transmission cavity on the right side of sliding bar and neat fit connects, second on the downside of sliding bar passes
Defeated intracavitary sets the first swing arm being connected with the right flank convolution of hammering sliding block, and deflection is fixedly installed on the first swing arm outer surface
Wheel, the first swing arm right side elongation tip fixed setting first bore runner, set in the first transmission cavity and be connected with the first engine
Transmitting device, inwall sets the power set to be connected with transmitting device on the right side of the second transmission cavity, automatic so as to realize
The transmission connection of control hammering and the work of hammering, meanwhile, realization automatically controls hammering work, improves the accuracy of hammering
And stability.
2. include being arranged on the second rotation that in the extension of the first transmission cavity left side and elongation is set up and down by transmitting device
Bar and it is arranged on and is set in extension on the right side of the first transmission cavity and extend the 3rd swing arm of setting up and down, the second swing arm bottom extended
It is connected at the top of tip and the first engine, sets the first transmission wheel on the second swing arm outer surface in the first transmission cavity, first
Slide guide chamber, slide guide intracavitary neat fit connection slider guide, slider guide top are set in matrix inwall on the right side of transmission cavity below extension
Face inside spin line is connected extends the second screw rod of setting upwards, elongation tip and the 3rd swing arm bottom at the top of the second screw rod
Portion's elongation tip is fixedly connected, and the second transmission wheel, the second transmission are fixedly installed on the 3rd swing arm outer surface in the first transmission cavity
Be connected transmission belt between wheel and the first transmission wheel, slider guide bottom tip convolution mating connection connection cone runner, so as to real
The lifting work of hammering sliding block is now automatically controlled, the hammering block of hammering slider bottom is visited to outside the bottom surface of matrix, meanwhile, realize
The mating connection work of first cone runner and the second engine.
3. the present invention is simple in construction, easy to operate, it can realize and automatically control the transmission connection of hammering and the work of hammering,
Meanwhile realize and automatically control hammering work, the accuracy and stability of hammering are improved, alleviates the labor intensity of worker,
Work is automatically moved in addition, can realize, reduces the cost of transport.
Brief description of the drawings
For ease of explanation, the present invention is described in detail by following specific embodiment and accompanying drawing.
Fig. 1 is a kind of free of contamination device external overall structure diagram for building of the present invention;
Fig. 2 is the sectional view of " A-A " in Fig. 1 of the invention;
Fig. 3 is structural representation when a kind of free of contamination equipment for building of the invention automatically controls hammering;
Fig. 4 is sectional view at A-B in Fig. 3.
Embodiment
As Figure 1-Figure 4, a kind of free of contamination equipment for building of the invention, including matrix 8 and convolution are arranged on
The runner 81 of the bottom of described matrix 8, tank 83 is provided with the bottom surface of described matrix 8, and the inner roof wall of tank 83 leads to provided with upward
The longitudinal chute 82 set is extended, is passed in the described matrix 8 of the top of longitudinal chute 82 provided with left and right elongation is set first
Defeated chamber 86, lead to provided with the second transmission cavity 84, the inner left wall top of longitudinal chute 82 in the right side inwall of longitudinal chute 82
Lead in portion provided with the first guide runner 85, the top of the first guide runner 85 and the left side of the first transmission cavity 86 elongation tip bottom
Portion is relative, and the first screw rod 852 that elongation is set up and down is provided with first guide runner 85, and first screw rod 852 pushes up
Portion's elongation tip is connected with the first engine 853, and the outer surface of the first engine 853 is arranged on first guide runner
In 85 inner roof walls and it is fixedly connected, spiral lamination is connected with flat with first guide runner 85 on first screw rod 852
The slider guide 851 of sliding fit connection, neat fit is connected with hammering sliding block 821, the hammering sliding block in the longitudinal chute 82
821 left end roofs are fixedly connected with the right side tip of slider guide 851, and hammering chute is provided with hammering sliding block 821 bottom surface
822, it is described to hammer neat fit connection hammering sliding bar 824 in chute 822, lead in the hammering right side inwall of chute 822 and pass through
Provided with the second guide runner 823, neat fit is connected with the sliding bar 825 that left and right elongation is set, institute in second guide runner 823
State the left side of sliding bar 825 elongation tip to be fixedly connected with the right hand top of hammering sliding bar 824, the right side of sliding bar 825
Elongation tip is probeed into second transmission cavity 84 and neat fit connects, second transmission of the downside of sliding bar 825
The first swing arm 841 being connected with the hammering sliding block 821 right flank convolution is provided with chamber 84, outside first swing arm 841
Deflecting wheel 843 is fixedly installed on surface, the right side of the first swing arm 841 elongation tip is fixedly installed the first cone runner 842,
The transmitting device being connected with first engine 853, second transmission cavity 84 are provided with first transmission cavity 86
The power set that right side inwall is provided with to be connected with the transmitting device, the left upper portion of described matrix 8 are fixedly installed
Electric lamp holder 801, the left surface ring of electric lamp holder 802 are fixedly installed lampshade 802, illumination are provided with the electric lamp holder 802
Electric light 803, the lighting lamp 803 are arranged on the home position of lampshade 802, are provided with first engine 853 excellent
Makeup is put.
Valuably, the transmitting device includes being arranged in the left side extension of the first transmission cavity 86 and extended up and down and sets
The second swing arm 861 for putting and it is arranged on and is provided with the right side extension of the first transmission cavity 86 and extends the 3rd of setting up and down
Swing arm 863, the bottom extended tip of the second swing arm 861 are connected with the top of the first engine 853, and described first passes
The outer surface of the second swing arm 861 in defeated chamber 86 is provided with the first transmission and takes turns 862, the right side extension of the first transmission cavity 86
Slide guide chamber 89 is provided with the inwall of described matrix 8 of lower section, neat fit is connected with slider guide 891 in the slide guide chamber 89, described
The top surface inside spin line of slider guide 891 is connected with the second screw rod 892 that elongation is set upwards, second screw rod 892
Top elongation tip is fixedly connected with the bottom extended tip of the 3rd swing arm 863, and described the in first transmission cavity 86
The second transmission wheel 864 is fixedly installed on the outer surface of three swing arm 863, the second transmission wheel 864 takes turns 862 with the described first transmission
Between be connected with transmission belt 865, the bottom tip convolution of slider guide 891 is connected with connection cone runner 893, so as to
The lifting work for automatically controlling hammering sliding block 821 is realized, the hammering block 831 of the bottom of hammering sliding block 821 is visited the bottom surface for arriving matrix 8
Outside, meanwhile, the mating connection work of the first cone runner 842 and the second engine 874 is realized.
Valuably, the power set include the 3rd transmission being arranged in the described matrix 8 of the lower section of slide guide chamber 89
Chamber 87, convolution mating connection are arranged on transmission assembly 871 and fixed setting institute in the inner left wall of the 3rd transmission cavity 87
The speed changer 873 in the right side inwall of the 3rd transmission cavity 87 is stated, the left surface of speed changer 873, which is connected with, probes into the described 3rd
The 4th cone runner 872 in transmission cavity 87, the right side tip of speed changer 873 are connected with the second engine 874, and described the
The right side tip of two engine 874 is connected with the second tooth runner 875 visited to outside the right flank of described matrix 8, and the described 3rd passes
Lead between defeated chamber 87 and the slide guide chamber 89 provided it is logical pass through groove 88, the transmission assembly 871 is arranged on described the including convolution
The 4th swing arm 8710 between two transmission cavities 84 and the 3rd transmission cavity 87 in described matrix 8 and it is respectively fixedly disposed at institute
The the second cone runner 8712 and third hand tap runner 8711 of the left and right sides of the 4th swing arm 8710 are stated, the second cone runner 8712 is located at
In second transmission cavity 84 of the lower section of first cone runner 842, the third hand tap runner 8711 is positioned at the described 3rd transmission
Leftward position in chamber 87, so as to realize that automatically controlling matrix 8 walks and hammer work.
Valuably, the first tooth runner 810, first tooth are fixedly installed on the runner 81 of the right side of described matrix 8 front side
Chain 811 is connected between runner 810 and the second tooth runner 875.
Valuably, neat fit is connected with hammering block 831, the top of hammering block 831 and the hammer in the tank 83
Hit between the bottom tip of sliding bar 824 and be provided with the slow part 826 that shakes, so as to impact caused by reducing hammering, improve the present apparatus
Service life.
Valuably, elastic component 827 is provided with the hammering chute 822 of the over top of hammering sliding bar 824, so as to
Realization is resumed work automatically.
Valuably, the optimization device includes the slow vibration plate for being fixedly installed on the left and right side of the first engine 853
8531 and the drop backings 8532 of the front and back sides of the first engine 853 is fixedly installed on, the optimization device reduces described the
One engine 853 operates caused vibrations and heat, ensures the normal operation of the first engine 853.
During original state, deflecting wheel 843 is influenceed and the pressure on top surface of elastic component 827 by self gravitation, makes the second biography
The bottom surface of sliding bar 825 in defeated chamber 84 at utmost offsets with the outer surface of deflecting wheel 843 close to the axial line side of the first swing arm 841
Connect, meanwhile, the first screw rod 852 drives slider guide 851 to be located at the top position in the first guide runner 85, now, by slide guide
Block 851 drives hammering sliding block 821 to be located at the top position in longitudinal chute 82, meanwhile, bottom is driven by hammering sliding bar 824
Hammering block 831 be fully located in tank 83, now, slider guide 851 is at utmost located at the inner top position of the first guide runner 85,
Make the first engine 853 of the bottom tip of slider guide 851 at utmost away from the inner bottom wall of the first guide runner 85, meanwhile, hammering is slided
The first cone runner 842 on the right flank of block 821 is at utmost away from the second cone runner 8712.
When needing to automatically control hammering work, the second tooth runner 875 is driven to circle round by the second engine 874 first,
Drive the first tooth runner 810 to circle round by the chain 811 on the second tooth runner 875, and then front side is driven by the first tooth runner 810
Runner 81 circle round, so as to realize the mobile working for automatically controlling matrix 8, cost of transportation is reduced, until matrix 8 is moved to needs
The opening position of hammering, now, the second engine 874 of control stop convolution, then drive the of bottom by the first engine 853
One screw rod 852 and second swing arm 861 at top circle round, and then drive slider guide 851 gradually along by the first screw rod 852
The bottom direction of one guide runner 85 is slided, meanwhile, hammering sliding block 821 is driven gradually along the bottom side of longitudinal chute 82 by slider guide 851
To slip, now, the hammering block 831 for driving bottom by hammering sliding bar 824 is gradually visited to outside the bottom of tank 83, meanwhile, make hammer
The the first cone runner 842 hit on the right flank of sliding block 821 gradually slides by the second cone runner 8712 top side, now, by second
The convolution of swing arm 861 drives the convolution of the first transmission wheel 862 simultaneously, and then the transmission belt 865 taken turns by the first transmission on 862 drives the
Two transmission wheels 864 and the 3rd swing arm 863 circle round, meanwhile, drive the gradual edge of the slider guide 891 of bottom to lead by the 3rd swing arm 863
Bottom direction in sliding chamber 89 is slided, until slider guide 851 as shown in Figure 3 is at utmost slid into the first guide runner 85 most
During bottom position, now, the bottom position for hammering sliding block 821 and at utmost sliding into longitudinal chute 82 is driven by slider guide 851
Put, meanwhile, hammering sliding bar 824 is driven by hammering sliding block 821 and hammers the maximum journey of hammering block 831 of the bottom of sliding bar 824
Degree is visited to outside the bottom surface of matrix 8, and now, hammering sliding block 821 drives the first cone runner 842 and second on right flank to bore runner
8712 ratcheting connections, meanwhile, the most bottom that slider guide 891 at utmost slid into slide guide chamber 89 is driven by the second screw rod 892
Portion position, now, drive the connection of bottom to bore runner 893 by slider guide 891 and pass through groove 88 through logical and at utmost probe into the 3rd
In transmission cavity 87 and make the left and right sides of connection cone runner 893 bottom respectively with the right hand top of third hand tap runner 8711 and the 4th
The ratcheting connection of the left side top of runner 872 is bored, now, drives the second tooth runner 875 to circle round by the second engine 874, by second
Chain 811 on tooth runner 875 drives the first tooth runner 810 to circle round, and then the runner of front side is driven by the first tooth runner 810
81 convolutions, so as to realize the mobile working for automatically controlling matrix 8, meanwhile, by the second engine 874 after the speed change of speed changer 873
Drive the 4th cone runner 872 to circle round, and then drive connection cone runner 893 and connection cone runner 893 left by the 4th cone runner 872
The transmission assembly 871 of side circles round, and now, is driven by transmission assembly 871 on the first cone runner 842 and the first cone runner 842
Deflecting wheel 843 circle round, by deflecting wheel 843 lasting convolution and with the bottom surface top pressure neat fit of sliding bar 825, simultaneously as
Top pressure active force of the sliding bar 824 by elastic component 827 is hammered, so as to realize the hammering that bottom is driven by hammering sliding bar 824
The reciprocating hammer of block 831 works.
The beneficial effects of the invention are as follows:
1. by the way that elongation tip is probeed into the second transmission cavity on the right side of sliding bar and neat fit connects, second on the downside of sliding bar passes
Defeated intracavitary sets the first swing arm being connected with the right flank convolution of hammering sliding block, and deflection is fixedly installed on the first swing arm outer surface
Wheel, the first swing arm right side elongation tip fixed setting first bore runner, set in the first transmission cavity and be connected with the first engine
Transmitting device, inwall sets the power set to be connected with transmitting device on the right side of the second transmission cavity, automatic so as to realize
The transmission connection of control hammering and the work of hammering, meanwhile, realization automatically controls hammering work, improves the accuracy of hammering
And stability.
2. include being arranged on the second rotation that in the extension of the first transmission cavity left side and elongation is set up and down by transmitting device
Bar and it is arranged on and is set in extension on the right side of the first transmission cavity and extend the 3rd swing arm of setting up and down, the second swing arm bottom extended
It is connected at the top of tip and the first engine, sets the first transmission wheel on the second swing arm outer surface in the first transmission cavity, first
Slide guide chamber, slide guide intracavitary neat fit connection slider guide, slider guide top are set in matrix inwall on the right side of transmission cavity below extension
Face inside spin line is connected extends the second screw rod of setting upwards, elongation tip and the 3rd swing arm bottom at the top of the second screw rod
Portion's elongation tip is fixedly connected, and the second transmission wheel, the second transmission are fixedly installed on the 3rd swing arm outer surface in the first transmission cavity
Be connected transmission belt between wheel and the first transmission wheel, slider guide bottom tip convolution mating connection connection cone runner, so as to real
The lifting work of hammering sliding block is now automatically controlled, the hammering block of hammering slider bottom is visited to outside the bottom surface of matrix, meanwhile, realize
The mating connection work of first cone runner and the second engine.
3. the present invention is simple in construction, easy to operate, it can realize and automatically control the transmission connection of hammering and the work of hammering,
Meanwhile realize and automatically control hammering work, the accuracy and stability of hammering are improved, alleviates the labor intensity of worker,
Work is automatically moved in addition, can realize, reduces the cost of transport.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any
The change or replacement expected without creative work, it should all be included within the scope of the present invention.Therefore, it is of the invention
Protection domain should be determined by the scope of protection defined in the claims.
Claims (7)
1. a kind of free of contamination equipment for building, including matrix and convolution are arranged on the runner of base bottom, it is characterised in that:
Tank is provided with matrix bottom surface, tank inner roof wall, which leads to, is provided with the longitudinal chute that upward elongation is set, the base above longitudinal chute
The internal left and right that is provided with extends the first transmission cavity set, leads in the inwall of longitudinal chute right side sliding provided with the second transmission cavity, longitudinal direction
Lead at the top of groove inner left wall provided with the first guide runner, the first guide runner top and elongation tip bottom on the left of the first transmission cavity
Relatively, the first screw rod that upper and lower elongation is set is provided with the first guide runner, elongation tip and first moves at the top of the first screw rod
Power machine is connected, and the first engine outer surface is arranged in the first guide runner inner roof wall and is fixedly connected, on the first screw rod
Spiral lamination is connected with the slider guide being connected with the first guide runner neat fit, and neat fit is connected with hammering in longitudinal chute
Sliding block, hammering sliding block left end roof are fixedly connected with tip on the right side of slider guide, and hammering chute, hammering are provided with hammering sliding block bottom surface
Neat fit connection hammers sliding bar in chute, leads in the inwall of hammering chute right side and has provided the second guide runner, the second guide runner
Interior neat fit is connected with the sliding bar that left and right elongation is set, and elongation tip is consolidated with hammering sliding bar right hand top on the left of sliding bar
Fixed connection, elongation tip in sliding bar right side probes into the second transmission cavity and neat fit connects, the second transmission on the downside of sliding bar
Intracavitary is provided with the first swing arm being connected with hammering sliding block right flank convolution, and deflection is fixedly installed on the first swing arm outer surface
Wheel, the first swing arm right side elongation tip are fixedly installed the first cone runner, are provided with the first transmission cavity and coordinate with the first engine
The transmitting device of connection, the power set that the second transmission cavity right side inwall is provided with to be connected with transmitting device, matrix are left
Upper lateral part is fixedly installed electric lamp holder, and electric lamp holder left surface ring is fixedly installed lampshade, lighting lamp is provided with electric lamp holder,
Lighting lamp is arranged on lampshade home position, and optimization device is provided with the first engine.
2. the free of contamination equipment for building of one kind according to claim 1, it is characterised in that:The transmitting device includes setting
Put on the left of first transmission cavity in extension and up and down elongation set the second swing arm and be arranged on it is described first transmission
It is provided with the right side of chamber in extension and extends the 3rd swing arm of setting up and down, the second swing arm bottom extended tip and described first
It is connected at the top of engine, the second swing arm outer surface in first transmission cavity is provided with the first transmission and taken turns, described
Slide guide chamber is provided with described matrix inwall on the right side of first transmission cavity below extension, the slide guide intracavitary neat fit is connected with
Slider guide, the slider guide top surface inside spin line are connected with the second screw rod that elongation is set upwards, second spiral
Elongation tip is fixedly connected with the 3rd swing arm bottom extended tip at the top of bar, the 3rd rotation in first transmission cavity
The second transmission wheel is fixedly installed on rod outer surface, biography is connected between the second transmission wheel and the first transmission wheel
Defeated band, the convolution of slider guide bottom tip are connected with connection cone runner.
3. the free of contamination equipment for building of one kind according to claim 1, it is characterised in that:The power set include setting
Put the 3rd transmission cavity in the described matrix below the slide guide chamber, convolution mating connection is arranged on the 3rd transmission cavity left side
Speed changer on the right side of transmission assembly and fixed setting the 3rd transmission cavity in the inwall of side in inwall, the speed changer left side
Face is connected with the 4th cone runner probeed into the 3rd transmission cavity, and tip is connected with second on the right side of the speed changer
Engine, the second engine right side tip is connected with the second tooth runner visited to outside described matrix right flank, described
Lead to have provided to lead between 3rd transmission cavity and the slide guide chamber and pass through groove, the transmission assembly is arranged on described second including convolution and passed
The 4th swing arm between defeated chamber and the 3rd transmission cavity in described matrix and to be respectively fixedly disposed at the 4th swing arm left
The the second cone runner and third hand tap runner of right both sides, the second cone runner bore described second below runner positioned at described first
In transmission cavity, the third hand tap runner is located at leftward position in the 3rd transmission cavity.
A kind of 4. free of contamination equipment for building stated according to claim 3, it is characterised in that:Front side turns on the right side of described matrix
The first tooth runner is fixedly installed on wheel, chain is connected between the first tooth runner and the second tooth runner.
5. the free of contamination equipment for building of one kind according to claim 1, it is characterised in that:Neat fit in the tank
Hammering block is connected with, the slow part that shakes is provided between the tip of the hammering sliding bar bottom at the top of the hammering block.
6. the free of contamination equipment for building of one kind according to claim 1, it is characterised in that:At the top of the hammering sliding bar
Elastic component is provided with the hammering chute of top.
7. the free of contamination equipment for building of one kind according to claim 1, it is characterised in that:The optimization device includes solid
Surely it is arranged on the slow vibration plate of the first engine left and right side and is fixedly installed on the drop of the first engine front and back sides
Backing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710870359.8A CN107630455B (en) | 2017-09-23 | 2017-09-23 | A kind of free of contamination equipment for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710870359.8A CN107630455B (en) | 2017-09-23 | 2017-09-23 | A kind of free of contamination equipment for building |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107630455A true CN107630455A (en) | 2018-01-26 |
CN107630455B CN107630455B (en) | 2018-08-03 |
Family
ID=61103790
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710870359.8A Expired - Fee Related CN107630455B (en) | 2017-09-23 | 2017-09-23 | A kind of free of contamination equipment for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107630455B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108296963A (en) * | 2018-04-04 | 2018-07-20 | 福建森德工贸有限公司 | One kind being used for numerically controlled processing equipment |
CN108312035A (en) * | 2018-04-04 | 2018-07-24 | 福州鑫厦鑫计算机有限公司长乐区分公司 | A kind of numerically controlled processing equipment |
CN108411754A (en) * | 2018-03-26 | 2018-08-17 | 林忠 | A kind of road furniture |
CN108442223A (en) * | 2018-03-26 | 2018-08-24 | 林忠 | A kind of flexible road furniture |
CN108487028A (en) * | 2018-03-26 | 2018-09-04 | 林忠 | A kind of water utilization apparatus |
CN108505423A (en) * | 2018-03-26 | 2018-09-07 | 林忠 | A kind of hydraulic engineering equipment |
CN108517749A (en) * | 2018-03-26 | 2018-09-11 | 陈居 | A kind of laser cutting machine people's device |
CN108527097A (en) * | 2018-04-04 | 2018-09-14 | 福州鑫厦鑫计算机有限公司长乐区分公司 | A kind of numerical control processing apparatus |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101684930B1 (en) * | 2016-06-07 | 2016-12-09 | 정은경 | Double Piston Pile driver having a circular crank room |
CN106522223A (en) * | 2016-12-26 | 2017-03-22 | 郑州天舜电子技术有限公司 | Pure mechanical building pile driver |
CN206467657U (en) * | 2016-12-02 | 2017-09-05 | 浙江双圆工程监理咨询有限公司 | A kind of reciprocation cycle formula piling machine |
CN206503129U (en) * | 2016-11-30 | 2017-09-19 | 曹红兵 | A kind of construction site quick roller-compactor in ground |
-
2017
- 2017-09-23 CN CN201710870359.8A patent/CN107630455B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101684930B1 (en) * | 2016-06-07 | 2016-12-09 | 정은경 | Double Piston Pile driver having a circular crank room |
CN206503129U (en) * | 2016-11-30 | 2017-09-19 | 曹红兵 | A kind of construction site quick roller-compactor in ground |
CN206467657U (en) * | 2016-12-02 | 2017-09-05 | 浙江双圆工程监理咨询有限公司 | A kind of reciprocation cycle formula piling machine |
CN106522223A (en) * | 2016-12-26 | 2017-03-22 | 郑州天舜电子技术有限公司 | Pure mechanical building pile driver |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108411754A (en) * | 2018-03-26 | 2018-08-17 | 林忠 | A kind of road furniture |
CN108442223A (en) * | 2018-03-26 | 2018-08-24 | 林忠 | A kind of flexible road furniture |
CN108487028A (en) * | 2018-03-26 | 2018-09-04 | 林忠 | A kind of water utilization apparatus |
CN108505423A (en) * | 2018-03-26 | 2018-09-07 | 林忠 | A kind of hydraulic engineering equipment |
CN108517749A (en) * | 2018-03-26 | 2018-09-11 | 陈居 | A kind of laser cutting machine people's device |
CN108296963A (en) * | 2018-04-04 | 2018-07-20 | 福建森德工贸有限公司 | One kind being used for numerically controlled processing equipment |
CN108312035A (en) * | 2018-04-04 | 2018-07-24 | 福州鑫厦鑫计算机有限公司长乐区分公司 | A kind of numerically controlled processing equipment |
CN108527097A (en) * | 2018-04-04 | 2018-09-14 | 福州鑫厦鑫计算机有限公司长乐区分公司 | A kind of numerical control processing apparatus |
Also Published As
Publication number | Publication date |
---|---|
CN107630455B (en) | 2018-08-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107630455A (en) | A kind of free of contamination equipment for building | |
CN200975217Y (en) | Canula drilling machine | |
CN110696200A (en) | Automatic drilling robot | |
CN107620307A (en) | A kind of pollution-free equipment for building | |
CN102974501B (en) | Oiling device for gear case and gear shaft | |
CN108005068A (en) | A kind of environment friendly and pollution-free equipment for building | |
CN208772911U (en) | A kind of automatic torsion spring device for torsional spring | |
CN207534293U (en) | Shift fork assembling fixture | |
CN107724388B (en) | A kind of flexible Architectural Equipment | |
CN107761723A (en) | A kind of efficient water construction facility | |
CN108221998A (en) | A kind of Architectural Equipment | |
CN107642087A (en) | A kind of environmentally friendly apparatus for building | |
CN107700492A (en) | A kind of water conservancy construction equipment | |
CN209292414U (en) | Automatic feeder and vacuum oil quenching air-quenching furnace | |
CN204566411U (en) | Portable kiln wall tapping machine | |
CN109869102B (en) | Automatic swing angle pole-lifting mechanism | |
CN107775307A (en) | Shift fork assembling fixture | |
CN107604911A (en) | A kind of environment protection architecture device | |
CN108221989A (en) | A kind of flexible easily Architectural Equipment | |
CN107604914A (en) | A kind of environmentally friendly water conservancy projects | |
CN211539761U (en) | Inner hole deburring device | |
CN107761724A (en) | A kind of novel building implement | |
CN214373520U (en) | Sampling device is used in geotechnical engineering construction | |
CN107542090B (en) | A kind of environment friendly and pollution-free water conservancy projects | |
CN107364012A (en) | A kind of labor-saving bridging apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180627 Address after: 276800 844 Honghe Road, Rizhao North Economic Development Zone, Shandong Applicant after: Shandong Prima Formwork Ltd. Co. Address before: 436006 9 building, Chen Cheng Building, 91 Gucheng Road, Ezhou, Hubei Applicant before: Tong Longfan |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180803 Termination date: 20190923 |