CN107700492A - A kind of water conservancy construction equipment - Google Patents

A kind of water conservancy construction equipment Download PDF

Info

Publication number
CN107700492A
CN107700492A CN201710931273.1A CN201710931273A CN107700492A CN 107700492 A CN107700492 A CN 107700492A CN 201710931273 A CN201710931273 A CN 201710931273A CN 107700492 A CN107700492 A CN 107700492A
Authority
CN
China
Prior art keywords
fortune
tip
chamber
guide channel
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710931273.1A
Other languages
Chinese (zh)
Other versions
CN107700492B (en
Inventor
廖广强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINGJIANG YIKAI VENTILATION EQUIPMENT Co.,Ltd.
Original Assignee
Ningde Yisheng Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningde Yisheng Intelligent Technology Co Ltd filed Critical Ningde Yisheng Intelligent Technology Co Ltd
Priority to CN201710931273.1A priority Critical patent/CN107700492B/en
Publication of CN107700492A publication Critical patent/CN107700492A/en
Application granted granted Critical
Publication of CN107700492B publication Critical patent/CN107700492B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/08Sinking workpieces into water or soil inasmuch as not provided for elsewhere

Abstract

The invention discloses a kind of water conservancy construction equipment, including pedestal and the hammering body being fixedly mounted in pedestal, hammering is provided with first that extension up and down is set and slides fortune chamber in vivo, first cunning fortune bottom of chamber portion extension tip, which is connected, is provided with kerve, kerve bottom insertion hammering body bottom surface, connected in first cunning fortune chamber left side top inwall provided with the first guide channel, locked instrument is provided with first guide channel, inwall midpoint, which connects to be provided with, on the right side of first cunning fortune chamber phoresys chamber, phoresy the hammering on the right side of chamber and be provided with cavity in vivo, connected on the right side of cavity in inwall and slide fortune chamber provided with second, first, which slides fortune intracavitary cunning fortune, is connected with the first cunning fortune bar for extending set up and down, first, which slides fortune bar top, extends tip extension to the first guide channel relative position, first cunning fortune bar bottom extension tip extends in kerve and tip is fixedly installed hammering plate;The present invention is simple in construction, and pile body effectively is sunk into designed elevation, improves the security of equipment operation, improves the service life of equipment.

Description

A kind of water conservancy construction equipment
Technical field
The present invention relates to Water Resources Domain, specifically a kind of water conservancy construction equipment.
Background technology
, it is necessary to which pile body is sunk into designed elevation in water construction work progress, now just need to utilize various pile monkeys Beat repeatedly impulsive force and pile body deadweight, overcome the side friction power of pile body and the resistance hammering of pile-end soil layer to realize.Mesh It is preceding using tubular diesel hammer as the most widely used one kind, it be using light diesel as fuel, to environment have pollution, Er Qiezhen Dynamic big, noise height, disturb residents seriously, and be manually difficult to control Mechanical Moving and move.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of water conservancy construction equipment, and it can solve the problem that above-mentioned present technology The problem of middle.
The present invention is achieved through the following technical solutions:The present invention a kind of water conservancy construction equipment, including pedestal with And the hammering body in the pedestal is fixedly mounted on, the hammering is provided with first that extension up and down is set and slides fortune chamber in vivo, described First cunning fortune bottom of chamber portion extension tip, which is connected, is provided with kerve, and the kerve bottom insertion is described to hammer body bottom surface, and described first slides Connected in fortune chamber left side top inwall provided with the first guide channel, be provided with locked instrument in first guide channel, described first Inwall midpoint connects provided with chamber is phoresied on the right side of sliding fortune chamber, and the hammering phoresied on the right side of chamber is provided with cavity, institute in vivo State to connect in the inwall of cavity right side and slide fortune chamber provided with second, the first cunning fortune intracavitary cunning fortune, which is connected with to extend up and down, to be set First put slides fortune bar, and described first slides and extend tip extension at the top of fortune bar to the first guide channel relative position, and described the One cunning fortune bar bottom extension tip extends in the kerve and tip is fixedly installed hammering plate, described to phoresy intracavitary mating connection There is a convex wheel, described above the convex wheel, which phoresys intracavitary and slide fortune, is connected with the push block for extending setting to the left, institute State to extend tip on the left of push block and slide with described first and transport bar outer right wall secure fit and be connected, the push block top surface with it is described Phoresy and the first stage clip is provided between intracavitary roof, the hammering phoresied between chamber and the cavity is turned round cooperation and connected in vivo Be connected to both sides to the left and right and extend the first bull stick set, extend on the left of first bull stick tip extend it is described phoresy intracavitary and with The convex wheel secure fit connection, the first bull stick right side extension tip extends in the cavity and tip is fixedly installed Part in succession, it is described to be fixedly installed the first motor, the first motor right side in the cavity inner left wall on the downside of part in succession Tip is connected with the first taper wheel extended in the cavity, and described second, which slides fortune intracavitary, is provided with to debug described in management and control The debugging apparatus that first taper wheel is connected with the part in succession, the pedestal bottom are provided with four rolling, former and later two Realized and linked by wheel shaft between the roller, the roller first half is provided with mud cover, is provided with first motor Motor control device.
Preferably technical scheme, the locked instrument include sliding fortune mating connection and are arranged in first guide channel Locking block and with the locking block spiral line be connected and up and down extend set the first spiral bar, first spiral Extend tip at the top of bar to be connected with the first guide channel inner roof wall revolution, the first spiral bar bottom extend tip with Second motor is connected, and the second motor outer surface is arranged in the first guide channel inner bottom wall and is fixedly connected, institute State sliding fortune on the locking block top surface on the right side of the first spiral bar and be connected with the locking raised line for extending setting to the right, it is described Extend tip on the right side of locking raised line to be connected with secure fit at the top of the described first cunning fortune bar left surface.
Preferably technical scheme, debugging apparatus are included being oppositely arranged on the second cunning fortune chamber up and down in the inwall of both sides The second guide channel and sliding fortune be connected and be arranged on the described second debugging block for sliding fortune intracavitary, second leads described in upper and lower both sides Sliding fortune is connected with the guiding block that inner side is connected with the debugging block sides adjacent secure fit in approaching channel, and the guiding block is left The second stage clip is provided with second guide channel of side, the interior revolution of debugging block left surface, which is connected with to extend to the left, to be set The second bull stick put, extend on the left of second bull stick tip extend in the cavity and tip be fixedly installed to it is described Second taper wheel of the first taper wheel wedging connection, the second taper wheel left surface is relative with the right-hand end of part in succession to be set Put, the groove in succession to be connected with the part in succession, the debugging block left side are provided with the second taper wheel left surface Spiral line is connected with the second spiral bar in face, and tip is connected with the 3rd motor on the right side of the second spiral bar, described 3rd motor outer surface is arranged on described second and slides in the inwall of fortune chamber right side and be fixedly connected.
Preferably technical scheme, the motor control device include being fixedly installed on top surface on first motor First management and control device and the second management and control device for being fixedly installed on top surface under first motor.
The beneficial effects of the invention are as follows:The present invention is simple in construction, and pile body effectively is sunk into designed elevation, passes through convex wheel The intracavitary of phoresying of top slides the push block that fortune mating connection extends setting to the left, and push block left side extension tip and first, which are slided, to be transported Bar outer right wall secure fit connects, and push block top surface and phoresys and sets the first stage clip between intracavitary roof, phoresy chamber and cavity it Between the hammering revolution in vivo both sides to the left and right that are connected extend the first bull stick set, extend tip on the left of the first bull stick and extend Phoresy intracavitary and be connected with convex wheel secure fit, extension tip is extended in cavity on the right side of the first bull stick and tip fixed setting connects Even part, in succession the first motor of fixed setting in the cavity inner left wall on the downside of part, the tip mating connection of the first motor right side extend The first taper wheel in cavity, second, which slides fortune intracavitary, sets to debug the debugging that management and control the first taper wheel is connected with part in succession Device, so as to realize that automatic clutch management and control the first taper wheel is connected with part in succession, the security of equipment operation is improved, is prevented Maloperation, cause equipment to cause the injured accident of operating personnel to occur, meanwhile, by by debugging apparatus and the first taper wheel and In succession part it is enclosed be arranged on hammering prevent foreign matter is fallen into from causing device damage in vivo, improve the service life of equipment, separately Outside, moreover it is possible to realize that automatic locking works, facilitate mobile or carrying work.
Brief description of the drawings
For ease of explanation, the present invention is described in detail by following specific embodiment and accompanying drawing.
Fig. 1 is a kind of water conservancy construction device external overall structure diagram of the present invention;
Fig. 2 is a kind of water conservancy construction device interior overall structure diagram of the present invention;
Fig. 3 is structural representation when a kind of water conservancy construction equipment of the present invention is packed up;
Structural representation when Fig. 4 is a kind of water conservancy construction equipment hammering work of the present invention;
Fig. 5 is a kind of water conservancy construction equipment bottom surface upward view of the present invention;
Fig. 6 is the first motor configuration schematic diagram of the present invention.
Embodiment
As shown in figs 1 to 6, a kind of water conservancy construction equipment of the invention, including pedestal 7 and it is fixedly mounted on the seat Hammering body 8 in body 7, the hammering body 8 is interior to be provided with the first cunning fortune chamber 81 for extending set up and down, and described first slides fortune chamber 81 bottom Portion's extension tip, which is connected, is provided with kerve 82, and the bottom of kerve 82 insertion hammering body 8 bottom surface, it is left that first cunning transports chamber 81 Connected in side roof part inwall provided with the first guide channel 83, first guide channel 83 is interior to be provided with locked instrument, and described first slides The fortune right side inwall midpoint of chamber 81 is connected provided with chamber 84 is phoresied, and chamber is provided with the hammering body 8 for phoresying the right side of chamber 84 Body 85, connect in the right side inwall of cavity 85 and slide fortune chamber 86 provided with second, described first, which slides sliding fortune in fortune chamber 81, coordinates and connect Upper and lower the first cunning fortune bar 810 for extending and setting is connected to, the top extension tip extension of the first cunning fortune bar 810 to described first is led The relative position of approaching channel 83, the first cunning fortune bar 810 bottom extension tip extends in the kerve 82 and tip is fixedly installed Plate 811 is hammered, described phoresy is connected with convex wheel 842 in chamber 84, the described of the top of convex wheel 842 is phoresied in chamber 84 Sliding fortune is connected with the push block 813 for extending setting to the left, and the left side of push block 813 extends tip and slided with described first Transport the connection of bar 810 outer right wall secure fit, the top surface of push block 813 and described phoresy are provided with first between the inner roof wall of chamber 84 Stage clip 841, the interior revolution of the hammering body 8 phoresied between chamber 84 and the cavity 85 are connected with both sides to the left and right and prolonged Long the first bull stick 843 set, the left side of the first bull stick 843 extend tip extend it is described phoresy in chamber 84 and with the convex The connection of 842 secure fits is taken turns, the right side of the first bull stick 843 extension tip extends in the cavity 85 and tip is fixedly installed Part 851 in succession, are fixedly installed the first motor 853 in the inner left wall of the cavity 85 of the downside of the part in succession 851, and described the The right side tip of one motor 853 is connected with the first taper wheel 852 extended in the cavity 85, and described second slides in fortune chamber 86 Provided with debugging described in management and control the debugging apparatus that the first taper wheel 852 is connected with the part in succession 851, the pedestal 7 Bottom is provided with four rolling 702, is realized and linked by wheel shaft 701 between former and later two described rollers 702, the roller 702 The first half is provided with mud cover 703, and motor control device is provided with first motor 853.
Valuably, the locked instrument includes the locking block that sliding fortune mating connection is arranged in first guide channel 83 831 and with the spiral line of locking block 831 be connected and up and down extend set the first spiral bar 832, first spiral shell The top of shape bar 832 extends tip and is connected with the inner roof wall of the first guide channel 83 revolution, the bottom of the first spiral bar 832 Extend tip to be connected with the second motor 833, the outer surface of the second motor 833 is arranged on bottom in first guide channel 83 In wall and it is fixedly connected, sliding fortune is connected with to the right on the top surface of the locking block 831 on the right side of the first spiral bar 832 Extend the locking raised line 812 set, the right side extension tip of locking raised line 812 is slided with described first transports the left surface top of bar 810 Portion's secure fit connection, so as to realize that automatic management and control locking is connected, it is moved easily or carries, meanwhile, prevent from moving or remove Fortune, which produces larger rocking, causes device damage.
Valuably, the debugging apparatus includes being oppositely arranged on second of the second cunning fortune chamber about 86 in the inwall of both sides Guide channel 87 and sliding fortune, which are connected, to be arranged on described second and slides debugging block 861 in fortune chamber 86, second described in upper and lower both sides Sliding fortune is connected with the guiding block 871 that inner side is connected with the debugging sides adjacent secure fit of block 861, institute in guide channel 87 State and the second stage clip 872 is provided with second guide channel 87 in the left side of guiding block 871, turned round in the debugging left surface of block 861 The second bull stick 862 for extending setting to the left is connected with, the left side of the second bull stick 862 extends tip and extends the cavity In 85 and tip is fixedly installed the second taper wheel 854 to be connected with the wedging of the first taper wheel 852, second cone The left surface of shape wheel 854 is oppositely arranged with the right-hand end of part in succession 851, be provided with the left surface of the second taper wheel 854 to With the part in succession 851 be connected groove 8541 in succession, it is described debugging the left surface of block 861 in spiral line be connected with second Spiral bar 863, the right side tip of the second spiral bar 863 are connected with the 3rd motor 864, the appearance of the 3rd motor 864 Face is arranged on described second and slides in the fortune right side inwall of chamber 86 and be fixedly connected, so as to realize automatic clutch management and control the first taper wheel 852 are connected with the part in succession 851, improve the security of equipment operation, prevent maloperation, cause equipment to cause operator The injured accident of member occurs, meanwhile, by by debugging apparatus and the first taper wheel 852 and 851 enclosed setting of part in succession Prevent foreign matter is fallen into from causing device damage in hammering body 8, improve the service life of equipment.
Valuably, the motor control device includes being fixedly installed on the first management and control of top surface on first motor 853 Device 8531 and the second management and control device 8532 for being fixedly installed on described first motor, 853 times top surfaces, the first management and control device 8531 are used In the rotating speed of the first motor 853 described in management and control, the second management and control device 8532 is used for the rotating speed of the first motor 853 described in management and control.
When needing to be moved through transport, the first spiral bar 832 is driven to turn round by the second motor 833 first, by the first spiral shell Shape bar 832 drives locking block 831 gradually to slide fortune along the top-direction in the first guide channel 83, meanwhile, lock is driven by locking block 831 Gu raised line 812 gradually slides fortune along the top-direction in the first guide channel 83, until locking raised line 812 is slided and is transported to the as shown in Figure 3 During top position in one guide channel 83, now, locking raised line 812 drives first to slide fortune bar 810 and at utmost extends first In sliding fortune chamber 81, meanwhile, slide fortune bar 810 by first and drive the hammering plate 811 of bottom to extend completely in kerve 82, now, first Sliding fortune bar 810 drives the push block 813 on right flank to overcome the elastic pressure on top surface of the first stage clip 841, and at utmost sliding be transported to is phoresied Tip position in chamber 84, meanwhile, push block 813 at utmost away from convex wheel 842, is then realized by mobile pedestal 7 Hammer the movement of body 8 or carry work;
When needing Driven Piles body running, locking block 831 is moved in the first guide channel 83 first top position, this When, push block 813 is made the bottom surface of push block 813 and the outer surface of cupular part of convex wheel 842 by the elastic pressure on top surface of the first stage clip 841 Sliding fortune is connected, meanwhile, drive the first cunning to transport the hammering plate that bar 810 and first slides fortune bar 810 bottom by push block 813 811 stretch out outside hammering body 8 bottom surface, then drive the second spiral bar 863 to turn round by the 3rd motor 864, by the second spiral bar 863 Drive debugging block 861 gradually to slide the left direction transported in chamber 86 along second and slide fortune, meanwhile, guiding block 871 is driven by debugging block 861 The pressure on top surface of the second stage clip 872 is overcome gradually to slide fortune along the left direction in the second guide channel 87, now, by the band of debugging block 861 Second taper wheel 854 of dynamic left side tip is gradually towards the sideslip fortune of part 851 1 in succession, until in the second taper wheel 854 as shown in Figure 4 Groove in succession 8541 with 851 fully mated connection of part in succession when, now, the left bottom of the second taper wheel 854 simultaneously with the first cone The right hand top of shape wheel 852 completes wedging connection work, and then the motor 864 of management and control the 3rd stops revolution, then, passes through the first motor 853 the first taper wheels 852 of drive turn round, and drive the second taper wheel 854 to turn round by the first taper wheel 852, meanwhile, by the second taper Wheel 854 drives the part in succession 851 in succession in groove 8541 to turn round, and then drives the first bull stick 843 and first turn by part 851 in succession The convex wheel 842 of the left side tip of bar 843 turns round, and now, turns round work by convex wheel 842, makes the protuberance on convex wheel 842 Continue the reciprocal bottom surface of top pressure push block 813, because push block 813 is by the pressure on top surface of the first stage clip 841, so as to realize by push Block 813 drives the first cunning fortune realization of bar 810 to continue reciprocal upper downslide fortune work, meanwhile, bar 810 is transported by the first cunning and drives hammering plate 811 continuous hammering work operations.
The beneficial effects of the invention are as follows:The present invention is simple in construction, and pile body effectively is sunk into designed elevation, passes through convex wheel The intracavitary of phoresying of top slides the push block that fortune mating connection extends setting to the left, and push block left side extension tip and first, which are slided, to be transported Bar outer right wall secure fit connects, and push block top surface and phoresys and sets the first stage clip between intracavitary roof, phoresy chamber and cavity it Between the hammering revolution in vivo both sides to the left and right that are connected extend the first bull stick set, extend tip on the left of the first bull stick and extend Phoresy intracavitary and be connected with convex wheel secure fit, extension tip is extended in cavity on the right side of the first bull stick and tip fixed setting connects Even part, in succession the first motor of fixed setting in the cavity inner left wall on the downside of part, the tip mating connection of the first motor right side extend The first taper wheel in cavity, second, which slides fortune intracavitary, sets to debug the debugging that management and control the first taper wheel is connected with part in succession Device, so as to realize that automatic clutch management and control the first taper wheel is connected with part in succession, the security of equipment operation is improved, is prevented Maloperation, cause equipment to cause the injured accident of operating personnel to occur, meanwhile, by by debugging apparatus and the first taper wheel and In succession part it is enclosed be arranged on hammering prevent foreign matter is fallen into from causing device damage in vivo, improve the service life of equipment, separately Outside, moreover it is possible to realize that automatic locking works, facilitate mobile or carrying work.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any The change or replacement expected without creative work, it should all be included within the scope of the present invention.Therefore, it is of the invention Protection domain should be determined by the scope of protection defined in the claims.

Claims (4)

1. a kind of water conservancy construction equipment, including pedestal and the hammering body that is fixedly mounted in pedestal, it is characterised in that:Hammer body Interior to be provided with upper and lower the first cunning fortune chamber for extending setting, the first cunning fortune bottom of chamber portion extension tip is connected to be provided with kerve, and kerve bottom is passed through Logical hammering body bottom surface, the first cunning, which is transported, to connect in chamber left side top inwall provided with the first guide channel, and the first guide channel is interior to be provided with lock It is fixedly mounted with and puts, first, which slides inwall midpoint on the right side of fortune chamber, connects provided with chamber is phoresied, and phoresys the hammering on the right side of chamber and is provided with cavity in vivo, Connected in inwall on the right side of cavity and slide fortune chamber provided with second, first, which slides fortune intracavitary, slides fortune and be connected with for extending set up and down One cunning fortune bar, first slides extension tip extension at the top of fortune bar, and, to the first guide channel relative position, first, which slides fortune bar bottom, extends end The tip is extended in kerve and tip is fixedly installed hammering plate, is phoresied intracavitary and is connected with convex wheel, phoresying above convex wheel Intracavitary slides fortune and is connected with the push block for extending setting to the left, extends on the left of push block outer on the right side of tip and the first cunning fortune bar Wall secure fit connects, and push block top surface and phoresys and is provided with the first stage clip between intracavitary roof, phoresys the hammer between chamber and cavity Hit internal revolution and be connected with the first bull stick that both sides to the left and right extend setting, the first bull stick left side extension tip, which extends, to be phoresied Intracavitary and it is connected with convex wheel secure fit, extends that tip is extended in cavity and tip is fixedly installed in succession on the right side of the first bull stick Part, the first motor is fixedly installed in the cavity inner left wall on the downside of part in succession, the first motor right side tip, which is connected with, to be stretched The first taper wheel in cavity, second, which slides fortune intracavitary, is provided with what is be connected to debug management and control the first taper wheel with part in succession Debugging apparatus, pedestal bottom are provided with four rolling, are realized and linked by wheel shaft between former and later two rollers, the roller first half is set Mud cover is equipped with, motor control device is provided with the first motor.
A kind of 2. water conservancy construction equipment according to claim 1, it is characterised in that:The locked instrument includes sliding fortune and coordinated Connect the locking block being arranged in first guide channel and be connected with the locking block spiral line and extend up and down and set The the first spiral bar put, the first spiral bar top extend tip and are connected with the first guide channel inner roof wall revolution, The first spiral bar bottom extends tip and the second motor is connected, and the second motor outer surface is arranged on described first In guide channel inner bottom wall and it is fixedly connected, sliding fortune is connected oriented on the locking block top surface on the right side of the first spiral bar Right side extends the locking raised line of setting, and the locking raised line right side extension tip is transported bar left surface top with the described first cunning and fixed It is connected.
A kind of 3. water conservancy construction equipment according to claim 1, it is characterised in that:Debugging apparatus includes being oppositely arranged on institute Stating the second cunning fortune chamber, the second guide channel in the inwall of both sides and sliding fortune mating connection are arranged on the second cunning fortune intracavitary up and down Debugging block, sliding fortune is connected with inner side and matched somebody with somebody with the debugging block sides adjacent fixation in the second guide channel described in upper and lower both sides The guiding block of connection is closed, the second stage clip is provided with second guide channel on the left of the guiding block, it is described to debug block left surface Interior revolution is connected with the second bull stick for extending setting to the left, and extending tip on the left of second bull stick extends the cavity Interior and tip is fixedly installed the second taper wheel to be connected with the first taper wheel wedging, the second taper wheel left side Face is oppositely arranged with the right-hand end of part in succession, is provided with the second taper wheel left surface and is connected to coordinate with the part in succession The groove in succession connect, spiral line is connected with the second spiral bar in the debugging block left surface, end on the right side of the second spiral bar The tip is connected with the 3rd motor, and the 3rd motor outer surface is arranged on the right side of the second cunning fortune chamber in inwall and fixed company Connect.
A kind of 4. water conservancy construction equipment according to claim 1, it is characterised in that:The motor control device includes fixing It is arranged on the first management and control device of top surface on first motor and is fixedly installed on the second management and control of top surface under first motor Device.
CN201710931273.1A 2017-10-09 2017-10-09 A kind of water conservancy construction equipment Active CN107700492B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710931273.1A CN107700492B (en) 2017-10-09 2017-10-09 A kind of water conservancy construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710931273.1A CN107700492B (en) 2017-10-09 2017-10-09 A kind of water conservancy construction equipment

Publications (2)

Publication Number Publication Date
CN107700492A true CN107700492A (en) 2018-02-16
CN107700492B CN107700492B (en) 2018-12-21

Family

ID=61184916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710931273.1A Active CN107700492B (en) 2017-10-09 2017-10-09 A kind of water conservancy construction equipment

Country Status (1)

Country Link
CN (1) CN107700492B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542089A (en) * 2017-10-09 2018-01-05 宁德市益升智能科技有限公司 A kind of water conservancy equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101684930B1 (en) * 2016-06-07 2016-12-09 정은경 Double Piston Pile driver having a circular crank room
CN106522223A (en) * 2016-12-26 2017-03-22 郑州天舜电子技术有限公司 Pure mechanical building pile driver
CN206467657U (en) * 2016-12-02 2017-09-05 浙江双圆工程监理咨询有限公司 A kind of reciprocation cycle formula piling machine
CN206503129U (en) * 2016-11-30 2017-09-19 曹红兵 A kind of construction site quick roller-compactor in ground

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101684930B1 (en) * 2016-06-07 2016-12-09 정은경 Double Piston Pile driver having a circular crank room
CN206503129U (en) * 2016-11-30 2017-09-19 曹红兵 A kind of construction site quick roller-compactor in ground
CN206467657U (en) * 2016-12-02 2017-09-05 浙江双圆工程监理咨询有限公司 A kind of reciprocation cycle formula piling machine
CN106522223A (en) * 2016-12-26 2017-03-22 郑州天舜电子技术有限公司 Pure mechanical building pile driver

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542089A (en) * 2017-10-09 2018-01-05 宁德市益升智能科技有限公司 A kind of water conservancy equipment

Also Published As

Publication number Publication date
CN107700492B (en) 2018-12-21

Similar Documents

Publication Publication Date Title
CN107630455B (en) A kind of free of contamination equipment for building
CN107700492A (en) A kind of water conservancy construction equipment
CN108104099A (en) A kind of improved-type compact road tamping unit
CN107542089A (en) A kind of water conservancy equipment
CN204847638U (en) Telescopic hose
CN104674874B (en) Channel cleanout device and dredging method thereof
CN108118695A (en) A kind of Novel water conservancy equipment
CN109185717A (en) A kind of gas pipeline leakage detection method
CN108222028A (en) A kind of novel compacting constructing device for water conservancy side slope
CN107574737A (en) A kind of town road tamping unit of high security
CN208074405U (en) A kind of pusher protrusive pipe crawling device
CN107740415A (en) A kind of water construction device
CN108086102A (en) A kind of safe town road tamping unit
CN108103920A (en) A kind of pavement construction auxiliary device
CN111501982B (en) Rail mounted sewer filter screen
CN107761728A (en) A kind of water construction device of multidirectional operation
CN107620307A (en) A kind of pollution-free equipment for building
CN107700491A (en) A kind of water conservancy projects
CN202989589U (en) Quick-opening transmission mechanism for cover of dry cleaning machine
CN203440397U (en) KR (knotted reactor) desulphurization dust removal device
CN209922782U (en) Double-pneumatic-driven line body jacking mechanism
CN107489148A (en) A kind of water conservancy construction facility
CN107724388B (en) A kind of flexible Architectural Equipment
CN206114347U (en) Hit formula suspended load sediment sampler
CN108086099A (en) A kind of easy to operate town road tamping unit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181029

Address after: 321312 second, Fengshan Street 157, Longzhushan village, Longshan Town, Yongkang City, Jinhua, Zhejiang

Applicant after: Jinhua Yongkang tenacious Technology Co., Ltd.

Address before: 352000 17, 2401, Wanda Plaza, 1 Tian Hu East Road, Jiaocheng District, Ningde, Fujian.

Applicant before: Ningde Yisheng Intelligent Technology Co., Ltd.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200925

Address after: 214500 Huaqiao road 18, Da Jue Industrial Zone, Jingjiang, Taizhou, Jiangsu

Patentee after: JINGJIANG YIKAI VENTILATION EQUIPMENT Co.,Ltd.

Address before: 321312 second, Fengshan Street 157, Longzhushan village, Longshan Town, Yongkang City, Jinhua, Zhejiang

Patentee before: JINHUA YONGKANG WANQIANG TECHNOLOGY Co.,Ltd.