CN107761724A - A kind of novel building implement - Google Patents
A kind of novel building implement Download PDFInfo
- Publication number
- CN107761724A CN107761724A CN201710955184.0A CN201710955184A CN107761724A CN 107761724 A CN107761724 A CN 107761724A CN 201710955184 A CN201710955184 A CN 201710955184A CN 107761724 A CN107761724 A CN 107761724A
- Authority
- CN
- China
- Prior art keywords
- sliding
- access slot
- chamber
- main frame
- recessed access
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000000523 sample Substances 0.000 claims abstract description 8
- 230000008878 coupling Effects 0.000 claims description 42
- 238000010168 coupling process Methods 0.000 claims description 42
- 238000005859 coupling reaction Methods 0.000 claims description 42
- 238000010276 construction Methods 0.000 abstract description 6
- 230000013011 mating Effects 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 241000282693 Cercopithecidae Species 0.000 description 1
- 238000011010 flushing procedure Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000010626 work up procedure Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/02—Placing by driving
- E02D7/06—Power-driven drivers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/10—Follow-blocks of pile-drivers or like devices
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Percussive Tools And Related Accessories (AREA)
Abstract
The invention discloses a kind of novel building implement, coordinate the main frame being arranged in clamping frame including clamping frame and switching, curved face is provided with the top of main frame, curved tip edge bar is installed with curved face, the angle being connected with curved tip edge bar is provided with clamping frame on the upside of curved tip edge bar and changes device, the first recessed access slot is provided with main frame bottom surface, stretched inside main frame on the upside of first recessed access slot provided with left and right and the first sliding chamber is set, lead to provided with the second sliding chamber the centre of first sliding intracavitary roof, second sliding intracavitary is sliding to be combined with drive block, the second sliding intracavitary at the top of drive block is provided with the first spring element, drive block bottom, which is installed with, probes into the first sliding two-sided piece of intracavitary, the connecting rod for being combined with the setting that stretches up and down is slipped in main frame between at the top of first sliding bottom of chamber portion and the first recessed access slot;The present invention is simple in construction, easy to operate, improves the operating efficiency and quality of hammering.
Description
Technical field
The present invention relates to technical field of buildings, specifically a kind of novel building implement.
Background technology
, it is necessary to which pile body is sunk into designed elevation in architectural process, now just need to utilize the jump repeatedly using various pile monkeys
The deadweight of dynamic impulsive force and pile body, the side friction power of pile body and the resistance hammering of pile-end soil layer is overcome to realize.At present with cartridge type
Diesel hammer is the most widely used one kind, but vibrates big, noise height, disturbs residents seriously, and is difficult to oblique hammering, it is impossible to suitable
Answer complicated constructions work environment.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of novel building implement, and it can solve the problem that above-mentioned present
The problem of in technology.
The present invention is achieved through the following technical solutions:A kind of novel building implement of the present invention, including folder
Gu frame and switching coordinate the main frame being arranged in the clamping frame, curved face is provided with the top of the main frame, on the curved face
It is installed with curved tip edge bar, is provided with the clamping frame on the upside of the curved tip edge bar and the curved tip edge bar is connected
Angle change device, the first recessed access slot is provided with the main frame bottom surface, inside the main frame on the upside of the first recessed access slot
Stretched provided with left and right and the first sliding chamber is set, the centre of the described first sliding intracavitary roof is led to provided with the second sliding chamber, described
Second sliding intracavitary, which is slipped, is combined with drive block, and the sliding intracavitary of described second at the top of the drive block is provided with the first spring element,
The drive block bottom, which is installed with, probes into the described first sliding two-sided piece of intracavitary, the described first sliding bottom of chamber portion and described first recessed
The connecting rod for being combined with the setting that stretches up and down is slipped in the main frame between at the top of access slot, stretch end pin at the top of the connecting rod
Probe into the described first sliding intracavitary and be fixedly connected with the two-sided piece of bottom, the connecting rod bottom stretch end pin probe into it is described
In first recessed access slot and end pin is installed with hammering head, the described first sliding intracavitary of the two-sided piece of left and right sides is relative be provided with
The described two-sided piece sliding biography connection device coordinated, driving chamber, the drive are provided with the main frame on rear side of the described first sliding chamber
Dynamic intracavitary switching is combined with the first Coupling Shaft of the setting that stretches up and down, and first Coupling Shaft is interior to be installed with deviation provided with outer surface
Wheel, the deviation, which takes turns to slip in the driving chamber of front side, is combined with wallboard, is provided with the driving chamber on front side of the wallboard
Second spring element, filled with respect to provided with the driving being connected with the wallboard in the main frame at left and right sides of the driving chamber
Put, the drive device coordinates to be slipped with the biography connection device, is provided between the connecting rod and the hammering head slow
Flushing device, internal face is fixedly installed portable plate to the buffer unit up and down, fixed between upper and lower two pieces of portable plates to connect
Bolster is connected to, the control device of the first Coupling Shaft described in control is provided with the driving chamber.
Preferably technical scheme, the angle change the second recessed access slot that device includes being arranged in the clamping frame
And switching is arranged in the described second recessed access slot and left and right and stretched the second Coupling Shaft of setting, is stretched on the left of second Coupling Shaft
Prolong end pin with the described second recessed access slot inner left wall switching to coordinate, the end pin that stretches on the right side of second Coupling Shaft changes with angle to be driven
Dynamic device mating connection, the angle change driver outer surface is arranged on the right side of the described second recessed access slot in inwall and fixed company
Connect, gear wheel is installed with second Coupling Shaft in the second recessed access slot, the gear wheel bottom stretches out described second
Recessed access slot is outer to be connected with the curved tip edge bar wedging, and the clamping top of the trellis, which is installed with, slings arm.
Preferably technical scheme, the biography connection device include the first trolley shoe, groove are provided with first trolley shoe
Chamber, slips the post that connects for being combined with the setting that stretches up and down in the vallecular cavity, it is described connect post up and down both sides stretch end pin respectively with
Both sides inwall is fixedly connected described first sliding chamber up and down, and the 3rd spring element is provided with the vallecular cavity connected on the outside of post,
Top on the inside of first trolley shoe be provided with described two-sided piece sliding the first angled end-face coordinated, outside first trolley shoe
The rear portion of side is provided with the second angled end-face.
Preferably technical scheme, the drive device include inner side with leading to the sliding of setting on the outside of the driving chamber
Groove and it is sliding be equipped with the drive block in the sliding groove, on front side of the sliding groove end pin with outside the described first sliding chamber
Setting is led at the rear portion of side, and the rear portion on the inside of the drive block is fixedly connected with the wallboard, the front portion on the inside of the drive block
Provided with to the 3rd angled end-face with the sliding cooperation of second angled end-face.
Preferably technical scheme, the end pin that stretches at the top of first Coupling Shaft is transferred with the driving chamber inner roof wall matches somebody with somebody
Close, the first Coupling Shaft bottom end pin that stretches is connected with hammering driver, and the hammering driver outer surface is arranged on
In the driving chamber inner bottom wall and secure fit connects.
Preferably technical scheme, the control device include being fixedly installed on first on the left of the hammering driver
Policer and the second policer being fixedly installed on the right side of the hammering driver.
The beneficial effects of the invention are as follows:
1. by the relative biography connection device set with two-sided piece of sliding cooperation of the first sliding intracavitary of the two-sided piece of left and right sides, first slides
Connect and driving chamber is set in the main frame on rear side of chamber, transferred in driving chamber and coordinate the first Coupling Shaft of the setting that stretches up and down, the first Coupling Shaft
The fixed deviation wheel in outer surface is inside set, is slipped in the driving chamber of deviation wheel front side and coordinates wallboard, the is set in the driving chamber on front side of wallboard
Two spring elements, it is relative in the main frame at left and right sides of driving chamber to set the drive device being connected with wallboard, drive device to
The sliding cooperation of connection device is passed, so as to realize that automatic pipe continues reciprocating hammer work, improves the efficiency of hammering work, reduction worker
The amount of labour, while improve hammering quality.
2. by angle change device include the second recessed access slot for being arranged in clamping frame and switching to be arranged on second recessed
In access slot and left and right stretches the second Coupling Shaft of setting, and stretch end pin and the second recessed access slot inner left wall turn on the left of the second Coupling Shaft
Cooperation is connect, the end pin that stretched on the right side of the second Coupling Shaft changes driver with angle and is connected, and angle changes driver outer surface and set
Put and in inwall and be fixedly connected, fixed gear wheel in the second Coupling Shaft in the second recessed access slot, tip edge on the right side of the second recessed access slot
Take turns bottom to stretch out with the mating connection of curved tip edge bar wedging outside the second recessed access slot, clamping top of the trellis is fixed to sling arm, so as to realize
Automatic pipe angle changes, and meets the inclined-plane hammering work of different angle, improves hammering operating efficiency.
3. the present invention is simple in construction, easy to operate, the adjustment work of automatic pipe hammering angle can be realized, meets different angles
The inclined-plane hammering work of degree, energy automatic pipe hammering work, alleviates worker's workload, improves the operating efficiency of hammering, together
When reduce the cost of construction, and enhance the quality of hammering.
Brief description of the drawings
For ease of explanation, the present invention is described in detail by following specific embodiment and accompanying drawing.
Fig. 1 is a kind of novel building implement overall structure diagram of the present invention;
Fig. 2 is a kind of novel building implement left view of the present invention;
Fig. 3 is the main frame internal structure schematic diagram of the present invention;
Fig. 4 is the sectional view of " A-A " in Fig. 3 of the present invention;
Fig. 5 is the structural representation of the buffer unit of the present invention.
Embodiment
As Figure 1-Figure 5, a kind of novel building implement of the invention, including clamping frame 6 and switching coordinate peace
Main frame 5 in the clamping frame 6, the top of main frame 5 are provided with curved face 51, curved tooth are installed with the curved face 51
Edge strip 52, the clamping frame 6 of the curved upside of tip edge bar 52 is interior to be provided with the folder being connected with the curved tip edge bar 52
Angle changes device, is provided with the first recessed access slot 55 in the bottom surface of main frame 5, in the main frame 5 on the upside of the first recessed access slot 55
Portion stretches provided with left and right sets the first sliding chamber 53, and the centre of the described first sliding inner roof wall of chamber 53 is led to slips chamber provided with second
54, slip in the described second sliding chamber 54 and be combined with drive block 541, the described second sliding chamber 54 at the top of drive block 541
The first spring element 542 is inside provided with, the bottom of drive block 541, which is installed with, probes into the described first sliding chamber 53 two-sided piece 5410,
Slip to be combined with the main frame 5 between the described first sliding bottom of chamber 53 and the first recessed top of access slot 55 and stretch up and down
The connecting rod 552 of setting, the top of the connecting rod 552 stretch end pin probe into the described first sliding chamber 53 and with described two-sided piece
5410 bottoms are fixedly connected, and the bottom of connecting rod 552 end pin that stretches is probeed into the described first recessed access slot 55 and end pin is installed with
Hammering first 551, it is relative in the described first sliding chamber 53 of two-sided piece 5410 left and right sides to be provided with and described two-sided piece 5410
The sliding biography connection device coordinated, the main frame 5 of the described first sliding rear side of chamber 53 is interior to be provided with driving chamber 57, the driving chamber 57
Interior switching is combined with the first Coupling Shaft 572 of the setting that stretches up and down, is installed with partially provided with outer surface in first Coupling Shaft 572
To wheel 571, slipped in the driving chamber 57 of the front side of deviation wheel 571 and be combined with wallboard 574, the front side of wallboard 574
Is provided with the second spring element 575 in the driving chamber 57, in the main frame 5 of the left and right sides of driving chamber 57 it is relative provided with and institute
The drive device of the mating connection of wallboard 574 is stated, the drive device coordinates to be slipped with the biography connection device, the connecting rod
Be provided with buffer unit 501 between 552 and the hammering first 551, the buffer unit about 501 internal face be fixedly installed
Portable plate 502, bolster 503 is fixedly connected between upper and lower two pieces of portable plates 502, pipe is provided with the driving chamber 57
Make the control device of first Coupling Shaft 572.
Valuably, the angle changes the second recessed access slot 62 and the switching that device includes being arranged in the clamping frame 6
It is arranged in the described second recessed access slot 62 and left and right to stretch the second Coupling Shaft 621 of setting, the left side of the second Coupling Shaft 621 is stretched
Prolong end pin with the described second recessed inner left wall of access slot 62 switching to coordinate, stretch end pin and angle on the right side of second Coupling Shaft 621
Change driver 623 to be connected, the angle changes the outer surface of driver 623 and is arranged in the described second recessed right side of access slot 62
In wall and it is fixedly connected, gear wheel 622, the tooth is installed with second Coupling Shaft 621 in the second recessed access slot 62
The bottom of edge wheel 622 is stretched out outside the second recessed access slot 62 to be connected with the curved wedging of tip edge bar 52, and the clamping frame 6 pushes up
Portion, which is installed with, slings arm 61, so as to realize that automatic pipe angle changes, meets the inclined-plane hammering work of different angle, improves hammering
Operating efficiency.
Valuably, the biography connection device includes the first trolley shoe 56, and vallecular cavity 561, institute are provided with first trolley shoe 56
State slipped in vallecular cavity 561 be combined with the setting that stretches up and down connect post 562, it is described connect post about 562 the both sides end pin that stretches divide
With the described first sliding chamber about 53 both sides inwall be fixedly connected, be provided with the vallecular cavity 561 connected on the outside of post 562
3rd spring element 564, the top of the inner side of the first trolley shoe 56 are oblique provided with slipping coordinate first with described two-sided piece 5410
End face 563, the rear portion in the outside of the first trolley shoe 56 are provided with the second angled end-face 564, so as to realize that automatic pipe hammers work
When top pressure pass and connect work, realize that drive block 541 overcomes the pressure on top surface upward sliding of the first spring element 542, meanwhile, by by the
The pressure on top surface of one spring element 542 realizes that automatic pipe hammers work.
Valuably, the drive device includes inner side with leading to the sliding groove 58 of setting on the outside of the driving chamber 57 and sliding
Connect the drive block 581 being equipped with the sliding groove 58, the sliding front side end pin of groove 58 and the described first sliding chamber 53
Setting is led at the rear portion in outside, and the rear portion of the inner side of drive block 581 is fixedly connected with the wallboard 574, the drive block 581
The front portion of inner side is provided with to the 3rd angled end-face 5810 with the sliding cooperation of second angled end-face 564, so as to realize automatic pipe
The driving that system passes connection device passes adapter system, improves automation control hammering work, improves the operating efficiency of hammering work.
Valuably, the end pin that stretched at the top of first Coupling Shaft 572 coordinates with the inner roof wall of driving chamber 57 switching, described
The bottom of first Coupling Shaft 572 end pin that stretches is connected with hammering driver 573, and hammering driver 573 outer surface is set
In the inner bottom wall of driving chamber 57 and secure fit connects.
Valuably, the control device includes being fixedly installed on first policer in the left side of hammering driver 573
5731 and second policer 5732 on hammering driver 573 right side is fixedly installed on, first policer 5731 is used for
The rotating speed of first Coupling Shaft 572 described in control, second policer 5732 are used for turning for the first Coupling Shaft 572 described in control
To.
When needing to hammer work, device control is changed by angle and adjusts main frame 5, the bottom surface of main frame 5 is hammered with needing
Inclined-plane angle of inclination it is identical, now, drive the first Coupling Shaft 572 to rotate by hammering driver 573, and then by first turn
Deviation wheel 571 in spindle 572 rotates,(Because wallboard 574 is by the pressure on top surface of the second spring element 575, make the rear side of wallboard 574
End face remains and the sliding cooperation in 571 front side outer surfaces of deviation wheel), and the second bullet is overcome by the drive wallboard 574 of deviation wheel 571
The pressure on top surface of power part 575, which is realized, slides back and forth work, now, drive block 581 is driven along the sliding fore-and-aft direction of groove 58 by wallboard 574
Reciprocatingly slide work, and the 3rd angled end-face 5810 on drive block 581 is back and forth probeed into the first sliding chamber 53 and slided with first
The sliding cooperation of the second angled end-face 564 on block 56 is connect, and then, drive the first trolley shoe 56 to overcome the 3rd elastic force by drive block 581
The pressure on top surface of part 564 realizes the work that horizontally slips, and by the first angled end-face 563 on the first trolley shoe 56 back and forth with two-sided piece
5410 sliding cooperations, and then glided by two-sided piece 5410 pressure on top surface for driving drive block 541 to overcome the first spring element 542 is back and forth upper
Start building to make, meanwhile, the hammering first 551 being fixedly connected by two-sided piece 5410 drive connecting rod 552 and the bottom of connecting rod 552 is realized
Automatic hammering work up and down.
The beneficial effects of the invention are as follows:
1. by the relative biography connection device set with two-sided piece of sliding cooperation of the first sliding intracavitary of the two-sided piece of left and right sides, first slides
Connect and driving chamber is set in the main frame on rear side of chamber, transferred in driving chamber and coordinate the first Coupling Shaft of the setting that stretches up and down, the first Coupling Shaft
The fixed deviation wheel in outer surface is inside set, is slipped in the driving chamber of deviation wheel front side and coordinates wallboard, the is set in the driving chamber on front side of wallboard
Two spring elements, it is relative in the main frame at left and right sides of driving chamber to set the drive device being connected with wallboard, drive device to
The sliding cooperation of connection device is passed, so as to realize that automatic pipe continues reciprocating hammer work, improves the efficiency of hammering work, reduction worker
The amount of labour, while improve hammering quality.
2. by angle change device include the second recessed access slot for being arranged in clamping frame and switching to be arranged on second recessed
In access slot and left and right stretches the second Coupling Shaft of setting, and stretch end pin and the second recessed access slot inner left wall turn on the left of the second Coupling Shaft
Cooperation is connect, the end pin that stretched on the right side of the second Coupling Shaft changes driver with angle and is connected, and angle changes driver outer surface and set
Put and in inwall and be fixedly connected, fixed gear wheel in the second Coupling Shaft in the second recessed access slot, tip edge on the right side of the second recessed access slot
Take turns bottom to stretch out with the mating connection of curved tip edge bar wedging outside the second recessed access slot, clamping top of the trellis is fixed to sling arm, so as to realize
Automatic pipe angle changes, and meets the inclined-plane hammering work of different angle, improves hammering operating efficiency.
3. the present invention is simple in construction, easy to operate, the adjustment work of automatic pipe hammering angle can be realized, meets different angles
The inclined-plane hammering work of degree, energy automatic pipe hammering work, alleviates worker's workload, improves the operating efficiency of hammering, together
When reduce the cost of construction, and enhance the quality of hammering.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any
The change or replacement expected without creative work, it should all be included within the scope of the present invention.Therefore, it is of the invention
Protection domain should be determined by the scope of protection defined in the claims.
Claims (6)
1. a kind of novel building implement, including clamping frame and switching coordinate the main frame being arranged in clamping frame, its feature
It is:Curved face is provided with the top of main frame, is installed with curved tip edge bar on curved face, is provided with the clamping frame on the upside of curved tip edge bar
Change device with the angle that curved tip edge bar is connected, be provided with the first recessed access slot in main frame bottom surface, on the upside of the first recessed access slot
Being stretched inside main frame provided with left and right and the first sliding chamber is set, the centre of the first sliding intracavitary roof is led to slips chamber provided with second,
Second sliding intracavitary, which is slipped, is combined with drive block, and the sliding intracavitary of second at the top of drive block is provided with the first spring element, drive block bottom
Portion, which is installed with, probes into the first sliding two-sided piece of intracavitary, is slipped in the main frame between the first sliding bottom of chamber portion and the first recessed access slot top
The connecting rod for the setting that stretches up and down is combined with, the end pin that stretched at the top of connecting rod probes into the first sliding intracavitary and consolidated with two-sided piece of bottom
Fixed connection, the connecting rod bottom end pin that stretches are probeed into the first recessed access slot and end pin is installed with hammering head, two-sided piece of left and right sides
First slips intracavitary relatively provided with interior provided with driving with the two-sided piece of sliding biography connection device coordinated, the first main frame slipped on rear side of chamber
Chamber, the interior switching of driving chamber are combined with the first Coupling Shaft of the setting that stretches up and down, are installed with partially provided with outer surface in the first Coupling Shaft
To wheel, slipped in the driving chamber of deviation wheel front side and be combined with wallboard, be provided with the second spring element in the driving chamber on front side of wallboard, drive
In main frame at left and right sides of chamber with respect to provided with wallboard be connected drive device, drive device to pass connection device slip
Coordinating, buffer unit is provided between connecting rod and hammering head, internal face is fixedly installed portable plate to buffer unit up and down, on
Bolster is fixedly connected between lower two pieces of portable plates, the control device of the first Coupling Shaft described in control is provided with driving chamber.
A kind of 2. novel building implement according to claim 1, it is characterised in that:The angle, which changes device, to be included
Setting that the second recessed access slot and switching being arranged in the clamping frame are arranged in the described second recessed access slot and left and right stretches
Second Coupling Shaft, the end pin that stretches on the left of second Coupling Shaft coordinate with the described second recessed access slot inner left wall switching, and described the
The end pin that stretched on the right side of two Coupling Shafts changes driver with angle and is connected, and the angle changes driver outer surface and is arranged on institute
State in the second recessed access slot right side inwall and be fixedly connected, tip edge is installed with second Coupling Shaft in the second recessed access slot
Wheel, the gear wheel bottom is stretched out outside the second recessed access slot to be connected with the curved tip edge bar wedging, the clamping frame
Top, which is installed with, slings arm.
A kind of 3. novel building implement according to claim 1, it is characterised in that:The biography connection device includes first
Trolley shoe, first trolley shoe is interior to be provided with vallecular cavity, and the post that connects for being combined with the setting that stretches up and down is slipped in the vallecular cavity, described
Connecting post, the both sides end pin that stretches is fixedly connected with both sides inwall above and below the described first sliding chamber respectively up and down, described to connect on the outside of post
The vallecular cavity in be provided with the 3rd spring element, the top on the inside of first trolley shoe is provided with and described two-sided piece sliding cooperation
First angled end-face, the rear portion on the outside of first trolley shoe are provided with the second angled end-face.
A kind of 4. novel building implement according to claim 3, it is characterised in that:The drive device includes inner side
The drive block in the sliding groove, the cunning are equipped with leading to the sliding groove of setting on the outside of the driving chamber and slipping
Settings is led at end pin and the rear portion on the outside of the described first sliding chamber on front side of access slot, rear portion and the wallboard on the inside of the drive block
It is fixedly connected, the front portion on the inside of the drive block is provided with to the 3rd angled end-face with the sliding cooperation of second angled end-face.
A kind of 5. novel building implement according to claim 1, it is characterised in that:Stretched at the top of first Coupling Shaft
Prolong end pin and the driving chamber inner roof wall is transferred and coordinated, the first Coupling Shaft bottom stretches end pin with hammering driver cooperation company
Connect, the hammering driver outer surface is arranged in the driving chamber inner bottom wall and secure fit connects.
A kind of 6. novel building implement according to claim 1, it is characterised in that:The control device includes fixing
The first policer being arranged on the left of the hammering driver and the second control being fixedly installed on the right side of the hammering driver
Device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710955184.0A CN107761724B (en) | 2017-10-13 | 2017-10-13 | A kind of novel building implement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710955184.0A CN107761724B (en) | 2017-10-13 | 2017-10-13 | A kind of novel building implement |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107761724A true CN107761724A (en) | 2018-03-06 |
CN107761724B CN107761724B (en) | 2018-08-31 |
Family
ID=61268228
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710955184.0A Expired - Fee Related CN107761724B (en) | 2017-10-13 | 2017-10-13 | A kind of novel building implement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107761724B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115341543A (en) * | 2022-08-19 | 2022-11-15 | 广州市胜特建筑科技开发有限公司 | Semi-automatic pile pressing mechanism of hole leading type static pile pressing machine |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20140030080A (en) * | 2013-09-26 | 2014-03-11 | 니뽄샤료세이조우 가부시키가이샤 | Pile driver |
CN105442521A (en) * | 2015-12-26 | 2016-03-30 | 刘汉佑 | Multifunctional tamping machine |
CN206245314U (en) * | 2016-12-02 | 2017-06-13 | 河北工程技术高等专科学校 | A kind of portable civil engineering piling machine |
CN206352293U (en) * | 2016-12-28 | 2017-07-25 | 佛山市鹏洋商贸有限公司 | A kind of portable pile hammer |
-
2017
- 2017-10-13 CN CN201710955184.0A patent/CN107761724B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20140030080A (en) * | 2013-09-26 | 2014-03-11 | 니뽄샤료세이조우 가부시키가이샤 | Pile driver |
CN105442521A (en) * | 2015-12-26 | 2016-03-30 | 刘汉佑 | Multifunctional tamping machine |
CN206245314U (en) * | 2016-12-02 | 2017-06-13 | 河北工程技术高等专科学校 | A kind of portable civil engineering piling machine |
CN206352293U (en) * | 2016-12-28 | 2017-07-25 | 佛山市鹏洋商贸有限公司 | A kind of portable pile hammer |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115341543A (en) * | 2022-08-19 | 2022-11-15 | 广州市胜特建筑科技开发有限公司 | Semi-automatic pile pressing mechanism of hole leading type static pile pressing machine |
CN115341543B (en) * | 2022-08-19 | 2024-01-30 | 广州市胜特建筑科技开发有限公司 | Semi-automatic pile pressing mechanism of hole guiding type static pile pressing machine |
Also Published As
Publication number | Publication date |
---|---|
CN107761724B (en) | 2018-08-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201258704Y (en) | Multifunction power tongs screw fastening device | |
CN107761724A (en) | A kind of novel building implement | |
CN204384376U (en) | A kind of electric-controlled type U-shaped orientation of the parts control mechanism | |
CN107513998A (en) | A kind of constructions work equipment | |
CN208363095U (en) | A kind of Static pressure pile driver | |
CN206702707U (en) | Frock clamping device and frock apparatus for fastening | |
CN205577005U (en) | A transmission system for hydraulic engineering groover | |
CN108221983A (en) | A kind of constructions work equipment of practicality | |
CN203514135U (en) | Novel hammer adjusting structure of tamping machine | |
CN203925277U (en) | A kind of adjusting microinching formula drilling well helicoid hydraulic motor | |
CN204171986U (en) | A kind of beam-pumping unit counterbalance adjusting device | |
CN107604914B (en) | A kind of water conservancy projects of environmental protection | |
CN206326489U (en) | Double end automatic polishing machine | |
CN205362736U (en) | Drilling equipment with press from both sides and get mechanism | |
CN107761523B (en) | A kind of multi-functional working tamping unit | |
CN218714806U (en) | Wall tile sticking device for building construction | |
CN216669306U (en) | Rock slotting device for vein exploration | |
CN213836648U (en) | Adjustable hydraulic hammer pile driver | |
CN201880719U (en) | Rotary cleaning device for closed drum | |
CN219589041U (en) | Damping and fixing device for heating and ventilation pipeline | |
CN217502038U (en) | Shaft seal steam supply and auxiliary steam header | |
CN216541017U (en) | Multi-angle drill bit suitable for machining of bottom surface of deep cavity | |
CN107761723A (en) | A kind of efficient water construction facility | |
CN213540258U (en) | Drilling device for hydrogeological test | |
CN207109262U (en) | A kind of microcephaly's sewing machine automatic feeding |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180705 Address after: 350800 No. 3, Xi Bin Road, Minqing Town, Minqing County, Fujian Province Applicant after: Fujian Minqing construction development and Development Co., Ltd. Address before: 277000 5 floor, block A, electronic software park, Zaozhuang high tech Zone, Guangming Road, Xuecheng District, Zaozhuang, Shandong. Applicant before: Cen Luoqiong |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180831 Termination date: 20181013 |
|
CF01 | Termination of patent right due to non-payment of annual fee |