CN107620455A - A kind of quick accurate setting-out construction method of stair facing - Google Patents

A kind of quick accurate setting-out construction method of stair facing Download PDF

Info

Publication number
CN107620455A
CN107620455A CN201710858145.9A CN201710858145A CN107620455A CN 107620455 A CN107620455 A CN 107620455A CN 201710858145 A CN201710858145 A CN 201710858145A CN 107620455 A CN107620455 A CN 107620455A
Authority
CN
China
Prior art keywords
stair
line
bench
scale
staircase
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710858145.9A
Other languages
Chinese (zh)
Inventor
尹佳其
陆恺
马建均
邵昶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG BOYUAN CONSTRUCTION GROUP Inc
Original Assignee
ZHEJIANG BOYUAN CONSTRUCTION GROUP Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG BOYUAN CONSTRUCTION GROUP Inc filed Critical ZHEJIANG BOYUAN CONSTRUCTION GROUP Inc
Priority to CN201710858145.9A priority Critical patent/CN107620455A/en
Publication of CN107620455A publication Critical patent/CN107620455A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

The invention discloses a kind of quick accurate setting-out construction method of stair finish coat, and it sets work by instrument, the surveys for being accurately rapidly completed stairway step facing position line such as application laser cross frame for line marking instrument, self-control modulus bar, 5m steel tapes.Once complete staircase platform set Founder, absolute altitude survey is set, step facing positions, balustrade makes setting-out, installation positions survey and set.Engineering survey person works' intensity is reduced, improves the multi-specialized cooperation spots localization precision of staircase, avoids the subitem Engineering Speciality conflict such as stair facing, handrail, reduction is done over again and waste of material.Instrument is conventional, method is simple, can grasp application by engineering survey personnel rapidly.

Description

A kind of quick accurate setting-out construction method of stair facing
Technical field
The present invention relates in the architectural engineering decorations stage, be it is a kind of can be to platform absolute altitude, the platform of stair finish coat Rank start-finish line, step finished surface mark and balustrade installation reference line carry out the construction method of speedy lofting.This method is created Laser cross frame for line marking instrument is applied in the speedy lofting operation of staircase step facing to the property made.
Background technology
The step of staircase structure construction drawing and building design drawing starting location dimension is identical, and structure chart is in structural elevation On reserved decorative layer thickness, but the not reserved riser decorative layer thickness in terms of the start-stop position of step.Current In stair facing setting-out construction, traditional setting out method efficiency is low, and error is big, and phenomenon of doing over again is more frequent, and waste of material is serious.
The content of the invention
Step a:Grown in stair Wang Jing to both ends and draw setting position wire.
Step b:According to positioning wire rope, well landing beam side, stair ladder step side laying ash are hoped in staircase metope, stair Cake.
Step c:Staircase wall plastering is completed according to metope ash cake.
Step d:According to landing beam side and ladder step side ash cake, using laser cross frame for line marking instrument on the metope of staircase both sides The vertical curve projected, in its upper end and hypomere one short vertical line of red lead stroke, be demarcated as stair step upper race terminated line, Lower race start line(3).
Step e:Fast leveling support is coordinated by laser cross frame for line marking instrument, 1m lines are decorated to landing using tape measure (4)Pilot measurement is carried out, is marked according to pilot measurement again to the 1m control lines of this platform(4)Carry out thin portion mark.
Step f:According to stair bench start-stop position and landing facing 1m control lines(4), using ink fountain in metope Mark, in the bench start-stop position line(3)The finished surface height of upper each mark first order step, by start-stop, 2 points are connected with the line of ink marker Come.
Step g:Utilize homemade modulus scale(5), contrast respectively to the vertical start-finish line for treating separated time bench from beginning to end, by Any marks the vertical finished surface mark of each step.Modulus scale needs to put in the opening positions of about 20cm up and down close to step Twice, at each bench port, 2 two marks for being used to determine step riser position are marked.
Step h:The tread for ejecting step one by one using ink fountain completes upper thread(7), applied for balustrade positioning, step facing Work provides foundation.
In order to further realize the purpose of the present invention, the wire in described step a is integrally fixed at top layer and bottom On stair Wang Jing both ends on set angle steel, the position of wire is passed through by being determined under the location control of top layer and bottom Plumb bob carries out perpendicularity correction and stretched, and angle steel is fixed on landing by expansion bolt, such as high level, positioning wire line Sectional draws and set, according to floor height situation, can every 7~10 layers of drawing set once.
In order to further realize the purpose of the present invention, the ash cake in described step b includes Wang Jing and grown to 2 of both ends really Determine the ash cake of bench start-stop position, and 2 gangboard lateral ash cakes of each bench for determining bench width.
In order to further realize the purpose of the present invention, when the decoration finished surface start stop bit in described step d is equipped with deviation, It can extend or shorten each adjacent plane position marked time by the internal buckle or flare of the riser finished surface of each stairway step Put, stair go is finely adjusted.
In order to further realize the purpose of the present invention, the self-control modulus scale in described step g(5)It is to be joined according to step Number is made using hard batten, after graduated scale is more than maximum step dimension step surface dimension enlargement 5mm per one-level graduated scale cun Plagioclase, the unit scales of self-control modulus scale are shown in formula:
L=
In formula:L --- self-control stair ladder step plagioclase separated time ruler units scale;
B --- maximum specification step step surface size in same project(Such as conventional 260mm, 280mm);
INT(x)+ 5 --- round up function, that is, makes by oneself after scale label is computed and round up, be accurate to 5mm.
Using the content of the invention described above compared with conventional construction method, engineering survey person works' intensity is reduced, is improved The multi-specialized cooperation spots localization precision of staircase, the subitem Engineering Speciality conflict such as stair facing, handrail is avoided, reduction is done over again and material Material wastes.
Brief description of the drawings:
Fig. 1:Laser cross frame for line marking instrument sets up schematic diagram
Fig. 2:Make modulus scale drawing by oneself
Fig. 3:Bench method for splitting schematic diagram
Fig. 4:Make tape measure method schematic diagram by oneself
Fig. 5:Stair facing control line actual effect figure
In figure:
1st, laser cross level provide determining the vertical reference face of bench start-finish line
2nd, laser cross level provide determining the level reference of bench start-finish line
3rd, bench start-finish line 4,1m control lines
5th, modulus chi 6, control line are made by oneself
7th, step tread finished surface line.
Embodiment:
Explanation that the present invention will be further described below in conjunction with the accompanying drawings:
The embodiments of the invention provide a kind of construction method of stair facing speedy lofting, including following steps(Embodiment So that one runs stair as an example):
Step a:Hope in well and grown to both ends in stair, draw setting position wire, wire is integrally fixed at the stair of top layer and bottom On Wang Jing both ends on set angle steel, the position of wire passes through plumb bob by being determined under the location control of top layer and bottom Carry out perpendicularity correction and stretch to tighten, angle steel is fixed on landing by expansion bolt;
Step b:According to positioning wire rope to the wall of staircase four carry out bracing wire, staircase metope, stair hope well landing beam side with And stair ladder step side sets ash cake;
Step c:Staircase wall plastering is completed according to metope ash cake;
Step d:Laser cross frame for line marking instrument is erected on landing Wang Jing extended line, according to set bench side Ash cake, the reference plane of laser cross level is determined, measure bottom positioning laser spots and the distance of Wang Jing sides ash cake.And according to The vertical curve that lateral fiducial plane is penetrated in staircase both sides metope upslide, demarcate the upper race terminated line of stair step(3), lower run Initial line(3)(Referring to Fig. 1 and Fig. 3);
Step e:Laser Line Marker is erected at the staircase platform to maintain an equal level with floor structure, opens horizontal reference plane.With 5m steel tapes are to next platform pilot measurement 1m control lines(4).Frame for line marking instrument is moved into the landing, it is right according to the mark of pilot measurement The 1m control lines of this platform(4)Carry out thin portion mark(Referring to Fig. 3);
Step f:According to stair bench start-stop position and landing facing 1m control lines(4), marked using ink fountain in metope, In the bench start-stop position line(3)The finished surface height of upper each mark first order step, by start-stop, 2 points are connected with the line of ink marker(Ginseng See Fig. 5);
Step g:Utilize homemade modulus scale(5), contrast respectively to the vertical start-finish line for treating separated time bench from beginning to end, one by one point Mark the vertical finished surface mark of each step.Modulus scale needs to put two in the opening positions of about 20cm up and down close to step Secondary, at each bench port, point marks 2 two marks for being used to determine step riser position(Referring to Fig. 4);
Step h:The tread for ejecting step one by one using ink fountain completes upper thread(7), carried for balustrade positioning, step Decorative Construction For foundation(Referring to Fig. 5).

Claims (5)

1. the quick accurate setting-out construction method of a kind of stair finish coat, it is characterised in that comprise the following steps:
Step a:Hope in well and grown to both ends in stair, draw setting position wire;
Step b:According to positioning wire rope, well landing beam side and stair ladder step side laying ash cake are hoped in staircase metope, stair;
Step c:Staircase wall plastering is completed according to metope ash cake;
Step d:According to landing beam side and ladder step side ash cake, thrown using laser cross frame for line marking instrument on the metope of staircase both sides The vertical curve penetrated, it is demarcated as the upper race terminated line of stair step(3), lower race start line(3);
Step e:Fast leveling support is coordinated by laser cross frame for line marking instrument, 1m lines are decorated to landing using tape measure(4)Enter Row pilot measurement, marked according to pilot measurement again to the 1m control lines of this platform(4)Carry out thin portion mark;
Step f:According to stair bench start-stop position(3)And landing facing 1m control lines(4), using ink fountain in metope mark Note, respectively highly, by start-stop, 2 points are connected the finished surface of mark first order step with the line of ink marker, shape on the bench start-stop position line Into an oblique line(6);
Step g:Utilize homemade modulus scale(5), contrast respectively to the vertical start-finish line for treating separated time bench from beginning to end, one by one point Mark the vertical finished surface mark of each step;
Modulus scale needs to put twice in the opening positions of about 20cm up and down close to step, and at each bench port, point marks 2 For determining two marks of step riser position;
Step h:The tread for ejecting step one by one using ink fountain completes upper thread(7), carried for balustrade positioning, step Decorative Construction For foundation.
2. step a according to claim 1, it is characterised in that described wire is integrally fixed at the stair of top layer and bottom On Wang Jing both ends on set angle steel, the position of wire passes through plumb bob by being determined under the location control of top layer and bottom Carry out perpendicularity correction and stretch, angle steel is fixed on landing by expansion bolt, and such as high level, positioning wire line can divide Duan Lashe, according to floor height situation, can every 7~10 layers of drawing set once.
3. step b according to claim 1, it is characterised in that described ash cake grows 2 determinations to both ends including Wang Jing The ash cake of bench start-stop position, and 2 gangboard lateral ash cakes of each bench for determining bench width.
4. step d according to claim 1, it is characterised in that, can when described decoration finished surface start stop bit is equipped with deviation By the internal buckle or flare of the riser finished surface of each stairway step, extend or shorten each adjacent plan-position marked time, Stair go is finely adjusted.
5. step g according to claim 1, it is characterised in that described self-control modulus scale(5)It is according to step parameter Made using hard batten, graduated scale is per one-level graduated scale cun more than oblique after maximum step dimension step surface dimension enlargement 5mm Long, the unit scales of self-control modulus scale are shown in formula:
L=
In formula:L --- self-control stair ladder step plagioclase separated time ruler units scale;
B --- maximum specification step step surface size in same project(Such as conventional 260mm, 280mm);
INT(x)+ 5 --- round up function, that is, makes by oneself after scale label is computed and round up, be accurate to 5mm.
CN201710858145.9A 2017-09-21 2017-09-21 A kind of quick accurate setting-out construction method of stair facing Pending CN107620455A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710858145.9A CN107620455A (en) 2017-09-21 2017-09-21 A kind of quick accurate setting-out construction method of stair facing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710858145.9A CN107620455A (en) 2017-09-21 2017-09-21 A kind of quick accurate setting-out construction method of stair facing

Publications (1)

Publication Number Publication Date
CN107620455A true CN107620455A (en) 2018-01-23

Family

ID=61090386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710858145.9A Pending CN107620455A (en) 2017-09-21 2017-09-21 A kind of quick accurate setting-out construction method of stair facing

Country Status (1)

Country Link
CN (1) CN107620455A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107798470A (en) * 2017-10-19 2018-03-13 鲲鹏建设集团有限公司 Stair complete period lean manages construction method
CN111608389A (en) * 2019-06-21 2020-09-01 中建材创新科技研究院有限公司 Stair floor tile paving construction method
CN114543764A (en) * 2021-12-27 2022-05-27 杭州正大装饰有限公司 Whole house axis lofting type data acquisition method and equipment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7614612B2 (en) * 2007-01-23 2009-11-10 Carolina Stair Supply, Inc. Adjustable baluster system
CN202391086U (en) * 2011-11-28 2012-08-22 任元根 Positioning device for stair steps of buildings
CN102864925A (en) * 2012-09-29 2013-01-09 朱宏宇 Stair mould base, stair and method for building stair mould base and stair
CN204899171U (en) * 2015-08-14 2015-12-23 中天建设集团有限公司 Stair controlling means that wipes one's face
CN205502542U (en) * 2016-04-14 2016-08-24 中天建设集团有限公司 When marking time fitment, stair put instrument of control line
DE102015002336A1 (en) * 2015-02-24 2016-08-25 Gunther O. Böke Setting aid for step-shaped setting of cuboid stones
CN106988533A (en) * 2017-05-12 2017-07-28 中国十七冶集团有限公司 A kind of construction method of concrete staircase tiling dual side-edge wall not lattice side's centering

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7614612B2 (en) * 2007-01-23 2009-11-10 Carolina Stair Supply, Inc. Adjustable baluster system
CN202391086U (en) * 2011-11-28 2012-08-22 任元根 Positioning device for stair steps of buildings
CN102864925A (en) * 2012-09-29 2013-01-09 朱宏宇 Stair mould base, stair and method for building stair mould base and stair
DE102015002336A1 (en) * 2015-02-24 2016-08-25 Gunther O. Böke Setting aid for step-shaped setting of cuboid stones
CN204899171U (en) * 2015-08-14 2015-12-23 中天建设集团有限公司 Stair controlling means that wipes one's face
CN205502542U (en) * 2016-04-14 2016-08-24 中天建设集团有限公司 When marking time fitment, stair put instrument of control line
CN106988533A (en) * 2017-05-12 2017-07-28 中国十七冶集团有限公司 A kind of construction method of concrete staircase tiling dual side-edge wall not lattice side's centering

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
23忽然之间89: "技术交底记录", 《楼梯间地面抹灰施工技术交底》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107798470A (en) * 2017-10-19 2018-03-13 鲲鹏建设集团有限公司 Stair complete period lean manages construction method
CN107798470B (en) * 2017-10-19 2020-06-19 鲲鹏建设集团有限公司 Stair full-period lean management construction method
CN111608389A (en) * 2019-06-21 2020-09-01 中建材创新科技研究院有限公司 Stair floor tile paving construction method
CN114543764A (en) * 2021-12-27 2022-05-27 杭州正大装饰有限公司 Whole house axis lofting type data acquisition method and equipment
CN114543764B (en) * 2021-12-27 2024-04-16 杭州正大装饰有限公司 Full-house axis lofting type data acquisition method and equipment

Similar Documents

Publication Publication Date Title
CN107620455A (en) A kind of quick accurate setting-out construction method of stair facing
CN106836806B (en) Method and device for constructing special-shaped concrete structure by using BIM technology and precision control method and device in process of constructing special-shaped concrete structure by using BIM technology
US20110107610A1 (en) Step and rafter tool
CN103308030B (en) Super High absolute altitude High Precision Automatic crimping and transfer processes method
CN106320707A (en) Full projection paying-off method
CN205718980U (en) A kind of prism bar system being quickly accurately positioned laser labelling
CN110331802A (en) A kind of construction method of polymorphic structure aluminium veneer curtain wall
CN101081986A (en) Coke oven masonry construction method employing upright line rod
GB2549823A (en) Bricky's profile tool
CN107798470B (en) Stair full-period lean management construction method
Lafever The modern builder's guide
CN202450787U (en) Tool for fast determining column positions
CN206971771U (en) A kind of Super High Core Walls Structure wall construction measurement and positioning system
CN109138451B (en) Construction method for paving stair floor tiles
CN105089216A (en) Three-dimensional positioning decoration construction method for spiral staircase stone facing
CN105544990B (en) Positioning paying-off and template construction method for arc-shaped handrail
CN201081703Y (en) Aircraft body level measuring point tester
CN103482042B (en) A kind of deep water comb shape slideway cross beam construction method of installation
CN107764235B (en) Elevation vertical transmission measurement method for high-rise building construction
CN203053430U (en) Photographic receiving device of laser electronic total station
CN1011901B (en) Method and equipment for laying residential building
CN108106601A (en) A kind of portable stair construction gradient determines equipment
US20170009472A1 (en) Method and apparatus for positioning, spacing and securement of studs within top and bottom framing plates
CN102561713A (en) Method for controlling building quality of concrete frame structure walls
CN102995899A (en) Measurement control method for size of vertical member for building construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180123