CN107612005A - 电站内储能系统协同汽轮机组调节级全负荷运行方法及系统 - Google Patents
电站内储能系统协同汽轮机组调节级全负荷运行方法及系统 Download PDFInfo
- Publication number
- CN107612005A CN107612005A CN201711023246.0A CN201711023246A CN107612005A CN 107612005 A CN107612005 A CN 107612005A CN 201711023246 A CN201711023246 A CN 201711023246A CN 107612005 A CN107612005 A CN 107612005A
- Authority
- CN
- China
- Prior art keywords
- steam turbine
- energy
- storage system
- power plant
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004146 energy storage Methods 0.000 title claims abstract description 58
- 238000000034 method Methods 0.000 title claims abstract description 9
- 238000004891 communication Methods 0.000 claims abstract description 7
- 230000005611 electricity Effects 0.000 claims abstract description 5
- 238000011017 operating method Methods 0.000 claims description 6
- 230000005540 biological transmission Effects 0.000 description 3
- 239000003245 coal Substances 0.000 description 2
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
Landscapes
- Control Of Eletrric Generators (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明公开了一种电站内储能系统系统汽轮机组调节级全负荷运行方法及系统,所述系统包括汽轮机组和用于根据电网调度服务器的指令控制汽轮机组工作的电厂DCS系统,还包括电厂远动装置RTU以及储能系统,所述电厂DCS系统的实际调节级为汽轮机组平均负荷调节级,储能系统容量为汽轮机组实际调节级与汽轮机组原始全负荷运行时调节级的差值;所述电厂远动装置RTU分别通过网络与电网调度服务器、电厂DCS系统以及储能系统进行数据通信。本发明能够在响应电网负荷指令的过程中通过储能系统配合使汽轮机组基本处于高效区,既可以降低汽轮机组的热耗率,又不影响电网对汽轮机组最大出力的要求。
Description
技术领域
本发明涉及电力系统技术领域,特别是一种电站的全负荷经济运行方法及系统。
背景技术
发电厂中的汽轮机组在部分负荷运行时,其热耗率相对全负荷显著增加,以某C300/220-16.67/537/537型汽轮机组为例,100%THA工况(汽轮机组额定出力工况)、50%THA工况设计热耗分别为7872kJ/kw.h、8315kJ/kw.h,二者相差约5.63%,折合供电标煤15~20g/kw.h。其主要原因是汽轮机组设计制造时是以100%THA工况为性能考核点,一般要保证该工况下性能最佳,然而在实际运行中,机组利用小时数越来越低,长期低负荷运行,导致供电煤耗指标偏高。
针对汽轮机组在低负荷下热耗率较高的情况,国内部分厂家采用减少调节级面积等措施对汽轮机组的调节级进行改造,尽可能的降低汽轮机组在低负荷下的热耗率;但这一措施不可避免降低了汽轮机组的最大带负荷出力能力,即降低了VWO工况(汽轮机组阀门全开工况)下的性能,影响了电网对机组出力的考核。
发明内容
本发明需要解决的技术问题是提供一种电站内储能系统协同汽轮机组调节级全负荷运行方法及系统,能够在响应电网负荷指令的过程中通过储能系统配合使汽轮机组基本处于高效区,既可以降低汽轮机组的热耗率,又不影响电网对汽轮机组最大出力的要求。
为解决上述技术问题,本发明所采取的技术方案如下。
电站内储能系统系统汽轮机组调节级全负荷运行系统,包括汽轮机组和用于根据电网调度服务器的指令控制汽轮机组工作的电厂DCS系统,还包括电厂远动装置RTU以及储能系统,所述电厂DCS系统的实际调节级为汽轮机组平均负荷调节级,储能系统容量为汽轮机组实际调节级与汽轮机组原始全负荷运行时调节级的差值;所述电厂远动装置RTU分别通过网络与电网调度服务器、电厂DCS系统以及储能系统进行数据通信,电厂远动装置RTU接收到电网调度服务器发送的AGC指令后同时发送给电厂DCS系统和储能系统,汽轮机组和储能系统共同相应AGC指令,在汽轮机组调度出力达到实际调节级时,储能系统放电满足电网对汽轮机组的出力要求;AGC指令要求降低负荷时,储能系统充电。
一种电站内储能系统系统汽轮机组调节级全负荷运行方法,具体包括以下步骤:
1)计算电厂DCS系统控制下的汽轮机组平均负荷时的调节级,根据此调节级改造汽轮机组的实际调节级;
2)计算汽轮机组改造后的实际调节级与汽轮机组原始全负荷运行时调节级的差值,选择相应容量的储能系统;
3)在电厂中设置电厂远动装置RTU,并通过网络分别与电网调度服务器、电厂DCS系统以及储能系统进行数据通信;
4)电厂远动装置RTU接收电网调度服务器发送的AGC指令,并判断AGC指令是降负荷指令还是升负荷指令;当AGC指令为升负荷指令时,运行步骤5);当AGC指令为降负荷指令时,运行步骤6);
5)电厂远动装置RTU同时向电厂DCS系统和储能系统发送升负荷AGC指令,电厂DCS系统判断机组汽轮机组当前负荷P是否低于汽轮机组实际调节级的最大出力限值Pmax,若是,则汽轮机组继续升负荷至Pmax,当P达到Pmax时,储能系统放电,满足电网对机组的出力要求;若否,则储能系统直接放电,满足电网对机组的出力要求;
6)电厂远动装置RTU向储能系统发送降负荷AGC指令,储能系统充电。
由于采用了以上技术方案,本发明所取得技术进步如下。
本发明的应用,使汽轮机组能够在响应电网负荷指令的过程中通过储能系统配合基本处于高效区,既降低了汽轮机组的热耗率,又不会影响电网对汽轮机组最大出力的要求,使得汽轮机组在全负荷工况下的节能效果变得更加卓越。
附图说明
图1为本发明所述系统的架构图;
图2为本发明的流程图。
其中:1、汽轮机组,2、电厂DCS系统,3、电厂远动装置RTU,4、储能系统,5、电网调度服务器。
具体实施方式
下面将结合具体实施例对本发明进行进一步详细说明。
一种电站内储能系统系统汽轮机组调节级全负荷运行系统,其结构如图1所示,包括汽轮机组、电厂DCS系统、电厂远动装置RTU以及储能系统,电厂DCS系统的实际调节级为汽轮机组平均负荷调节级,储能系统容量为汽轮机组实际调节级与汽轮机组全负荷运行时调节级的差值;电厂远动装置RTU分别通过网络与电网调度服务器、电厂DCS系统以及储能系统进行数据通信。
本发明中的电厂远动装置RTU用于接收电网调度服务器发送的控制指令,当电厂远动装置RTU接收到电网调度服务器发送的AGC指令后,同时发送给电厂DCS系统和储能系统,汽轮机组和储能系统共同相应AGC指令,在汽轮机组调度出力达到实际调节级时,储能系统放电,满足电网对汽轮机组的出力要求;AGC指令要求降低负荷时,储能系统充电;从而可以实现在对汽轮机组调节级优化改造后,既能够降低热耗率,又能够迅速响应电网对汽轮机组最大出力的要求。
一种电站内储能系统系统汽轮机组调节级全负荷运行方法,其流程如图2所示,具体包括以下步骤:
1)根据汽轮机组日常运行工况,计算电厂DCS系统控制下的汽轮机组平均负荷时的实际调节级,根据此调节级对汽轮机组最大调节级进行优化改造,即将汽轮机组的最大负荷调节级改造为平均负荷调节级。
2)计算汽轮机组改造后的实际调节级与汽轮机组原始全负荷运行时调节级的差值,并根据此差值选择相应容量的储能系统。
3)在电厂中设置电厂远动装置RTU,并通过网络分别与电网调度服务器、电厂DCS系统以及储能系统进行数据通信。
4)电厂远动装置RTU接收电网调度服务器发送的AGC指令,并判断AGC指令是降负荷指令还是升负荷指令;当AGC指令为升负荷指令时,运行步骤5);当AGC指令为降负荷指令时,运行步骤6)。
5)电厂远动装置RTU同时向电厂DCS系统和储能系统发送升负荷AGC指令,电厂DCS系统判断机组汽轮机组当前负荷P是否低于汽轮机组实际调节级的最大出力限值Pmax,若是,则汽轮机组继续升负荷至Pmax,当P达到Pmax时,储能系统放电,满足电网对机组的出力要求;若否,则储能系统直接放电,满足电网对机组的出力要求。
6)电厂远动装置RTU向储能系统发送降负荷AGC指令,储能系统充电。
以上所述,仅是本发明的最佳实施例而已,并非对本发明作任何形式上的限制,任何熟悉本领域的技术人员,在不脱离本发明技术方案范围情况下,利用上述揭示的方法内容对本发明技术方案做出许多可能的变动和修饰,均属于权利要求书保护的范围。
Claims (2)
1.电站内储能系统系统汽轮机组调节级全负荷运行系统,包括汽轮机组和用于根据电网调度服务器的指令控制汽轮机组工作的电厂DCS系统,其特征在于:还包括电厂远动装置RTU以及储能系统,所述电厂DCS系统的实际调节级为汽轮机组平均负荷调节级,储能系统容量为汽轮机组实际调节级与汽轮机组原始全负荷运行时调节级的差值;所述电厂远动装置RTU分别通过网络与电网调度服务器、电厂DCS系统以及储能系统进行数据通信,电厂远动装置RTU接收到电网调度服务器发送的AGC指令后同时发送给电厂DCS系统和储能系统,汽轮机组和储能系统共同相应AGC指令,在汽轮机组调度出力达到实际调节级时,储能系统放电满足电网对汽轮机组的出力要求;AGC指令要求降低负荷时,储能系统充电。
2.一种电站内储能系统系统汽轮机组调节级全负荷运行方法,其特征在于,具体包括以下步骤:
1)计算电厂DCS系统控制下的汽轮机组平均负荷时的调节级,根据此调节级改造汽轮机组的实际调节级;
2)计算汽轮机组改造后的实际调节级与汽轮机组原始全负荷运行时调节级的差值,选择相应容量的储能系统;
3)在电厂中设置电厂远动装置RTU,并通过网络分别与电网调度服务器、电厂DCS系统以及储能系统进行数据通信;
4)电厂远动装置RTU接收电网调度服务器发送的AGC指令,并判断AGC指令是降负荷指令还是升负荷指令;当AGC指令为升负荷指令时,运行步骤5);当AGC指令为降负荷指令时,运行步骤6);
5)电厂远动装置RTU同时向电厂DCS系统和储能系统发送升负荷AGC指令,电厂DCS系统判断机组汽轮机组当前负荷P是否低于汽轮机组实际调节级的最大出力限值Pmax,若是,则汽轮机组继续升负荷至Pmax,当P达到Pmax时,储能系统放电,满足电网对机组的出力要求;若否,则储能系统直接放电,满足电网对机组的出力要求;
6)电厂远动装置RTU向储能系统发送降负荷AGC指令,储能系统充电。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711023246.0A CN107612005B (zh) | 2017-10-27 | 2017-10-27 | 电站内储能系统协同汽轮机调节级全负荷运行方法及系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711023246.0A CN107612005B (zh) | 2017-10-27 | 2017-10-27 | 电站内储能系统协同汽轮机调节级全负荷运行方法及系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107612005A true CN107612005A (zh) | 2018-01-19 |
CN107612005B CN107612005B (zh) | 2020-09-18 |
Family
ID=61080370
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711023246.0A Active CN107612005B (zh) | 2017-10-27 | 2017-10-27 | 电站内储能系统协同汽轮机调节级全负荷运行方法及系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107612005B (zh) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101855769A (zh) * | 2007-07-25 | 2010-10-06 | 特鲁丽特公司 | 管理混合电力的产生及应用的装置、系统和方法 |
CN102891495A (zh) * | 2012-09-18 | 2013-01-23 | 中国电力科学研究院 | 一种电池储能系统参与电网一次调频优化控制方法 |
CN202772599U (zh) * | 2012-05-18 | 2013-03-06 | 北京睿能世纪科技有限公司 | 一种发电系统 |
CN104065095A (zh) * | 2014-05-26 | 2014-09-24 | 国家电网公司 | 一种电池储能系统辅助一次调频优化控制方法 |
CN204005922U (zh) * | 2014-06-09 | 2014-12-10 | 国网山西省电力公司电力科学研究院 | 火电机组直接能量平衡协调控制系统 |
CN104632302A (zh) * | 2015-01-05 | 2015-05-20 | 广东电网有限责任公司电力科学研究院 | 一种凝汽式汽轮机滑压运行曲线测试/实施方法 |
US20160094035A1 (en) * | 2014-09-26 | 2016-03-31 | Enrichment Technology Company Ltd., Zweigniederlassung Deutschland | Combined electrical power plant |
CN105490292A (zh) * | 2016-01-18 | 2016-04-13 | 华北电力科学研究院有限责任公司 | 一种储能系统参与电网二次频率控制的方法及装置 |
CN105958551A (zh) * | 2016-06-01 | 2016-09-21 | 河北省电力建设调整试验所 | 一种利用储能提高火力发电厂agc响应的方法 |
CN106786693A (zh) * | 2016-12-20 | 2017-05-31 | 浙江海洋大学 | 用于一次调频与agc辅助调节技术的一种储能装置系统 |
KR20170067331A (ko) * | 2015-12-08 | 2017-06-16 | 삼성중공업 주식회사 | 선박 및 그 전력 운용 방법 |
-
2017
- 2017-10-27 CN CN201711023246.0A patent/CN107612005B/zh active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101855769A (zh) * | 2007-07-25 | 2010-10-06 | 特鲁丽特公司 | 管理混合电力的产生及应用的装置、系统和方法 |
CN202772599U (zh) * | 2012-05-18 | 2013-03-06 | 北京睿能世纪科技有限公司 | 一种发电系统 |
CN102891495A (zh) * | 2012-09-18 | 2013-01-23 | 中国电力科学研究院 | 一种电池储能系统参与电网一次调频优化控制方法 |
CN104065095A (zh) * | 2014-05-26 | 2014-09-24 | 国家电网公司 | 一种电池储能系统辅助一次调频优化控制方法 |
CN204005922U (zh) * | 2014-06-09 | 2014-12-10 | 国网山西省电力公司电力科学研究院 | 火电机组直接能量平衡协调控制系统 |
US20160094035A1 (en) * | 2014-09-26 | 2016-03-31 | Enrichment Technology Company Ltd., Zweigniederlassung Deutschland | Combined electrical power plant |
CN104632302A (zh) * | 2015-01-05 | 2015-05-20 | 广东电网有限责任公司电力科学研究院 | 一种凝汽式汽轮机滑压运行曲线测试/实施方法 |
KR20170067331A (ko) * | 2015-12-08 | 2017-06-16 | 삼성중공업 주식회사 | 선박 및 그 전력 운용 방법 |
CN105490292A (zh) * | 2016-01-18 | 2016-04-13 | 华北电力科学研究院有限责任公司 | 一种储能系统参与电网二次频率控制的方法及装置 |
CN105958551A (zh) * | 2016-06-01 | 2016-09-21 | 河北省电力建设调整试验所 | 一种利用储能提高火力发电厂agc响应的方法 |
CN106786693A (zh) * | 2016-12-20 | 2017-05-31 | 浙江海洋大学 | 用于一次调频与agc辅助调节技术的一种储能装置系统 |
Non-Patent Citations (3)
Title |
---|
丁冬,杨水丽,李建林等: "辅助火电机组参与电网调频的BESS容量配置", 《储能科学与技术》 * |
张澄: "锂电池储能技术参与循环流化床机组AGC调节的运用研究", 《中国优秀硕士学位论文全文数据库-工程科技II辑》 * |
李秀平,苗承刚,牛志军等: "调节级喷嘴面积对机组性能的影响与改造", 《中国电力》 * |
Also Published As
Publication number | Publication date |
---|---|
CN107612005B (zh) | 2020-09-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105337294B (zh) | 协调风电场参与电力系统一次调频的储能配置方法 | |
CN104810842B (zh) | 基于不同时间尺度的独立微电网分层协调控制方法 | |
CN104467030B (zh) | 一种基于风电与火电联合发电的功率分配方法 | |
CN102709954B (zh) | 风光储联合发电系统有功协调控制方法 | |
CN105490304A (zh) | 一种多端柔性直流电网跨区域平抑风电波动的协调控制方法 | |
CN104682437B (zh) | 一种风电场的有功/无功实时闭环下垂控制方法 | |
CN105244912B (zh) | 有源配电网孤岛恢复供电及黑启动方法 | |
CN104362671A (zh) | 一种大规模风电和抽水蓄能联合送出多目标优化协调方法 | |
CN102493915A (zh) | 风电场的风机调用方法及风机调用系统 | |
CN104124714B (zh) | 一种分布式电源并网功率控制方法、装置及系统 | |
CN104410094A (zh) | 一种电池储能电站的有功功率分配方法 | |
CN202957612U (zh) | 含风光储的智能微网及其控制系统 | |
CN205011850U (zh) | 铝电解槽热平衡控制装置 | |
CN107017659B (zh) | 基于分布式光伏电站区域保护系统进行柔性发电的方法 | |
CN110378523B (zh) | 一种用于热电风电联合参与电网调峰的容量配置方法 | |
CN106549421A (zh) | 一种水电与光电多目标优化设计与协调控制方法 | |
CN104348162B (zh) | 330kV风电场汇集变电站电压控制方法 | |
CN109888775A (zh) | 一种考虑风电接入的低负荷运行日输电网结构优化方法 | |
CN106786686B (zh) | 利用储能正外部性削减多风电场弃风的风-储系统协调控制策略 | |
CN207518286U (zh) | 电站内储能系统协同汽轮机组调节级全负荷运行系统 | |
CN107612005A (zh) | 电站内储能系统协同汽轮机组调节级全负荷运行方法及系统 | |
CN106532740A (zh) | 具备agc接口功能的核电汽轮机数字功频电液调节系统 | |
CN105305474A (zh) | 一种电网负荷快速平衡调节系统及其控制方法 | |
CN106849111B (zh) | 一种基于光伏逆变器调相的串供线路调压方法 | |
CN205178522U (zh) | 一种电网负荷快速平衡调节系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 050000 2nd floor, Yingpan commercial and residential building, 129 Nanxiao street, Qiaoxi District, Shijiazhuang City, Hebei Province Patentee after: Hebei Jiantou energy science and Technology Research Institute Co.,Ltd. Address before: 050000 2nd floor, Yingpan commercial and residential building, 129 Nanxiao street, Qiaoxi District, Shijiazhuang City, Hebei Province Patentee before: HEBEI JI-YAN ENERGY SCIENCE AND TECHNOLOGY RESEARCH INSTITUTE Co.,Ltd. |