CN107611909A - A kind of pre-buried well with cable guide structure - Google Patents
A kind of pre-buried well with cable guide structure Download PDFInfo
- Publication number
- CN107611909A CN107611909A CN201710803677.2A CN201710803677A CN107611909A CN 107611909 A CN107611909 A CN 107611909A CN 201710803677 A CN201710803677 A CN 201710803677A CN 107611909 A CN107611909 A CN 107611909A
- Authority
- CN
- China
- Prior art keywords
- cable
- side plate
- guide structure
- footstock
- well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The invention discloses a kind of pre-buried well with cable guide structure,Including cable well body,The cable well body is spliced by prefabricated bottom plate and side plate,The bottom plate is provided with the neck for fixed side,Each side plate is plugged on neck and is fixedly connected by corner fittings between adjacent side plates,The side plate upper end is connected with footstock,The footstock bottom is provided with the stopper slot matched with each side plate,The top of the footstock is provided with the concave station for being used for assembling cover plate,Structure more firm stable,Also more convenient and quicker is installed,Substantially increase the laying efficiency of cable,The later stage for being advantageous to cable is changed,Safeguard and overhaul,Simultaneously,It is provided for being oriented to the turning of cable wheel group of cable in pre-buried well,Protection and guide effect well are played in cable process of deployment,Reduce resistance,Effectively cable is avoided to land scratch,It is time saving and energy saving to operate,Reduce work difficulty,Ensure to shorten the duration while construction quality.
Description
Technical field
The present invention relates to pre-buried well, particularly a kind of pre-buried well with cable guide structure of applicable communications cable laying.
Background technology
The laying of communication cable is an essential job in communication engineering, and traditional communication cable process of deployment is
Groove is first excavated, reinforcing of then building a wall in the trench forms pipe well, and labor intensity is big, and time-consuming, efficiency is low, is also unfavorable for cable
Later stage change, safeguard and maintenance.Existing there are some and laid using prefabricated pipe well, and pipe well landfill directly is arrived into groove
In, but such pipe well is generally directly filling into well structure by cement, and structure is more single, and support force is relatively low, easily collapses, peace
Dress is also more inconvenient with transporting, and the cable port in pipe well for cabling is more coarse, and cable is easily damaged in line process is spread,
Operation is also more wasted time and energy.
The content of the invention
To solve the above problems, it is an object of the invention to provide a kind of assembling with cable guide structure it is more convenient, knot
The more practical pre-buried well of structure.
Technical scheme is used by the present invention solves its problem:
A kind of pre-buried well with cable guide structure, including cable well body, the cable well body is by prefabricated bottom plate and side
Plate is spliced, and the bottom plate is provided with the neck for fixed side, and each side plate is plugged on neck and between adjacent side plates
It is fixedly connected by corner fittings, the side plate upper end is connected with footstock, and the footstock bottom is provided with the stopper slot matched with each side plate,
The top of the footstock is provided with the concave station for being used for assembling cover plate, and cable port is at least provided with two blocks of side plates, and in side plate
Side is provided with the turning of cable wheel group for being used for being oriented to cable at cable port.
Preferably, side vertex is provided with the lock fastener for being used for locking bottom plate and side plate in the cable shaft body.
Preferably, the cable well body is square cable well, and the footstock is square base.
Preferably, the bottom plate is provided with osculum.
Preferably, the turning of cable wheel group includes fan, and along fan arc-shaped side set it is some
Individual leading block, the fan be fixed on the side plate interior sides and make the both ends of arc-shaped side respectively with the electricity in adjacent side plates
Cable mouth is corresponding.
Preferably, the fan includes arc frame and right angle frame, and the leading block is provided with arcuately frame arrangement
Horizontal pulley and longitudinal pulley, guiding and the longitudinal pulley of the horizontal pulley are directed to same arcuate directions.
Preferably, a side of the right angle frame is provided with the steel being placed in cable port corresponding with arc frame end
Pipe, another side is provided with vertically disposed telescopically adjustable adjusting rod.
Preferably, the bottom of the fan is provided with the adjustment seat for being used for adjusting height.
The beneficial effects of the invention are as follows:The pre-buried well of the present invention is formed using prefabricated with connecting method, and structure is more firm
It is stable, also more convenient and quicker is installed, substantially increases the laying efficiency of cable, the later stage for being advantageous to cable is changed, safeguards and examined
Repair, meanwhile, it is provided for being oriented to the turning of cable wheel group of cable in pre-buried well, good guarantor is played in cable process of deployment
Shield and guide effect, resistance is reduced, effectively avoid cable from landing scratch, operation is time saving and energy saving, reduces work difficulty, ensures construction
Shorten the duration while quality.
Brief description of the drawings
The invention will be further described with example below in conjunction with the accompanying drawings.
Fig. 1 is the structural representation of cable well body in the present invention;
Fig. 2 is the mounting structure schematic diagram of turning of cable wheel group in the present invention.
Embodiment
Referring to Fig. 1, a kind of pre-buried well with cable guide structure of the invention, including cable well body 1, the cable well body 1
It is spliced by prefabricated bottom plate 11 and side plate 12, the neck for fixed side 12 is provided with bottom plate 11, each side plate 12 is inserted
It is connected on neck and is fixedly connected between adjacent side plates 12 by corner fittings 15, is connected with footstock 13 in the upper end of side plate 12, the footstock
13 bottoms are provided with the stopper slot matched with each side plate 12, and the top of footstock 13 is provided with the concave station 131 for being used for assembling cover plate 14, at least
Cable port 121 is provided with two blocks of side plates 12, and is provided with positioned at the inner side of side plate 12 at cable port 121 and is used to be oriented to cable
Turning of cable wheel group 2.Wherein, bottom plate 11, side plate 12 and footstock 13 are prefabricated component, cement steel can be used to make, can also adopted
With for high-strength inorganic composite, the high-strength inorganic composite refer to by multicomponent reactive powder blend material, inorganic coagulation material,
The multiple materials such as continuous grading normal sand, steel fibre form mixture by optimal proportion and prepared by techniques such as high temperature heats
The high-performance composite materials formed.High-strength inorganic composite is except with high resistance to compression and rupture strength, high-durability, high volume
Outside the features such as stability, also there is higher crack resistance and activeness and quietness function, be remarkably improved the shock resistance, antifatigue of product
Ability, using the material, manufactured product, inorganic material pore structure significantly improve under special process, impervious, freeze proof, resistance to
More traditional cement steel greatly improves in terms of corrosivity, durability.
Pre-buried well is formed using connecting method, and sound construction is stable, quick and easy for installation, substantially increases the laying of cable
Efficiency, the later stage for being advantageous to cable are changed, safeguard and overhauled.Meanwhile by setting turning of cable wheel group 2 in pre-buried well,
Protection and guide effect well are played during cable laying to cable, reduces resistance, effectively avoids cable from landing scratch, behaviour
It is time saving and energy saving to make, and reduces work difficulty, ensures to shorten the duration while construction quality.
The embodiment, cable well body 1 is square cable well, and the footstock 13 is square base.In order that pre-buried well construction
More firmly, the lock fastener for being used for locking bottom plate 11 and side plate 12 is provided with the inner side vertex of cable well body 1, specifically, locking
Fastener is triangular structure, can match the drift angle of cable well body 1, i.e. lock fastener while locked bottom plate 11 and side plate 12, make knot
Structure is more stable.
In embodiment, osculum is provided with bottom plate 11, the product in cable well body 1 can be discharged in time by osculum
Water, ponding is avoided to influence the facility in well body.
Above-mentioned, turning of cable wheel group 2 includes fan, and along fan arc-shaped side set several lead
To pulley, fan be fixed on the inner side of the side plate 12 and make the both ends of arc-shaped side respectively with the cable port in adjacent side plates 12
121 is corresponding.
Referring to Fig. 2, in embodiment, fan includes arc frame 21 and right angle frame 22, and arc frame 21 and right angle frame 22 are equal
For double-layer frame, leading block is provided with the horizontal pulley 23 and longitudinal pulley 24 that arcuately frame 21 arranges, and horizontal pulley 23 is led
Same arcuate directions are directed to longitudinal pulley 24.
Turning of cable wheel group 2, the frame 22 at right angle can be preferably transitioned into from cable port 121 for the ease of the communications cable
One side is provided with the steel pipe 27 being placed in cable port 121 corresponding with the end of arc frame 21, and another side is provided with vertical
The telescopically adjustable adjusting rod 25 set, the side of fan are close to the side wall of cable well body 1, and opposite side is by regulation
Bar 25 carries out position adjustments, and two adjusting rods 25 are provided with embodiment.It is used to adjust height in addition, being provided with the bottom of fan
The adjustment seat 26 of degree.
During use:Seat adjusts the height of fan, steel pipe 27 is injected in the cable port 121 of cable well body 1, makes one
The right angle frame 22 of side is close to the metope of the upstream cable port 121 of cable well body 1, then adjusts two adjusting rods 25, makes adjusting rod 25
One end be close on the metope of adjacent side plates 12 of cable well body 1, turning of cable wheel group 2 is fixed on cable solid and reliablely
In well body 1.During cabling, under the guide effect of horizontal pulley 23 and longitudinal pulley 24, cable will lead to steady and smooth
Cross pre-buried well.
It is described above, simply presently preferred embodiments of the present invention, the invention is not limited in above-mentioned embodiment, as long as
It reaches the technique effect of the present invention with identical means, should all belong to protection scope of the present invention.
Claims (8)
1. a kind of pre-buried well with cable guide structure, including cable well body, it is characterised in that:The cable well body is by prefabricated
Bottom plate and side plate are spliced, and the bottom plate is provided with the neck for fixed side, and each side plate is plugged on neck and adjacent
It is fixedly connected between side plate by corner fittings, the side plate upper end is connected with footstock, and the footstock bottom is provided with and matched with each side plate
Stopper slot, the top of the footstock is provided with the concave station for being used for assembling cover plate, is at least provided with cable port, and position on two blocks of side plates
The turning of cable wheel group for being used for being oriented to cable is provided with cable port in side plate interior sides.
2. the pre-buried well according to claim 1 with cable guide structure, it is characterised in that:The cable shaft body medial roof
The lock fastener for being used for locking bottom plate and side plate is provided with angle.
3. the pre-buried well according to claim 1 or 2 with cable guide structure, it is characterised in that:The cable well body is
Square cable well, the footstock are square base.
4. the pre-buried well according to claim 3 with cable guide structure, it is characterised in that:The bottom plate is provided with draining
Hole.
5. the pre-buried well according to claim 1 with cable guide structure, it is characterised in that:The turning of cable wheel group bag
Fan, and several leading blocks of the arc-shaped side setting along fan are included, the fan is fixed on described
Side plate interior sides and make the both ends of arc-shaped side corresponding with the cable port in adjacent side plates respectively.
6. the pre-buried well according to claim 5 with cable guide structure, it is characterised in that:The fan includes arc
Shape frame and right angle frame, the leading block are provided with the arcuately horizontal pulley of frame arrangement and longitudinal pulley, the horizontal pulley
Guiding is directed to same arcuate directions with longitudinal pulley.
7. the pre-buried well according to claim 6 with cable guide structure, it is characterised in that:One side of the right angle frame
The steel pipe being placed in cable port corresponding with arc frame end is provided with, another side is provided with vertically disposed scalable tune
The adjusting rod of section.
8. according to any described pre-buried wells with cable guide structure of claim 5-7, it is characterised in that:The fan
Bottom be provided with and be used to adjust the adjustment seat of height.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710803677.2A CN107611909A (en) | 2017-09-08 | 2017-09-08 | A kind of pre-buried well with cable guide structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710803677.2A CN107611909A (en) | 2017-09-08 | 2017-09-08 | A kind of pre-buried well with cable guide structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107611909A true CN107611909A (en) | 2018-01-19 |
Family
ID=61062929
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710803677.2A Pending CN107611909A (en) | 2017-09-08 | 2017-09-08 | A kind of pre-buried well with cable guide structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107611909A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113794163A (en) * | 2021-09-24 | 2021-12-14 | 温州华电实业有限公司 | Cable laying mechanism in power construction |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104113033A (en) * | 2014-08-02 | 2014-10-22 | 宁夏平罗凌云建材实业有限公司 | Novel assembled type reinforced concrete cable trough |
CN204356800U (en) * | 2014-10-10 | 2015-05-27 | 国网辽宁省电力有限公司葫芦岛供电公司 | Resin-based commutation cable shaft |
CN205160011U (en) * | 2015-11-11 | 2016-04-13 | 广州汇隽电力工程设计有限公司 | Novel prefabricated type cable trench |
CN205543992U (en) * | 2016-01-22 | 2016-08-31 | 昆明瑞建送变电工程有限公司 | A bear guider that is used for cable shaft to export and follows department down |
CN206471754U (en) * | 2017-01-12 | 2017-09-05 | 江门市赛为电力科技有限公司 | A kind of novel cable quarter block |
-
2017
- 2017-09-08 CN CN201710803677.2A patent/CN107611909A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104113033A (en) * | 2014-08-02 | 2014-10-22 | 宁夏平罗凌云建材实业有限公司 | Novel assembled type reinforced concrete cable trough |
CN204356800U (en) * | 2014-10-10 | 2015-05-27 | 国网辽宁省电力有限公司葫芦岛供电公司 | Resin-based commutation cable shaft |
CN205160011U (en) * | 2015-11-11 | 2016-04-13 | 广州汇隽电力工程设计有限公司 | Novel prefabricated type cable trench |
CN205543992U (en) * | 2016-01-22 | 2016-08-31 | 昆明瑞建送变电工程有限公司 | A bear guider that is used for cable shaft to export and follows department down |
CN206471754U (en) * | 2017-01-12 | 2017-09-05 | 江门市赛为电力科技有限公司 | A kind of novel cable quarter block |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113794163A (en) * | 2021-09-24 | 2021-12-14 | 温州华电实业有限公司 | Cable laying mechanism in power construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105714963B (en) | A kind of inorganic light weight combined heat-insulating integral exterior wall cladding system and its installation method | |
CN104264920B (en) | Construction method of ultrahigh large-curvature circular spiral as-cast-finish stair | |
CN106869368A (en) | A kind of assembling type steel structure external hanging type wallboard base-supporting attachment structure | |
CN208934190U (en) | A kind of assembled steel frame wall filled with masonry structural system | |
CN107611909A (en) | A kind of pre-buried well with cable guide structure | |
CN207436503U (en) | Efficient construction of precast floorslab hangs membrane module | |
CN207504539U (en) | A kind of cable trough with cable protection external member | |
CN107453302A (en) | A kind of pre-embedded device suitable for communications cable laying | |
CN209369118U (en) | A kind of connection system of steel frame and prefabricated panel | |
CN204356896U (en) | Based on the assembling Framed Structure with Special-Shaped Columns that 3D prints | |
CN107546700A (en) | A kind of cable well suitable for communication engineering | |
CN106284999A (en) | Assembled architecture haydite concrete batten of internal partition mounting process | |
CN205348813U (en) | Portable brick wall masonry device | |
CN107591768A (en) | A kind of structure improved communications cable ditch well | |
CN107975069A (en) | A kind of pre-buried cable well of improved locking mechanism | |
CN107642107A (en) | A kind of pre-buried well body of the communications cable | |
CN107732815A (en) | A kind of prefabricated trough of communication cable | |
CN107732813A (en) | A kind of communications cable walks line trenches | |
CN107769131A (en) | A kind of built-in type communications cable wire casing | |
CN204645358U (en) | Template and floor | |
CN107706874A (en) | A kind of cable trough with cable protection external member | |
CN207436515U (en) | The hoisting beam of efficient construction of precast floorslab | |
CN208844879U (en) | A kind of modular is aerial freely to adjust pedestal | |
CN107761771A (en) | A kind of prefabricated well body with wire protecting structure | |
CN207032297U (en) | The inner supporting device of basement prefabricated board loose tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |