CN205348813U - Portable brick wall masonry device - Google Patents

Portable brick wall masonry device Download PDF

Info

Publication number
CN205348813U
CN205348813U CN201620129308.0U CN201620129308U CN205348813U CN 205348813 U CN205348813 U CN 205348813U CN 201620129308 U CN201620129308 U CN 201620129308U CN 205348813 U CN205348813 U CN 205348813U
Authority
CN
China
Prior art keywords
mould
along
vertical rod
horizontal brace
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620129308.0U
Other languages
Chinese (zh)
Inventor
宋仲华
申占民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620129308.0U priority Critical patent/CN205348813U/en
Application granted granted Critical
Publication of CN205348813U publication Critical patent/CN205348813U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a portable brick wall masonry device, including two foundation seats, eight pole settings, eight thongs round pin, two horizontal braces, four gen dingmo, four in the same direction as the mould parts, constituting the rectangle by base, horizontal brace, ding mo with in the same direction as the mould, a set of pole setting is respectively placed at four angles in the rectangle, and every assemblage pole is with thong round pin from the outside to alternating the downthehole of income pole setting, the horizontal brace passes from the pole setting in the middle of, has butyl's mould feather key in every gen dingmo's inboard welding, passes through in connecting bolt fixes the guide way at the horizontal brace at the lower extreme of butyl's mould, every has suitable mould feather key in the same direction as the inboard welding of mould, fixes in the guide way of butyl's mould through connecting bolt. Through carrying out simple equipment and adjustment to the device to repeated the same operating procedure, can realize to the wall body lay bricks fast, spread the thick liquid and caulk, can improve the work efficiency greatly. The device simple structure, easy and simple to handle, the people of any experience of not laying bricks can all use, has better popularization and application and worth.

Description

A kind of portable brick building wall device
Technical field
This utility model relates to a kind of construction instrument, particularly to a kind of brick building wall device.
Background technology
Standard fireclay brick is of a size of 240 × 115 × 53 millimeters (long × wide × high), according to national regulation and practical application, thickness of building by laying bricks or stones for siphonal culvert, pipe trench or the two-way body of wall such as ground enclosure wall, gallery, passage generally has 12 centimetres, 24 centimetres, 37 centimetres etc. several (to be commonly called as 12 walls, 24 walls, 37 walls, gray seam thickness between brick and brick is 1 centimetre), wherein in the majority with 24 walls (wall thickness 24 centimetres), and the method building 24 walls by laying bricks or stones is in the majority with " fourth one is suitable " masonry method.When traditional-handwork builds two-way 24 wall by laying bricks or stones, first adopt cement mortar to beat and build blinding layer, for levelling ground, it is simple to construction and building wall;Then paving grouts and builds ground floor header brick, puts into mortar, form vertical mortar seam by squeezing and pressing method between brick and brick;After one layer of header brick masonry, spreading horizontal mortar up, form horizontal mortar joint, width (thickness) degree finally building stretcher, vertical mortar seam and horizontal mortar joint again on horizontal mortar joint by laying bricks or stones all requires 10mm, the like, the height that building wall extremely needs the most at last.When the method builds two-way brick wall body by laying bricks or stones, have the disadvantages that one be the technical merit to workman, proficiency level require higher;Two is the bad assurance of thickness of mortar joint, it is possible to cause became uneven phenomenon;Three is the bad control of perpendicularity of body of wall;Four be left and right two bodies of wall every layer brick be likely to not on a horizontal plane, can not being substantially parallel of axis direction;Five is that labor strength is big, and efficiency of construction is low.
Utility model content
This utility model aims to provide a kind of brick building wall device, simply assembles and adjusts by this device is carried out, and repeats identical operating procedure, it may be achieved to quickly the laying bricks of body of wall, spreads slurry and joint filling, can be greatly improved work efficiency.This utility model is realized by below scheme:
A kind of portable brick building wall device, including two foundation seats, eight vertical rods, eight latches, two horizontal braces, four Gen Dingmo, four suitable mould parts;It is one group by base, horizontal brace to be one group and constitute rectangle as horizontal edge, Ding Mo and suitable mould as longitudinal edge;With every two vertical rods for one group, respectively placing one group of vertical rod at defined four angles of rectangle, the lower end often organizing vertical rod is bolted on base, and upper end is then connected with each other two vertical rods by connector;Every vertical rod longitudinally linearly has multiple hole, often group vertical rod with a latch from outside to intert vertical rod hole in;Horizontal brace length is identical with base, and traverse in the middle of vertical rod, lower end frame, on latch, is provoked by eight latches;It is welded with fourth mould feather key in the inner side of every Gen Dingmo, is fixed in the gathering sill of horizontal brace by connecting bolt in the lower end of fourth mould;Every, along being welded with inside mould along mould feather key, is fixed in the gathering sill of fourth mould by connecting bolt.
Opening to outer/inner for adjustable fourth mould with along mould, to facilitate realization to lay bricks and the demoulding, be provided with fourth mould tensioner between two Gen Dingmo of same longitudinal edge, two ends and fourth mould are connected firmly;Same longitudinal edge two along mould between install along mould tensioner, two ends are connected firmly with along mould.
For convenience of in doing spacing and reference to Ding Mo with along mould, described fourth mould tensioner and along mould tensioner two outside be respectively mounted a nugget genus plate washer.
For convenience of the center position place moving and being arranged on described base, loop-shaped handle is installed.Loop-shaped handle is installed at the center position place of described horizontal brace.
After installing device at the construction field (site), when building header brick by laying bricks or stones, first make both sides fourth moulds simultaneously along fourth mould gathering sill to middle slip, inwall is close to vertical rod, form the station building header brick by laying bricks or stones, one by one header brick is put between fourth mould feather key, obstruct due to feather key, space is formed between brick and brick, after treating that the header brick of flood is all put, pour mortar into, with brick cutter or trowel mortar inserted make firm by ramming in space closely knit, and surface smear is smooth, form certain thickness horizontal mortar joint and can complete building by laying bricks or stones of header brick;When building stretcher by laying bricks or stones, make again both sides along mould simultaneously along along mould gathering sill to middle slip, until its inwall is close to vertical rod, form the station building stretcher by laying bricks or stones, one by one stretcher is put along between mould feather key, due to stretcher be two pieces placed side by side, all can form certain distance space before and after it between brick and two pieces of bricks, brick, under the effect conducted oneself with dignity and slightly knock, is firmly bonded with the horizontal mortar joint of lower section;After treating that the stretcher of flood is all put, pour mortar into, with brick cutter or trowel mortar inserted and make firm by ramming closely knit and surface smear is smooth in space, form certain thickness vertical mortar seam, building by laying bricks or stones of stretcher can be completed;Treat Ding Mo and along, after mould all builds by laying bricks or stones, making to slide laterally along along mould gathering sill along mould simultaneously, till sliding into the end, then make fourth mould slide laterally simultaneously, till sliding into the end, Ding Mo and along the whole demoulding of mould;Two people are respectively arranged at two of this device, wherein a people is by horizontal brace handle in advance, horizontal brace is lifted up in the lump together with the fourth mould on top, suitable mould and miscellaneous part, when arriving next station, latch is extracted, insert the pin hole of next station, horizontal brace is put down frame on latch, building by laying bricks or stones of next layer of header brick and stretcher can be entered;By above-mentioned steps circulation operation, the whole of both sides body of wall can be completed and build task by laying bricks or stones.
Compared with prior art, this device is for having the building walls such as the siphonal culvert of two-way brick wall, pipe trench or ground enclosure wall, gallery, passage, by this device being carried out simply assembling and adjusting, and repeat identical operating procedure, can realize quickly the laying bricks of body of wall, spread slurry and joint filling, work efficiency can be greatly improved.This apparatus structure is simple, easy and simple to handle, and the people of any experience of not laying bricks can use, and has good application value.
Accompanying drawing explanation
Fig. 1 embodiment 1 build device overall structure schematic diagram by laying bricks or stones
Fig. 2 embodiment 1 build device section sub-unit detail drawing by laying bricks or stones.
Detailed description of the invention
Embodiment 1
A kind of portable brick building wall device, overall structure is as it is shown in figure 1, include 2, eight latches of 1, eight vertical rods of two foundation seats, 4, four fourth moulds of 3, two horizontal braces 5, four along mould 6 parts;Loop-shaped handle 1-1 is installed at the center position place of base 1, loop-shaped handle 4-1 is installed at the center position place of horizontal brace 4.It is one group by base 1, horizontal brace 4 to be one group and constitute rectangle as horizontal edge, fourth mould 5 and suitable mould 6 as longitudinal edge;With every two vertical rods 2 for one group, respectively placing one group of vertical rod at defined four angles of rectangle, often the lower end of vertical 2 bars of group is bolted on base 1, and upper end is then connected with each other two vertical rods by connector 7;Every vertical rod longitudinally linearly has multiple hole 2-2, often group vertical rod 2 with a latch 3 from outside to intert vertical rod hole 8 in;The length of horizontal brace 4 is identical with the length of base 1, and horizontal brace 4 is from the middle traverse of vertical rod 2, and lower end frame, on latch 3, is provoked by eight latches 3;As shown in the parts detail drawing of Fig. 2, it is welded with fourth mould feather key 5-1 in the inner side of every fourth mould 5, is fixed in the fourth mould gathering sill 4-2 of horizontal brace 4 by connecting bolt in the lower end of fourth mould;Being provided with fourth mould tensioner 8 between two fourth moulds 5 of same longitudinal edge, phase two ends and fourth mould 5 are connected firmly;Every, along being welded with inside mould 6 along mould feather key 6-1, is fixed in the suitable mould gathering sill 5-2 of fourth mould by connecting bolt;Same longitudinal edge two along mould 6 between install along mould tensioner 9, its two ends are connected firmly with along mould 6;Fourth mould tensioner 8 and along mould tensioner 9 two outside be respectively mounted a nugget genus plate washer 10.
During installation, as in figure 2 it is shown, base 1 lies in a horizontal plane on terrace, base handle 1-1 is welded on middle part, it is simple to lift;Vertical rod 2 is fixedly mounted on base 1 by bearing and bolt;Latch 3 inserts in the pin hole 2-2 in vertical rod 2, and eight latches 3 are at grade;Horizontal brace 4 is from the middle traverse of front and back vertical rod 2, and load is on latch 3, and horizontal brace handle 4-1 is welded on middle part, it is simple to lift.Every two fourth moulds 5 are one group, are placed in the both sides of vertical rod 2 respectively, and connecting bolt drawknot is passed through in bottom, connecting bolt upper end is fixed on the inner chamber of fourth mould 5, lower end snaps in fourth mould gathering sill 4-2, makes fourth mould 5 under the constraint of connecting bolt, can only along fourth mould gathering sill about 4-2 sliding;It is placed in the upper surface of fourth mould 5 along mould 6, ties again by connecting bolt and be fixed in the suitable mould gathering sill 5-2 of fourth mould 5, and under the constraint of connecting bolt, can only along along mould gathering sill about 5-2 sliding;It is connected with along mould tensioner 9 by fourth mould tensioner 8 between the two fourth moulds 5 in left and right and two suitable moulds 6, fourth mould tensioner 8 and suitable mould tensioner 9 are all a kind of tightening hoops with reverse thread, when rotating tightening hoop, the tensioning bolt at two ends and can simultaneously inwardly or outwardly moving, drive fourth mould 5 and be flared out or inward collapsible in respective gathering sill along mould 6, reaching the demoulding and the purpose laid bricks;Baffle plate 10 is two blocks of sheet metals, and tensioning bolt is from traverse in steel plate, and baffle plate 10 acts primarily as spacing and reference effect, it is to avoid tightening hoop is close to too much.Fourth mould feather key 5-1 and suitable mould feather key 6-1 is used that the round steel processing of diameter 10 millimeters, first round steel is cut into every section long 53 millimeters (thickness of one block of standard brick), then half-and-half cut open, one side with plane is welded on fourth mould 5 and the inner side along mould 6, during welding the upper end of fourth mould feather key 5-1 from fourth mould 5 along 10 millimeters (spaces as fill level mortar joint), there are certain altitude (being used for clamping next layer of brick), the width that headroom is one block of standard brick of adjacent two fourth mould feather key 7-4 in the lower edge from fourth mould 5, the lower end;The lower end of suitable mould feather key 6-1 is lower to concordant with suitable mould 8,10 millimeters (space as fill level mortar joint) of residue, upper end, adjacent two length that headroom is one block of standard brick along mould feather key 6-1.
After installing device at the construction field (site), when building header brick by laying bricks or stones, first make both sides fourth moulds 5 simultaneously along fourth mould gathering sill 4-2 to middle slip, inwall is close to vertical rod 2, form the station building header brick by laying bricks or stones, one by one header brick is put between fourth mould feather key 5-1, obstruct due to feather key, space is formed between brick and brick, after treating that the header brick of flood is all put, pour mortar into, with brick cutter or trowel mortar inserted make firm by ramming in space closely knit, and surface smear is smooth, the horizontal mortar joint forming 10mm can complete building by laying bricks or stones of header brick;When building stretcher by laying bricks or stones, make again both sides along mould 6 simultaneously along along mould gathering sill 5-2 to middle slip, until its inwall is close to vertical rod 2, form the station building stretcher by laying bricks or stones, one by one stretcher is put along between mould feather key 6-1, due to stretcher be two pieces placed side by side, all can form 10mm space before and after it between brick and two pieces of bricks, brick, under the effect conducted oneself with dignity and slightly knock, is firmly bonded with the horizontal mortar joint of lower section;After treating that the stretcher of flood is all put, pour mortar into, with brick cutter or trowel mortar inserted and make firm by ramming closely knit and surface smear is smooth in space, form the vertical mortar seam of 10mm, building by laying bricks or stones of stretcher can be completed;Treat Ding Mo and along, after mould all builds by laying bricks or stones, making to slide laterally along along mould 6 gathering sill 5-2 along mould simultaneously, till sliding into the end, then make fourth mould 5 slide laterally simultaneously, till sliding into the end, fourth mould 5 and along the whole demoulding of mould 6;Two people are respectively arranged at two of this device, wherein a people is by horizontal brace handle 4-1 in advance, horizontal brace 4 is lifted up in the lump together with the fourth mould 5 on top, suitable mould 6 and miscellaneous part, when arriving next station, latch 3 is extracted, insert the pin hole of next station, horizontal brace is put down frame on latch, building by laying bricks or stones of next layer of header brick and stretcher can be entered;By above-mentioned steps circulation operation, the whole of both sides body of wall can be completed and build task by laying bricks or stones.

Claims (5)

1. a portable brick building wall device, it is characterised in that: include two foundation seats, eight vertical rods, eight latches, two horizontal braces, four Gen Dingmo, four suitable mould parts;It is one group by base, horizontal brace to be one group and constitute rectangle as horizontal edge, Ding Mo and suitable mould as longitudinal edge;With every two vertical rods for one group, respectively placing one group of vertical rod at defined four angles of rectangle, the lower end often organizing vertical rod is bolted on base, and upper end is then connected with each other two vertical rods by connector;Every vertical rod longitudinally linearly has multiple hole, often group vertical rod with a latch from outside to intert vertical rod hole in;Horizontal brace length is identical with base, and traverse in the middle of vertical rod, lower end frame, on latch, is provoked by eight latches;It is welded with fourth mould feather key in the inner side of every Gen Dingmo, is fixed in the gathering sill of horizontal brace by connecting bolt in the lower end of fourth mould;Every, along being welded with inside mould along mould feather key, is fixed in the gathering sill of fourth mould by connecting bolt.
2. portable brick building wall device as claimed in claim 1, it is characterised in that: being provided with fourth mould tensioner between two Gen Dingmo of same longitudinal edge, two ends and fourth mould are connected firmly;Same longitudinal edge two along mould between install along mould tensioner, two ends are connected firmly with along mould.
3. portable brick building wall device as claimed in claim 2, it is characterised in that: described fourth mould tensioner and along mould tensioner two outside be respectively mounted a nugget genus plate washer.
4. the portable brick building wall device as described in one of claim 1 ~ 3, it is characterised in that: loop-shaped handle is installed at the center position place of described base.
5. the portable brick building wall device as described in one of claim 1 ~ 3, it is characterised in that: loop-shaped handle is installed at the center position place of described horizontal brace.
CN201620129308.0U 2016-02-20 2016-02-20 Portable brick wall masonry device Expired - Fee Related CN205348813U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620129308.0U CN205348813U (en) 2016-02-20 2016-02-20 Portable brick wall masonry device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620129308.0U CN205348813U (en) 2016-02-20 2016-02-20 Portable brick wall masonry device

Publications (1)

Publication Number Publication Date
CN205348813U true CN205348813U (en) 2016-06-29

Family

ID=56179733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620129308.0U Expired - Fee Related CN205348813U (en) 2016-02-20 2016-02-20 Portable brick wall masonry device

Country Status (1)

Country Link
CN (1) CN205348813U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106593476A (en) * 2016-12-30 2017-04-26 江苏建筑职业技术学院 Self supporting storey pole masonry combined device used for karst metro lining and construction method
CN110331860A (en) * 2019-04-30 2019-10-15 上海二十冶建设有限公司 It fills walling and automates building method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106593476A (en) * 2016-12-30 2017-04-26 江苏建筑职业技术学院 Self supporting storey pole masonry combined device used for karst metro lining and construction method
CN106593476B (en) * 2016-12-30 2018-09-11 江苏建筑职业技术学院 Karst lining structure of metro builds combination unit and construction method by laying bricks or stones with self-supporting marked rod
CN110331860A (en) * 2019-04-30 2019-10-15 上海二十冶建设有限公司 It fills walling and automates building method

Similar Documents

Publication Publication Date Title
CN203947788U (en) A kind of integrated apparatus of laying bricks fast, spreading slurry, joint filling
CN107605177A (en) The construction method of efficient precast floor slab and its independent support frame
CN106120929A (en) Bucket for excavating U-shaped side ditch and slip-form cast-in-place construction method for U-shaped side ditch
CN205348813U (en) Portable brick wall masonry device
CN105697019B (en) Shaft wall cast-in-situ concrete joint and its erecting device and construction method
CN110359586B (en) Post-cast strip structure and construction method
CN111042569B (en) Construction method for additionally building linear accelerator machine room in limited space of hospital basement
CN108951840A (en) Based on setting bracket single side formwork basement arc external wall construction method
CN206844275U (en) Mutual buckle type precast concrete cover ditch and its suspender
CN210286436U (en) Rain sewage pipe hoist and mount system that slides
CN107905368A (en) A kind of assembled beam and assembled column connection structure and construction method
CN207436503U (en) Efficient construction of precast floorslab hangs membrane module
CN209620240U (en) Between integrally assembling staircase
CN207829495U (en) Combined tool for controlling plumpness and thickness of horizontal and vertical mortar joints for wall masonry
CN205348812U (en) A device that is used for building by laying bricks or stones fast two -way brick wall and personally experiences sth. part of body
CN105544561A (en) Construction method for quickly pouring anti-slide pile protection wall concrete
CN206319319U (en) Steel pipe Larsen steel plate combination fender post constructing structure
CN206736921U (en) A kind of haulage equipment of slope protection block
CN205422720U (en) Vertical wall of a well cast in situ concrete connects stubble and formwork device thereof
CN107453302A (en) A kind of pre-embedded device suitable for communications cable laying
CN201321720Y (en) Ring-beam no-putlog-hole template erecting device in brick and concrete structure construction
CN212052851U (en) Foundation reinforcing structure for ancient building foundation in soft soil area
CN207538506U (en) The independent supporting rack of efficient construction of precast floorslab
CN211621589U (en) Pile digging device for concrete pipe piles in constructional engineering
CN110965580B (en) Symmetrical synchronous layered distribution pouring system for open cut tunnel lining and construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160629