CN207032297U - The inner supporting device of basement prefabricated board loose tool - Google Patents
The inner supporting device of basement prefabricated board loose tool Download PDFInfo
- Publication number
- CN207032297U CN207032297U CN201720959443.2U CN201720959443U CN207032297U CN 207032297 U CN207032297 U CN 207032297U CN 201720959443 U CN201720959443 U CN 201720959443U CN 207032297 U CN207032297 U CN 207032297U
- Authority
- CN
- China
- Prior art keywords
- plate
- column
- prefabricated board
- bolt
- basement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
It the utility model is related to a kind of inner supporting device of basement prefabricated board loose tool, for being supported between the first prefabricated board and the second prefabricated board that are oppositely arranged, first prefabricated board and the second prefabricated board are erected on the edge of basement bed course, and the inner supporting device of basement prefabricated board loose tool includes:It is erected in basement and is attached at least one first column of the first prefabricated board;It is erected in basement and is attached at least one second column of the second prefabricated board;It is fixed at least one first articulated elements of the first column;It is correspondingly arranged with the first articulated elements and is fixed at least one second articulated elements of the second column;And at least one support tube of adjustable in length, it is connected between the first articulated elements and the second articulated elements, so as to which support tube is stayed between the first column and the second column.The present apparatus is conveniently dismantled reusable.
Description
Technical field
The realm of building construction is the utility model is related to, espespecially a kind of inner supporting device of basement prefabricated board loose tool.
Background technology
Brick setting replaces a kind of method of plank sheathing or steel form formwork when brick mold is basement foundation construction.Mainly should
The place for being not easy to remove for side forms such as basement foundation beam, cushion cap, sumps.But earthwork during extensive brick mold building construction
Excavated volume is big, brick and mortar price are higher, if any waterproof requirement when need to also be plastered on the inside of brick mold, artificial input amount
Greatly, the bonding mortar strength such as need can just carry out next procedure construction, long construction period after reaching.
, being capable of fast Speed Pinyin using the prefabricated board of concrete prefabricated finished product compared with brick mold made of traditional brick setting
Dress, it is time saving and energy saving, it is not required to carry out processing of plastering.Concrete prefabricated board intensity is higher than traditional brick masonry strength, the earthwork around cushion cap
Crack is less prone to during backfill and is caved in, the construction quality of brick mold can be effectively improved, the more traditional brick mold of composite price is cheap,
Cost is not only reduced, while greatly improves efficiency of construction, effectively shortens the process duration.
Prefabricated board is supported using flitch support or steel pipe as a kind of new template system mostly, but it is so not
It is very low beneficial to the recycling of material, recovery utilization rate.
Utility model content
A kind of the defects of the purpose of this utility model is to overcome prior art, there is provided interior branch of basement prefabricated board loose tool
Support arrangement, solve the problems, such as that the recovery utilization rate of the inner support of prefabricated board in the prior art is low.
Realizing the technical scheme of above-mentioned purpose is:
The utility model provides a kind of inner supporting device of basement prefabricated board loose tool, for being supported in be oppositely arranged the
Between one prefabricated board and the second prefabricated board, first prefabricated board and second prefabricated board are erected on the side of basement bed course
Edge, the inner supporting device of the basement prefabricated board loose tool include:
It is erected in basement and is attached at least one first column of the first prefabricated board;
It is erected in basement and is attached at least one second column of the second prefabricated board;
It is fixed at least one first articulated elements of first column;
It is correspondingly arranged with first articulated elements and is fixed at least one second articulated elements of second column;With
And
At least one support tube of adjustable in length, it is connected between first articulated elements and second articulated elements,
So as to which the support tube is stayed between first column and second column.
The beneficial effect of the inner supporting device of the utility model basement prefabricated board loose tool:
The inner supporting device of the utility model basement prefabricated board loose tool by least one first column by being erected on ground
It is lower indoor and be attached at the first prefabricated board, at least one second column is erected in basement and is attached at the second prefabricated board,
It is articulated with using support tube between the first column and the second column, i.e., support tube coordinates the first column and the second column to stay on the
Between one prefabricated board and the second prefabricated board, so as to realize the reinforcing support to the first prefabricated board and the second prefabricated board.Support tube
Adjustable in length, so as to which the length of support tube can be adjusted according to distance between the first column and the second column when installing support tube
Degree, using being articulated and connected, support tube can rotate support tube, so as to according to the direction for being actually needed change support tube, applicability
Extensively.It is detachably connected between first column and the second column and support tube, convenient disassembly, is easy to recovery to have enough to meet the need, repeats recovery
Utilize, greatly reduce the input of flitch, steel pipe, save substantial amounts of working procedure, reduce labour's input, reduction is constructed into
This.The utility model replaces brick mold using prefabricated board loose tool, and lifting is convenient, saves brick using amount, saves and the ring such as builds, plasters by laying bricks or stones
Section, environmental pollution is small, than brick mold plus environmental protection.Prefabricated board can arbitrarily be cut, any splicing, can be in difficulty of construction the earth
Side uses, and can accelerate manufacturing schedule.The physical dimension of prefabricated board is accurate, Stability Analysis of Structures, does not go out during backfill incumbent
What deforms, caved in, and has impermeability and frost resistance, convenient, fast.The surface of prefabricated board is smooth, without plastering processing just
Waterproof matrix can be directly done, saves to plaster and dries required time and labour, further shorten the duration.
The utility model basement prefabricated board loose tool inner supporting device further improvement is that, first articulated elements
Including:
It is fastened transversely to the first supporting plate of first column;And
The first connecting plate of the support tube first end is fastened transversely to, first connecting plate is placed in first supporting plate
On, first connecting plate and first supporting plate are worn by the first bolt and coordinate the first nut connect, so that described the
One connecting plate can rotate on first supporting plate around first bolt;
Second articulated elements includes:
It is fastened transversely to the second supporting plate of second column;And
Second connecting plate at the end of support tube second is fastened transversely to, second connecting plate is placed in second supporting plate
On, second connecting plate and second supporting plate are worn by the second bolt and coordinate the second nut connect, so that described the
Two connecting plates can rotate on second supporting plate around second bolt.
The utility model basement prefabricated board loose tool inner supporting device further improvement is that, first articulated elements
Also include:
It is fastened transversely to first column and the first upper mounted plate on the upside of first supporting plate;
It is fastened transversely to first column and the first bottom plate on the downside of first supporting plate, described first
Bolt wears first bottom plate, first supporting plate, first connecting plate and first upper mounted plate, institute successively
The bottom for stating the first bolt is attached at first bottom plate, first nut be screwed together in the top of first bolt and
It is attached at first upper mounted plate;
Second articulated elements also includes:
It is fastened transversely to second column and the second upper mounted plate on the upside of second supporting plate;
It is fastened transversely to second column and the second bottom plate on the downside of second supporting plate, described second
Bolt wears second bottom plate, second supporting plate, second connecting plate and second upper mounted plate, institute successively
The bottom for stating the second bolt is attached at second bottom plate, second nut be screwed together in the top of second bolt and
It is attached at second upper mounted plate.
The utility model basement prefabricated board loose tool inner supporting device further improvement is that, in addition to adjustable length
At least one down tube of section, the down tube are articulated between two neighboring support tube.
The utility model basement prefabricated board loose tool inner supporting device further improvement is that, the support tube bag
Include:
Sleeve pipe, the guiding through described sleeve pipe opposite sides is offered along the length direction of described sleeve pipe in described sleeve pipe
Strip hole;
The connecting tube being inserted in described sleeve pipe, offer in the connecting tube and pass through along the length direction of the connecting tube
Wear the regulation strip hole of the connecting tube opposite sides;
3rd bolt, through the guiding strip hole and the regulation strip hole, adjust described sleeve pipe and the connecting tube
Relative position, and coordinate the 3rd nut connection described sleeve pipe and connecting tube;And
4th bolt, regulation strip hole and described sleeve pipe through the side wall of connecting tube one correspond to the guiding strip of side wall
Hole, and coordinate the 4th nut fastening described sleeve pipe and the connecting tube.
The utility model basement prefabricated board loose tool inner supporting device further improvement is that, the support tube also wraps
Pad is included, pad is in described sleeve pipe and under the 3rd nut and the 4th nut.
Brief description of the drawings
Fig. 1 is the front view of the inner supporting device of the utility model basement prefabricated board loose tool.
Fig. 2 is the top view of the inner supporting device of the utility model basement prefabricated board loose tool.
Fig. 3 is the enlarged diagram of A in Fig. 1.
Fig. 4 is the enlarged diagram of B in Fig. 1.
Fig. 5 is the sleeve pipe of inner supporting device and the connection signal of connecting tube of the utility model basement prefabricated board loose tool
Figure.
Fig. 6 is Fig. 5 top view.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Refering to Fig. 1, it is shown that the front view of the inner supporting device of the utility model basement prefabricated board loose tool.Refering to Fig. 2,
Show the top view of the inner supporting device of the utility model basement prefabricated board loose tool.With reference to shown in Fig. 1 and Fig. 2, this practicality
The inner supporting device of Novel underground room prefabricated board loose tool is used to be supported in the first prefabricated board 10 and the second prefabricated board being oppositely arranged
Between 11, the first prefabricated board 10 and the second prefabricated board 11 are erected on the edge of basement bed course 12, basement prefabricated board fetal membrane
Inner supporting device includes:It is erected in basement and is attached at least one first column 20 of the first prefabricated board 10;It is erected on
Basement is interior and is attached at least one second column 21 of the second prefabricated board 11;It is fixed at least one the of the first column 20
One articulated elements 30;It is correspondingly arranged with the first articulated elements 30 and is fixed at least one second articulated elements 50 of the second column 21;With
And at least one support tube 40 of adjustable in length, it is connected between the first articulated elements 30 and the second articulated elements 50, so as to support
Pipe 40 is stayed between the first column 20 and the second column 21.The first column and second is coordinated using support tube in the utility model
Column is stayed between the first prefabricated board and the second prefabricated board, so as to realize the reinforcing branch to the first prefabricated board and the second prefabricated board
Support.The adjustable in length of support tube, so as to be adjusted when installing support tube according to distance between the first column and the second column
The length of support tube, for support tube using being articulated and connected, support tube can rotate is actually needed change support tube so as to basis
Direction, applicability is wide.It is detachably connected between first column and the second column and support tube, convenient disassembly, is easy to recovery week
Turn, repeat and recycle, reduce construction cost.
Refering to Fig. 3, it is shown that A enlarged diagram in Fig. 1.With reference to shown in Fig. 1 to Fig. 3, as the utility model underground
One better embodiment of the inner supporting device of room prefabricated board loose tool, the first articulated elements 30 include:It is fastened transversely to the first column
20 the first supporting plate 31;And the first connecting plate 32 of the first end of support tube 40 is fastened transversely to, the first connecting plate 32 is placed in
On one supporting plate 31, the first connecting plate 32 and the first supporting plate 31 are worn by the first bolt 33 and coordinate the first nut 34 to connect, from
And the first connecting plate 32 can rotate on the first supporting plate 31 around the first bolt 33.So, support tube 40 can be in the horizontal direction
On rotated around the first column 20, so as to during support tube 40 be installed can according to actual conditions adjustment support tube 40
And the first angle between column 20, compared to support tube 40 directly is fixed on into the first column 20, support tube 40 and first are stood
Post 20 is articulated and connected, and convenient dismounting, can be used in turn.
In the present embodiment, the end of support tube 40 is blocked using steel plate, so as to which the first connecting plate 32 is fastened transversely to
On the steel plate of the end of support tube 40.The end of first connecting plate 32 is curved end, so as to facilitate the first connecting plate 32 around
One bolt 33 rotates, and prevents the right angle of the end of the first connecting plate 32 from hindering to rotate.
Refering to Fig. 4, it is shown that B enlarged diagram in Fig. 1.With reference to shown in Fig. 1 to Fig. 4, the second articulated elements 50 includes:It is horizontal
To the second supporting plate 51 for being fixed on the second column 21;And second connecting plate 52 at the end of support tube 40 second is fastened transversely to, the
Two connecting plates 52 are placed on the second supporting plate 51, are worn the second connecting plate 52 and the second supporting plate 51 by the second bolt 53 and are coordinated the
Two nuts 54 connect, so as to which the second connecting plate 52 can rotate on the second supporting plate 51 around the second bolt 53.So, support tube 40
It can be rotated in the horizontal direction around the second column 21, so that can be according to actual feelings during support tube 40 is installed
Angle between the condition adjustment column 21 of support tube 40 and second, compared to support tube 40 directly is fixed on into the second column 21, will be propped up
The column 21 of stay tube 40 and second is articulated and connected, and convenient dismounting, can be used in turn.In the present embodiment, the end of support tube 40 uses
Steel plate blocks, on the steel plate so as to the end that the second connecting plate 32 is fastened transversely into support tube 40.Second connecting plate 52
End is curved end, so as to facilitate the second connecting plate 52 to be rotated around the second bolt 53, prevents the end of the second connecting plate 52
Right angle hinders to rotate.
As a better embodiment of the inner supporting device of the utility model basement prefabricated board loose tool, the first articulated elements
30 also include:It is fastened transversely to the first column 20 and positioned at the first upper mounted plate 35 of the upside of the first supporting plate 31;It is fastened transversely to
First column 20 and the first bottom plate 36 on the downside of the first supporting plate 31, the first bolt 33 wear first time fixation successively
Plate 36, the first supporting plate 31, the first connecting plate 32 and the first upper mounted plate 35, the bottom of the first bolt 33 are attached at first time fixation
Plate 36, the first nut 34 are screwed together in the top of the first bolt 33 and are attached at the first upper mounted plate 35, so as to the first connecting plate 32
It can be rotated on the first supporting plate 31 around the first bolt 33.
In the present embodiment, the first supporting plate 31, the first upper mounted plate 35 and the first bottom plate 36 are perpendicularly fixed at
On one drawknot plate 37, and the first drawknot plate 37 is sticked and is fixed on the first column 20, so as to realize the He of the first upper mounted plate 35
First bottom plate 36 is fastened transversely on the first column 20.First drawknot plate 37 plays drawknot and consolidates fixed effect so that
The connection of first supporting plate 31, the first upper mounted plate 35 and the first bottom plate 36 and the first column 20 is more firm.
So increase the first upper mounted plate 35 and the first bottom plate 36, the first bolt in the both sides up and down of the first supporting plate 31
33 bottom is attached at the first bottom plate 36, and the first nut 34 is attached at the first upper mounted plate 35, you can by the first bolt 33
It is fixed, so as to which on the one hand, the first overlapped connecting plate 32 and the first supporting plate 31 are only to be passed through with the first bolt 33, convenient
The relative rotation of first connecting plate 32 and the first supporting plate 31, flexible adjustment, prevent from directly using nut by the He of the first connecting plate 32
When first supporting plate 31 is fastenedly connected, the first connecting plate 32 and the first supporting plate 31 are difficult to rotate.On the other hand, the first upper mounted plate 35
Upper end progress to the first bolt 33 is spacing, and the first bottom plate 36 carries out spacing to the lower end of the first bolt 33, that is to say, that
If there are three blocks of plates of upper, middle and lower, pressure can be shared, so as to ensure the vertical stabilization of the first bolt 33, prevents the first bolt
33 there is the problem of tilting and deforming and have influence on the stress of other rod member.
With reference to shown in Fig. 1 to Fig. 4, the second articulated elements 50 also includes:It is fastened transversely to the second column 21 and is located at the second support
Second upper mounted plate 55 of the upside of plate 51;Second time for being fastened transversely to the second column 21 and being located at the downside of the second supporting plate 51 is solid
Fixed board 56, the second bolt 53 wear the second bottom plate 56, the second supporting plate 51, the second connecting plate 52 and the second upper mounted plate successively
55, the bottom of the second bolt 53 is attached at the second bottom plate 56, and the second nut 54 is screwed together in the top of the second bolt 53 and patch
Located at the second upper mounted plate 55, so as to which the second connecting plate 52 can rotate on the second supporting plate 51 around the second bolt 53.
In the present embodiment, the second supporting plate 51, the second upper mounted plate 55 and the second bottom plate 56 are perpendicularly fixed at
On two drawknot plates 57, and the second drawknot plate 57 is sticked and is fixed on the second column 21, so as to realize the He of the second upper mounted plate 55
Second bottom plate 56 is fastened transversely on the second column 21.Second drawknot plate 57 plays drawknot and consolidates fixed effect so that
The connection of second supporting plate 51, the second upper mounted plate 55 and the second bottom plate 56 and the second column 21 is more firm.
So increase the second upper mounted plate 55 and the second bottom plate 56, the second bolt in the both sides up and down of the second supporting plate 51
55 bottom is attached at the second bottom plate 56, and the second nut 54 is attached at the second upper mounted plate 55, you can by the second bolt 55
It is fixed, so as to which on the one hand, the second overlapped connecting plate 52 and the second supporting plate 51 are only to be passed through with the second bolt 53, convenient
The relative rotation of second connecting plate 52 and the second supporting plate 51, flexible adjustment, prevent from directly using nut by the He of the second connecting plate 52
When second supporting plate 51 is fastenedly connected, the second connecting plate 52 and the second supporting plate 51 are difficult to rotate, on the other hand, the second upper mounted plate 55
Upper end progress to the second bolt 53 is spacing, and the second bottom plate 56 carries out spacing to the lower end of the second bolt 53, that is to say, that
If there are three blocks of plates of upper, middle and lower, pressure can be shared, so as to ensure the vertical stabilization of the second bolt 53, prevents the second bolt
53 there is the problem of tilting and deforming and have influence on the stress of other rod member.
The present apparatus also includes at least one down tube 60 of adjustable in length, and down tube 60 is articulated with two neighboring support tube
Between 40, down tube 60 plays a part of support and connects two neighboring support tube 40, adds the overall stability of the present apparatus.
Refering to Fig. 5, it is shown that the sleeve pipe of the inner supporting device of the utility model basement prefabricated board loose tool and connecting tube
Connection diagram.Refering to Fig. 6, it is shown that Fig. 5 top view.With reference to shown in Fig. 1, Fig. 5 and Fig. 6, support tube 40 includes:Sleeve pipe
41, the guiding strip hole through sleeve pipe opposite sides is offered on sleeve pipe 41 along the length direction of sleeve pipe 41;It is inserted in sleeve pipe
Connecting tube 42 in 41, the tune through the opposite sides of connecting tube 42 is offered along the length direction of connecting tube 42 in connecting tube 42
Strip hole is saved, the relative position of strip hole and regulation strip hole, adjusting sleeve pipe 41 and connecting tube 42 is passed through by the 3rd bolt 43,
And coordinate the fixed sleeving 41 of the 3rd nut 43 and connecting tube 42;And the 4th bolt 44, through the regulation of the side wall of connecting tube 42 1
The guiding strip hole of strip hole and the corresponding side wall of sleeve pipe 41, and coordinate the 4th nut tightening casing 41 and connecting tube 42.Pass through edge
Regulation strip hole and be oriented to the relative position of strip hole adjusting sleeve pipe 41 and connecting tube 42, so as to stretch or shorten support tube 40
Length, and coordinate the tightening casing 41 of the 4th nut 44 and connecting tube 42.Relative it can so be moved using sleeve pipe 41 and connecting tube 42
Move to realize the adjustable length of support tube 40, can be according to the first column 20 and the second column during support tube 40 is installed
The distance between 21 move the relative position of sleeve pipe 41 and connecting tube 42, adjusting sleeve pipe 41 and connecting tube 42 so that adjust it
Support tube 40 afterwards can be stayed between the first column 20 and the second column 21, so as to prefabricated to the first prefabricated board 10 and second
Plate 11 is supported fixation.
In the present embodiment, support tube 40 also includes pad 45, and pad is on sleeve pipe 41 and positioned at the 3rd nut 43 and the
Under four nuts 44, so as to strengthen the firm connection between sleeve pipe 41 and connecting tube 42.
The construction method of the inner supporting device of the utility model basement prefabricated board loose tool is illustrated below.Construction
Method comprises the following steps:
The first prefabricated board 10 and the second prefabricated board 11 being oppositely arranged are provided, by the first prefabricated board 10 and the second prefabricated board 11
It is erected on the edge of basement bed course 12;
At least one first column 20 is provided, the first column 20 is erected in basement and is attached at the first prefabricated board
10;
At least one second column 21 is provided, the second column 21 is erected in basement and is attached at the second prefabricated board
11;
At least one first articulated elements 30 is provided, the first articulated elements 30 is fixed on the first column 20;
At least one second articulated elements 50 is provided, the second articulated elements 50 and the first articulated elements 30 are correspondingly arranged and fixed
In the second column 21;And
At least one support tube 40 of adjustable in length is provided, support tube 40 is connected to the first articulated elements 30 and the second hinge
Between fitting 50 so that support tube 40 is rotationally stayed between the first column 20 and the second column 21.
Specifically, the first prefabricated board 10 and the second prefabricated board 11 is erected on after the edge of basement bed course, it is necessary to will
The position of first prefabricated board 10 and the second prefabricated board 11 is fixed.First prefabricated board 10 is resisted against using the first column 20, adopted
Be resisted against the second prefabricated board 11 with the second column 21, by support tube 40 be articulated and connected in the first column 20 and the second column 21 it
Between, so as to which support tube 40 is supported between the first column 20 and the second column 21, so the first prefabricated board 10 and second is prefabricated
Plate 11 is stood tightly against to be fixed in sidewall of basement.First column 20, the second column 21 and the convenient disassembly of support tube 40, can week
Turn to use, accelerating construction progress.
As a better embodiment of the construction method of the inner supporting device of the utility model basement prefabricated board loose tool,
First prefabricated board 10 and the second prefabricated board 11 are erected on to the edge of basement bed course 12 to be included:Pouring the bed course 12 of basement
During reserve the first groove 120 and the second groove 121 that are oppositely arranged, the first groove 120 and the second groove 121 are located at pad
Close to the edge of sidewall of basement on layer 12;First prefabricated board 10 is inserted in the first groove 120, by the second prefabricated board 11
It is inserted in the second groove 121.So, the first groove 120 can carry out spacing, the second groove to the bottom of the first prefabricated board 10
The bottom progress of 121 pair of second prefabricated board 11 is spacing, prevents the bottom of the first prefabricated board 10 and the bottom hair of the second prefabricated board 11
Raw skew, enhance the stability of structural base, so as in subsequent installation support tube 40 to the bottom of the first prefabricated board 10 and the
The top of two prefabricated boards 11 is supported fixation, finally realizes to the bottom of the first prefabricated board 10 and the reinforcing of the second prefabricated board 11
Support.
As a better embodiment of the construction method of the inner supporting device of the utility model basement prefabricated board loose tool,
There is provided the first articulated elements 30 includes:
First supporting plate 31 is provided, the first supporting plate 31 is fastened transversely to the first column 20;
First connecting plate 32 is provided, the first connecting plate 32 is fastened transversely to the first end of support tube 40, by the first connection
Plate 32 is placed on the first supporting plate 31;
First upper mounted plate 35 is provided, the first upper mounted plate 35 is fastened transversely to the first column 20 and is located at the first support
The upside of plate 31;
First bottom plate 36 is provided, the first bottom plate 36 is fastened transversely to the first column 20 and is located at the first support
The downside of plate 31;
First bottom plate 36, the first supporting plate 31 are worn, on the first connecting plate 32 and first using the first bolt 33 successively
Fixed plate 35, the first connecting plate 32 is rotated on the first supporting plate 31 around the first bolt 33 and arrives appropriate position to adjust support tube 40
Put;
The bottom of first bolt 33 is attached at the first bottom plate 36, the first nut 34 is screwed together in the first bolt 33
Top and it is attached at the first upper mounted plate 35 and tightens fixation;
So by fixing the first upper mounted plate 35 and the first bottom plate 36 in the both sides up and down of the first supporting plate 31, upwards
Lift the first bolt 33 so that the bottom of the first bolt 33 is attached at the first bottom plate 36, and the first nut 34 is screwed down
It is dynamic, so as to be attached at the first upper mounted plate 35, you can the first bolt 33 is fixed on into the first upper mounted plate 35 and first time fixation
Plate 36, so as to, on the one hand, the first overlapped connecting plate 32 and the first supporting plate 31 are only passed through with the first bolt 33, side
Just the relative rotation of the first connecting plate 32 and the first supporting plate 31, flexible adjustment, prevent from directly using nut by the first connecting plate 32
When being fastenedly connected with the first supporting plate 31, the first connecting plate 32 and the first supporting plate 31 are compressed and are difficult to rotate.On the other hand, first
Upper end progress of the upper mounted plate 35 to the first bolt 33 is spacing, and the first bottom plate 36 is limited the lower end of the first bolt 33
Position, that is to say, that if there are three blocks of plates of upper, middle and lower, pressure can be shared, so as to ensure the vertical stabilization of the first bolt 33,
Prevent the first bolt 33 from the problem of tilting and deforming and have influence on the stress of other rod member occur.
There is provided the second articulated elements 50 includes:
Second supporting plate 51 is provided, the second supporting plate 51 is fastened transversely to the second column 21;
Second connecting plate 52 is provided, the second connecting plate 52 is fastened transversely to the second end of support tube 40, by the second connection
Plate 52 is placed on the second supporting plate 51;
Second upper mounted plate 55 is provided, the second upper mounted plate 55 is fastened transversely to the second column 21 and is located at the second support
The upside of plate 51;
Second bottom plate 56 is provided, the second bottom plate 56 is fastened transversely to the second column 21 and is located at the second support
The downside of plate 51;
Second bottom plate 56, the second supporting plate 51 are worn, on the second connecting plate 52 and second using the second bolt 53 successively
Fixed plate 55, the second connecting plate 52 is rotated on the second supporting plate 51 around the second bolt 53 and arrives appropriate position to adjust support tube 40
Put;
The bottom of second bolt 53 is attached at the second bottom plate 56, the second nut 54 is screwed together in the second bolt 53
Top and it is attached at the second upper mounted plate 55 and tightens fixation.
So by fixing the second upper mounted plate 55 and the second bottom plate 56 in the both sides up and down of the second supporting plate 51, upwards
Lift the second bolt 53 so that the bottom of the second bolt 53 is attached at the second bottom plate 56, and the second nut 54 is screwed down
It is dynamic, so as to be attached at the second upper mounted plate 55, you can the second bolt 53 is fixed on into the second upper mounted plate 55 and second time fixation
Plate 56, so as to which overlapped the second connecting plate 52 and the second supporting plate 51 are only to be passed through with the second bolt 53, facilitate the second company
The relative rotation of the supporting plate 51 of fishplate bar 52 and second, flexible adjustment, prevent from directly using nut by the second connecting plate 52 and the second support
When plate 51 is fastenedly connected, the second connecting plate 52 and the second supporting plate 51 are compressed and are difficult to rotate, on the other hand, the second upper mounted plate
The upper end progress of 55 pair of second bolt 53 is spacing, and lower end progress of second bottom plate 56 to the second bolt 53 is spacing, that is,
Say, if there are three blocks of plates of upper, middle and lower, pressure can be shared, so as to ensure the vertical stabilization of the second bolt 53, prevent second
There is the problem of tilting and deforming and have influence on the stress of other rod member in bolt 53.
There is provided support tube 40 includes:
Sleeve pipe 41 is provided, the guiding strip hole through the opposite sides of sleeve pipe 41 is opened up along the length direction of sleeve pipe 41;
Connecting tube 42 is provided, the regulation strip through the opposite sides of connecting tube 42 is opened up along the length direction of connecting tube 42
Hole;
Connecting tube 42 is inserted in sleeve pipe 41;
3rd bolt 43 and the 3rd nut are provided, by the 3rd bolt 43 through strip hole and regulation strip hole is oriented to, adjusted
The relative position of sleeve pipe 41 and connecting tube 42, and coordinate the 3rd nut connection sleeve pipe 41 and connecting tube 42;And
4th bolt 44 and the 4th nut are provided, by the 4th bolt 44 through the side wall of connecting tube 42 1 regulation strip hole and
The guiding strip hole of the corresponding side wall of sleeve pipe 41 simultaneously coordinates the 4th nut tightening casing 41 and connecting tube 42.
So, the 3rd bolt 43 can only move being oriented in strip hole, be oriented to strip hole and play a part of guiding, can allow tune
Regulating device slides along strip hole is oriented to, prevent sleeve pipe 41 and the internal diameter of connecting tube 42 small one and large one when, do not adjusted along straight line
During length, the stress of each component changes.4th bolt 44 passes through the regulation strip hole and sleeve pipe of the side wall of connecting tube 42 1
The guiding strip hole of 41 corresponding side walls, so as to which the side wall of connecting tube 42 and sleeve pipe 41 be fastened, prevents connecting tube 42 from covering
Teetertottered in pipe 41.
When adjusting the length of support tube 40, unscrew the 4th nut, connecting tube 42 is stretched or shorten along strip hole is oriented to
With the relative position of sleeve pipe 41, the 4th nut is tightened after modulating correct position, connecting tube 42 and sleeve pipe 41 can thus be entered
Row is fastenedly connected.
In the present embodiment, the 4th nut uses wing nut, and adjusting wing nut manually without instrument can is carried out
Fastening.
, can sleeve pipe so as to facilitate demounting bolt by plugging and being bolted sleeve pipe 41 and connecting tube 42
41 and the position of connecting tube 42 relatively move and realize the adjustable length of support tube 40., can during support tube 40 is installed
Sleeve pipe 41 and connecting tube 42, adjusting sleeve pipe 41 and connecting tube are moved according to the distance between the first column 20 and the second column 21
42 relative position so that the support tube 40 after adjusting can be stayed between the first column 20 and the second column 21, so as to
Fixation is supported to the first prefabricated board 10 and the second prefabricated board 11.
The inner supporting device of the utility model basement prefabricated board loose tool has the beneficial effect that:
The inner supporting device of the utility model basement prefabricated board loose tool by least one first column by being erected on ground
It is lower indoor and be attached at the first prefabricated board, at least one second column is erected in basement and is attached at the second prefabricated board,
It is articulated with using support tube between the first column and the second column, i.e., support tube coordinates the first column and the second column to stay on the
Between one prefabricated board and the second prefabricated board, so as to realize the reinforcing support to the first prefabricated board and the second prefabricated board.Support tube
Adjustable in length, so as to which the length of support tube can be adjusted according to distance between the first column and the second column when installing support tube
Degree, using being articulated and connected, support tube can rotate so as to according to the direction for being actually needed change support tube, applicability support tube
Extensively.It is detachably connected between first column and the second column and support tube, convenient disassembly, is easy to recovery to have enough to meet the need, repeats recovery
Utilize, greatly reduce the input of flitch, steel pipe, save substantial amounts of working procedure, reduce labour's input, reduction is constructed into
This.The utility model replaces brick mold using prefabricated board loose tool, and lifting is convenient, saves brick using amount, saves and the ring such as builds, plasters by laying bricks or stones
Section, environmental pollution is small, than brick mold plus environmental protection.Prefabricated board can arbitrarily be cut, any splicing, can be in difficulty of construction the earth
Side uses, and can accelerate manufacturing schedule.The physical dimension of prefabricated board is accurate, Stability Analysis of Structures, does not go out during backfill incumbent
What deforms, caved in, and has impermeability and frost resistance, convenient, fast.The surface of prefabricated board is smooth, without plastering processing just
Waterproof matrix can be directly done, saves to plaster and dries required time and labour, further shorten the duration.
The utility model is described in detail above in association with accompanying drawing embodiment, those skilled in the art can root
Many variations example is made to the utility model according to described above.Thus, some details in embodiment should not be formed to this practicality
New restriction, the utility model will be used as the scope of protection of the utility model using the scope that appended claims define.
Claims (6)
1. a kind of inner supporting device of basement prefabricated board loose tool, for being supported in the first prefabricated board being oppositely arranged and second pre-
Between making sheet, first prefabricated board and second prefabricated board are erected on the edge of basement bed course, it is characterised in that described
The inner supporting device of basement prefabricated board loose tool includes:
It is erected in basement and is attached at least one first column of the first prefabricated board;
It is erected in basement and is attached at least one second column of the second prefabricated board;
It is fixed at least one first articulated elements of first column;
It is correspondingly arranged with first articulated elements and is fixed at least one second articulated elements of second column;And
At least one support tube of adjustable in length, it is connected between first articulated elements and second articulated elements, so as to
The support tube is stayed between first column and second column.
2. the inner supporting device of basement prefabricated board loose tool as claimed in claim 1, it is characterised in that first articulated elements
Including:
It is fastened transversely to the first supporting plate of first column;And
The first connecting plate of the support tube first end is fastened transversely to, first connecting plate is placed on first supporting plate,
First connecting plate is worn by the first bolt to connect with first supporting plate and the first nut of cooperation, so as to which described first connects
Fishplate bar can rotate on first supporting plate around first bolt;
Second articulated elements includes:
It is fastened transversely to the second supporting plate of second column;And
Second connecting plate at the end of support tube second is fastened transversely to, second connecting plate is placed on second supporting plate,
Second connecting plate is worn by the second bolt to connect with second supporting plate and the second nut of cooperation, so as to which described second connects
Fishplate bar can rotate on second supporting plate around second bolt.
3. the inner supporting device of basement prefabricated board loose tool as claimed in claim 2, it is characterised in that first articulated elements
Also include:
It is fastened transversely to first column and the first upper mounted plate on the upside of first supporting plate;
It is fastened transversely to first column and the first bottom plate on the downside of first supporting plate, first bolt
Wear first bottom plate, first supporting plate, first connecting plate and first upper mounted plate successively, described
The bottom of one bolt is attached at first bottom plate, and first nut is screwed together in the top of first bolt and is sticked
In first upper mounted plate;
Second articulated elements also includes:
It is fastened transversely to second column and the second upper mounted plate on the upside of second supporting plate;
It is fastened transversely to second column and the second bottom plate on the downside of second supporting plate, second bolt
Wear second bottom plate, second supporting plate, second connecting plate and second upper mounted plate successively, described
The bottom of two bolts is attached at second bottom plate, and second nut is screwed together in the top of second bolt and is sticked
In second upper mounted plate.
4. the inner supporting device of basement prefabricated board loose tool as claimed in claim 1, it is characterised in that also including adjustable length
At least one down tube of section, the down tube are articulated between two neighboring support tube.
5. the inner supporting device of basement prefabricated board loose tool as claimed in claim 1, it is characterised in that the support tube bag
Include:
Sleeve pipe, the guiding strip through described sleeve pipe opposite sides is offered in described sleeve pipe along the length direction of described sleeve pipe
Hole;
The connecting tube being inserted in described sleeve pipe, offered along the length direction of the connecting tube through institute in the connecting tube
State the regulation strip hole of connecting tube opposite sides;
3rd bolt, through the guiding strip hole and the regulation strip hole, the phase of regulation described sleeve pipe and the connecting tube
To position, and coordinate the 3rd nut connection described sleeve pipe and the connecting tube;And
4th bolt, regulation strip hole and described sleeve pipe through the side wall of connecting tube one correspond to the guiding strip hole of side wall,
And coordinate the 4th nut fastening described sleeve pipe and the connecting tube.
6. the inner supporting device of basement prefabricated board loose tool as claimed in claim 5, it is characterised in that the support tube also wraps
Pad is included, pad is in described sleeve pipe and under the 3rd nut and the 4th nut.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720959443.2U CN207032297U (en) | 2017-08-03 | 2017-08-03 | The inner supporting device of basement prefabricated board loose tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720959443.2U CN207032297U (en) | 2017-08-03 | 2017-08-03 | The inner supporting device of basement prefabricated board loose tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207032297U true CN207032297U (en) | 2018-02-23 |
Family
ID=61474168
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720959443.2U Active CN207032297U (en) | 2017-08-03 | 2017-08-03 | The inner supporting device of basement prefabricated board loose tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207032297U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107313451A (en) * | 2017-08-03 | 2017-11-03 | 中建八局浙江建设有限公司 | The inner supporting device and its construction method of basement prefabricated board loose tool |
-
2017
- 2017-08-03 CN CN201720959443.2U patent/CN207032297U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107313451A (en) * | 2017-08-03 | 2017-11-03 | 中建八局浙江建设有限公司 | The inner supporting device and its construction method of basement prefabricated board loose tool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101818527B (en) | Assembled integral shear wall structure system and construction method thereof | |
CN101956458B (en) | Construction method of overlong and superhigh single-side fair-faced concrete wall | |
CN103821364B (en) | The construction method of reinforced concrete water pond | |
CN109736353A (en) | Construction method of composite single-side formwork deep foundation pit basement outer wall | |
CN101818539A (en) | Assembled integral building and construction method thereof | |
CN105040970A (en) | Comprehensive gymnasium high formwork support system and construction method of comprehensive gymnasium high formwork support system | |
CN207130622U (en) | A kind of flower basket type anticollision barrier construction formwork | |
CN113338617B (en) | One-time pouring template system for roof ultrahigh parapet and construction method thereof | |
CN103806647A (en) | Assembly and disassembly process for large-span concrete bidirectional dense rib beam formwork case | |
CN105952146A (en) | Early-removal construction method | |
CN108951840A (en) | Based on setting bracket single side formwork basement arc external wall construction method | |
CN104153495A (en) | Multifunctional lightweight concrete curtain wall connecting structure | |
CN207032297U (en) | The inner supporting device of basement prefabricated board loose tool | |
CN107313451A (en) | The inner supporting device and its construction method of basement prefabricated board loose tool | |
CN212784485U (en) | Inner supporting device of distribution box | |
CN204001309U (en) | A kind of syndeton of Multi-function light concrete curtain wall | |
CN109441099A (en) | Basement single side formwork system and the method for utilizing its outer wall of basement of constructing | |
CN106245770A (en) | Expanded letter variable cross-section annular stiff beam construction method | |
CN111663770B (en) | Quick and easy combination and shaping mold for post-cast strip of cast-in-place slab and construction method of quick and easy combination and shaping mold | |
CN108951699B (en) | Festival segmentation removal centre form and support of utility tunnel | |
CN208330400U (en) | A kind of tunnel pin-connected panel ditch template system | |
CN207934055U (en) | A kind of prefabricated cushion cap template and prefabricated cushion cap loose tool | |
CN202970006U (en) | L-shaped prefabricated clear water bleacher plate installation construction structure | |
CN201695548U (en) | Large steam lightweight aerated concrete panel | |
CN207700643U (en) | Waterproof layer terrace template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |