CN209369118U - A kind of connection system of steel frame and prefabricated panel - Google Patents

A kind of connection system of steel frame and prefabricated panel Download PDF

Info

Publication number
CN209369118U
CN209369118U CN201821632057.3U CN201821632057U CN209369118U CN 209369118 U CN209369118 U CN 209369118U CN 201821632057 U CN201821632057 U CN 201821632057U CN 209369118 U CN209369118 U CN 209369118U
Authority
CN
China
Prior art keywords
prefabricated panel
steel
connection system
connector
horizontal girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821632057.3U
Other languages
Chinese (zh)
Inventor
王静峰
赵鹏
汪皖黔
潘广东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei University of Technology
Original Assignee
Hefei University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei University of Technology filed Critical Hefei University of Technology
Priority to CN201821632057.3U priority Critical patent/CN209369118U/en
Application granted granted Critical
Publication of CN209369118U publication Critical patent/CN209369118U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model belongs to building engineering field, more particularly to the connection system of a kind of steel frame and prefabricated panel, the steel frame includes vertical steel column and horizontal girder steel, every horizontal girder steel is vertically set between two vertical steel columns, the connection system further includes the first connector and the second connector, the horizontal girder steel of first connector connection top and the upper end of prefabricated panel, the horizontal girder steel of second connector connection lower section and the lower end of prefabricated panel, the prefabricated panel array are arranged at the empty frames that upper and lower two horizontal girder steels and adjacent vertical steel column are formed.The advantages of utility model, is: connecting the built-in fitting in horizontal girder steel and prefabricated panel by connector, realizes the connection of prefabricated panel and steel frame.

Description

A kind of connection system of steel frame and prefabricated panel
Technical field
The utility model relates to building engineering field, the connection system of especially a kind of steel frame and prefabricated panel.
Background technique
In recent years, China's assembled architecture flourishes, and especially assembling type steel structure is built, and enters a new hair Exhibition period.Prefabricated assembled component is readily produced and safeguards that economic benefit is very high, and utilization scope is extensive, and it is current to meet China Architectural industrialization development trend.Steel frame can be very good to realize the prefabrication and assembly construction of structure, while have that space is big, cloth Set the features such as flexible.
In the prior art, prefabricated panel is big with volume due to being self-possessed, and construction technology is comparatively laborious, is not formed really Prefabricated construction, while construction quality is difficult to ensure.Lacking good connection type is a maximum defect in the system.Cause This, needs to research and develop new connection system.
Utility model content
In order to optimize the connection type between steel frame and prefabricated panel, for this purpose, the utility model provides a kind of steel frame With the connection system of prefabricated panel.
To achieve the above object, the utility model uses following technical scheme:
A kind of connection system of steel frame and prefabricated panel, the steel frame include vertical steel column and several horizontal steel Beam, every horizontal girder steel are vertically set between adjacent vertical steel column, which further includes the first connector and second Connector, the horizontal girder steel of the first connector connection top and the upper end of prefabricated panel, the water of the second connector connection lower section The lower end of flat girder steel and prefabricated panel, the prefabricated panel array setting are formed in upper and lower two horizontal girder steels and vertical steel column Empty frames at.
Optimization, first connector includes upper fixed part and the upper limit portion of interconnection, upper fixed part and level Girder steel is fixedly connected, and prefabricated panel upper end is connect by built-in fitting thereon with upper limit portion;Second connector includes lower solid Determine portion and lower limit portion, lower fixed part is fixedly connected with the horizontal girder steel of lower section, and prefabricated panel lower end is pre-buried by thereon Part is connect with lower limit portion.
Optimization, the lower fixed part extends to form holding for support prefabricated panel bottom on the direction far from horizontal girder steel Support portion.
Optimization, strip hole and lower strip hole, upper strip hole and lower length are respectively arranged in upper limit portion, lower limit portion The length direction in hole is vertical.
Optimization, the length direction and the length direction of horizontal girder steel of lower strip hole are parallel.
Optimization, it is provided with ribs between upper fixed part and upper limit portion, is set between lower fixed part and lower limit portion It is equipped with lower ribs.
Optimization, the prefabricated panel includes by the wallboard keel shoe of C-type steel assembly, for filling and wrapping up wallboard keel The light polymer of frame, the built-in fitting pass through wallboard keel shoe and are fixed on prefabricated panel.
Optimization, the C-type steel corresponding position that built-in fitting is arranged is enclosed with keel reinforcer, sets on the keel reinforcer It is equipped with the hole that built-in fitting passes through.
Optimization, the length of supporting part is less than or equal to the face of prefabricated panel lining keel shoe in the outer part to prefabricated panel The distance of medial surface.
Optimization, there is the construction joint of certain distance between two horizontally adjacent prefabricated panels, vertical adjacent two It is filled between a prefabricated panel and on construction joint and is used for water-proof, heat-insulating, heat-preserving material.
Utility model has the advantages that
(1) the utility model connects the built-in fitting in horizontal girder steel and prefabricated panel by connector, realizes prefabricated panel With the connection of steel frame.
(2) in the utility model connector different location use corresponding first connector and the second connector, second Connector is subjected to the weight of prefabricated panel, also cooperates the first connector that prefabricated panel is made to bear external wind load, wind lotus Load acts on prefabricated panel, is then transmitted on connector by built-in fitting, is eventually transferred on steel frame.
(3) in the utility model strip hole position and direction setting, realize prefabricated panel up and down, left and right two dimensions Position is adjusted, and is overcome because of built-in fitting position inaccuracy and/or connector and bring installation due to horizontal girder steel link position deviation It is inconvenient.
(4) in the utility model the structure and material of prefabricated panel use so that prefabricated panel meets the requirements in intensity In the case where, it can reduce the weight of prefabricated panel, the section stiffness of such second connector support prefabricated panel requires can be with It reduces.
(5) the utility model deadlight keel shoe uses light gauge cold-formed steel shape, and with light weight, intensity is high, performance is good The advantages that good.Installation built-in fitting reduces the intensity of C-type steel in order to prevent, so the C-type steel at setting built-in fitting wraps up keel Reinforcer.
(6) structural strength of connector can be enhanced in connector setting ribs.
(7) length of supporting part is less than or equal on the inside of the face of prefabricated panel lining keel shoe in the outer part to prefabricated panel The distance in face is the construction joint of an entirety between two adjacent prefabricated panels, pacifies in prefabricated panel on such vertical direction After dress, whole construction joint filling is handled, filling as a whole, water-proof, heat-insulating, heat-preserving effect is more preferable.
(8) there is certain construction joint between two prefabricated panels horizontally adjacent in the utility model, filling processing can be with The water-proof, heat-insulating, heat-preserving performance for the metope that all prefabricated panels are formed after installing is improved, and construction joint can also improve the system Aseismic deformability.
Detailed description of the invention
Fig. 1 is the main perspective view of connection system of a kind of steel frame of the utility model and prefabricated panel.
Fig. 2 is the sectional view of the I-I of Fig. 1.
Fig. 3 is the enlarged drawing in Fig. 2 at A.
Fig. 4 is the enlarged drawing in Fig. 2 at B.
Fig. 5 is the perspective view of steel frame.
Fig. 6 is the cross-sectional view of prefabricated panel.
Fig. 7 is the perspective view of keel reinforcer.
Fig. 8 is the perspective view of prefabricated panel.
Fig. 9 is the perspective view of connector.
Figure 10 is the main view of built-in fitting.
The meaning of label symbol is as follows in figure:
The vertical horizontal girder steel of steel column 102- of 1- steel frame 101-
Light polymeric layer of the 2- prefabricated panel 201-C fashioned iron 202- for filling
Light polymeric layer 204- keel reinforcer of the 203- for package
Fixed part on 31- the first connector 311- upper limit portion 312-
Strip hole on the upper ribs 314- of 313-
Fixed part on 32- the second connector 321- upper limit portion 322-
The supporting part strip hole 325- on the upper ribs 324- of 323-
4- built-in fitting 401- internal thread sleeve 402- anchor slab 403- bolt
5- construction joint 6-PVC pipe
Specific embodiment
Embodiment 1
As shown in figures 1-8, the connection system of a kind of steel frame and prefabricated panel, including steel frame 1, prefabricated panel 2, connection Part.The embodiment is described in detail each component in the system and each component connection type respectively.
Steel frame 1
As shown in figure 5, steel frame 1 includes that 2 vertical horizontal 102,2 horizontal girder steels 102 of girder steel of steel column 101 and 2 piece hang down It is straight to be arranged between two vertical steel columns 101.Vertical steel column 101 is square bar tubing string, the width and thickness size point of column section Not Wei 400mm, 14mm, horizontal girder steel 102 uses the horizontal girder steel 102 of H-type, deck-molding, deck-siding, web thickness, edge of a wing thickness Respectively 400mm, 200mm, 8mm, 13mm.By taking two neighbouring horizontal girder steels 102 as an example.
Prefabricated panel 2
As shown in figs 6-8, prefabricated panel 2 includes by the assembled wallboard keel shoe of C-type steel 201, for the light polymerization of filling Nitride layer 202 and light polymeric layer 203 for package, built-in fitting 4 pass through wallboard keel shoe and are fixed on prefabricated panel 2.
201 corresponding position of C-type steel that built-in fitting 4 is arranged is enclosed with keel reinforcer 204, sets on keel reinforcer 204 It is equipped with the hole that built-in fitting 4 passes through.C-type steel is light gauge cold-formed steel shape.
As shown in Figure 10, wherein built-in fitting 4 includes internal thread sleeve 401, anchor slab 402, bolt 403, and internal thread sleeve 401 is vertical In the hole of thickness direction setting and one end in C-type steel 201 and keel reinforcer 204 of prefabricated panel 2, internal thread sleeve 401 The other end be fixed with anchor slab 402, prevent internal thread sleeve 401 from falling off out of C-type steel 201.Keel reinforcer 204 be it is U-shaped, The aperture at its edge of a wing, hole size, position should hole sizes corresponding to C-type steel 201, position consistency.
After built-in fitting 4 is fixed on wallboard steelframe, the placement of wallboard steelframe pours light polymer in a mold, eventually forms pre- Prefabricated panel 2 is stretched out in wallboard 2 processed, the end that wherein internal thread sleeve 401 passes through C-type steel 201.Internal thread sleeve 401 is arranged in wallboard On steelframe, built-in fitting 4 can be increased in this way and bear external pulling force without extracting from prefabricated panel 2.By designing anchor slab 402 and keel reinforcer 204, guarantee the intensity and safety of connecting structure.
Prefabricated panel 2 pour after thickness 200mm, 2 height H of prefabricated panel0=H-t2(20~30) mm, wherein H is layer Height, i.e., the difference in height of adjacent two horizontal girder steels, t2For the thickness of the second connector 32.20~30mm is neighbouring two Gap size between prefabricated panel 2.
The light polymer dry density is not more than 800kg/m3, by mineral base binder, mortar mixture and polyphenyl second Alkene constitute novel wall material, by material component difference can be divided into the light polymer of gypsum base, the light polymer of cement base and other Light polymer.
Connector
As shown in figure 9, connector includes the first connector 31 and the second connector 32, the first connector 31 connection top Horizontal girder steel 102 and prefabricated panel 2 upper end, the second connector 32 connection lower section horizontal girder steel 102 and prefabricated panel 2 Lower end.Prefabricated panel 2 is arranged by connector array in every adjacent two horizontal girder steels 102 and the formation of vertical steel column 101 Empty frames at.
First connector 31 includes upper fixed part 312 and the upper limit portion 311 of connection, upper fixed part 312 and horizontal girder steel 102 is fixed, and the upper end of prefabricated panel 2 is connect by the pre-buried built-in fitting 4 inside it in one end with upper limit portion 311.Second Connector 32 includes lower fixed part 322 and lower limit portion 321, and lower fixed part 322 is fixedly connected with the horizontal girder steel 102 of lower section, 2 lower end of prefabricated panel is connect by the pre-buried built-in fitting 4 inside it in one end with lower limit portion 321.Lower fixed part 322 is to remote Side from horizontal girder steel 102 upwardly extends the supporting part 325 as 2 bottom of support prefabricated panel, and the weight of prefabricated panel 2 is main It is born by the second connector 32, external wind load is mainly born by the first connector 31 and the second connector 32 jointly.Wind load It acts on prefabricated panel 2, is then transmitted on connector, is eventually transferred on steel frame 1 by built-in fitting 4.
Strip hole 314 and lower strip hole 324, upper strip hole are respectively arranged in upper limit portion 311, lower limit portion 321 314 is vertical with the length direction of lower strip hole 324.Optimization, the length of the length direction of lower strip hole 324 and horizontal girder steel 102 It is parallel to spend direction.The length of upper strip hole 314 and lower strip hole 324 is slotted hole, and the length of slotted hole is 3 times of diameter, Error when error and installation to meet the production of prefabricated panel 1 and connector.
Ribs 313, lower fixed part 322 and lower limit portion are provided between upper fixed part 312 and upper limit portion 311 Lower ribs 323 is provided between 321.Connector thickness, width can be determined according to supporting part 325,2 stress size of prefabricated panel The thickness of degree, upper ribs 313 and lower ribs 323.
Steel frame 1, prefabricated panel 2, connector connection structure
Picture 1-4 and shown in Fig. 9, internal thread sleeve 401 stretches out the end of prefabricated panel 2, and bolt 403 passes through strip hole 304 Internal thread sleeve 401 is screwed in, prefabricated panel 2 is fixed on horizontal girder steel 102.
The length of supporting part 325 is equal to the face of 2 lining keel shoe of prefabricated panel in the outer part to 2 medial surface of prefabricated panel Distance.Upper fixed part 312 and lower fixed part 322 and respective horizontal girder steel 102 are fixed by welding.Connector is hanging down Directly move back and forth on the direction of horizontal girder steel 102 and vertical steel column 101, built-in fitting 4 is in upper strip hole 314 and lower strip hole 324 fixed positions finally facilitate all prefabricated panels 2 in suitable model to realize the adjustment on 2 three-dimensional of prefabricated panel Enclose interior fixation.Upper fixed part 312 and the orthogonal connection in upper limit portion 311, lower fixed part 322 and lower limit portion 321 hang down mutually It is direct-connected to connect.
There is the construction joint 5 of certain distance between two horizontally adjacent prefabricated panels 2, vertical two adjacent prefabricated panels The bridge cut-off for water-proof, heat-insulating, heat-preserving is filled between 2 and on construction joint 5.Filler material is the mixing of polyethylene stick, marine glue Object.The size of construction joint 5 is 20-30mm.
Other embodiment, the length of supporting part 325 are less than the face of 2 lining keel shoe of prefabricated panel in the outer part in advance The distance of 2 medial surface of wallboard processed, and wallboard keel shoe is located on supporting part 325 in the projection on 325 direction of supporting part.
Optimization, it is provided with rubber pad on supporting part 325, flexibility between prefabricated panel 2 and connector can in this way taken It connects, reduces the destruction to prefabricated panel 2.There is certain buffer function under geological process, improve the deformability of structure, most The flexible connection of prefabricated panel 2 and main structure is realized eventually.
Embodiment 2
The production method for the system that steel frame 1 and prefabricated panel 2 connect in embodiment 1, comprising the following steps:
S1, production C-type steel and aperture, are assembled into wallboard keel shoe for C-type steel, by 204 sets of keel reinforcer in wallboard dragon One end of internal thread sleeve 401 and anchor slab 402 are fixed and form built-in fitting 4 by the corresponding position of skeleton, and internal thread sleeve 401 passes through dragon Hole on bone reinforcer 204,201 corresponding position of C-type steel, the cloth on the inside of two C-type steel junctions of wallboard keel shoe upper end Pvc pipe 6 is set, as the hole for hoist for hoisting prefabricated wallboard 2, wallboard keel shoe is placed in mold, pours light polymerization Object forms prefabricated panel 2;Assembled horizontal girder steel 102 and vertical steel column 101 form steel frame 1;Make the first connector 31 and Two connectors 32.
S2,102 lower surface of horizontal girder steel that the first connector 31 is fixed on to top, the second connector 32 is fixed on Prefabricated panel 2 is lifted into corresponding position by the upper surface of the horizontal girder steel 102 of lower section, and bolt is passed through connector and is screwed into internal thread Sleeve 401, so that prefabricated panel is fixed on steel frame 1;
S3, scene carry out assembly by connector and horizontal girder steel 102, and in-situ precast wallboard 2 is alternately spelled in the horizontal direction Dress, it is successively assembled then up.Prefabricated panel 2 all after installation, is filled in the gap between two adjacent prefabricated panels 2 Heat retaining and insulated waterproof material.
The above is only the preferred embodiments that the utility model is created, and are not intended to limit the utility model creation, all Made any modifications, equivalent replacements, and improvements etc., should be included in this within the spirit and principle that the utility model is created Within the protection scope that utility model is created.

Claims (10)

1. the connection system of a kind of steel frame and prefabricated panel, the steel frame (1) includes vertical steel column (101) and several water Flat girder steel (102), every horizontal girder steel (102) are vertically set between adjacent vertical steel column (101), which is characterized in that should Connection system further includes the first connector (31) and the second connector (32), the horizontal girder steel of the first connector (31) connection top (102) and the upper end of prefabricated panel (2), the second connector (32) connect the horizontal girder steel (102) and prefabricated panel (2) of lower section Lower end, prefabricated panel (2) array setting is in upper and lower two horizontal girder steels (102) and vertical steel column (101) formation At empty frames.
2. the connection system of a kind of steel frame according to claim 1 and prefabricated panel, which is characterized in that described first connects Fitting (31) includes upper fixed part (312) and upper limit portion (311) of interconnection, upper fixed part (312) and horizontal girder steel (102) it is fixedly connected, prefabricated panel (2) upper end is connect by built-in fitting (4) thereon with upper limit portion (311);Second connects Fitting (32) includes lower fixed part (322) and lower limit portion (321), and lower fixed part (322) and the horizontal girder steel (102) of lower section are solid Fixed connection, prefabricated panel (2) lower end are connect by built-in fitting (4) thereon with lower limit portion (321).
3. the connection system of a kind of steel frame according to claim 2 and prefabricated panel, which is characterized in that the lower fixation Portion (322) extends to form the supporting part (325) of support prefabricated panel (2) bottom on the direction far from horizontal girder steel (102).
4. the connection system of a kind of steel frame according to claim 2 and prefabricated panel, which is characterized in that upper limit portion (311), be respectively arranged with strip hole (314) and lower strip hole (324) on lower limit portion (321), upper strip hole (314) and under The length direction of strip hole (324) is vertical.
5. the connection system of a kind of steel frame according to claim 4 and prefabricated panel, which is characterized in that lower strip hole (324) length direction and the length direction of horizontal girder steel (102) are parallel.
6. the connection system of a kind of steel frame according to claim 2 and prefabricated panel, which is characterized in that upper fixed part (312) it is provided between upper limit portion (311) ribs (313), between lower fixed part (322) and lower limit portion (321) It is provided with lower ribs (323).
7. the connection system of a kind of steel frame according to claim 2 and prefabricated panel, which is characterized in that the dry wall Plate (2) includes the wallboard keel shoe by C-type steel (201) assembly, the light polymer for filling and wrapping up wallboard keel shoe, described Built-in fitting (4) passes through wallboard keel shoe and is fixed on prefabricated panel (2).
8. the connection system of a kind of steel frame according to claim 6 or 7 and prefabricated panel, which is characterized in that setting is pre- C-type steel (201) corresponding position of embedded part (4) is enclosed with keel reinforcer (204), is arranged on the keel reinforcer (204) The hole for thering is built-in fitting (4) to pass through.
9. the connection system of a kind of steel frame according to claim 3 and prefabricated panel, which is characterized in that supporting part (325) length be less than or equal to the face of prefabricated panel (2) lining keel shoe in the outer part to prefabricated panel (2) medial surface away from From.
10. the connection system of a kind of steel frame according to claim 3 and prefabricated panel, which is characterized in that the level There is the construction joint of certain distance between two adjacent prefabricated panels (2), between vertical two adjacent prefabricated panels (2) and applies Work is sewed on filled with for water-proof, heat-insulating, heat-preserving material.
CN201821632057.3U 2018-09-29 2018-09-29 A kind of connection system of steel frame and prefabricated panel Active CN209369118U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821632057.3U CN209369118U (en) 2018-09-29 2018-09-29 A kind of connection system of steel frame and prefabricated panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821632057.3U CN209369118U (en) 2018-09-29 2018-09-29 A kind of connection system of steel frame and prefabricated panel

Publications (1)

Publication Number Publication Date
CN209369118U true CN209369118U (en) 2019-09-10

Family

ID=67838284

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821632057.3U Active CN209369118U (en) 2018-09-29 2018-09-29 A kind of connection system of steel frame and prefabricated panel

Country Status (1)

Country Link
CN (1) CN209369118U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109322424A (en) * 2018-09-29 2019-02-12 合肥工业大学 A kind of the connection system and production method of steel frame and prefabricated panel
CN112127501A (en) * 2020-09-16 2020-12-25 天津利起亨建筑安装工程有限公司 Combined wall structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109322424A (en) * 2018-09-29 2019-02-12 合肥工业大学 A kind of the connection system and production method of steel frame and prefabricated panel
CN112127501A (en) * 2020-09-16 2020-12-25 天津利起亨建筑安装工程有限公司 Combined wall structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN104652830B (en) The construction method that a kind of Prefabricated construction panel and prefabricated panel are built
CN104453014B (en) The method of attachment of 3D printing filled wall and constructional column and attachment structure
CN106245678B (en) Outer wall of basement single side formwork construction method based on steel pipe truss
CN105113660B (en) A kind of construction method for the constructional column constructed simultaneously with frame structure filling wall
CN106088327A (en) Manufacture method based on the assembling frame post that 3D prints
CN109322425A (en) A kind of plug-in connection system of combined wall board and preparation method thereof
CN105155724A (en) Construction method of structural column for simultaneous construction with frame-structured filled wall
CN209369118U (en) A kind of connection system of steel frame and prefabricated panel
CN104358337A (en) Light-weight composite floor slab structure for assembling integral prefabricated double thin plates, and construction method
CN109386050A (en) A kind of multi-layer combined type house structure
CN207812741U (en) Pre-manufactured steel structure overlapped shear wall
CN209384462U (en) A kind of plug-in connection system of combined wall board
CN105970976A (en) Vertical connection structure for supporting row piles and main underground structure
CN101761187B (en) Construction separating device for concrete of vertical structure in same wall body with different labels as well as pouring and tamping method thereof
CN109322424A (en) A kind of the connection system and production method of steel frame and prefabricated panel
CN209837372U (en) Wall structure member built by cutting barred rocks by prestress machine
CN106759885B (en) Cold formed steel structure house inner wall structural system
CN105113663A (en) Assembly type constructional column constructed simultaneously with framework structure infill wall
CN105113662A (en) Assembled constructional column constructed together with frame structure infilled wall
CN213268513U (en) Outer wall structure
CN211714007U (en) Construction elevator foundation structure
CN104711979B (en) A kind of pile under water reinforces self-locking plate and its reinforcement means
CN204491947U (en) A kind of laminated floor slab
CN210238895U (en) Hollow superstructure of no roof beam
CN203160237U (en) Anti-floating anchor rod structure of raft