CN107607363A - Sampler and sampling method - Google Patents

Sampler and sampling method Download PDF

Info

Publication number
CN107607363A
CN107607363A CN201610551587.4A CN201610551587A CN107607363A CN 107607363 A CN107607363 A CN 107607363A CN 201610551587 A CN201610551587 A CN 201610551587A CN 107607363 A CN107607363 A CN 107607363A
Authority
CN
China
Prior art keywords
port
drainage tube
extracted
sample
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610551587.4A
Other languages
Chinese (zh)
Other versions
CN107607363B (en
Inventor
吴景晖
姚力军
应迪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO CHAMPION NEW MATERIALS Co Ltd
Original Assignee
NINGBO CHAMPION NEW MATERIALS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO CHAMPION NEW MATERIALS Co Ltd filed Critical NINGBO CHAMPION NEW MATERIALS Co Ltd
Priority to CN201610551587.4A priority Critical patent/CN107607363B/en
Publication of CN107607363A publication Critical patent/CN107607363A/en
Application granted granted Critical
Publication of CN107607363B publication Critical patent/CN107607363B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

A kind of sampler and sampling method, wherein, sampler includes:First drainage tube, the first drainage tube have first port and second port and the Centronics port between first port and second port, and first port is suitable to be passed through sample to be extracted;Second drainage tube, the second drainage tube have the 3rd port and the 4th port, and the 3rd port is connected with Centronics port, and collection device, collection device is connected with the 4th port;Device of air is protected, the protection device of air is connected with second port, and the protection device of air is suitable to be passed through protective gas to second port.The sampler is easy to clear up after operation.

Description

Sampler and sampling method
Technical field
The present invention relates to the production field of chemical material, more particularly to a kind of sampler and sampling method.
Background technology
During the generation that the chemical material of intense reaction easily occurs with air at some, produced to analyze each operation Journey, control technological parameter to the chemical material in production process, it is necessary to be sampled.
Such as, it is necessary to be sampled to titanium tetrachloride during titanium tetrachloride is produced.
At present, the device of titanium tetrachloride sampling device and production titanium tetrachloride is integrally formed.Titanium tetrachloride sampling device bag Include drainage tube, sampling valve and sampling mouth.During sampling, the titanium tetrachloride of production process flows through drainage tube, sampling valve and sampling plug Mouthful, and titanium tetrachloride is extracted from sampling mouth using needle tubing.
However, the sampler of prior art is not easily cleaned after sampling terminates.
The content of the invention
The present invention solves the problems, such as to be to provide a kind of sampler and sampling method, so that sampler is easily cleared up.
To solve the above problems, the present invention provides a kind of sampler, including:First drainage tube, the first drainage tube have First port and second port and the Centronics port between first port and second port, first port are suitable to be passed through Sample to be extracted;Second drainage tube, the second drainage tube have the 3rd port and the 4th port, and the 3rd port connects with Centronics port It is logical;Collection device, collection device are connected with the 4th port;Device of air is protected, the protection device of air is connected with second port, institute Protection device of air is stated to be suitable to be passed through protective gas to second port.
Optionally, the protective gas is argon gas, nitrogen, oxygen, carbon dioxide, Krypton or radon gas.
Optionally, in addition to:Air extractor, the air extractor are connected with second port.
Optionally, the air extractor is aspiration pump, pump bowl or negative pressure drainage ball.
Optionally, in addition to:First valve, is arranged between second port and air extractor.
Optionally, in addition to:First monitoring device, the first monitoring device are connected with the first drainage tube, the first monitoring device Between second port and Centronics port, first monitoring device is suitable to monitor sample to be extracted in sampling process the Position in one drainage tube.
Optionally, first monitoring device is first liquid level gauge or first pressure table.
Optionally, the second drainage tube is vertically arranged relative to the first drainage tube.
Optionally, the collection device is vacuum tank, the sealing jar equipped with inert gas or is more than sky equipped with density The opening jar of the inert gas of gas.
Optionally, in addition to:Second valve, it is arranged between second port and protection device of air.
Optionally, in addition to:3rd valve, is arranged between Centronics port and first port;4th valve, it is arranged at Between Two-port netwerk and Centronics port.
Optionally, first drainage tube also has additional port, and the additional port is located at second port and intermediate ends Between mouthful;The sampler also includes:3rd drainage tube, a port of the 3rd drainage tube are drawn by additional port and first Flow tube connects, and the another port of the 3rd drainage tube connects with the 4th port.
Optionally, in addition to:5th valve, is arranged between additional port and Centronics port;6th valve, it is arranged at Between the two-port of three drainage tubes.
Optionally, the quantity of the 3rd drainage tube is one or more.
Optionally, in addition to:Second monitoring device, the second monitoring device are connected with the 3rd drainage tube, the second monitoring device Between two ports of the 3rd drainage tube, second monitoring device exists suitable for monitoring sample to be extracted in sampling process Position in 3rd drainage tube.
Optionally, second monitoring device is second liquid level gauge or second pressure gauge.
Optionally, in addition to:7th valve, it is arranged between the 4th port and collection device.
Optionally, the material of the sample to be extracted is titanium tetrachloride, the concentrated sulfuric acid or sulfur trioxide.
The present invention also provides a kind of method that sampler using above-mentioned offer is sampled, including:Using protection gas Device carries out the first inflation, makes to be full of protective gas in the first drainage tube and the second drainage tube;After carrying out the first inflation, it will wait to carry Take sample to be passed through from first port, sample to be extracted is flowed along the first drainage tube and the second drainage tube;Using collection device The sample to be extracted from the outflow of the second drainage tube is collected in the 4th port;After collecting sample to be extracted, entered using protection device of air Row second is inflated, and makes sample to be extracted discharge remaining in the first drainage tube and the second drainage tube.
Compared with prior art, technical scheme has advantages below:
Sampler provided by the invention includes protection device of air, and the protection device of air is suitable to be passed through guarantor to second port Protect gas.Protection device of air can be given in the first drainage tube and the second drainage tube and be filled with protective gas, by the in sampling process Remaining sample to be extracted discharge in one drainage tube and the second drainage tube.Avoid remaining in the first drainage tube and the second drainage tube More sample to be extracted so that sampler is easy to clear up.Meanwhile avoid during sampler is cleared up, first draws Remaining sample to be extracted is discharged in external environment in flow tube and the second drainage tube.So as to avoid that environment is polluted.
Secondly, protection device of air can give the first drainage tube and the second drainage tube to be full of protective gas, so as to discharge first Air in drainage tube and the second drainage tube, the sample to be extracted in sampling process is avoided to occur with the contact with moisture in air Reaction, so as to avoid the remaining bi-products in the tube wall of the first drainage tube and the second drainage tube.So that sampler is easy to Cleaning.
Again, sampler is independently of the device for producing sample to be extracted, individually sampler can be carried out assembling and Dismounting.So that the early-stage preparations of sampling are relatively simple.
Sampling method provided by the invention, before sample to be extracted is passed through into first port, carried out using protection device of air First inflation so that protective gas is full of in the first drainage tube and the second drainage tube, so as to avoid what is be passed through from first port Sample and air contact to be extracted.The sample to be extracted that avoids being passed through from first port and the reaction of moisture in air and generate pair Product, avoid the remaining bi-products in the tube wall of the first drainage tube and the second drainage tube.After collecting sample to be extracted, using protection Device of air carries out the second inflation so that remaining sample to be extracted discharge in the first drainage tube and the second drainage tube, avoids the The more sample to be extracted of remaining in one drainage tube and the second drainage tube.So that after collecting sample to be extracted, sampler is easy to Cleaning.
Brief description of the drawings
Fig. 1 is a kind of structural representation of sampler;
Fig. 2 is the structural representation of the sampler provided in one embodiment of the invention;
Fig. 3 is the flow chart of sampling method in one embodiment of the invention;
Fig. 4 is the structural representation of the sampler provided in another embodiment of the present invention;
Fig. 5 is the flow chart of sampling method in another embodiment of the present invention.
Embodiment
As described in background, sampler of the prior art is difficult to clear up.
Fig. 1 is a kind of sampler, and sampler includes:Drainage tube 10;First valve F1 and the second valve F2, positioned at drainage tube Between 10 two-port;Mouth M is sampled, in the drainage tube 10 between the first valve F2 and the second valve F3.
For test tube 20 to produce a part for the device of chemical example, test tube 20 has P1 ports and P2 ports;In test tube 20 It is provided with the 3rd valve F3.Two-port of the two-port of drainage tube 10 respectively with test tube 20 connects.3rd valve F3 is arranged at test tube 20 Two-port between.Test tube 20 and sampler are integrally formed.The chemical example is titanium tetrachloride.
When producing titanium tetrachloride, titanium tetrachloride is passed through by P1 ports, is flowed out by the 3rd valve F3 from P2 ports.Need to sample When, the first valve F2 and the second valve F3 are first opened, is then shut off the 3rd valve F3, now, titanium tetrachloride flows through from drainage tube 10.Open Mouth M is sampled, titanium tetrachloride is extracted at sampling mouth M using needle tubing.
However, above-mentioned sampler, after sampling terminates, sampler is not easily cleaned, it has been investigated that, reason is:
Before titanium tetrachloride is extracted, it is necessary to open sampling mouth M, part titanium tetrachloride exposure in atmosphere with air Moisture react, the accessory substance of formation is attached to the inwall of drainage tube 10 near sampling mouth M.Tetrachloro is extracted using needle tubing During changing titanium, due to residual air in the syringe needle of needle tubing, titanium tetrachloride easily with the moisture in air remaining in needle tubing React, the accessory substance of formation is attached in syringe needle.In addition, after sampling terminates, there is substantial amounts of four chlorination in drainage tube Titanium remaining.
To sum up so that after sampling terminates, the cleaning difficulty increase to sampler.
On this basis, the present invention provides a kind of sampler, including:First drainage tube, the first drainage tube have first Port and second port and the Centronics port between first port and second port, first port are suitable to be passed through to wait to carry Take sample;Second drainage tube, the second drainage tube have the 3rd port and the 4th port, and the 3rd port connects with Centronics port;Receive Acquisition means, collection device are connected with the 4th port;Device of air is protected, the protection device of air is connected with second port, the guarantor Shield device of air is suitable to be passed through protective gas to second port.
The protection device of air is suitable to be passed through protective gas to second port.On the one hand, protect device of air can be to first Protective gas is filled with drainage tube and the second drainage tube, will be remaining in the first drainage tube and the second drainage tube in sampling process Sample discharge to be extracted.Avoid the sample to be extracted that remaining is more in the first drainage tube and the second drainage tube.On the other hand, protect Shield device of air can give the first drainage tube and the second drainage tube to be full of protective gas, so as to discharge the first drainage tube and the second drainage Air in pipe, the sample to be extracted in sampling process is avoided to be reacted with the contact with moisture in air, so as to avoid Remaining bi-products in the tube wall of first drainage tube and the second drainage tube.So that sampler is easy to clear up.
It is understandable to enable the above objects, features and advantages of the present invention to become apparent, below in conjunction with the accompanying drawings to the present invention Specific embodiment be described in detail.
Fig. 2 is the structural representation of the sampler provided in one embodiment of the invention.
The sampler includes:First drainage tube M1, the first drainage tube M1 have first port A and second port B, with And the Centronics port between first port A and second port B, first port A are suitable to be passed through sample to be extracted;Second drainage Pipe M2, the second drainage tube M2 have the 3rd port and the 4th port, and the 3rd port connects with Centronics port;Collection device 100, receive Acquisition means 100 are connected with the 4th port;Device of air 110 is protected, the protection device of air 110 is connected with second port B, the guarantor Shield device of air 110 is suitable to be passed through protective gas to second port B.
The sample to be extracted can be to be easy to the chemical substance that moisture in air reacts, such as titanium tetrachloride, dense sulphur Acid or sulfur trioxide.The sample to be extracted can also be other chemical substances.
In the present embodiment, the second drainage tube M2 is vertically arranged relative to the first drainage tube M1.In other embodiments, second Drainage tube can be with an angle relative to the first drainage tube.
Protective gas is stored with the protection device of air 110.
The protective gas is argon gas, nitrogen, oxygen, carbon dioxide, Krypton or radon gas.
The protection device of air 110 is suitable to be passed through protective gas to second port B.On the one hand, protect device of air 110 can To protective gas is filled with the first drainage tube M1 and the second drainage tube M2, the first drainage tube and second are drained in sampling process Remaining sample to be extracted discharge in pipe.Avoid the sample to be extracted that remaining is more in the first drainage tube M1 and the second drainage tube M2 Product so that sampler is easy to clear up.Meanwhile avoid during sampler is cleared up, the first drainage tube M1 and second draws Remaining sample to be extracted is discharged in external environment in flow tube M2.So as to avoid that environment is polluted.
On the other hand, protection device of air 110 can be full of protective gas to the first drainage tube M1 and the second drainage tube M2, from And the air in the first drainage tube M1 and the second drainage tube M2 is discharged, avoid sample to be extracted and the first drainage in sampling process The contact with moisture in air in pipe M1 and the second drainage tube M2 and react, so as to avoid in the first drainage tube M1 and second Remaining bi-products in drainage tube M2 tube wall.So that sampler is easy to clear up.
The sampler also includes:Air extractor 120, the air extractor 120 are connected with second port B.
The air extractor 120 is suitable to reduce the pressure in the first drainage tube M1 and the second drainage tube M2.
The air extractor 120 is aspiration pump, pump bowl or negative pressure drainage ball.
When sample to be extracted is being passed through into first port A during producing sample technique to be extracted, produced The sample to be extracted mobility of itself in journey, without the effect of air extractor 120, sample to be extracted also can be along the first drainage tube M1 and the second drainage tube M2 inwall are flowed.
When first port A is connected with storage device, in the case of sample to be extracted is stored in storage device, it is necessary to using taking out Device of air 120 reduces the air pressure in the first drainage tube M1 so that sample to be extracted is along the first drainage tube M1 from first port A Flowed to second port B direction.Meanwhile when the liquid level of sample to be extracted reaches Centronics port, sample to be extracted can flow through Second drainage tube M2 reaches the 4th port.
The sampler also includes:First valve F11, is arranged between second port B and air extractor 120.Open First valve F11, air extractor 120 connect with second port B;Close the first valve F11, air extractor 120 and second port B Block.
The sampler also includes:Second valve F12, it is arranged between second port B and protection device of air 110.Beat The second valve F12 is opened, protection device of air 110 connects with second port B;Close the second valve F12, protect device of air 110 and the Two-port netwerk B is blocked.
The sampler also includes:3rd valve F13, it is arranged between Centronics port and first port A;4th valve F14, it is arranged between second port B and Centronics port.
The sampler also includes:First monitoring device 130, the first monitoring device 130 are connected with the first drainage tube M1, Between second port B and Centronics port, first monitoring device 130 is suitable in sampling process first monitoring device 130 Position of the middle monitoring sample to be extracted in the first drainage tube M1.
First monitoring device 130 is first liquid level gauge or first pressure table.
The collection device 100 is suitable to collect the sample to be extracted from the outflow of the 4th port.
In the present embodiment, the collection device 100 is vacuum tank, by the inside and outside pressure difference of vacuum tank, by the 4th port In the sample to be extracted suction vacuum tank of outflow.In other embodiments, the collection device is the sealing equipped with inert gas Jar.The collection device can be the opening jar for the inert gas for being more than air equipped with density.The collection device also may be used Think the sealing jar equipped with dry air.
The sampler also includes:7th valve F17, it is arranged between the 4th port and collection device 100.7th valve Door F17 be suitable to control collection device 100 in collect sample to be extracted number.
In the present embodiment, sampler can be carried out individually independently of the device for producing sample to be extracted to sampler Assembly and disassembly.So that the early-stage preparations of sampling are relatively simple.
Accordingly, the present invention also provides a kind of method being sampled using above-mentioned sampler, refer to Fig. 3, including Following steps:
S01:First inflation is carried out using protection device of air, made in the first drainage tube and the second drainage tube full of protection gas Body;
S02:After carrying out the first inflation, sample to be extracted is passed through from first port, sample to be extracted is drawn along first Flow tube and the flowing of the second drainage tube;
S03:Sample to be extracted from the outflow of the second drainage tube is collected in the 4th port using collection device;
S04:After collecting sample to be extracted, the second inflation is carried out using protection device of air, draws the first drainage tube and second Remaining sample to be extracted discharge in flow tube.
Above-mentioned sampling method is described in detail with reference to reference to figure 2.
With reference to figure 2, the first inflation is carried out using protection device of air 110, made in the first drainage tube M1 and the second drainage tube M2 Full of protective gas.
Specifically, closing the first valve F11 and the 7th valve F17, the second valve F12, the 3rd valve F13 and the 4th are opened Valve F14, the first inflation is carried out using protection device of air 110, made in the first drainage tube M1 and the second drainage tube M2 full of protection Gas.
With reference to figure 2, after carrying out the first inflation, sample to be extracted is passed through from first port A, makes sample to be extracted along the One drainage tube M1 and the second drainage tube M2 flowings.
In one embodiment, first port A is connected with storage device, and sample to be extracted is stored with the storage device Product.
Specifically, after carrying out the first inflation, the second valve F12 and the 3rd valve F13 is closed, by first port A and storage Device connects;After first port A is connected with storage device, air extractor 120 is opened;Then the first valve F11 and the 3rd is opened Valve F13, sample to be extracted is set to be flowed along the first drainage tube M1 and the second drainage tube M2 inwall.
In another embodiment, first port A is connected with producing the device of sample to be extracted.In the case, by The sample to be extracted mobility of itself in production process, without the effect of air extractor 120, sample to be extracted also can be along first Drainage tube M1 and the second drainage tube M2 inwall are flowed.
Specifically, after carrying out the first inflation, the second valve F12 and the 3rd valve F13 is closed, by first port A and production The device connection of sample to be extracted;After first port A be connected with producing the device of sample to be extracted, open the first valve F11 with 3rd valve F13, sample to be extracted is set to be flowed along the first drainage tube M1 and the second drainage tube M2 inwall.
Sample to be extracted along the first drainage tube M1 and the second drainage tube M2 flow while, according to the first monitoring device 130 monitoring situation, the first valve F11 is adjusted, controls sample to be extracted along the first drainage tube M1's and the second drainage tube M2 The speed of inwall flowing.
With reference to figure 2, the sample to be extracted from the second drainage tube M2 outflows is collected in the 4th port using collection device 100.
Specifically, after sample to be extracted is flow between Centronics port and second port B, the 7th valve F17 is opened, is collected Device 100 collects the sample to be extracted from the second drainage tube M2 outflows in the 4th port.
With reference to figure 2, after collecting sample to be extracted, the second inflation is carried out using protection device of air 110, makes the first drainage tube M1 With sample to be extracted discharge remaining in the second drainage tube M2.
When first port A is connected with storage device, in the presence of the second inflation, the first drainage tube M1 and second are drawn Remaining sample to be extracted is discharged in storage device in flow tube M2.
When first port A is connected with producing the device of sample to be extracted, in the presence of the second inflation, by the first drainage Remaining sample to be extracted is discharged in the device for producing sample to be extracted in pipe M1 and the second drainage tube M2.
Sampling method provided by the invention, before sample to be extracted is passed through into first port, carried out using protection device of air First inflation so that protective gas is full of in the first drainage tube and the second drainage tube, so as to avoid what is be passed through from first port Sample and air contact to be extracted.The sample to be extracted that avoids being passed through from first port and the reaction of moisture in air and generate pair Product, avoid the remaining bi-products in the tube wall of the first drainage tube and the second drainage tube.After collecting sample to be extracted, using protection Device of air carries out the second inflation so that remaining sample to be extracted discharge in the first drainage tube and the second drainage tube, avoids the The more sample to be extracted of remaining in one drainage tube and the second drainage tube.So that after collecting sample to be extracted, sampler is easy to Cleaning.
Fig. 4 is the structural representation of the sampler provided in another embodiment of the present invention.
The sampler includes:First drainage tube M3, the first drainage tube M3 have first port C and second port D, with And the Centronics port between first port C and second port D, the additional terminals between second port D and Centronics port Mouthful;First port C is suitable to be passed through sample to be extracted;Second drainage tube M4, the second drainage tube M4 has the 3rd port and the 4th end Mouthful, the 3rd port connects with Centronics port;Collection device 200, collection device 200 are connected with the 4th port;3rd drainage tube M5, 3rd drainage tube M5 a port is connected by additional port with the first drainage tube M3, the 3rd drainage tube M5 another port Connected with the 4th port;Device of air 210 is protected, the protection device of air 210 is connected with second port D, the protection device of air 210 are suitable to be passed through protective gas to second port D.
The material of the sample to be extracted with reference to the foregoing embodiments, is no longer described in detail.
Second drainage tube M4 and the first drainage tube M3 position relationship with reference to the foregoing embodiments in the second drainage tube M2 and One drainage tube M1 position relationship, is no longer described in detail.
The effect and the selection of specific device of the protection device of air 210 are with reference to the foregoing embodiments.The protective gas Material is with reference to the foregoing embodiments.
The sampler also includes:Air extractor 220, the air extractor 220 are connected with second port D.
The effect of the air extractor 220 and the selection of specific device with reference to the foregoing embodiments, are no longer described in detail.
Because the sampler includes the 3rd drainage tube M5, on the one hand, the 3rd drainage tube M5 can slow down sample to be extracted The speed that product flow in the first drainage tube M3 and the second drainage tube M4 so that sampling process is easily controlled.On the other hand, it is central Between the first drainage tube M3 between port and additional port when damaging, first port C can be utilized between Centronics port The first drainage tube M3, the second drainage tube M4, first between the 3rd drainage tube M5 and additional port and second port D draw Flow tube M3 is sampled.
The quantity of the 3rd drainage tube M5 is one or more.In the present embodiment, with the 3rd drainage tube M5's Quantity is one and is used as example.In other embodiments, when the quantity of the 3rd drainage tube is multiple, multiple 3rd drainage tubes are simultaneously Connection.
First port C can be connected with storage device, and sample to be extracted is stored in the storage device, now need to be evacuated Device 220 is worked, and the air pressure in the first drainage tube M3 is reduced so that sample to be extracted is along the first drainage tube M3 from first end Mouth C to second port D direction flowing.Meanwhile when the liquid level of sample to be extracted reaches Centronics port, sample to be extracted can flow Reach the 4th port through the second drainage tube M4.Sample to be extracted can also flow through the 3rd drainage tube M5.
The first port C can also be connected with producing the device of sample to be extracted.Now, by waiting to carry in production process The mobility of sample itself is taken, without the effect of air extractor 220, sample to be extracted also can be along the first drainage tube M3, second Drainage tube M4 and the 3rd drainage tube M5 inwall are flowed.
The sampler also includes:First valve F21, is arranged between second port D and air extractor 220.Open First valve F21, air extractor 220 connect with second port D;Close the first valve F21, air extractor 220 and second port D Block.
The sampler also includes:Second valve F22, it is arranged between second port D and protection device of air 210.Beat The second valve F22 is opened, protection device of air 210 connects with second port D;Close the second valve F22, protect device of air 210 and the Two-port netwerk D is blocked.
The sampler also includes:3rd valve F23, it is arranged between Centronics port and first port C;4th valve F24, it is arranged between second port D and additional port.
In the present embodiment, the sampler also includes:5th valve F25, be arranged at additional port and Centronics port it Between;6th valve F26, it is arranged between the 3rd drainage tube M5 two-port.
The 5th valve F25's and the 6th valve F26 act as:(1) by adjusting the 5th valve F25, control and wait to carry Take flow velocity of the sample in the first drainage tube M3;By adjusting the 6th valve F26, sample to be extracted is controlled in the 3rd drainage tube M5 In flow velocity;(2) after sampling terminates, the 5th valve F25 and the 6th valve F26 can be closed by intersecting so that by first Remaining sample to be extracted discharge in drainage tube M3, the second drainage tube M4 and the 3rd drainage tube M5.
The sampler also includes:First monitoring device 230, the first monitoring device 230 are connected with the first drainage tube M3, Between second port D and Centronics port, first monitoring device 230 is suitable in sampling process first monitoring device 230 Position of the middle monitoring sample to be extracted in the first drainage tube M3.
First monitoring device 230 is first liquid level gauge or first pressure table.
The sampler also includes:Second monitoring device (not shown), the second monitoring device connect with the 3rd drainage tube M5 Connect, the second monitoring device is arranged between the 3rd drainage tube M5 two-port, and second monitoring device is suitable in sampling process Position of the middle monitoring sample to be extracted in the 3rd drainage tube M5.
Second monitoring device is second liquid level gauge or second pressure gauge.
The effect of the collection device 200 and device selection are with reference to the foregoing embodiments.
The sampler also includes:7th valve F27, it is arranged between the 4th port and collection device 200.7th valve Door F27 be suitable to control collection device 200 in collect sample to be extracted number.
Accordingly, the present invention also provides a kind of method being sampled using above-mentioned sampler, with reference to figure 5, including:
S11:First inflation is carried out using protection device of air, made in the first drainage tube, the second drainage tube and the 3rd drainage tube Full of protective gas;
S12:After carrying out the first inflation, sample to be extracted is passed through from first port, sample to be extracted is drawn along first Flow tube, the second drainage tube and the flowing of the 3rd drainage tube;
S13:Sample to be extracted from the outflow of the second drainage tube is collected in the 4th port using collection device;
S14:After collecting sample to be extracted, the second inflation is carried out using protection device of air, makes the first drainage tube, the second drainage Remaining sample to be extracted discharge in pipe and the 3rd drainage tube.
Above-mentioned sampling method is described in detail with reference to Fig. 4.
With reference to figure 4, the first inflation is carried out using protection device of air 210, makes the first drainage tube M3, the second drainage tube M4 and the Protective gas is full of in three drainage tube M5.
Specifically, closing the first valve F21 and the 7th valve F27, the second valve F22, the 3rd valve F23, the 4th are opened Valve F24, the 5th valve F25 and the 6th valve F26, the first inflation is carried out using protection device of air 210, makes the first drainage tube Protective gas is full of in M3, the second drainage tube M4 and the 3rd drainage tube M5.
With reference to figure 4, after carrying out the first inflation, sample to be extracted is passed through from first port C, makes sample to be extracted along the One drainage tube M3, the second drainage tube M4 and the 3rd drainage tube M5 flowings.
In one embodiment, first port C is connected with storage device, and sample to be extracted is stored with the storage device Product.
Specifically, after carrying out the first inflation, the second valve F22 and the 3rd valve F23 is closed, by first port C and storage Device connects;After first port C is connected with storage device, air extractor 220 is opened;Then the first valve F21 and the 3rd is opened Valve F23, make inwall flowing of the sample to be extracted along the first drainage tube M3, the second drainage tube M4 and the 3rd drainage tube M5.
In another embodiment, first port C is connected with producing the device of sample to be extracted.In the case, by The sample to be extracted mobility of itself in production process, without the effect of air extractor 220, sample to be extracted also can be along first Drainage tube M3, the second drainage tube M4 and the 3rd drainage tube M5 inwall flowing.
Specifically, after carrying out the first inflation, the second valve F22 and the 3rd valve F23 is closed, by first port C and production The device connection of sample to be extracted;After first port C is connected with the device of production sample to be extracted, the first valve is then opened F21 and the 3rd valve F23, make sample to be extracted along in the first drainage tube M3, the second drainage tube M4 and the 3rd drainage tube M5 Wall flows.
Sample to be extracted along the first drainage tube M1, the second drainage tube M2 and the 3rd drainage tube M5 flow while, according to The monitoring situation of first monitoring device 230, the first valve F21 is adjusted, controls sample to be extracted along the first drainage tube M3, second The speed of drainage tube M4 and the 3rd drainage tube M5 inwall flowing.
Sample to be extracted along the first drainage tube M1, the second drainage tube M2 and the 3rd drainage tube M5 flow while, also may be used With the monitoring situation according to the second monitoring device, adjust the first valve F21, control sample to be extracted along the first drainage tube M3, The speed of second drainage tube M4 and the 3rd drainage tube M5 inwall flowing.
With reference to figure 4, the sample to be extracted from the second drainage tube M4 outflows is collected in the 4th port using collection device 200.
Specifically, after sample to be extracted is flow in the first drainage tube M1, the second drainage tube M2 and the 3rd drainage tube M5, beat The 7th valve F27 is opened, collection device 200 collects the sample to be extracted from the second drainage tube M4 outflows in the 4th port.
With reference to figure 4, after collecting sample to be extracted, the second inflation is carried out using protection device of air 210, makes the first drainage tube Remaining sample to be extracted discharge in M3, the second drainage tube M4 and the 3rd drainage tube M5.
When first port C is connected with storage device, in the presence of the second inflation, the first drainage tube M3, second are drawn Remaining sample to be extracted is discharged in storage device in flow tube M4 and the 3rd drainage tube M5.
When first port C is connected with producing the device of sample to be extracted, in the presence of the second inflation, by the first drainage Remaining sample to be extracted is discharged in the device for producing sample to be extracted in pipe M3, the second drainage tube M4 and the 3rd drainage tube M5.
Specifically, during second inflates, Ke Yishi:Close the 5th valve F25, the first valve F21 and the 7th valve Door F27, opens the second valve F22, the 4th valve F24, the 6th valve F26 and the 3rd valve F23, makes the second drainage tube M4 and the Remaining sample to be extracted discharge in three drainage tube M5;The first valve F21, the 6th valve F26 and the 7th valve F27 are closed, is beaten The second valve F22, the 4th valve F24, the 5th valve F25 and the 3rd valve F23 are opened, makes remaining in the first drainage tube M3 to wait to carry Sample is taken to discharge.
Sampling method provided by the invention, before sample to be extracted is passed through into first port, carried out using protection device of air First inflation so that be full of protective gas in the first drainage tube, the second drainage tube and the 3rd drainage tube, so as to avoid from first The sample and air contact to be extracted that port is passed through.Avoid the sample to be extracted that is passed through from first port and the moisture in air anti- Answer and generate accessory substance, avoid the remaining bi-products in the tube wall of the first drainage tube, the second drainage tube and the 3rd drainage tube.Collect After sample to be extracted, the second inflation is carried out using protection device of air so that the first drainage tube, the second drainage tube and the 3rd drainage tube Middle remaining sample to be extracted discharge, avoid the first drainage tube, the second drainage tube and in the 3rd drainage tube remaining it is more Sample to be extracted.So that after collecting sample to be extracted, sampler is easy to clear up.
Although present disclosure is as above, the present invention is not limited to this.Any those skilled in the art, this is not being departed from In the spirit and scope of invention, it can make various changes or modifications, therefore protection scope of the present invention should be with claim institute The scope of restriction is defined.

Claims (19)

  1. A kind of 1. sampler, it is characterised in that including:
    First drainage tube, the first drainage tube have first port and second port and positioned at first port and second port it Between Centronics port, first port be suitable to be passed through sample to be extracted;
    Second drainage tube, the second drainage tube have the 3rd port and the 4th port, and the 3rd port connects with Centronics port;
    Collection device, collection device are connected with the 4th port;
    Device of air is protected, the protection device of air is connected with second port, and the protection device of air is suitable to be passed through to second port Protective gas.
  2. 2. sampler according to claim 1, it is characterised in that the protective gas is argon gas, nitrogen, oxygen, two Carbonoxide, Krypton or radon gas.
  3. 3. sampler according to claim 1, it is characterised in that also include:Air extractor, the air extractor and Two-port netwerk connects.
  4. 4. sampler according to claim 3, it is characterised in that the air extractor be aspiration pump,
    Pump bowl or negative pressure drainage ball.
  5. 5. sampler according to claim 3, it is characterised in that also include:First valve, be arranged at second port and Between air extractor.
  6. 6. sampler according to claim 1, it is characterised in that also include:First monitoring device,
    First monitoring device is connected with the first drainage tube, and the first monitoring device is described between second port and Centronics port First monitoring device is suitable to monitor position of the sample to be extracted in the first drainage tube in sampling process.
  7. 7. sampler according to claim 6, it is characterised in that first monitoring device be first liquid level gauge or First pressure table.
  8. 8. sampler according to claim 1, it is characterised in that the second drainage tube is vertically set relative to the first drainage tube Put.
  9. 9. sampler according to claim 1, it is characterised in that the collection device be vacuum tank,
    Sealing jar equipped with inert gas or the opening jar equipped with density more than the inert gas of air.
  10. 10. sampler according to claim 1, it is characterised in that also include:Second valve, is arranged at second port Between protection device of air.
  11. 11. sampler according to claim 1, it is characterised in that also include:3rd valve, is arranged at Centronics port Between first port;4th valve, is arranged between second port and Centronics port.
  12. 12. sampler according to claim 1, it is characterised in that first drainage tube also has additional port, institute Additional port is stated between second port and Centronics port;
    The sampler also includes:3rd drainage tube, a port of the 3rd drainage tube are drained by additional port and first Pipe connects, and the another port of the 3rd drainage tube connects with the 4th port.
  13. 13. sampler according to claim 12, it is characterised in that also include:5th valve, is arranged at additional port Between Centronics port;6th valve, it is arranged between the two-port of the 3rd drainage tube.
  14. 14. sampler according to claim 12, it is characterised in that the quantity of the 3rd drainage tube be one or It is multiple.
  15. 15. sampler according to claim 12, it is characterised in that also include:Second monitoring device, the second monitoring dress Put and be connected with the 3rd drainage tube, the second monitoring device is located between two ports of the 3rd drainage tube, second monitoring device Suitable for monitoring position of the sample to be extracted in the 3rd drainage tube in sampling process.
  16. 16. sampler according to claim 15, it is characterised in that second monitoring device be second liquid level gauge or Person's second pressure gauge.
  17. 17. sampler according to claim 1, it is characterised in that also include:7th valve, it is arranged at the 4th port Between collection device.
  18. 18. sampler according to claim 1, it is characterised in that the material of the sample to be extracted be titanium tetrachloride, The concentrated sulfuric acid or sulfur trioxide.
  19. 19. a kind of sampling method, the sampler provided using claim 1 to 18 any one, it is characterised in that including:
    First inflation is carried out using protection device of air, makes to be full of protective gas in the first drainage tube and the second drainage tube;
    After carrying out the first inflation, sample to be extracted is passed through from first port, makes sample to be extracted along the first drainage tube and the Two drainage tubes flow;
    Sample to be extracted from the outflow of the second drainage tube is collected in the 4th port using collection device;
    After collecting sample to be extracted, the second inflation is carried out using protection device of air, made residual in the first drainage tube and the second drainage tube Remaining sample to be extracted discharge.
CN201610551587.4A 2016-07-11 2016-07-11 Sampling device and sampling method Active CN107607363B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610551587.4A CN107607363B (en) 2016-07-11 2016-07-11 Sampling device and sampling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610551587.4A CN107607363B (en) 2016-07-11 2016-07-11 Sampling device and sampling method

Publications (2)

Publication Number Publication Date
CN107607363A true CN107607363A (en) 2018-01-19
CN107607363B CN107607363B (en) 2019-12-20

Family

ID=61055300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610551587.4A Active CN107607363B (en) 2016-07-11 2016-07-11 Sampling device and sampling method

Country Status (1)

Country Link
CN (1) CN107607363B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108827720A (en) * 2018-08-27 2018-11-16 云南电网有限责任公司电力科学研究院 A kind of outer cold water water intake system applied to high voltage direct current converter valve

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2473308Y (en) * 2001-04-18 2002-01-23 吕杰 Isobaric inflator for hollow glass
CN101343734A (en) * 2007-07-10 2009-01-14 茂德科技股份有限公司 Method for removing forerunner of atom layer deposition process
CN101556220A (en) * 2009-05-26 2009-10-14 郑州市光力科技发展有限公司 Air pumping, sampling and detecting device and quick pumping and sampling system and method
CN201859072U (en) * 2010-10-28 2011-06-08 攀枝花钢城集团有限公司 Titanium tetrachloride sampling device for producing refined titanium tetrachloride
CN102288457A (en) * 2011-05-11 2011-12-21 北京市环境保护科学研究院 Portable system for collecting volatile gas in soil and collecting method thereof
CN103115026A (en) * 2013-02-28 2013-05-22 攀钢集团攀枝花钢钒有限公司 Vacuumizing device
CN105092282A (en) * 2015-06-03 2015-11-25 山东潍坊润丰化工股份有限公司 Vacuum sampling device and sampling method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2473308Y (en) * 2001-04-18 2002-01-23 吕杰 Isobaric inflator for hollow glass
CN101343734A (en) * 2007-07-10 2009-01-14 茂德科技股份有限公司 Method for removing forerunner of atom layer deposition process
CN101556220A (en) * 2009-05-26 2009-10-14 郑州市光力科技发展有限公司 Air pumping, sampling and detecting device and quick pumping and sampling system and method
CN201859072U (en) * 2010-10-28 2011-06-08 攀枝花钢城集团有限公司 Titanium tetrachloride sampling device for producing refined titanium tetrachloride
CN102288457A (en) * 2011-05-11 2011-12-21 北京市环境保护科学研究院 Portable system for collecting volatile gas in soil and collecting method thereof
CN103115026A (en) * 2013-02-28 2013-05-22 攀钢集团攀枝花钢钒有限公司 Vacuumizing device
CN105092282A (en) * 2015-06-03 2015-11-25 山东潍坊润丰化工股份有限公司 Vacuum sampling device and sampling method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108827720A (en) * 2018-08-27 2018-11-16 云南电网有限责任公司电力科学研究院 A kind of outer cold water water intake system applied to high voltage direct current converter valve

Also Published As

Publication number Publication date
CN107607363B (en) 2019-12-20

Similar Documents

Publication Publication Date Title
JP2611179B2 (en) Fullerene manufacturing method and apparatus
CN207103844U (en) Reclaim the device of residual powder on 3D printing shaping substrate
CN107607363A (en) Sampler and sampling method
CN104492104A (en) Design method of boiler for preparing concentrated solution
US2884021A (en) Apparatus for the collection of fractions
CN113950367A (en) Closed system for mixing dry powder with solvent during pharmaceutical production or processing
CN203440069U (en) Fusion furnace for preparing fused salt
CN108414341A (en) A kind of cell concentration system and method
CN107991147A (en) A kind of novel portable vacuum tank gas sampling assembly
CN108827719A (en) High-precision titanium tetrachloride solution sampling bottle
CN206428324U (en) Purging system and its chemical vapor depsotition equipment
CN214668096U (en) Sample detection device and suction mechanism thereof
CN206920172U (en) A kind of enclosed sampling circulatory system
CN203900049U (en) Negative pressure type nuclear magnetism tube cleaning device
CN106618645A (en) Capsule type cell sampler
CN209513527U (en) The online straight measurement equipment of BaP in atmospheric environment
CN206303921U (en) GI Medicine positions sampler
CN220633172U (en) Antibacterial filtering device for water treatment equipment
CN206375903U (en) A kind of installation for fermenting for biofermentation product
CN217251279U (en) Liquid chlorine steel bottle air duct pull throughs
JP2003004600A (en) Liquid sampling apparatus for trace analysis, method of sampling liquid specimen for trace analysis and method of introducing the specimen into analytical equipment
CN216012837U (en) Online sampling bucket of negative pressure polyurethane reation kettle
CN206535569U (en) A kind of easy-to-dismount crucible filter
CN207567213U (en) For the RNA extraction elements of liver cancer miRNA expressions detection
CN104399261B (en) Prepare the equipment of concentrate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Sampling device and sampling method

Effective date of registration: 20231228

Granted publication date: 20191220

Pledgee: China Co. truction Bank Corp Yuyao branch

Pledgor: NINGBO CHUANGRUN NEW MATERIALS Co.,Ltd.

Registration number: Y2023980073914

PE01 Entry into force of the registration of the contract for pledge of patent right